HomeMy WebLinkAbout15 - Design Report - Westbrook - Stormwater STORMWATER MANAGEMENT DESIGN REPORT WESTBROOK SUBDIVISION Prepared for: Rosa-Johnson Development, LLC. 125 Central Avenue, Bozeman, MT 59718 Prepared by: C&H Engineering and Surveying, Inc. 1091 Stoneridge Drive, Bozeman, MT 59718 (4Qb)�.5$fi1 +A5 Project umTer: 14693 JANUARY 2015 INTRODUCTION Westbrook Subdivision is a 63 lot residential subdivision located east of Laurel Parkway and south of Annie Street. The 33.57-acre development is situated in the South Half of Section 4,Township 2 South, Range 5 East of P.M.M., Gallatin County, Montana. This project will require connection to existing City of Bozeman water and sanitary sewer systems. STORMWATER MANAGEMENT Design of the stormwater facilities for this project will be based on the City of Bozeman Design Standards and Specifications Policy, March 2004 including Addendums 1 through 5. The subdivision will be divided into separate drainage areas. A composite"C"runoff coefficient will be calculated for each drainage area along with the post-development time of concentration. Inlets will be placed along roadways at intervals to ensure the gutter capacity is not exceeded. Per the City of Bozeman Design Standards, storm sewer facilities shall be sized for the 25-year storm event. Curbs can flow at a depth up to 0.15 feet below the top of curb elevation. Flows will be calculated at a point just upstream of the inlets to ensure adequate capacity. Detailed calculations for the composite "C" factor, time of concentration, and curb depth check for each drainage area can be found in Appendix B. PVC pipe will be used to connect the inlets to manholes and ponds. Per City of Bozeman Design Standards,the pipe shall be sized for the 25-year storm event. The minimum pipe size shall be 12 inch for inlets and 15 inch for mains within the storm drain system. At the design flow, a minimum of 3 feet per second of velocity is required to prevent sedimentation in the pipe system. Each inlet will have a 9 inch sump for sediment collection as well. Detailed calculations for design flow, peak capacity, and velocity for each pipe section can be found in Appendix C. Retention ponds will be used to retain stormwater as it percolates into the soil and evaporates. Detention ponds will be used to treat stormwater prior to discharging it to Baxter Creek. Design water depths will not exceed 1.5 feet. Retention ponds will be sized per City of Bozeman Design Standards to handle the entire volume from the 10-year, 2-hour storm event. Detention ponds Design Report-Page 2 of 11 will also be sized per City of Bozeman Design Standards. The pre-developed runoff rate is calculated and a discharge structure is designed to limit the outfall from the detention pond to the pre-developed runoff rate. The release volume is subtracted from the runoff volume to calculate required storage. The storm duration is increased until the maximum required storage is calculated. Detailed calculations for the detention and retention pond volumes can be found in Appendix D. STORMWATER DESIGN Stormwater runoff from the subdivision will be conveyed to one of three detention/retention facilities. A plan view of the site highlighting the drainage areas and the stormwater features is included in Appendix B. The western part of the site will drain into Existing Detention Pond #1 that is located at the southeast corner of the intersection of Laurel Parkway and Sherwood Way. This pond has an existing outlet structure that discharges into Baxter Creek. Retention Pond #2 is a retention pond that retains runoff from Annie Street and it will eventually be modified with the site plan for Lot 1, Block 5 of Westbrook to be a detention pond. Detention Pond #3 is a detention pond that will detain and release runoff from the southeast area of the site. Detention Pond #3 will discharge treated stormwater into Baxter Creek. RETENTION POND #2 Retention Pond#2 will retain runoff from Drainage Areas #10, #11, #12, and#13. The retention pond is sized per City of Bozeman Design Standards where Q = CIA and V = 7200Q. The weighted "C" factor is 0.85, the intensity is 0.41, and the total area is 1.06 acres. (See Appendix D for detailed calculation). This requires a minimum volume of 2,669 cubic feet. Retention Pond#2 is proposed to have a volume of 4,190 cubic feet at the 1.5 foot design water depth. RETENTION POND #2 PIPE SIZING The eastern part of Annie Street will drain to inlets located west of the future intersection with Abigail Lane. A 15 inch pipe will be installed from Storm Inlet 44 on the north side of Annie Street to Storm Inlet 43 on the south side of the street. The 15 inch pipe will drain Drainage Areas Design Report-Page 3 of 11 #11 and #13. The time of concentration for this pipe is equal to the time of concentration of Drainage Area#13, 3.31 minutes. At this time of concentration, the calculated peak flow rate is 1.97 cfs. A 15 inch pipe at 0.4% slope has a maximum capacity of 4.39 cfs. At the design peak flow rate of 1.97 cfs, the velocity of the water in the pipe is 3.31 fps. The pipe from ST#4 to ST #3 is 44 feet long so the time spent in the pipe from ST #4 to ST #3 is 0.22 minutes. (See Appendix C for detailed calculations). A 15 inch pipe will be installed from Storm Inlet #3 to Retention Pond #2 and will drain the combined runoff from Drainage Area#10 and #12 as well as the pipe from ST 44 to ST#3. The combination of these drainage areas includes a total of 1.06 acres. The time of concentration from the furthest point in the drainage area is equal to the time of concentration of the pipe from ST#4 to ST #3 plus the time spent in the pipe from ST #4 to ST #3. This is calculated above to be 3.53 minutes. Using this time of concentration, the peak flow rate will be 4.32 cfs. A 15 inch pipe at 0.44% slope has a maximum capacity of 4.61 cfs and at the design peak flow rate of 4.32 cfs the velocity of the water in the pipe will be 3.98 fps and the water will flow at a depth of 12.4 inches. The pipe will flow into Retention Pond #2 which is sized per City of Bozeman Design Standards above. (See Appendix C for detailed calculations). DETENTION POND #3 Detention Pond #3 will retain and release runoff from Drainage Areas #1, #2, #3, and#4. These drainage areas combined have a total area of 9.11 acres and a composite "C" runoff coefficient of 0.44. The pre-developed runoff rate is calculated to be 1.29 cfs. (See Appendix D for detailed calculations). The storage volume is computed by increasing the storm duration and computing the runoff volume minus the release volume. The release rate is equal to the pre-developed runoff rate. The maximum storage required occurs at a storm duration of 34 minutes and is equal to 4,917 cubic feet. Detention Pond #3 has a volume of 6,600 cubic feet. An outlet structure will be constructed for the pond and will have an 18 inch outfall pipe. This pipe is sized to carry the 25 year flow as required by the City of Bozeman Design Standards. A weir will be constructed in the outlet structure to limit the runoff to the pre-developed flow rate. This weir will have a slot width of 2.5 inches to limit the discharge to 1.29 cfs. (See Appendix D for detailed calculations). Design Report-Page 4 of 11 DETENTION POND #3 PIPE SIZING A 15 inch pipe will be installed from Storm Inlet#1 to Storm Inlet 42. The 15 inch pipe will drain Drainage Areas#2 and#3. The combination of these drainage areas includes a total of 4.38 acres. The time of concentration for this pipe is equal to the time of concentration of Drainage Area#3 which is 23.09 minutes. At this time of concentration, the calculated peak flow rate is 2.83 cfs. A 15 inch pipe at 0.53% slope has a maximum capacity of 5.06 cfs. At the design peak flow rate of 2.83 cfs, the velocity of the water in the pipe is 4.01 fps. The pipe from ST#1 to ST#2 is 65 feet long so the time spent in the pipe from ST#1 to ST#2 is 0.27 minutes. (See Appendix C for detailed calculations). An 18 inch pipe will be installed from Storm Inlet #2 to Detention Pond #3 and will drain the combined runoff from Drainage Area 41 and #4 as well as the pipe from ST #1 to ST #2. The combination of these drainage areas includes a total of 9.11 acres. The time of concentration from the furthest point in the drainage area is equal to the time of concentration of Drainage Area #4 which is 23.36 minutes. Using this time of concentration,the peak flow rate will be 5.70 cfs. An 18 inch pipe at 0.51%slope has a maximum capacity of 8.07 cfs and at the design peak flow rate of 5.70 cfs the velocity of the water in the pipe will be 4.68 fps and the water will flow at a depth of 