Loading...
HomeMy WebLinkAbout12 - Design Report - South University District Ph 1 - Storm Storm Water Plan South University District — Phase 1 February 2012 Submitted to: City of Bozeman Engineering Department 20 East Olive Bozeman, MT 59715 Prepared by: Stahly Engineering and Associates 7585 Shedhorn Drive Bozeman, MT 59718 (406) 522-9526 NA SrrAHLY 1970 9f�OClRT�5�� South University District — Phase 1 Storm Water Plan Contents Existing Conditions and General Design Criteria Storm Drainage Plan Description Estimation of Runoff Pre-development Runoff— Phase 1 Post-development Runoff— Phase 1 Pre-development Runoff— Phase 2-3 Post-development Runoff— Phase 2-3 Storage/Treatment Facilities Discharge Structure and Storm Sewer Curb Capacity Inlet Capacity Facilities Maintenance Figures and Tables Figure 1. Detention Pond Basin Exhibit (separate figure in Appendix) Figure 2 Inlet Basin Exhibit (separate figure in Appendix) Table 1. Runoff Calculations — Phase 1 Table 2. Runoff Calculations— Phases 2-3 Appendix Detention Basin Calculations Inlet Basin/Pipe Sizing Calculations Gutter Capacity Calculations Outfall Structure Calculations Figures/Maps Storm Water Plan 1 2/17/2012 Existinq Conditions and General Design Criteria The existing condition at the site for the proposed South University District (SUD) — Phase 1 includes 17.6 acres of undeveloped agricultural land west of Bobcat Stadium and south of the Stadium Center Subdivision within the City of Bozeman. Down-gradient development has restricted storm drainage paths leaving the property to the north. An existing creek (Mandeville Creek) runs along the west edge of the property and is the only acceptable location for storm water to leave the site. This drainage flows north through neighboring developments. In accordance with the City of Bozeman Design Standards and Specifications Policy(COB Standards) an engineering analysis has been conducted for the SLID property to limit post-development runoff to pre-development rates. Storm runoff originating on the site will be detained on-site and released at rates less than the pre-development rates. Furthermore, detention basins will reduce storm water velocity and allow solids, silt, oils, grease, and other pollutants to settle from the runoff before the flows leave the site. Inlets and storm sewers are sized to pass the 25-year event without overtopping roadways. Should a larger event overtop the roadways grading will divert overflows to the west to the existing Mandeville Creek. Storm Drainage Plan The overall storm drainage plan for SLID — Phase 1 is depicted on Figure 2 in the Appendix of this report. Overall drainage direction on the proposed development is indicated by arrows showing the proposed drainage patterns and inlet locations. Estimation of Runoff The rational method was used to estimate peak flow rates and volumes from storm runoff. Standard assumptions in using the rational method include that rainfall is uniformly distributed over a watershed for the duration of a storm event, the peak runoff rate occurs when the storm duration equals the time of concentration, and the runoff coefficient for a watershed is constant for similar land use. Time of concentration was determined from the