HomeMy WebLinkAbout16 - Design Report - Egbert Electric & Plumbing Site - Stormwater DESIGN REPORT
STORMWATER MANAGEMENT
EGBERT ELECTRIC & PLUMBING SITE
Prepared for:
Meadowlark Rentals, LLC
P.O. Box 4314
Bozeman, MT 59771
Prepared by:
C&H Engineering and Surveying, Inc.
1091 Stoneridge Drive
Bozeman, MT 59718
(406) 587-1115
Project Number: 16260
July 2016
INTRODUCTION
The proposed Egbert Electric Fz Plumbing project is located on Tract C of the plat recorded in
Book 135 of Deed, Page 492. The lot is 1.45 acres.The project is located in Bozeman, Montana at
875 Bridger Drive.
RETENTION POND DESIGN
Retention ponds have been sized according to City of Bozeman Design Standards and are sized to
capture the entire volume of the 10-year 2-hour storm event. Stormwater runoff from the project
will be conveyed to two retention facilities —Retention Pond 41 on the south side of the site and
Retention Pond #2 on the north side of the site. Drainage Area #1 will discharge into Retention
Pond#1 at the south side of the site.Drainage Area#2 will discharge into Retention Pond#2 at the
north side of the site. Runoff will sheet flow from across the parking lot and will enter the ponds
through curb cuts at the perimeter of the parking lot. Water will be retained in the ponds where it
will infiltrate and evaporate.A drainage area map is included in Appendix A. Calculations for each
individual drainage area (contributing area, weighted C factor, and time to concentration) are
included in Appendix B.
Retention Pond #1
Retention Pond#1 is located on the south side of the site.It receives runoff from Drainage Area#1,
totaling 0.80 acres. The required pond volume was calculated to be 1766 cubic feet. The proposed
pond design has a volume of 1850 cubic feet. In the case of a storm exceeding the 10-yr 2-hour
design stone, runoff will pond on the south side of the parking lot until it overflows across the
property to the west and onto Birdie Drive. From there it will enter the City of Bozeman storm
drainage system which eventually outlets into the East Gallatin River.
Retention Pond #2
Retention Pond#2 is located on the north side of the site.It receives runoff from Drainage Area#2,
totaling 0.70 acres. The required pond volume was calculated to be 1669 cubic feet. The proposed
Design.Report-Page 2 of 5
pond design has a volume of 1890 cubic feet. In the case of a storm exceeding the 10-yr 2-hour
design storm, runoff will overflow onto the property to the north, as is the current situation,
eventually flowing onto Birdie Drive. From there it will enter the City of Bozeman storm drainage
system which eventually outlets into the East Gallatin River.
Design Report-Page 3 of S
APPENDIX A
DRAINAGE AREA MAP
Design Report-Page 4 of 5
D1RA/IGWE ARE4 E UMT
EGBERT ELECTRIC & PLUMBING SITE
845 BRIDGER DRIVE, BOZEMAN, MONTANA
LEGEND
7 ROOF
LANDSCAPE
HARDSCAPE
R-3 ZONING 206.4 (R)
[S89.33.5t E]
207.21 091728'08" (M)
ncr j --s
un
r
LOT 2 %/• / / -�
to
F
LOT 3
4OF
, }43F
ry _ GAS - -
CAW
_ Ft I%6..O0 3RDGER CAM'0N M- k
Scale In Feet
40 0 40
12 0 12 R-2 ZONVIAG `_ --- -- — —
Scale In Meters -
Contour Intervals: f Foot
r
Engineering and Surveying Inc.
1091 6caneridge 06v.•9azemen.MT 59718
Phone(406)587.1115•Fex(406)587-9768
www chengioe¢rs •inloochengineers.wm Sheet I of 1 #16260
APPENDIX B
DRAINAGE AREA AND POND SIZING
CALULATIONS
Design Report-Page 5 of 5
PRE-DEVELOPMENT RUNOFF
1. Calculate Tc(Pre-Development)
Tc Overland Flow
Tc= 1.87 (1.1-CC)D'/2/S,i3
-----------------------------
'Storm
S=Slope of Basin (%} 1.5 I'Return (yrs Cf
C= Rational Method Runoff Coefficient 0.2 ,2 to 10 1
Cf= Frequency Adjustment Factor 1.1 1 11 to 25 1.1
D= Length of Basin (ft) 230 ;26 to 50 1.2
151 to 100 1.25
Tc(Pre-Development) (minutes) 22
2. Calculate Rainfall intensity(Duration=Pre-Development Tc)
i=0.64x os5 (10-yr Storm, Fig. 1-3, COB Design Standards)
x=storm duration(hrs) 0.36 (Tc Pre-Development)
i=rainfall intensity(inJhr.) 1.24
3. Calculate Runoff Rate(Pre-Development)
Q = CiA
C = Rational Method Runoff Coefficient 0.2 (open land)
i = rainfall intensity(in./hr.) 1.24 (calculated above)
A=Area(acres) 1.45
Q=Runoff Rate (Pre-Development)(cfs) 0.36
RETENTION POND # 1
REQUIRED VOLUME
9. Calculate Area and Weighted C Factor
Contributing Area C Area (ft 2) C*Area
Hardscape 0.95 20800 19760
Landscape 0.2 9663 1933
Roof 095 4593 4363
Total 36066 26066
C=Weighted C Factor 0.74
3. Calculate Required Volume
Q =CIA
V=7200Q
C =Weighted C Factor 0.74'
1 = intensity(in/hr) 0A1 (10 yr, 2hr storm)
A=Area(acres) 0.80
Q = runoff(cfs) 0:25
V= REQUIRED VOL(ft) 1766
RETENTION POND# 2
REQUIRED VOLUME
1. Calculate Area and Weighted C Factor
Contributing Area C Area (ft 2) C *Area
Hardscape 0.95 16147 15339
Landscape 0.2 5804 1161
Roof 095 8551 8124
Total 30602 24624
C=Weighted C Factor (181
3. Calculate Required Volume
Q =CIA
V=7200Q
C=Weighted C Factor 081
1 = intensity(in/hr) 0.41 (10 yr, 2hr storm)
A=Area(acres) Q70
Q =runoff(cfs) 023'
V= REQUIRED VOL(ft) 1669'