11.8 inches. The pipe will flow into Detention Pond #3 which is sized per City of Bozeman Design Standards above. (See Appendix C for detailed calculations). OUTLET STRUCTURE AND PIPING—DETENTION POND#3 An outlet structure and piping will be installed in the northeast corner of Detention Pond#3. The outlet structure will be sized per City of Bozeman Design Standards and a slot width of 2.5 inches will be used to limit the runoff to the pre-developed runoff rate. The outlet pipe will be sized as an 18 inch pipe which at the 0.53% slope has a maximum capacity of 8.23 cfs. This exceeds the 25 year design flow rate of 5.70 cfs and will adequately provide overflow capacity from the detention pond. (See Appendix C and D for detailed calculations). EXISTING DETENTION POND #1 Existing Detention Pond 41 will retain and release runoff from Drainage Areas#5, #6, 0, #8,#9, Boulder Creek 0, Boulder Creek#8, Laurel Glen ST#1, Laurel Glen ST#3, and Laurel Glen ST Design Report-Page 5 of I I #4. These drainage areas combined have a total area of 26.65 acres and a composite "C" runoff coefficient of 0.52. The Boulder Creek Drainage Areas are included in Appendix B. The Laurel Glen Drainage Areas are per the original Laurel Glen stormwater design report. The existing Laurel Glen Drainage Areas are assigned a 0.50 "C"runoff coefficient as a conservative estimate of the actual conditions. The original design report had a composite "C" of 0.39. The pre-developed runoff rate is calculated to be 3.29 cfs. (See Appendix D for detailed calculations). The storage volume is computed by increasing the storm duration and computing the runoff volume minus the release volume. The release rate is equal to the pre-developed runoff rate. The maximum storage required occurs at a storm duration of 55 minutes and is equal to 20,104 cubic feet. The Existing Detention Pond 41 will be reshaped to have a volume of 21,535 cubic feet at the 1.5 foot design water depth. An existing outlet structure will be modified to limit the discharge to the pre-developed runoff rate. The outlet pipes are sized to carry the 25 year flow as required by the City of Bozeman Design Standards. The existing weir will be modified with a steel plate to have a slot width of 6.5 inches to limit the discharge to 3.29 cfs. (See Appendix D for detailed calculations). EXISTING DETENTION POND #1 PIPE SIZING NORTH END On the north end of the detention pond on the future Sherwood Way that is part of Boulder Creek, an existing 15 inch pipe is installed from Existing Storm Inlet#4 to Existing Storm Inlet#5. The 15 inch pipe will drain Boulder Creek Drainage Area#8. This drainage area includes a total of 0.28 acres. The time of concentration for this pipe is equal to the time of concentration of Boulder Creek Drainage Area#8 which is 6.33 minutes. At this time of concentration,the calculated peak flow rate is 0.70 cfs. A 15 inch pipe at 0.09% slope has a maximum capacity of 2.08 cfs. At the design peak flow rate of 0.70 cfs,the velocity of the water in the pipe is 1.46 fps. At this slope the velocity of the water doesn't meet City of Bozeman Design Standards and this pipe will have to be removed and replaced with the construction of Boulder Creek to meet the 3 fps velocity requirement. The pipe from EX#4 to EX#5 is 32 feet long so the time spent in the pipe from EX #4 to EX #5 is 0.37 minutes. (See Appendix C for detailed calculations). An existing 15 inch pipe is installed from Existing Storm Inlet #5 to Existing Detention Pond #1 Design Report-Page 6 of']I and will drain the combined runoff from Boulder Creek Drainage Area 47 and the pipe from EX#4 to EX #5. The combination of these drainage areas includes a total of 0.77 acres. The time of concentration from the furthest point in the drainage area is equal to the time of concentration of Boulder Creek Drainage Area #7 which is 9.31 minutes. Using this time of concentration, the peak flow rate will be 1.57 cfs. A 15 inch pipe at 0.42%slope has a maximum capacity of4.50 cfs and at the design peak flow rate of 1.57 cfs the velocity of the water in the pipe will be 3.15 fps and the water will flow at a depth of 6.3 inches. The pipe will flow into Existing Detention Pond #1 which is sized per City of Bozeman Design Standards above. (See Appendix C for detailed calculations). SOUTH END Two new inlets will be cut into the existing curb along Laurel Parkway to ensure the curb flow capacity is not exceeded. These new inlets will be piped in the boulevard to minimize the impact to the existing street. The new pipe will connect to the existing inlet located south of the intersection of Laurel Parkway and Annie Street and will travel through the existing stonnwater system to the Existing Detention Pond #1. Pipe size calculations are given below and detailed calculations are provided in Appendix C that take into account the new flows from Westbrook Subdivision as well as the existing flows from Laurel Glen Subdivision. A 15 inch pipe will be installed from Storm Inlet#3A to Storm Manhole#4. The 15 inch pipe will drain Drainage Area #5. This drainage area includes a total of 4.18 acres. The time of concentration for this pipe is equal to the time of concentration of Drainage Area#5 which is 18.43 minutes. At this time of concentration, the calculated peak flow rate is 3.56 cfs. A 15 inch pipe at 0.40% slope has a maximum capacity of 4.39 cfs. At the design peak flow rate of 3.56 cfs, the velocity of the water in the pipe is 3.75 fps. The pipe from ST 43A to ST#4 is 5 feet long so the time spent in the pipe from ST #3A to ST #4 is 0.02 minutes. (See Appendix C for detailed calculations). A 15 inch pipe will be installed from Storm Manhole #4 to Storm Manhole 43. The 15 inch pipe will drain runoff from the pipe from ST#3A to ST#4. This drainage area includes a total of 4.18 acres. The time of concentration for this pipe is equal to the time of concentration of Drainage Design Report-Page 7 of 11 Area #5 plus the time spent in the pipe from ST #3A to ST #4 which is 18.45 minutes. At this time of concentration,the calculated peak flow rate is 3.55 cfs. A 15 inch pipe at 1.05%slope has a maximum capacity of 7.12 cfs. At the design peak flow rate of 3.55 cfs, the velocity of the water in the pipe is 5.48 fps. The pipe from ST#4 to ST #3 is 170 feet long so the time spent in the pipe from ST#4 to ST#3 is 0.52 minutes. (See Appendix C for detailed calculations). A 15 inch pipe will be installed from Storm Manhole #3 to Storm Manhole#2. The 15 inch pipe will drain runoff from the pipe from ST #4 to ST #3. This drainage area includes a total of 4.18 acres. The time of concentration for this pipe is equal to the time of concentration of the pipe from ST #3A to ST #4 plus the time spent in the pipe from MH #4 to MH #3 which is 18.97 minutes. At this time of concentration, the calculated peak flow rate is 3.49 cfs. A 15 inch pipe at 0.91% slope has a maximum capacity of 6.63 cfs. At the design peak flow rate of 3.49 cfs, the velocity of the water in the pipe is 5.54 fps. The pipe from ST#3 to ST#2 is 97 feet long so the time spent in the pipe from ST 43 to ST #4 is 0.29 minutes. (See Appendix C for detailed calculations). A 15 inch pipe will be installed from Storm Inlet#2A to Storm Manhole#2. The 15 inch pipe will drain Drainage Area #6. This drainage area includes a total of 3.29 acres. The time of concentration for this pipe is equal to the time of concentration of Drainage Area#6 which is 23.68 minutes. At this time of concentration, the calculated peak flow rate is 2.22 cfs. A 15 inch pipe at 0.60% slope has a maximum capacity of 5.38 cfs. At the design peak flow rate of 2.22 cfs, the velocity of the water in the pipe is 3.96 fps. The pipe from ST#2A to MH#2 is 5 feet long so the time spent in the pipe from ST #2A to MH #2 is 0.02 minutes. (See Appendix C for detailed calculations). A 15 inch pipe will be installed from Storm Manhole #2 to Storm Manhole#1. The 15 inch pipe will drain runoff from pipe ST#2A to SM#2 and from pipe SM#3 to SM#2. This drainage area includes a. total of 7.46 acres. The time of concentration for this pipe is equal to the time of concentration of Drainage Area#6 plus the time spent in the pipe from ST#2A to SM#2 which is 23.70 minutes. At this time of concentration,the calculated peak flow rate is 5.24 cfs. A 15 inch pipe at 0.82%slope has a maximum capacity of 6.29 cfs. At the design peak flow rate of 5.24 cfs, Design Report-Page 8 of 11 the velocity of the water in the pipe is 5.39 fps. The pipe from MH 42 to MH #1 is 332 feet long so the time spent in the pipe from MH#2 to MH#1 is 1.03 minutes. (See Appendix C for detailed calculations). A 15 inch pipe