slope of the basin, rational runoff coefficient and flow length (COB Standards— Equation II.E.6). Storm Water Plan 2 2/17/2012 Pre-development Runoff- Phase 1 A runoff coefficient of 0.20 for open land was selected for pre-development conditions. An average overland slope of 2.5% over a basin length of 1,650 feet provides a time of concentration of 50.4 minutes. The Bozeman OF curves show a rainfall intensity for the 10-year design storm event of 0.72 in/hr. Applying this over the 17.6 acre site produces a runoff flow rate of 2.52 cfs at the downstream end of the basin. Post-development Runoff- Phase 1 Post-construction runoff was calculated using a runoff coefficient of 0.60 (commercial neighborhood) to account for future site development in accordance with the master plan. The increased impervious area reduces the time of concentration to 28.0 minutes. The Bozeman IDP curves show a 10-year storm intensity of 1.05 in/hr. The rational method provides a 1 0-year peak runoff rate of 11.08 cfs. The same analysis for a 25-year event provides a peak runoff rate of 14.54 cfs. Table 1 Runoff Calculations - Phase 1 Pre-development Post-Development Post-Development Open Land Commercial Commercial Land Use Neighborhood Neighborhood Drainage Area (acres) 17.6 17.6 17.6 Slope (%) 2.5 2.5 2.5 Overland Runoff Coefficients 0.2 0.6 0.6 Frequency Adjustment Factor, Cf 1 1 1.1 Design Storm Frequency 1 0-year 16-year 25-year Basin Length (ft) 1,650 1,650 1,650 Time of Concentration, Tc(min) 50.4 28.0 28.0 Intensity at Tc (Figure 1-2 pg. 29)(in/hr) 1 0.72 1.05 1.38 Runoff Rate(cfs) 1 2.52 11.08 14.54 The storm water detention pond for Phases 2 and 3 will also be constructed with SUD - Phase 1 and was therefore analyzed to size the basin needed for this future development. Pre-development Runoff- Phase 2-3 A runoff coefficient of 0.20 for open land was selected for pre-development conditions. An average overland slope of 2.5% over a basin length of 2,620 feet provides a time of concentration of 63.5 minutes. The Bozeman OF curves show a rainfall intensity for the 1 0-year design storm event of 0.62 in/hr. Applying this over the 36.5 acre Phase 2-3 site produces a runoff flow rate of 4.51 cfs at the downstream end of the basin. Storm Water Plan 3 2/17/2012 Post-development Runoff— Phase 2-3 Post-construction runoff was calculated using a runoff coefficient of 0.60 (commercial neighborhood) to account for future site development in Phases 2-3 in accordance with the master plan. The increased impervious area reduces the time of concentration to 35.3 minutes. The Bozeman IDP curves show a 10-year storm intensity of 0.90 in/hr. The rational method provides a 1 0-year peak runoff rate of 19.81 cfs. The same analysis for a 25-year event provides a peak runoff rate of 26.06 cfs. Table 2 Runoff Calculations— Phase 2-3 Pre-development Post-Development Post-Development Open Land Commercial Commercial Land Use Neighborhood Neighborhood Drainage Area (acres) 36.5 36.5 36.5 Slope (%) 2.5 2.5 2.5 Overland Runoff Coefficients 0.2 0.6 0.6 Coefficients Frequency Adjustment UFactor, Cf 1 1 1.1 Design Storm Frequenc 1 0-year 0-year 25-year Basin Length (ft) 2,620 2,620 2,620 Time of Concentration, Tc(min) 63.5 35.3 35.3 Intensity