will be installed from Storm Manhole #1 to Existing Inlet #1. The 15 inch pipe will drain runoff from pipe MH #2 to MH #1. This drainage area includes a total of 7.46 acres. The time of concentration for this pipe is equal to the time of concentration of the pipe from MH#2 to MH #1 plus the time spent in the pipe from MH#2 to MH #1 which is 24.73 minutes. At this time of concentration,the calculated peak flow rate is 5.10 cfs. A 15 inch pipe at 5.20%slope has a maximum capacity of 15.85 cfs. At the design peak flow rate of 5.10 cfs, the velocity of the water in the pipe is 10.92 fps. The pipe from MH#1 to EX ST#1 is 5 feet long so the time spent in the pipe from MH#1 to EX ST#1 is 0.01minutes. (See Appendix C for detailed calculations). An existing 15 inch pipe is installed from Existing Inlet#1 to Existing Manhole#2. The pitch on the existing line is not adequate to drain the flows from ST MH#1 to Existing Inlet#1 and the flow from the Existing Pipe #5 detailed in the original Laurel Glen stormwater design report to have a flow of 2.95 cfs. This 15 inch pipe will be removed and replaced with a new 15 inch pipe that will maintain the same invert at Existing Inlet #1 and will match the outflow invert elevation in Existing Manhole#2. The combination of these drainage areas includes a total of 7.46 acres plus Storm #1 Area from Laurel Glen of 6.77 acres for a total of 14.23 acres. The time of concentration for this pipe is equal to the time of concentration of the Existing Pipe #5 calculated in the original Laurel Glen storm design to be 27.00 minutes. At this time of concentration, the calculated peak flow rate is 7.77 cfs. A 15 inch pipe at 2.78% slope has a maximum capacity of 11.63 cfs. At the design peak flow rate of 7.77 cfs,the velocity of the water in the pipe is 9.58 fps. The pipe from EX INLET #1 to EX MH #2 is 95 feet long so the time spent in the pipe from EX INLET#1 to EX MH#2 is 0.17 minutes. (See Appendix C for detailed calculations). An existing 24 inch pipe is installed from Existing Manhole#2 to Existing Inlet#3. This pipe will drain the water from the pipe from EX INLET#1 TO EX MH#2 as well as the water from Existing Pipe #6 from the original Laurel Glen stormwater design report. The combination of these drainage areas includes a total of 7.46 acres plus the Storm#1 area from Laurel Glen of 6.77 acres Design Report-Page 9 of 11 plus the Storm#3 area of 9.27 acres and Storm 44 area of 1.35 acres for a total of 24.85 acres. The time of concentration for this pipe is equal to the time of concentration of the pipe from EX INLET #1 to EX MH 42 plus the time spent in the pipe. This is calculated above to be 27.17 minutes. The composition of the Laurel Glen drainage areas is not known, and therefore the peak flow for a different time of concentration cannot be determined. To be conservative,the peak flows for each existing pipe section is added to the flows generated by Westbrook. This is a conservative assumption because as time of concentration increases while the water passes through the stormwater system, the intensity decreases and the peak flow is reduced. At this time of concentration, the calculated peak flow rate is 15.61 cfs. A 24 inch pipe at 0.53% slope has a maximum capacity of 17.72 cfs. At the design peak flow rate of 15.61 cfs, the velocity of the water in the pipe is 5.96 fps. The pipe from EX MH #2 to EX IN #3 is 89 feet long so the time spent in the pipe from EX MH #2 to EX IN #3 is 0.25 minutes. (See Appendix C for detailed calculations). An existing 24 inch pipe is installed from Existing Inlet #3 to Existing Inlet 44. This pipe will drain the water from the pipe from EX MH #2 to EX IN #3 as well as the water from Drainage Area#7 and Drainage Area#8. The combination of these drainage areas includes a total of 25.40 acres. The time of concentration for this pipe is equal to the time of concentration of the pipe from EX MH#2 to EX IN#3 plus the time spent in the pipe. This is calculated above to be 27.42 minutes. At this time of concentration,the calculated peak flow rate is 16.14 cfs. A 24 inch pipe at 1.10% slope has a maximum capacity of 25.52 cfs. At the design peak flow rate of 16.14 cfs, the velocity of the water in the pipe is 8.12 fps. The pipe from EX IN #3 to EX IN #4 is 47 feet long so the time spent in the pipe from EX IN #3 to EX IN #4 is 0.10 minutes. (See Appendix C for detailed calculations). An existing 24 inch pipe is installed from Existing Inlet #4 to Existing Detention Pond #1. This pipe will drain the water from the pipe from EX IN #3 to EX IN #4 as well as the water from Drainage Area#9. The combination of these drainage areas includes a total of 25.61 acres. The time of concentration for this pipe is equal to the time of concentration of the pipe EX IN#3 to EX IN #4 plus the time spent in the pipe. This is calculated above to be 27.52 minutes. At this time of concentration, the calculated peak flow rate is 16.39 cfs. A 24 inch pipe at 0.51% slope has a Design Report-Page 10 of 11 maximum capacity of 17.38 cfs. At the design peak flow rate of 16.39 cfs, the velocity of the water in the pipe is 5.86 fps. The pipe from EX IN#4 to EX POND#1 is 216 feet long so the time spent in the pipe from EX IN 44 to EX POND #1 is 0.61 minutes. (See Appendix C for detailed calculations). OUTLET STRUCTURE AND PIPING—EXISTING DETENTION POND #1 Existing Detention Pond#1 has an existing outlet structure and piping. The existing structure will be modified to narrow the slot to 6.5 inches by bolting a ''/z inch thick galvanized steel plate to the weir structure. The existing dual 15 inch diameter outlet pipes are 61 feet long and sloped at 3.79%. At this slope the outlet pipes have a maximum capacity of 27.06 cfs. This is well over the 25 year flow rate of 17.96 cfs and will adequately provide overflow capacity from the detention pond. (See Appendix C and D for detailed calculations). Design Report-Page 11 of 11 LEGEND E%IsnNG seor ELEvama4 /I _._._._— MARK A. (0. No.9578E5 zf,OD.DO) PRovosEo swT ELEvaTDN EXSDNG PoWER BO% I \$�j RfO1�9�tCA,IE'�� IX6liNC TEIEPwNE BDX (` e4lET 1 ,!f l4�� EX6DNG ELECTRIC WX B"� � BC 4 \ w ~ EX6TING SANRART SEWER MANHOLE \ A Sheet 1 of f EXISDND_DART SEWER CLfNroUT IXISDND_E HYpRNR BC 07 EX TING WATER VALVE IX6i1NG CURD SLOP ' / ; D(VOM NLET EKGDNG POWER POLE 1 O \\ ')PD, 4 .' ­TING LID i POLE ) - Il �'\ (�d I � 5 ® PROPOSED ED STORM DRNSTORM INLET ' \ \�' kO\•P�/ \ \ ce PROPOSN WOLE ® PROPMEo SANDARTFc I 5C]YER MNADLE ' \ \ C Q O�C PROPO5E0ED CLFANOUT ' �i .. , gg PROPMSNNTPRTWATER VASEWERVE W [} ® PROPOSED CURB STOP �`' \ H PROPMEo{tRE Hrwwn ..:I-. �. � /� soau wLET 4(4e�)51A)434.38(n.3ar) OS .®1 PROPED WATER WELL ;':;. ,, ' ,I g J ,bi R OVT yI PROwSEo LKMT POLE •` -.t. IX INLET 4 / (S):4)4B.el(IS) '. PROPERTY BOUNCN4Y UNE - \�Y~ 'i.$ Rd9 .32# -.�a) V� F]-A--# / ...\ :1FUT1DMG I—ERTT"NE E%SDMH 2(44•)s.11a6969(28.62R) \ \ \-/L/l —SEteAD%uNERIN:4752 el EDGE FL.N(5):474 ID(w) -- \. - OF WETVND ._ ___.EASEMENT UNE EX 4"""2 _ EXISTING FENCE WM J5295 e4J OUT(N)!4]46.]2 INV�O (NE) ]].10 INV (W)m)4e 12 ----IX6TING OVERHEAD ELECTRIC UNE (SW) )4)fO \ W —NO UNDERGROUND ELECTRIC LINE ]V kfv IN(SE) J 955 \ � IXt3TNC C15 UNE E%INLET I _ -'-- UNO PHONE UNE RE) 4)532) EXISTING UNDERGRO 1 F%ISDNG OVFAHCAD PHONE LINE OUT( 4]498J �� \ \ STORM IALEi 3 48" STA 13(21.92-R) A RROPMED WATER..ICE RIM D:IN I 4753O1 II \ \ \ // {�1. ( � 85(IT)) 8"N—PwPMED T WATER AWN p1V OUT(N)-4749.74 4 a 5—PROPOSED 4 SPN11Ntt SEWER SEI CE I.1N(W)-4749)4 e' STA PROPOSED 6'SNtlTNiT SEWER MNN GOMH 1 4 IOa)518(]355'R) R 4) 4T—PROPOSED STORM SEWER R IN(5):4)984 —PON \ \ --u.,c ---PROPOSED UNDERGROUND ELECTRIC UNE R OUT(W):f)49e (15) ) _.. \ .- — —PROPOSED SWALE/RETENDON POND CONTOUR tO0 Saale O Feet T� ' .:..1 / `))\DEtO.T%H F�.g11�ET,I4'e')STA 1 t 5)(O.O1'L) PROPMEU CVPD ANo GUTTER I., / M \4(NE):4p.,//.O IE) 3C C JO L / STORM INLET 2(4T)/iA Sa9,M(..A,) i L Scale lTl NeLere SOMM 2(46 STA J 42 ST(35]B'R ' 1 / R IN(SW)A)52.59 !A') e� COTILOMT Intervals: F F..t / / FL OUT(N)4]5L5 8') ,./� .• R m t5) )52),(,r) DA 01 / R IN(W):4)52.)1(IT) ITT STORM FVIET 2A 4e')STA OUT ]a42.6O R (E)4J52]4(15) STORM INLET 1 111") 4a6. (0,00') e SOMH 3(46)STA 6 (SO FR x4(s): DA 02 IR.�(NE):4)52.94 s L OUT N)4 ') 11 I O DA A SONH4(4S)TA 4, R e4 (N):4 5 39 (I R OUT SroaM INLET sa(4T srA 4.1e.M(zs B ) R OlR(E):4)35 t1 -.-0.. _ UA Z8 0jj� 0 DA 05 ) 1 t 1 - J/) DA „4 leette Date:1-19-15 -DRAINAGE MAP D AI oA) swi:r=too 114691 DRAINAGE AREA# 1 Contributing Area C Area (ft) C * Area Composite ROW ROW 0.7375 10631 784o ((0.95*43)+(0.2*17))/60 OS/Park 0.2 0 0 0.7375 Lots 0.35 34701 12145 Total 45332 "1'9085".1 C = Weighted C Factor 0.44 A=Area(acres) 1.04 Required Gutter/Pipe Capacity (25-yr Storm) Tc Overland Flow Tc= 1.87 (1.1-CCf)D1/2/S1/3 Storm S = Slope of Basin(%) 0.5 Return Cf C =Rational Method Runoff Coefficient 0.35 2 to 10 1 Cf=Frequency Adjustment Factor 1,1 I 1 to 25 1.1 D=Length of Basin(ft) 110 26 to 50 1.2 51 to 100 1.25 Tc Overland Flow(minutes) _ 17.67: Te Gutter Flow Tc=L/V/60 V= (1.486/n)R2/3 S 11 n= Mannings Coefficient 0:013 R=Hydraulic Radius A/P (ft) 013 (015'below top of curb) S = slope (ft/ft) 0.005 L = length of gutter(ft) 310 V=mean velocity(ft/s) 2.12 Tc Gutter Flow(minutes) Tc Total (Overland + Gutter) = 20: 0 Q = CIA C = Weighted C Factor ` 0.44 (calculated above) I=0.78 Tc o.64(in/hr) 1S7 Drainage Area#1 A= area (acres) 1.04 Qrequired (Cfs) = 0.72; Provided Gutter Capacity (flowing at 0.15' below ton of curb) Q = (1.486/n)AR"'S"' n = Mannings Coefficient 0.013 A =area(ft2) 1. 4 P=wetted perimeter(ft) 9; 3 R=Hydraulic Radius A/P (ft) 0.13 ............................ S = slope (ft/ft) 0.005 Qprovided (CfS) = 1.63 GUTTER HAS ADEQUATE CAPACITY Drainage Area#1 DRAINAGE AREA # 2 Contributing Area C Area(ft 2) C * Area Composite ROW ROW 0.7375 9405 6936 ((0.95*43)+(0.2*17))/60 OS/Park 0.2 3309 662 0.7375 Lots 0.35 25845 ;,9,046� Total 38559 1:6643:3' C = Weighted C Factor 0.43 A=Area(acres) 0.89; Required Gutter/Pipe Capacity (25-yr Storm) Tc Overland Flow Tc = 1.87 (1.1-CCf)D1/2/S1/3 Storm S = Slope of Basin (%) 0.5 Return Cf C =Rational Method Runoff Coefficient 0.35 2 to 10 1 C f=Frequency Adjustment Factor 1:1 I 1 to 25 1.1 D =Length of Basin (ft) 110 26 to 50 1.2 51 to 100 1.25 Tc Overland Flow(minutes) Tc Gutter Flow (West on Babcock) Tc =LN160 V = (1.486/n)R2/3 S1/2 n=Mannings Coefficient 0.013 R=Hydraulic Radius A/P (ft) 0:13 (0.15' below top of curb) S = slope (ft/ft) 0.005 L=length of gutter(ft) 285 V=mean velocity(ft/s) 2:1 Tc Gutter Flow(minutes) Tc Total (Overland + Gutter) Q = CIA C =Weighted C Factor 0.43�(calculated above) I= 0.78 Tc 0.64(in/hr) Drainage Area#2 A=area (acres) 0.89, Qrequired (efs) Provided Gutter Capacity (flowing at 0.15' below top of curb) Q = (1.486/n)ARZi3S" n=Mannings Coefficient . I'6013' A = area(ft) P =wetted perimeter(ft) 9.23' R=Hydraulic Radius A/P (ft) 0.13` S = slope (ft/ft) 0.005 Qprovided (cfs) = 2.6-3 GUTTER HASADEQUATE CAPACITY Drainage Area#2 DRAINAGE AREA # 3 Contributing Area C Area(ft 2) C * Area Composite ROW ROW 0.7375 44648 32928, ((0.95*43)+(0.2*17))/60 OS/Park 0.2 9905 1981 0.7375 Lots 0.35 97865 34253- Total 152418 _6916T.7' C = Weighted C Factor OA5 A =Area(acres) 3.50 Required Gutter/Pipe Capacity (25-yr Storm) Tc Overland Flow Tc= 1.87 (1.1-CCf)D1/2/S1/3 Storm S = Slope of Basin (%) 0.5 Return Cf C =Rational Method Runoff Coefficient 035 2 to 10 1 Cf=Frequency Adjustment Factor 1 1 11 to 25 1.1 D = Length of Basin(ft) 110 26 to 50 1.2 51 to 100 1.25 Tc Overland Flow(minutes) = 17:67'' Tc Gutter Flow (West on Babcock) Tc=L/V/60 V=(1.486/n)R2/3 S1/2 n=Mannings Coefficient 0:fl13 R=Hydraulic Radius A/P (ft) 0.13 (0.15'below top of curb) S = slope (ft/ft) 0.008 L = length of gutter(ft) 845 V=mean velocity(ft/s) �Zb0 Tc Gutter Flow(minutes)_ 5:42. Tc Total (Overland+ Gutter) Q = CIA C =Weighted C Factor45 (calculated above) I= 0.78 Tc 0'64(in/hr) 1g44' Drainage Area#3 A= area (acres) 3.50' Qrequired (efs) — 2.2& Provided Gutter Capacity (flowing at 0.15' below ton of curb) Q= (1.486/n)AR'/3S1/1 n=Mannings Coefficient 0013 A= area(ftZ) 1.24' P=wetted perimeter(ft) 9.23 R=Hydraulic Radius A/P (ft) S =slope (ft/ft) 0.005 Qprovided WS) = 2.63` GUTTER HAS ADEQUATE CAPACITY Drainage Area#3 DRAINAGE AREA # 4 Contributing Area C Area(ft) C * Area Composite ROW ROW 0.7375 32067 � D{49 ((0.95*43)+(0.2*17))/60 OS/Park 0.2 3389 618 0.7375 Lots 0.35 125284 43849' Total 160740 68176.6 C = Weighted C Factor 0,412 A=Area(acres) 369' Required Gutter/Pipe Capacity (25-yr Storm) Tc Overland Flow Tc= 1.87 (1.1-CCf)D1/2/S1/3 Storm S = Slope of Basin (%) 0.5 Return Cf C =Rational Method Runoff Coefficient 0.35' 2 to 10 1 Cf=Frequency Adjustment Factor 1:1 I I to 25 1.1 D =Length of Basin(ft) 110 26 to 50 1.2 51 to 100 1.25 Tc Overland Flow(minutes) _ 1 7.67 Tc Gutter Flow (West on Babcock) Tc=L/V/60 V = (1.486/n)R2/3 S12 n=Mannings Coefficient 0.013 R=Hydraulic Radius A/P (ft) 0.13 (0.15' below top of curb) S = slope (ft/ft) 0.008 L= length of gutter(ft) 983 V=mean velocity(ft/s) 2:60 Tc Gutter Flow(minutes) Tc Total (Overland+ Gutter) Q= CIA C = Weighted C Factor0,42 (calculated above) I=0.78 Tc-0 64(in/hr) 1:.40 Drainage Area#4 A = area(acres) 3.69 [required (efS) Provided Gutter Capacity (flowing at 0.15' below top of curb) Q =(1.486/n)AR"S" n= Mannings Coefficient 0.013` A =area(ft2) 1.24; P =wetted perimeter(ft) 9.23 R= Hydraulic Radius A/P (ft) S = slope (ft/ft) 0.005 Qprovided (CfS) = 2.63 GUTTER HAS ADEQUATE CAPACITY Drainage Area#4 DRAINAGE AREA # 5 Contributing Area C Area(ft2) C * Area Composite ROW ROW 0.7375 38869 2866,E ((0.95*43)+(0.2*17))/60 OS/Park 0.2 0 0" 0.7375 Lots 0.35 107223 37528 Laurel Pkwy ROW 0.81 21200 , ` 17172' Durston ROW 0.68 14592 , 9923'! Total 181'884, ,=, 932881 C = Weighted C Factor 0.54' A=Area(acres) 418 Required Gutter/Pine Capacity (25-yr Storm) Tc Overland Flow Tc= 1.87 (1.1-CCr)D1/2/S1/3 Storm S = Slope of Basin (%) 1 Return Cf C =Rational Method Runoff Coefficient 0.35i 2 to 10 1 Cf=Frequency Adjustment Factor 1.1 11 to 25 1.1 D = Length of Basin(ft) 120 26 to 50 1.2 51 to 100 1.25 Tc Overland Flow(minutes) = 14.65 Tc Gutter Flaw (West on Babcock) Tc=L/V/60 V = (1.486/n)R2/3 S 1/2 n=Mannings Coefficient 0.013 R=Hydraulic Radius A/P (ft) 0:13,(0.15' below top of curb) S = slope (ft/ft) 0.010 L= length of gutter(ft) 680 V =mean velocity(ft/s) 3.00! Tc Gutter Flow(minutes) = 3 38 Tc Total (Overland+ Gutter) = 18.43 Q = CIA Drainage Area#5 C = Weighted C Factor 0.51 (calculated above) I= 0.78 Tc-0.64(in/hr) A = area(acres) Qrequired (Cfs) Provided Gutter Capacity (flowing at 0.15' below ton of curb) Q = (1.486/n)AR"'S" n=Mannings Coefficient O.013, A=area(ft 2) 1:24 P=wetted perimeter(ft) 9.23' R=Hydraulic Radius A/P (ft) 0.13' S = slope (ft/ft) 0.01 Qprovided (Cfs) GUTTER HAS ADEQUATE CAPACITY Drainage Area#5 DRAINAGE AREA# 6 Contributing Area C Area(ft 2) C * Area Composite ROW ROW 0.7375 16331 12044 ((0.95*43)+(0.2*17))/60 OS/Park 0.2 3300 b60 0.7375 Lots 0.35 96575 33801 Laurel Pkwy ROW 0.81 26918 21804i Total 14314 68309.E C = Weighted C Factor 048 A=Area(acres) 329' Required Gutter/Pine Capacity (25-yr Storm) Tc Overland Flow Tc= 1.87 (1.1-CC)D1/2/S113 Storm S = Slope of Basin (%) 1 Return Cf C = Rational Method Runoff Coefficient 0.35 2 to 10 1 Cf=Frequency Adjustment Factor 1>1 1 I to 25 1.1 D =Length of Basin(ft) 220 26 to 50 1.2 51 to 100 1.25 Tc Overland Flow(minutes) = 19.83 Tc Gutter Flow (West on Babcock) Tc=LN160 V =(1.486/n)R2i3 Slit n=Mannings Coefficient 0:013 R= Hydraulic Radius A/P (ft) 0,13 (0.15' below top of curb) S = slope (ft/ft) 0.010 L =length of gutter(ft) 693 V=mean velocity(ft/s) 3;00 Tc Gutter Flow(minutes)_ ::3:8;5 Tc Total (Overland+ Gutter) Q = CIA C = Weighted C Factor 0.48 (calculated above) Drainage Area#6 I= 0.78 Tc-°.64(in/hr) 1.41 A = area (acres) 1. 9 Qrequired (CfS) _ 212 Provided Gutter Capacity (flowing at 0.15' below ton of curb) Q= (1.486/n)AR"S" n=Mannings Coefficient fl,013;' A =area(ft2) 1.24 P =wetted perimeter(ft) 9:2 : R= Hydraulic Radius A/P (ft) 0.13' S = slope (ft/ft) 0.01 Qprovided WS) _ 1,72 GUTTER HAS ADEQUATE CAPACITY Drainage Area#6 DRAINAGE AREA # 7 Contributing Area C Area(ft) C * Area Road 0.95 7485 ,7111' Boulevard 0.2 1969 .394 Total 9454� �7505 C = Weighted C Factor A = Area(acres) 0�2'' Required Gutter/Pipe Capacity (25-yr Storm) Tc Overland Flow Tc= 1.87 (1.1-CCf)D"/S1/3 Storm S = Slope of Basin(%) 0.5 Return Cf C =Rational Method Runoff Coefficient 035 2 to 10 1 Cf=Frequency Adjustment Factor 1:1 11 to 25 1.1 D = Length of Basin(ft) 20 26 to 50 1.2 51 to 100 1.25 Tc Overland Flow(minutes)_ 7.53 Tc Gutter Flow (West on Babcock) Tc= L/V/60 V = (1.486/n)R2/3 S11 n= Mannings Coefficient 0.013' R=Hydraulic Radius A/P (ft) ` 0.13 (0.15' below top of curb) S = slope (ft/ft) 0.010 L=length of gutter(ft) _ 141 V =mean velocity(ft/s) 3.00 Te Gutter Flow(minutes) = 0.78 Tc Total (Overland+ Gutter)= 832 Q = CIA C = Weighted C Factor 0,79 (calculated above) 1 = 0.78 Tc-0 64(in/hr) 2.36 A = area(acres) 02 Drainage Area#7 Qrequired (Cfs) = 0.48 Provided Gutter Capacity (flowing at 0.15' below top of curb) Q = (1.486/n)AR"S" n= Mannings Coefficient 0.013 A = area(ft2) : �} P = wetted perimeter(ft) 9:23 R=Hydraulic Radius A/P (ft) S = slope (ft/ft) 0.01 Qprovided WS) = 3.72' GUTTER HAS ADEQUATE CAPACITY Drainage Area#7 DRAINAGE AREA # 