at Tc (Figure 1-2 pg. 29)(in/hr) 1 0.62 0.90 1.19 Runoff Rate (cfs) 4.51 19.81 26.06 Storage/Treatment Facilities Simple pond routing using the modified rational method is provided in the Appendix at the end of the report. This spreadsheet shows a required storage of 15,245 cubic feet of runoff for the 1 0-year event for Phase 1 and 34,359 cubic feet for Phases 2-3. The required storage is provided by 2 basins, one for the Phase 1 runoff and one for the Phase2-3 runoff. The Phase 1 pond has a bottom area of 8,748 square feet and 4:1 side slopes. The bottom elevation is 4928.00 and surface overflow to the west is provided at an elevation of 4930.50. The maximum depth is 1.5 feet, with a total volume of approximately 16,344 cubic feet. The pond for the future Phases 2-3 development has a bottom area of 21,790 square feet and 4:1 side slopes. The bottom elevation is 4930.5 and the surface overflow to the west is provided at an elevation of 4933.00. The maximum depth is 1.5 feet, with a total volume of approximately 35,600 cubic feet at this depth. The detention basins are located at the northwest (down- gradient) end of the site and will be vegetated with grass. Storm Water Plan 4 2/17/2012 Discharge Structure and Storm Sewer The detention basin outflow for both the Phase 1 and the Phase 2-3 development is restricted by a typical control structure as depicted in COB Standards Figure A- 2. Using the weir calculation equation given in Section II.D.2 of the COB Standards, the slot width of both weir structures was determined. The slot width for the Phase 1 pond discharge structure is 5 inches and the slot width for the Phase 2-3 discharge structure is 9 inches. These slot widths limit the discharge from the structure to pre-developed rates at the maximum depth of 1.5 feet. Outfall structure calculation can be found in the Appendix. In the occurrence of an event greater than the 10-year event the ponds are sized for, the overflow of the ponds directs flow to the west to Mandeville Creek. Curb Capacity Where runoff flows in SUD — Phase 1 will be partially carried in the curb and gutter of a 35' wide road. Capacity of this curb and gutter was analyzed to determine if the curb would be overtopped in a 25-year event and one lane of traffic would remain open. The maximum 25-year event for any of the curb inlet basins produces approximately 0.65 cfs of runoff. The capacity of the curb at the minimum slope of 0.73% is 6.08 cfs at a depth of .15 feet below the top of the curb. Therefore, curb capacities in the development are adequate for runoff control. Inlet Capacity The curb inlets on the roadways in the development were analyzed to ensure they have capacity to accept flows conveyed to them without reaching a point 0.15 feet from the top of the curb. The COB approved Neenah Foundry R-3067- L inlet structure has a capacity of 5.98 cfs at 0.35 feet of head (0.15 below top of curb). This capacity will convey the necessary flows. Facilities Maintenance The proposed storm drainage facilities will be operated and maintained by the property owner. The owner is responsible for quarterly maintenance of all storm water facilities. The maintenance includes, but is not limited to, visual inspection and removal