8 Contributing Area C Area(ft 2) C * Area Road 0.95 11302 10737 Boulevard 0.2 2963 593 Total -14265 11330 C = Weighted C Factor 0.79 A =Area(acres) 033 Required Gutter/Pipe Capacity (25-yr Storm) Tc Overland Flow Tc= 1.87 (1.1-CCf)D"/S1/3 Storm S = Slope of Basin(%) 1 Return Cf C =Rational Method Runoff Coefficient 0:35' 2 to 10 1 C f=Frequency Adjustment Factor 1.1 11 to 25 1.1 D= Length of Basin(ft) 20 26 to 50 1.2 51 to 100 1.25 Tc Overland Flow(minutes) Tc Gutter Flow (West on Babcock) Tc =L/V/60 V = (1.486/n)R2/3 S11 n=Mannings Coefficient 0:013 R=Hydraulic Radius A/P (ft) 0h1�3 (0.15' below top of curb) S = slope (ft/ft) 0.005 L= length of gutter(ft) 390 V = mean velocity(ft/s) Tc Gutter Flow(minutes) Tc Total (Overland+ Gutter) = 905 Q= CIA C =Weighted C Factor 0.79-(calculated above) I=0.78 Tc-O 64(in/hr) 2; A= area(acres) 033 Drainage Area#8 Qrequired (Cfs) = 0.68 Provided Gutter Capacity (flowing at 0.15' below ton of curb) Q = (1.486/n)AR"S" n=Mannings Coefficient 0.013 A= area(ft) 1.24'` P =wetted perimeter(ft) 9"21 R= Hydraulic Radius A/P (ft) 0:1 S = slope (ft/ft) 0.01 Qprovided WS) _ 3.72; GUTTER HAS ADEQUATE CAPACITY Drainage Area#8 DRAINAGE AREA # 9 Contributing Area C Area(ft2) C * Area Road 0.95 9208 8748 Boulevard 0.2 0 0' Total >9208 8748 C = Weighted C Factor 0.95 A=Area(acres) 0.21 Required Gutter/Pipe Capacity (25-yr Storm) Tc Overland Flow Tc= 1.87 (1.1-CCf)D"/S1/3 Storm S = Slope of Basin (%) 1 Return Cf C =Rational Method Runoff Coefficient 0.351 2 to 10 1 Cf=Frequency Adjustment Factor 1.1 11 to 25 1.1 D= Length of Basin (ft) 0 26 to 50 1.2 51 to 100 1.25 Tc Overland Flow(minutes) = 0;00 Tc Gutter Flow (West on Babcock) Tc=L/V/60 V = (1.486/n)R213 S1/2 n=Mannings Coefficient 04013 R=Hydraulic Radius A/P (ft) 0.13 (0.15' below top of curb) S = slope (ft/ft) 0.005 L= length of gutter (ft) 390 V =mean velocity (ft/s) 2.12; Tc Gutter Flow(minutes) Tc Total (Overland + Gutter) _ 107 Q = CIA C = Weighted C Factor >0.95%(calculated above) I=0.78 Tc 064(in/hr) 5:23 A= area(acres) 0.21 Drainage Area#9 Qrequired (efs) = 1.05• Provided Gutter Capacity (flowing at 0.15' below top of curb) Q = (1.486/n)AR"S" n =Mannings Coefficient 0.013' A= area(ft) „ ).24 P=wetted perimeter(ft) .23 R=Hydraulic Radius A/P (ft) 013' S = slope (ft/ft) 0.01 Qprovided WS) GUTTER HAS ADEQUATE CAPACITY Drainage Area#9 DRAINAGE AREA# 1.0 Contributing Area C Area(ft 2) C * Area Road 0.95 9819 9328: Boulevard 0.2 2658 532 Total 12477 9860 C = Weighted C Factor 0 79 A=Area(acres) 029 Required Gutter/Pipe Capacity (25-yr Storm) Tc Overland Flow Tc = 1.87 (1.1-CC)D"/S1/3 Storm S = Slope of Basin (%) 1 Return Cf C =Rational Method Runoff Coefficient 0 35 2 to 10 1 C f=Frequency Adjustment Factor 1 ), 11 to 25 1.1 D =Length of Basin (ft) 16 26 to 50 1.2 51 to 100 1.25 Tc Overland Flow(minutes) Tc Gutter Flow (West on Babcock) Tc=L/V/60 V = (1.486/n)R2/3 Sv2 n=Mannings Coefficient .,0 Q13 R=Hydraulic Radius A/P (ft) 0:I (0.15' below top of curb) S= slope (ft/ft) 0.005 L= length of gutter(ft) 340 V=mean velocity(ft/s) 21 Tc Gutter Flow(minutes) Tc Total (Overland+ Gutter) Q= CIA C = Weighted C Factor 0 7 !'(calculated above) 1 =0.78 Tc 0 64(in/hr) 2 83 A= area(acres) 0 2 ` Drainage Area#10 Qrequired (CfS) = 0.64 Provided Gutter Capacity (flowing at 0.15' below ton of curb) Q = (1.486/n)AR"SU2 n=Mannings Coefficient Ob 1 A= area(ft2) 124` P = wetted perimeter(ft) 9 R=Hydraulic Radius A/P (ft) S = slope (ft/ft) 0.01 Qprovided (CfS) _ .`172 GUTTER HAS ADEQUATE CAPACITY Drainage Area#10 DRAINAGE AREA # I I Contributing Area C Area(ft) C * Area Road 0.95 8063 7660' Boulevard 0.2 0 : �Q Total ,8463 C = Weighted C Factor 095 A=Area(acres) 019 Required Gutter/Pipe Capacity (25-yr Storm) Tc Overland Flow Tc= 1.87 (1.1-CCf)D"/S1/3 Storm S = Slope of Basin(%) 1 Return Cf C= Rational Method Runoff Coefficient .035 2 to 10 1 Cf= Frequency Adjustment Factor 1.,1 11 to 25 1.1 D =Length of Basin(ft) 0 26 to 50 1.2 51 to 100 1.25 Tc Overland Flow(minutes) Tc Gutter Flow (West on Babcock) Tc=LN160 V = (1.486/n)R" S" n=Mannings Coefficient 0,�013 R=Hydraulic Radius A/P (ft) 013 (0.15`below top of curb) S = slope (ft/ft) 0.005 L= length of gutter(ft) 340 V=mean velocity(ft/s) 2.42 Tc Gutter Flow(minutes)_ Tc Total (Overland+ Gutter) = 2'67: Q = CIA C = Weighted C Factor 0 95„(calculated above) I = 0.78 Tc- 64(in/hr) 5 71 A = area(acres) 0 1 . Drainage Area#11 Qrequired (CfS) Provided Gutter Capacity (flowing at 0.15' below top of curb) Q = (1.486/n)AR"S" n=Mannings Coefficient 0 b'13' A= area(ft2) ). P=wetted perimeter(ft) 93 R=Hydraulic Radius A/P (ft) S = slope (ft/ft) 0.01 Qprovided (CfS) = 3.72' GUTTER HASADEQUATE CAPACITY Drainage Area#11 DRAINAGE AREA# 12 Contributing Area C Area(ft 2) C * Area Road 0.95 12254 1�61 Boulevard 0.2 3314 Total155682304 C= Weighted C Factor 079 A=Area(acres) =0:3`6' Required Gutter/Pipe Capacity (25-yr Storm) Tc Overland Flow Tc= 1.87 (1.1-CCf)D1/2/S1/3 Storm S = Slope of Basin(%} 1 Return Cf C =Rational Method Runoff Coefficient0;35 2 to 10 1 C f=Frequency Adjustment Factor 11 to 25 1.1 D =Length of Basin (ft) 16 26 to 50 1.2 51 to 100 1.25 Tc Overland Flow(minutes) Tc Gutter Flow (West on Babcock) Tc=L/V/60 V = (1.486/n)R2i3 S12 n=Mannings Coefficient 0'0 R=Hydraulic Radius A/P (ft) 0;,13 (0.15'below top of curb) S = slope (ft/ft) 0.005 L= length of gutter(ft) 421 V=mean velocity (ft/s) 212_ Tc Gutter Flow(minutes) Tc Total (Overland+ Gutter)= 8 Q = CIA C = Weighted C Factor 0 79'(calculated above) 1 = 0.78 Tc 0.64(in/hr) 2 69 A=area(acres) fl.3 Drainage Area#12 Qrequired (CfS) = 0.76' Provided Gutter Capacity (flowing at 0.15' below ton of curb) Q = (1.486/n)AR"S" n=Mannings Coefficient A=area(ft2) 124, P =wetted perimeter(ft) �� 93 R=Hydraulic Radius A/P (ft) S = slope (ft/ft) 0.01� Qprovided WS) GUTTER HAS ADEQUATE CAPACITY Drainage Area#12 DRAINAGE AREA # 13 Contributing Area C Area(ft 2) C * Area Road 0.95 10063 :, .` �9, Boulevard 0.2 0 �0 Total �956�0: C = Weighted C Factor A=Area(acres) :Q23 Required Gutter/Pipe Capacity (25-yr Storm) Tc Overland Flow Tc= 1.87 (1.1-CCf)D"/SI/3 Storm S = Slope of Basin(%) 1 Return Cf C=Rational Method Runoff Coefficient 03 2 to 10 1 Cf= Frequency Adjustment Factor la 11 to 25 1.1 D = Length of Basin (ft) 0 26 to 50 1.2 51 to 100 1.25 Tc Overland Flow(minutes) _ 0,00, Tc Gutter Flow (West on Babcock) Tc=L/V/60 V = (1.486/n)R21 S11 n=Mannings Coefficient 0013 R=Hydraulic Radius A/P (ft) 0 13.(0.15' below top of curb) S = slope (ft/ft) 0.005 L= length of gutter(ft) 421 V=mean velocity(ft/s) 1 Tc Gutter Flow(minutes) Tc Total (Overland+Gutter) Q= CIA C= Weighted C Factor 0 (calculated above) 1=0.78 Tc-0.64(in/hr) 4 98r A=area(acres) ; 0, 3 Drainage Area#13 Qrequired (cfs) = LO,9. Provided Gutter Capacity (flowing at 0.15' below top of curb) Q = (1.486/n)AR"S" n= Mannings Coefficient A=area P = wetted perimeter(ft) 923 R=Hydraulic Radius A/P (ft) 0.13 S = slope (ft/ft) 0.01 Qprovided WS) _ 172 GUTTER HAS ADEQUATE CAPACITY Drainage Area#13 DRAINAGE AREA # BC 7 Contributing Area C Area (ft2) C * Area Sherwood Composite ROW Sherwood ROW 0.7625 12150 .9264 ((0.95*45)+(0.2*15))/60 Laurel Pkwy ROW 0.81 21500 17415' Total 33650 26679` 0.7625 C = Weighted C Factor 0.79i A=Area(acres) 0 77 Required Gutter/Pipe Capacity (25-yr Storm) Te Overland Flow Tc= 1.87 (1.1-CCf)D1/2/S1/3 Storm S = Slope of Basin (%) 1 Return Cf C =Rational Method Runoff Coefficient 0.35 2 to 10 1 C f=Frequency Adjustment Factor 1.11 11 to 25 1.1 D =Length of Basin (ft) 13.5 26 to 50 1.2 51 to 100 1.25 Tc Overland Flow(minutes) = 4.91 Tc Gutter Flow (West on Babcock) Tc =L/V/60 V = (1.486/n)R2/1 S12 n= Mannings Coefficient 0.013 R= Hydraulic Radius A/P (ft) 0.13 (0.15' below top of curb) S = slope (ft/ft) 0.005 L=length of gutter (ft) 560 V =mean velocity(ft/s) 2.12 Tc Gutter Flow(minutes) = 4.40 Tc Total (Overland + Gutter)= 9:31 Q = CIA C= Weighted C Factor 0.79"(calculated above) I= 0.78 Tc-0 .64(in/hr) `2:57 A= area(acres) '0.77, Drainage Area#BC7 Qrequired (Cfs) = 1.57' Provided Gutter Capacity (flowing at 0.15' below ton of curb) Q = (1.486/n)ARv3Si/2 n= Mannings Coefficient 0.01,3 A=area(ft) 1.24 P =wetted perimeter(ft) � R= Hydraulic Radius A/P (ft) 0.13 S = slope (ft/ft) 0.01 Qprovided (Cfs) _ 172(, GUTTER HAS ADEQUATE CAPACITY Drainage Area#BC7 DRAINAGE AREA # BC 8 Contributing Area C Area(ft2) C * Area Sherwood Composite ROW Sherwood ROW 0.7625 12150 9264 ((0.95*45)+(0.2*15))/60 Total 12150, 9264 0.7625 C = Weighted C Factor A=Area(acres) 0.28 Required Gutter/Pipe Capacity (25-yr Storm) Tc Overland Flow Tc = 1.87 (1.1-CC)D1/2/S1/3 Storm S = Slope of Basin (%) 1 Return Cf C = Rational Method Runoff Coefficient 0.35 2 to 10 1 Cf=Frequency Adjustment Factor 1.1 11 to 25 1.1 D = Length of Basin(ft) 13.5 26 to 50 1.2 51 to 100 1.25 Tc Overland Flow(minutes) Tc Gutter Flow (West on Babcock) Tc=L/V/60 V= (1.486/n)R21 S112 n=Mannings Coefficient 0.013 R=Hydraulic Radius A/P (ft) 0:13 (0.15' below top of curb) S = slope (ft/ft) 0.005 L=length of gutter(ft) 180 V =mean velocity(ft/s) 2.12' Tc Gutter Flow(minutes) 141 Tc Total (Overland+Gutter) -6.33, Q = CIA C = Weighted C Factor 9'76 (calculated above) I = 0.78 Tc 0.64(in/hr) 29, A= area(acres) 028 Drainage Area#BC8 Qrequired (efs) — 0.70 Provided Gutter Capacity (flowinjZ at 0.1.5' below ton of curb) Q = (1.486/n)AR"'Svz n=Mannings Coefficient 0,013 A=area(ft2) 1,24 P =wetted perimeter(ft) 9;23' R=Hydraulic Radius A/P (ft) 0:13 S = slope (ft/ft) 0.01 Qprovided (cfs) = 3:72`; GUTTER HAS ADEQUATE CAPACITY Drainage Area#BC8 STORM PIPE 4 TO 3 Contributing Area C Area(ft2) C * Area Road 0.95 18126 17220! Total 18126 17219>7 C = Weighted C Factor 0.95 A=Area(acres) 0.42 Te Total (min)= 3.31 Q = CIA C = Weighted C Factor 0.95 (calculated above) I = 0.78 Tc•0.64(in/hr) 4.98 A= area(acres) 0.42 Qrequired (Cfs) = 1.97' STORM PIPE ST4toST3 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: ST#4 to ST#3 MAX FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 14.07 inches Mannings Formula d n= 0.013 mannings D 0= 57.7 degrees Q=(1.486/n)AR "'S"' n S= 0.004 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh"'Sv2 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.20 3.30 0.36 3.68 4.39 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Conc 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: ST#4 to ST#3 MAX FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT ________ D= 15 inches d= 7.4 inches Mannings Formula d n= 0.013 mannings D 0= 178.5 degrees Q=(1.486/n)AR "'S"' n S= 0.004 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh1/3S11 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 0.60 1.95 0.31 3.31 2.00 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 STORM PIPE 3 TO POND Contributing Area C Area(ft) C * Area Road 0.95 40199 38189ti Boulevard 0.2 5972 1 t94i Total 46171 39383.5' C = Weighted C Factor 0.85 A=Area(acres) 1.06 Tc Total (min) = 3.53 Q= CIA C = Weighted C Factor 0.85 (calculated above) I = 0.78 Tc 064(in/hr) 4.78 A = area(acres) 1.06i Qrequired (efs) — 4.32' STORM PIPE ST3toPOND MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: ST#3 to POND MAX FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 14.07 inches Mannings Formula d n= 0.013 mannings D 0= 57.7 degrees Q=(1.486/n)ARh"'S"' S= 0.0044 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh"'Sv2 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ftls flow,cfs PVC 0.013 1.20 3.30 0.36 3.86 4.61 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Conc 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: ST#3 to POND By: Date: Chk. By: Date: Clear Data Entry 6 Cells INPUT 7D= 15 inches A E-- d= 12.4 inches Mannings Formula d n= 0.013 mannings D 0= 98.4 degrees Q=(1.486/n)ARh213SIl S= 0.0044 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh213SI/2 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.08 2.85 0.38 3.98 4.32 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 STORM PIPE I TO 2 Contributing Area C Area (ft) C * Area ROW 0.7375 54053 39864 Boulevard/OS/Park 0.2 13214 ,2643 Lots 0.35 123710 43299 Total 190977` ` 858'0'4 C = Weighted C Factor 0.45 A =Area(acres) 438. Tc Total (min) Q= CIA C = Weighted C Factor 0.45 (calculated above) 1 =0.78 Tc o.64(in/hr) A= area(acres) 4.38 Qrequired (Cfs) STORM PIPE ST1 toST2 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: ST#1 TO ST#2 PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 14.07 inches Mannings Formula d n= 0.013 mannings D 0= 57.7 degrees Q=(1.486/n)ARh21IS112 S= 0.0053 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh2i3S1/2 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.20 3.30 0.36 4.23 5.06 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: ST#1 TO ST#2 By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 8.4 inches Mannings Formula d 0. n= 0.013 mannings D 0= 166.2 degrees Q=(1.486/n)AR 213S112 h S= 0.0053 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh213SI12 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 0.71 2.11 0.33 4.01 2.84 PE(<g"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 STORM PIPE 2 TO POND Contributing Area C Area(ft2) C * Area ROW 0.7375 96751 7,1354' Boulevard/OS/Park 0.2 16603 3321 Lots 0.35 283695 99293' Total 397049... 173968' C =Weighted C Factor A=Area(acres) 911 Tc Total (min)= 23.36 Q= CIA C = Weighted C Factor 0.44"(calculated above) I= 0.78 Tc o.64(in/hr) I A3'' A=area(acres) 9.11 Qrequired (Cfs) STORM PIPE ST2topond MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: ST#2 to POND PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 18 inches d= 16.88 inches Mannings Formula d n= 0.013 mannings D 0= 57.8 degrees Q=(1.486/n)ARn 21IS112 5= 0.0051 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rn2/ISI/2 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.72 3.96 0.44 4.69 &07 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: ST#2 to POND By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 18 inches d= 11.8 inches Mannings Formula d n= 0.013 mannings D 0= 143.7 degrees Q=(1.486/n)AR 213S1r2 h S= 0.0051 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh21IS11 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.23 2.83 0.43 4.68 5.74 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: DETENTION POND#1 OUTLET PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Celis INPUT D= 18 inches d= 16.88 inches Mannings Formula d n= 0.013 mannings D 0= 57.8 degrees Q=(1.486/n)AR "'S"' n S= 0.0053 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh...Sv2 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.72 3.96 0.44 4.78 8.23 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Conc 0.013 STORM PIPE EX #4 TO EX#5 Contributing Area C Area(ft2) C * Area Composite ROW (Sherwood) Sherwood ROW 0.7625 12150 9264 ((0.95*45)+(0.2*15))/60 Total 12150 9264.38 0.7625 C = Weighted C Factor A = Area(acres) 0:28 i Tc Total (min)= 6:33 Q = CIA C = Weighted C Factor 0.76'(calculated above) I= 0.78 Tc-osa(in/hr) 3.29`' A =area(acres) Qrequired (efs) STORM PIPE EX4toEX5 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: EX#4 to EX#5 PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 14.07 inches Mannings Formula d n= 0.013 mannings D 0= 57.7 degrees AR Q=(1.486/n "'Svz ) h S= 0.0009 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh'/'Sv2 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ftz Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.20 3.30 0.36 1.74 2.08 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: EX#4 to EX#5 By: Date: Chk. By: Date: Clear Data Entry 8 Cells INPUT D= 15 inches _ __ d= 6.3 inches Mannings Formula d n= 0.013 mannings D 0= 161.6 degrees Q=(1.486/n)ARh113SIll S= 0.0009 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rt,v3Sv2 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 0.49 1.76 0.28 1.46 0.71 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 STORM PIPE EX#5 TO POND Contributing Area C Area(ft2) C * Area Composite ROW(Sherwood) Laurel Parkway ROW 0.81 21500 17415 Sherwood ROW 0.7625 12150 9264 ((0.95*45)+(0.2*15))/60 Totals : 33Ei5 0.7625 C = Weighted C Factor `�Q.79< A =Area(acres) Tc Total (min) Q= CIA C = Weighted C Factor 0.79"(calculated above) I= 0.78 Tc o.64(in/hr) 2y A=area(acres) Qrequired (CfS) _ �57 STORM PIPE EX5toPOND MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: EX#5 to POND PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 14.07 inches Mannings Formula d n= 0.013 mannings D 0= 57.7 degrees Q=(1.486/n)AR "'Svz n S= 0.0042 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rn2i3S11 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.20 3.30 0.36 3.77 4.50 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: EX#5 to POND By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 6.3 inches Mannings Formula d n= 0.013 mannings D 0= 161.6 degrees Q=(1.486/n)ARn 213S112 S= 0.0042 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rn21IS112 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity fUs flow,cfs PVC 0.013 0.49 1.76 0.28 3.15 1.54 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 STORM PIPE 3A TO 4 Contributing Area C Area(ft) C * Area Composite ROW(interior st) ROW Interior Streets 0.7375 38869 28666 ((0.95*43)+(0.2*17))/60 OS/Park 0.2 0 01 0.7375 Lots 0.35 107223 37528 Laurel Pkwy ROW 0.81 21200 17172 Durston ROW 0.68 14592 9923 Total 181884 93298.5 