of sediment from curbs, inlets, detention basins, and outlet structures as well as any necessary repairs to the facilities. Storm Water Plan 5 2/17/2012 APPENDIX DETENTION BASIN CALCULATION Phase 1 Runoff Calculations Time of Concentration Calculations Preconstruction Postconstruction Storm Sewer Flow Land Use Open Land REMU REMU Drainage Area(acres) 17.57 17.57 17.57 Slope(%) 2.6 2.5 2.5 Runoff Coefficients 0.2 0.6 0.6 Frequency Adjustment Factor,Cf 1 1 1.1 Basin Length(ft) 1650 1650 1650 Time of Concentration(min) 50.4 28.0 24.6 Peak Flow Calculations Design Storm 10-Year 10-Year 25-Year Intensity at Tc (Figure 1-2 pg.29)(inlhr) 0.72 1.05 1.36 Peak Runoff Rate at Tc(Q=CIA)(cfs) 2.52 11.O6 14.54 (max release rate) Required Storage Volume MAX VOL. 15245.30 Storm Duration Intensity Future Runoff Rate Runoff Volume Release Volume Required Storage Notes (minutes) (inlhr) (Q=CIA)(cis) (co (cf) (cq 2 5.84 61.55 7386.06 302.37 7083.69 4 3.72 39.22 9413.99 604.75 8809.24 6 2.86 30.14 10849.39 907.12 9942.27 8 2.37 25.00 11998.70 1209.50 10769.20 10 2.05 21.62 12973.36 1511.87 11461.49 12 1.82 19.21 13828.21 1814.24 12013.97 14 1.65 17.37 14594.77 2116.62 12478.15 16 1.51 15.93 15293.07 2418.99 12874.07 18 1.40 14.76 15936.68 2721.37 13215.32 20 1.31 13.78 16535.34 3023.74 13511.60 24 1.16 12.24 17624.89 3628.49 13996.40 26 1.10 11.62 18125.63 3930.86 14194.77 28 1.05 11.07 18601.92 4233.24 14368.69 30 1.00 10.59 19056.58 4535.61 14520.97 32 0.96 10.15 19491.94 4837.99 14653.95 34 0.93 9.76 19909.95 5140.36 14769.59 36 0.89 9.40 20312.27 5442.73 14869.53 38 0.86 9.08 20700.31 5745.11 14955.20 40 0.83 8.78 21075.29 6047.48 15027.81 42 0.61 8.51 21436.27 6349.86 15088.42 44 0.78 8.25 21790.19 6652.23 15137.96 46 0.76 8.02 22131.85 6954.61 15177.25 48 0.74 7.80 22463.99 7256.98 15207.01 50 0.72 7.60 22787.26 7559.35 15227.90 52 0.70 7.40 23102.22 7861.73 15240.49 54 0.69 7.23 23409.40 8164.10 15245.30 Required Storage 56 0.67 7.06 23709.28 8466.48 15242.80 58 0.65 6.90 24002.27 8768.85 15233.42 60 0.64 6.75 24288.77 9071.22 15217.54 62 0.63 6.60 24569.12 9373.60 15195.52 64 0.61 6.47 24843.66 9675.97 15167.68 66 0.60 6.34 25112.67 9978.35 15134.33 68 0.59 6.22 25376.44 10280.72 15095.72 70 0.58 6.10 25635.21 10583.10 15052.11 72 0.57 5.99 25889.22 10885.47 15003.75 74 0.56 5.89 26138.68 11187.84 14950.114 76 0.55 5.79 26383.80 11490.22 14893.56 78 0.54 5.69 26624.76 11792.59 14832.17 80 0.53 5.60 26661.73 12094,97 14766.77 82 0.52 5.51 27094.89 12397.34 14697.55 84 0.51 5.42 27324.38 12699.71 14624.66 86 0.51 5.34 27550.34 13002.09 14548.25 BB 0.50 5.26 27772.92 13304.46 14468.45 90 0.49 5.18 27992.23 13606.84 14385.39 92 0.48 5.11 28208.39 13909.21 14299.18 94 0.46 5.04 28421.52 14211.59 14209.93 96 0.47 4.97 28631.72 14513.96 14117.76 98 0.47 4.90 28839.10 14816.33 14022.76 100 0.46 4.84 29043.74 15118.71 13925.03 102 0.45 4.78 29245.74 15421.08 13824.66 104 0.45 4.72 29445.18 15723.46 13721.72 106 0.44 4.66 29642.14 16025.83 13616.31 108 0.44 4.60 29836.71 16328.20 13508.50 110 0.43 4.55 30028.94 16630.58 13398.36 112 0.43 4.50 30218.91 16932.95 13285.96 114 0.42 4.45 30406.70 17235.33 13171.37 116 0.42 4.40 30592.35 17537.70 13054.65 118 0.41 4.35 30775.93 17840.08 12935.86 120 0.41 4.30 30957.51 