C = Weighted C Factor 0.51 A=Area(acres) 4.18 Tc Total (min) = 18.43' Q = CIA C = Weighted C Factor 0.51 (calculated above) I = 0.78 Tc o.64(in/hr) 1.66'; A =area(acres) 4.18'!; Qrcquired (efs) = 3.56': STORM PIPE ST3AtoST4 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: ST#3A to ST#4 PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT ________ D= 15 inches d= 14.07 inches Mannings Formula d n= 0.013 mannings D 0= 57.7 degrees AR Q=(1.486/n "'Sv2 ) n S= 0.004 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh'/'S'iz S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.20 3.30 0.36 3.68 4.39 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: ST#3A to ST#4 By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 10.8 inches Mannings Formula d n= 0.013 mannings D 0= 127.8 degrees Q=(1.486/n)ARh21IS112 S= 0.004 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh21IS11 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 0.95 2.53 0.37 3.75 3.55 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Conc 0.013 STORM PIPE 4 TO 3 Contributing Area C Area(ft2) C * Area Composite ROW(interior st) ROW Interior Streets 0.7375 38869 28666 ((0.95*43)+(0.2*17))/60 OS/Park 0.2 0 0 0.7375 Lots 0.35 107223 37528 Laurel Pkwy ROW 0.81 21200 :17',172 Durston ROW 0.68 14592 9923 Total 1818'84 932M3 C = Weighted C Factor 0.51' A=Area(acres) 4:18' Tc Total (min) = 18,45,' Q = CIA C = Weighted C Factor 0.51`,(calculated above) I= 0.78 Tc 0.64(in/hr) 1.6b A= area(acres) 4.18 Qrequired (Cfs)= 3.55 STORM PIPE MH4toMH3 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: MH#4 to MH#3 PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 8 Cells INPUT D= 15 inches d= 14.07 inches Mannings Formula d n= 0.013 mannings D 0= 57.7 degrees Q=(1.486/n AR zi3Sii2 ) n S= 0.0105 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rn2r3Sv2 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ftls flow,cfs PVC 0.013 1.20 3.30 0.36 5.96 7.12 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Conc 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: MH#4 to MH #3 By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 7.8 inches Mannings Formula d n= 0.013 mannings D 0= 175.4 degrees Q=(1.486/n)AR v3Sv2 n S= 0.0105 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh"'S" S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 0.64 2.01 0.32 5.48 3.54 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 STORM PIPE 3 TO 2 Contributing Area C Area(ftz) C * Area Composite ROW (interior st) ROW Interior Streets 0.7375 38869 28666 ((0.95*43)+(0.2*17))/60 OS/Park 0.2 0 0' 0.7375 Lots 0.35 107223 37528 Laurel Pkwy ROW 0.81 21200 _ �17172 Durston ROW 0.68 14592 9923 Total 1,81884 -93288.5 C = Weighted C Factor 0.5,1, A =Area(acres) 4.18 Tc Total (min) = 18.97 Q = CIA C = Weighted C Factor 0:51`(calculated above) I = 0.78 Tc 0.64(in/hr) 1.63 A = area (acres) 4.18 Qrequired (Cfs) = 3.49` STORM PIPE ST3toST2 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: ST#3 to ST#2 PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 14.07 inches Mannings Formula d n= 0.013 mannings D 0= 57.7 degrees Q=(1.486/n)AR zisSv2 n S= 0.0091 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rn213S11 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.20 3.30 0.36 5.54 6.63 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: ST#3 to ST#2 By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 8.1 inches Mannings Formula d n= 0.013 mannings D 0= 170.8 degrees Q=(1.486/n)AR zrsSvz h S= 0.0091 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh213Sv2 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 0.68 2.06 0.33 5.18 3.50 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Conc 0.013 STORM PIPE 2A TO 2 Contributing Area C Area(ft2) C * Area Composite ROW(interior st) ROW Interior Streets 0.7375 16331 42044 ((0.95*43)+(0.2*17))/60 OS/Park 0.2 3300 ~660' 0.7375 Lots 0.35 96575 33801 Laurel Pkwy ROW 0.81 26918, . `21.804 Total WIN 68308.9 C = Weighted C Factor '0.48' A=Area(acres) 129' Tc Total (min) _ 23.68� Q = CIA C = Weighted C Factor 0'.48 (calculated above) I= 0.78 Tc"0.64(in/hr) 1.41 A=area(acres) 3.29> Qregttired (Cfs) — 2.22' STORM PIPE ST2AtoMH2 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: ST#2A to MH#2 PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 14.07 inches Mannings Formula d n= 0.013 mannings D 0= 57.7 degrees Q=(1.486AR /n 2r3S112 ) n S= 0.006 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rn2/3S1/2 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.20 3.30 0.36 4.50 5.38 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: ST#2A to MH#2 By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 7 inches Mannings Formula d n= 0.013 mannings D 0= 172.4 degrees Q=(1.486/n)AR 213SI12 h S= 0.006 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh2i3Sv2 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 0.56 1.88 0.30 3.96 2.22 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Conc 0.013 STORM PIPE 2 TO 1 Contributing Area C Area (ft2) C * Area Composite ROW(interior st) ROW Interior Streets 0.7375 55200 ((0.95*43)+(0.2*17))/60 OS/Park 0.2 3300 = 650 0.7375 Lots 0.35 203798 71329' Laurel Pkwy ROW 0.81 48118 �3897 Durston ROW 0.68 14592 9923' Total 325008 16I597 C = Weighted C Factor 0a0 A =Area(acres) 7;4b Tc Total (min) _ 23�.' Q =CIA C = Weighted C Factor 0.50 (calculated above) I =0.78 Tc 0.64(in/hr) 1 � ; A =area(acres) : 6 Qrequired (cfs) _ 52 TOTAL 5.24 cfs STORM PIPE MH2toMH1 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: MH#2 to MH#1 PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 14.07 inches Mannings Formula d n= 0.013 mannings D 0= 57.7 degrees Q=(1.486/n)AR "'Svz n S= 0.0082 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rn2i3S112 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.20 3.30 0.36 5.26 6.29 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: MH#2 to MH#1 By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT _ _ D=C15 inches__ _ d= 11.1 inches Mannings Formula d n= 0.013 mannings D 0= 122.6 degrees AR Q=(1.486/n) 213Sv2 n S= 0.0082 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)R,"S'12 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 0.97 2.59 0.38 5.39 5.25 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Conc 0.013 STORM PIPE 1 TO EX MH 1 Contributing Area C Area (ft2) C * Area Composite ROW(interior st) ROW Interior Streets 0.7375 55200 40710 ((0.95*43)+(0.2*17))/60 OS/Park 0.2 3300 , `' 60` 0.7375 Lots 0.35 203798I329 Laurel Pkwy ROW 0.81 48118 --38976 Durston ROW 0.68 1459223 Total 325.608 1615. 7 C =Weighted C Factor 0, A=Area(acres) 7.4i Tc Total (min) Q = CIA C = Weighted C Factor 0.50 (calculated above) I= 0.78 Tc 064(in/hr) A =area(acres) 7x46 Qrequired (efs) _ ",5.10 TOTAL 5.10 efs STORM PIPE MH1toEX1 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: MH#1 to EX#1 PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 14.07 inches Mannings Formula d n= 0.013 mannings D 0= 57.7 degrees AR Q=(1.486/n 2r3Sv2 ) n S= 0.052 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh213Sv2 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.20 3.30 0.36 13.25 15.85 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: MH#1 to EX#1 By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 6.1 inches Mannings Formula d n= 0.013 mannings D 0= 158.5 degrees 0=(1.486/n)ARh213SI12 S= 0.052 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh213SI12 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 0.47 1.73 0.27 10.92 5.12 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Conc 0.013 STORM PIPE EX #1 TO EX#2 Contributing Area C Area(ft2) C * Area Composite ROW(interior st) ROW Interior Streets 0.7375 55200 40710 ((0.95*43)+(0.2*17))/60 OS/Park 0.2 3300 G60 0.7375 Lots 0.35 203798 �`71329 Laurel Pkwy ROW 0.81 48118 3,8976 Durston ROW 0.68 14592 9923 Total 325008 161597i C = Weighted C Factor 050 A=Area(acres) 7.46 Tc Total (min) _ 27;00' Q = CIA C = Weighted C Factor 0,50 (calculated above) 1= 0.78 Tc o.64(ln/hr) 1.30' A =area(acres) 7.46' Qrequired (Cfs) EX. PIPE#5 PER ALLIED 2.95 ORIGINAL STORM DESIGN REPORT (CFS) TOTAL 7.77 cfs STORM PIPE EX1toEX2 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: EX INLET#1 to EX MH#2 PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 14.07 inches Mannings Formula d n= 0.013 mannings D 0= 57.7 degrees Q=(1.486/n)ARh2isSv2 S= 0.028 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh213S112 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.20 3.30 0.36 J--9.72 11.63 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: EX INLET#1 to EX MH#2 By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 