18142.45 12815.06 Phase 2 and 3 Runoff Calculations Time of Concentration Calculations Preconstruction Postconstruction Storm Sewer Flow Land Use Open Land REMU REMU REMU Drainage Area(acres) 36.52 36.52 36.52 36.52 Slope(%) 2.5 2.5 2.5 2.5 Runoff Coefficients 0.2 0.6 0.6 0.6 Frequency Adjustment Factor,Cf 1 1 1.1 1.1 Basin Length(ft) 2620 2620 2620 2620 Time of Concentration(min) 63.5 35.3 31.0 25.0 Peak Flow Calculations Design Storm 10-Year 10-Year 25-Year 25-Year Intensity at To (Figure 1-2 pg.29)(in/hr) 0.62 0.90 1.19 1.37 Peak Runoff Rate at Tc(Q=CIA)(cis) 4.51 19.81 26.06 29.93 (max release rate) Required Storage Volume MAX VOL. 34358.76 Storm Duration Intensity Future Runoff Rate Runoff Volume Release Volume Required Storage Notes (minutes) (in/hr) (Q=CIA)(cfs) (cf) (cf) (co 2 5.84 127.94 15352.25 540.80 14811.45 4 3.72 81.53 19567.37 1081.60 18485.77 6 2.86 62.64 22550.93 1622.41 20928.53 8 2.37 51.96 24939.80 2163.21 22776.60 10 2.05 44.94 26965.69 2704.01 24261.68 12 1.82 39.92 28742.53 3244.81 25497.72 14 1.65 36.11 30335.86 3765.61 26550.25 16 1.51 33.11 31787.29 4326.41 27460.88 18 1.40 30.67 33125.08 4867.22 28257.86 20 1.31 28.64 34369.41 5408.02 28961.39 24 1.16 25.44 36634.10 6489.62 30144.48 26 1.10 24.15 37674.91 7030.42 30644.49 28 1.05 23.01 38664.90 7571.22 31093.67 30 1.00 22.01 39609.92 8112.03 31497.90 32 0.96 21.10 40514.83 8652.83 31862.01 34 0.93 20.29 41383.69 9193.63 32190.06 36 0.89 19.55 42219.92 9734.43 32485.49 38 0.86 18.87 43026.48 10275.23 32751.25 40 0.83 18.25 43805.89 10816.03 32989.86 42 0.81 17.68 44560,37 11356.84 33203.54 44 0.76 17.16 45291.84 11897.64 33394.21 46 0.76 16.67 46002.01 12438.44 33563.57 48 0.74 16.21 46692.38 12979.24 33713.14 50 0.72 15.79 47364.29 13520.04 33844.25 52 0.70 15.39 48018.96 14060.84 33958.11 54 0.69 15.02 46657.45 14601.65 34055.81 56 0.67 14.67 49280.76 15142.45 34138.31 58 0.65 14.34 49889.75 15683.25 34206.50 60 0.64 14.02 50465.25 16224.05 34261.20 62 0.63 13.73 51067.98 16764.85 34303.12 64 0.61 13.45 51638.61 17305.65 34332.96 66 0.60 13.18 52197.77 17846.46 34351.31 68 0.59 12.93 52746.02 18387.26 34358.76 Required Storage 70 0.58 12.69 53283.88 18928.06 34355.82 72 0.57 12.46 53811.85 19468.86 34342.99 74 0.56 12.24 54330.37 20009.66 34320.71 76 0.55 12.03 54839.86 20550.46 34289.39 78 0.54 11.82 55340.70 21091.27 34249.44 80 0.53 11.63 55833.27 21632.07 34201.20 82 0.52 11.45 66317.89 22172.87 34145.02 84 0.51 11.27 56794.90 22713.67 34081.22 86 0.51 11.10 57264.57 23254.47 34010.10 88 0.50 10.93 57727.20 23795.27 33931.93 90 0.49 10.77 58183.04 24336.08 33846.97 92 0.48 10.62 56632.35 24876.88 33755.47 94 0.48 10.47 59075.35 25417.68 33657.67 96 0.47 10.33 59512.27 25958.48 33553.79 98 0.47 10.19 59943.30 26499.28 33444.02 100 0.46 10.06 60368.66 27040.08 33328.58 102 0.45 9.93 60788.53 27580.89 33207.64 104 0.45 9.81 61203.07 28121.69 33081.38 106 0.44 9.69 61612.47 28662.49 32949.98 108 0.44 9.57 62016.87 29203.29 32813.56 110 0.43 9.46 62416.44 29744.09 32672.35 112 0.43 9.35 62811.31 30284.89 32526.42 114 0.42 9.24 63201.63 30825.70 32375.93 116 0.42 9.14 63587.51 31366.50 32221.02 118 0.41 9.04 63969.10 31907.30 32061.80 120 0.41 8.94 64346.51 32448.10 31896.41 INLET BASIN PIPE SIZING CALCULATIONS Phase 'I Inlet Basin and Pipe Capacity Calculations Inlet Basin 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Land Use REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU Drainage Area acres 0.50 0.95 1.37 0.47 0.46 0.60 0.23 0.73 0.38 0.16 0.27 1.96 0.28 0.79 0.35 1.03 0.33 0.30 0.24 1.16 1.72 0.21 0.27 1.61 0.62 0.38 0.50 Slope %) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 Runoff Coefficients 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 Frequency Adjustment Factor,Cf 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 Basin Length ft 388 612 317 594 594 221 250 700 4.13 113 306 350 216 281 207 726 412 245 246 250 316 258 251 313 314 230 418 Time of Concentration min 11.9 15.0 16.0 17.0 18.0 19.0 20.0 21.0 22.0 23.0 24.0 25.0 26.0 27.0 28.0 29.0 30.0 31.0 32.0 33.0 34.0 35.0 36.0g25 E25yr 39.0 40.0 Peak Flow Calculations Design Storm 25 r 25 r 25 r 25 r 25 r 25 r 25 r 25 r 25 r 25yr 25 r 25 r 25 r 25 r 25 r 25 r 25 r 25 r 25 r 25 r 25 r 25 r 25 r 25 r 25 r Intensit at Tc Fi ure 1-2 .29 (in/hr 2.19 1.89 1.82 1.75 1.69 1.63 1.58 1.53 1.48 1.44 1.40 1.37 1.33 1.30 1.27 1.24 1.22 1.19 1.17 1.14 1.12 1.10 1.06 1.03 1.01 Peak Runoff Rate at Tc(Q=CIA)(cfs) 0.66 1.08 1.49 0.49 0.47 0.59 0.22 0.67 0.34 0.14 0.23 1.61 0.22 0.62 0.27 0.77 0.24 0.21 0.17 0.80 1.16 0.14 0.18 0.23 1 0.30 Phase 1 Pipe Capacity Detention Basin A Pipe Network Pipe Number 1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A 12A 13A 14A 15A 16A 17A 18A 19A 20A 21A 22A 23A 24A 25A 26A 27A Pipe Size(in) 24.00 15.00 15.00 24.00 15.00 12.00 24.00 12.00 24.00 15.00 12.00 18.00 12.00 15.00 18.00 15.00 15.00 18.00 15.00 12.00 18.00 15.00 15.00 15.00 18.00 18.00 18.00 Manning's"n" PVC 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 Area(ft) 3.14 1.23 1.23 3.14 1.23 0.79 3.14 0.79 3.14 1.23 0.79 1.77 0.79 1.23 1.77 1.23 1.23 1.77 1.23 0.79 1.77 1.23 1.23 1.23 1.77 1.77 1.77 Wetted Perimeter ft 6.28 3.93 3.93 6.28 3.93 3.14 6.28 3.14 6.28 3.93 3.14 4.71 3.14 3.93 4.71 3.93 3.93 4.71 3.93 3.14 4.71 3.93 3.93 3.93 4.71 4.71 4.71 Hydraulic Radius ft 0.50 0.31 1 0.31 0.50 0.31 0.25 0.50 1 0.25 0.50 0.31 0.25 0.38 0.25 0.31 0.38 0.31 0.31 0.38 0.31 0.25 0.38 0.31 0.31 0.31 0.38 0.38 1 0.38 Slope ft/ft 0.0045 0.0035 10.0035 0.0025 0.0035 0.0050 0.0025 0.0050 0.0025 0.0035 0.0050 0.0100 0.0050 0.0035 0.0125 10.0035 0.00351 0.0186 0.0035 0.0050 0.0186 0.0035 0.0035 0.0035 0.0784 0.0050 0.0050 Full Flow Capacity cfs 15.22 3.83 1 3.83 11.34 3.83 2.53 11.34 2.53 11.34 3.83 2.53 10.53 2.53 3.83 11.78 3.83 3.83 1 14.36 3.83 2.53 14.36 3.83 3.83 3.83 29.49 7.45 7.45 Velocity(ft/sec) 4.84 3.12 3.12 3.61 3.12 3.22 3.61 3.22 3.61 3.12 3.22 5.96 3.22 3.12 6.66 3.12 3.12 8.13 3.12 3.22 8.13 3.12 3.12 3.12 16.69 4.21 4.21 Contributing Inlet Basin 1 2 3 NONE 4 5 6 7 NONE 8 9 10 11 12 13 14 15 NONE 16 17 18 19 20 21 22 23 24 Contributing Pipes 2A 3A NONE 5A 6A NONE 8A NONE 10A 11A NONE 13A NONE NONE 16A 17A NONE 19A 20A NONE 22A 23A NONE NONE 26A 27A NONE 4A 7A 9A 12A 14A 18A 21A 24A 15A Actual Pipe Flow(cfs) 12.42 2.57 1.49 9.19 0.96 0.47 8.23 0.22 7.43 1.01 0.34 6.42 0.23 1.61 4.45 0.88 0.27 3.34 1.01 0.24 2.34 0.96 1 0.80 1.16 1.34 1 1.20 1.03 Detention Basin B Pipe Network Pipe Number 1B 2B 3B 4B 5B 6B 7B 8B 9B Pipe Size in 30.00 30.00 12.00 24.00 24.00 12.00 24.00 24.00 12.00 Mannin 's"n" PVC 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 Area 4.91 4.91 0.79 3.14 3.14 0.79 3.14 3.14 0.79 Wetted Perimeter(ft) 7.85 7.85 3.14 6.28 6.28 3.14 6.28 6.28 3.14 Hydraulic Radius ft 0.63 0.63 1 0.25 0.50 0.50 0.25 0.50 0.50 0.25 Slope(ft/ft) 0.0179 0.0179 0.0050 0.0100 0.0050 0.0050 0.0050 0.0106 0.0050 Full Flow Capacity cfs 55.02 55.02 2.53 22.68 16.04 2.53 16.04 23.35 2.53 Velocity(ft/sec) 11.21 11.21 3.22 7.22 5.11 3.22 5.11 7.43 3.22 Contributing Inlet Basin NONE NONE 25 NONE NONE 26 NONE NONE 27.00 Contributing Pipes 2B 3B NONE 5B 6B NONE 8B 9B NONE 4B 7B Flow Contribution from Phase 2-3(cfs) 9.98 9.98 9.98 Actual Pipe Flow(cfs) 30.86 30.86 0.39 20.49 10.51 0.23 10.28 1 0.30 0.30 GUTTER CAPACITY CALCULATIONS Gutter Capacity Calcs Right-side slope X:1 0.05 Left-side slope X:1 50.00 Channel bottom width(ft) 0 Flow Depth (ft) 0.400 Flow Area (ft^2) 4.004 Wetted Perimeter(ft) 20.404 Width 0.040 Hydraulic Radius (ft) 0.196 Manning's Roughness 0.013 Slope(ft/ft) 0.010 Average Velocity(ft/sec) 3.87 Flow(ft^3/sec) 15.49 OUTFALL STRUCTURE CALCULATIONS Outfall Structure Sizing South University District Phase 1� Pre-developed Runoff cfs � 2.52 Weir Coefficient"C 3.33 Head ft 1.5 Slot Width (in) 5 Phase 2-3 Pre-developed Runoff(Q) 4.51 Weir Coefficient"C" 3.33 Head ft 1.5 Slot Width 9 FIGURES/MAPS ��6�8EE�j'y6' bC:D I STAHLY w op Q o� � m �o� 1K�VJ tM w C I.Loj= Z ��(n u I QII — u Z W m uTl, i TTc'1 w .a Z e d ID wa I NIP 1' �m z I— -� U1 t g g b ^ O tl s G Q N N hm Pq o a _ 7 t�J L a w F o E /�N L G 000 W _ N O W I _ _ o _ b LLJ a W U) a_ J Q m _ J9 s Lillp�s3w a a zZ2 Z ° a w x 2 2 LJ W O O e N m m i 0 DESIGNEn CDP e DRAWNRIBIR CHECKED CDP CDP 9 B DATE 2/6/12 z 0 100 TO0 400 SHEET IN FEET FIGURE1 ��6111 FEAjy� PIPE 4A\ PIPE 5A PIPE 7A PIPE 10A STAR LY PIPE 6 PIPE 9A N �U DETENTI❑N BASIN A PIPE 1A PIPE eA IPE 11A .— <- za• s• w o < IPE 12A TORMWATER - - 01 DETENTION BASIN BOTTOM ELEV \ G 'INLET 4928.0 via (T A A R f✓l _- _ /0 PIPE 2A ` PIPE 3A AREA DRAIN b IPE 14 p c a w tl INUET(T� _ PIPE 3Aco ,PIPE 16A PIPE 1 c C — - —INL A 12 - t Z w m IIN :&0 17A . - - -- w c ca� w - INLETp IN 14 ,2 z w-d DETENTION BASIN - O O - __.. - I.-�r_�I I_' PIPE 18A -f - _ -_- -- Z m NQ _ OUTLET TO - - -0 - -- - --- W p m m MANDEMLLE CREEK - //�� _. J t�gg J�, o- F1NIHEI ADE \ Q DO N a liw CONTOU (Ty?) I L �j O PIPE 25A ED CONTOURS( I CURB',INLET!Tw m m IPE�27A C� p �j 5' P I w N <—c —q<— —<—< —>—>-->--� —>—� p o i l ^EI( { P 23 P E 2� s A( ( ) a � to IPE 26A I dam) w m E DETENTION BASIN _.L 1_ LLl-1 1 - -I I_l�L_l�l-.I jP II1 - n ZJ o BOTTOM EL STORMWATFR nII-I� .' 4930.5 i I I _11_.r.. -F1- - - __ N VVV L T SI� I �AS�N 20 o 7 1 DETE ION BAS CONTOD GRADE CONTOURS(TW) V v ll ' ll � II '� III bbl ��� II ; I ! Ilii � " T I 1 _ � � - , a DETENTION BASIN -0 OUTLET TO MANDEVILLE CREEK - � I I � � p 1! INLET B 2 w PIPE 3B / X V Q J N P 1B 3D 4 f 4 4 IPE 9B W J Q y 4 PIPE 2B Z STUB FOR FLOE STUB FOR FUTURE w O y M/JN E%TEN IPE 6B MAIN EXTENSION Q > z 2 i STUB FOR FUTURE PIPE 4 PIPE 5 PIPE 7 m m -j a MAIN EXTENSION PIPE BB W F- = W 0 ��/ N C m ii m DESIGNED CDP DRAWN RBR CHECKED CDP n DATE 2/6/12 0 50 `fi6D 200 SHEET IN FEET FIGURE 2