9.4 inches Mannings Formula d n= 0.013 mannings D 0= 150.7 degrees Q=(1.486/n)ARh2�35'i2 S= 0.028 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh213S1/2 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 0.81 2.28 0.35 9.58 7.75 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Conc 0.013 STORM PIPE EX#2 TO EX#3 Contributing Area C Area(ft2) C * Area Composite ROW(interior st) ROW Interior Streets 0.7375 55200 40710 ((0.95*43)+(0.2*17))/60 OS/Park 0.2 3300 660 0.7375 Lots 0.35 203798 71329' Laurel Pkwy ROW 0.81 48118 .,38976 Durston ROW 0.68 14592 9923 Total 325008 161597` C = Weighted C Factor 0.s0 A=Area(acres) 7.46 Tc Total (min) _ 27:17 Q = CIA C = Weighted C Factor "0.50 (calculated above) I=0.78 Tc-O 64(in/hr) 130 A=area(acres) 7.46 Qrequired (efs) EX. PIPE 45 PER ALLIED 2.95 ORIGINAL STORM DESIGN REPORT (CFS) EX. PIPE #6 PER ALLIED 7.86 ORIGINAL STORM DESIGN REPORT(CFS) TOTAL 15.61 cfs STORM PIPE EX2toEX3 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: EX MH#2 to EX MH#3 PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT ____ D= 24 inches d= 22.51 inches Mannings Formula d n= 0.013 mannings D 0= 57.7 degrees Q=(1.486 n AR ZisSvz / ) n S= 0.0053 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)R,"S'12 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 3.06 5.28 0.58 J-­;.7;- 17.72 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: EX MH#2 to EX MH#3 By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 24 inches d= 18.6 inches Mannings Formula d n= 0.013 mannings D 0= 113.3 degrees Q=(1.486/n)ARhzr3Sii2 S= 0.0053 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh213SI12 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 2.61 4.31 0.61 5.96 15.58 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Conc 0.013 STORM PIPE EX#3 TO EX #4 Contributing Area C Area(ft2) C * Area Composite ROW(interior st) ROW Interior Streets 0.7375 55200 , 40710 ((0.95*43)+(0.2*17))/60 OS/Park 0.2 8232 "'1646 0.7375 Lots 0.35 203798 =71329 Laurel Pkwy ROW 0.81 48118 ",:389"76 Road 0.95 18787 17848' Durston ROW 0.68 14592 9921` Total 348727 180431 C = Weighted C Factor 052: A =Area(acres) 801 Tc Total (min) _ 27.42 Q = CIA C = Weighted C Factor 0.52 (calculated above) I = 0.78 Tc°.64(in/hr) 4 A=area(acres) 80 Qrequired (cfs) EX. PIPE#5 PER ALLIED 2.95 ORIGINAL STORM DESIGN REPORT (CFS) EX. PIPE#6 PER ALLIED 7.86 ORIGINAL STORM DESIGN REPORT(CFS) TOTAL 16.14 cfs STORM PIPE EX3toEX4 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: EX IN#3 to EX IN#4 PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 8 Cells INPUT ________ D= 24 inches d= 22.51 inches Mannings Formula d n= 0.013 mannings D 0= 57.7 degrees AR / Q=(1.486 n 2isSvz ) n S= 0.011 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rn2'3S12 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 3.06 5.28 0.58 8.34 25.52 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Cone 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: EX IN#3 to EX IN #4 By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 24 inches d= 14.5 inches Mannings Formula d n= 0.013 mannings D 0= 156.0 degrees Q=(1.486/n)AR zi3Sii2 h S= 0.011 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh213SI12 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.98 3.56 0.56 8.12 16.11 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 STORM PIPE EX #4 TO EXISTING DETENTION POND 91 Contributing Area C Area(ft) C * Area Composite ROW (interior st) ROW Interior Streets 0.7375 5520071'0 ((0.95*43)+(0.2*17))/60 OS/Park 0.2 8232 164 0.7375 Lots 0.35 203798 Laurel Pkwy ROW 0.81 481188976' Road 0.95 27995 2659,5,E Durston ROW 0.68 14592 9Q23 Total 357935 1',89179 C = Weighted C Factor 0;5 A= Area(acres) $;22 Tc Total (min) Q = CIA C = Weighted C Factor (calculated above) I= 0.78 Tc o.ba(in/hr) ' A = area(acres) 8:22 Qrequired (Cfs) _ .5'. EX. PIPE#5 PER ALLIED 2.95 ORIGINAL STORM DESIGN REPORT (CFS) EX. PIPE#6 PER ALLIED 7.86 ORIGINAL STORM DESIGN REPORT (CFS) TOTAL 1.6.39 Cfs STORM PIPE EX4toEXDT#1 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: EX IN#4 to EX POND#1 PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 24 inches d= 22.51 inches Mannings Formula d n= 0.013 mannings D 0= 57.7 degrees AR / Q=(1.486 n 2/35112 ) n S= 0.0051 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh21IS11 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 3.06 5.28 0.58 5.68 17.38 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: EX IN#4 to EX POND#1 By: Date: Chk. By: Date: Clear Data Entry A Cells INPUT _____ CD= 24 inches d= 20 inches Mannings Formula d n= 0.013 mannings D 0= 96.4 degrees Q=(1.486 n AR 2rsS�tz / ) h S= 0.0051 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rh21IS112 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 2.80 4.60 0.61 5.86 16.39 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 MANNING'S EQUATION FOR PIPE FLOW Project: Westbrook Location: EX DETENTION POND#1 OUTLET PEAK FLOW By: Date: Chk. By: Date: Clear Data Entry 0 Cells INPUT D= 15 inches d= 14.07 inches Mannings Formula d n= 0.013 mannings Q=(1.486 n AR "'Sv2 D 0= 57.7 degrees / } n S= 0.0379 slope in/in R=A/P A=cross sectional area P=wetted perimeter V=(1.49/n)Rnzi3S1/2 S=slope of channel Q=V X A n=Manning's roughness coefficient Solution to Mannings Equation Manning's n-values Wetted Hydraulic Area,ft2 Perimeter,ft Radius,ft velocity ft/s flow,cfs PVC 0.013 1.20 3.30 0.36 11.31 13.53 PE(<9"dia) 0.015 PE(>12"dia) 0.02 PE(9-12"dia) 0.017 CMP 0.025 ADS N12 0.012 HCMP 0.023 Concl 0.013 RETENTION POND # 2 REQUIRED VOLUME 1. Calculate Area and Weighted C Factor Contributing Area C Area (ft 2) C *Area Road 095 40199 38189 Boulevard 0.2 5972 1194' Total 46171 39363 C=Weighted C Factor 0,85 3. Calculate Required Volume Q = CIA V=7200Q C =Weighted C Factor 0.9& 1 = intensity(inihr) 0.41 (10 yr, 2hr storm) A=Area (acres) Q = runoff(cfs) V= REQUIRED VOL (ft) 2669` DETENTION POND # 3 REQUIRED VOLUME 2. Calculate Area and Weighted C Factor(Post-Development) Contributing Area C Area (ft2) C *Area ROW 0.7375 96751 71354 Open Land 0.2 16603 _3321 Low-Med Residential 0.35 283695 99293 Total 397049 173968 A =Area(acres) 9.1150 C= Weighted C Factor 0.44 3. Calculate TC (Pre-Development) Tc Overland Flow Tc = 1.87 (1.1-CC)D'/2/S'/3 ------------------------------ ;Storm S = Slope of Basin (%) 1 !Return (yrs) Cf C = Rational Method Runoff Coefficient 0.2 12 to 10 1 Cf= Frequency Adjustment Factor 1.1 Ill to 25 1.1 D = Length of Basin (ft) 983 126 to 50 1.2 51 to 100 1.25 Tc(Pre-Development) (minutes) 52 ------------------------------ 4. Calculate Rainfall Intensity(Duration =Pre-Development Tc) i = 0.64x o.se(10-yr Storm, Fig. 1-3, COB Design Standards) x= storm duration (hrs) 0.86 (Tc Pre-Development) i=rainfall intensity(in./hr.) 0.71 5. Calculate Runoff Rate(Pre-Development) Q = CiA C = Rational Method Runoff Coefficient 0.2 (open land) i = rainfall intensity (in./hr.) 0.71 (calculated above) A=Area (acres) 9.11 (calculated above) Q=Runoff Rate (Pre-Development)(cfs) 1.29 6. Calculate Required Pond Volume Total Area (acres) = 9.11 acres Weighted C = 0.44 Discharge Rate (cfs) = 1.29 cfs (Equal to Pre-Development Runoff Rate) Duration(min) Duration(hrs) Intensity Q (cfs) Runoff Release Required '�(in/hr) Volume Volume Storage (ft) 30 0.50 1.00 4.01 7219 2317 4903 31 0.52 0.98 3.93 7303 2394 4909 32 0.53 0.96 3.85 7384 2471 4913 33 0.55 0.94 3.77 7464 2548 4916 34 0.57 0.93 3.70 7543 2625 4917 35 0.58 0.91 3.63 7620 2703 4917 36 0.60 0.89 3.56 7695 2780 4915 37 0.62 0.88 3.50 7769 2857 4912 38 0.63 0.86 3.44 7842 2934 4908 39 0.65 0.85 3.38 7914 3012 4902 OUTLET STRUCTURE SLOT Q=CLH 112 Q = Discharge (cfs) 1.29 C = Weir Coefficient 3.33 (per COB Design Standards) H = Head (ft) 1.5 L = Horizontal Length (ft) 0.21 L =Slot Width (inches) 2.5 EXISTING DETENTION POND #1 REQUIRED VOLUME 2. Calculate Area and Weighted C Factor(Post-Development) Contributing Area C Area (ft 2) C *Area Interior St. ROW 0.7375 55200 40710' Lots 0.35 203798 71329 Laurel Pkwy ROW 0.81 69618 56391 Durston ROW 0.68 14592 9923 Sherwood ROW 0.7625 24300 18529 Road Surface 0.95 27995 26595 Open Space 0.2 8232 1646 EX ST#1 0.5 294780 147390 EX ST#3 0.5 403599 201800 EX ST#4 0.5 58872 29436 Total 1160986 603748 A =Area(acres) 26.6526 C= Weighted C Factor 0.52 3. Calculate T, (Pre-Development) Tc Overland Flow Tc= 1.87 (1.1-CC)D112/S1'3 ,----------------------------- Storm S = Slope of Basin (%) 1 ;Return (yrs) Cf , C = Rational Method Runoff Coefficient 0.2 12 to 10 1 Cf= Frequency Adjustment Factor 1.1 111 to 25 1.1 D = Length of Basin (ft) 1480 126 to 50 1.2 151 to 100 1.25 ----------------------------- Tc(Pre-Development)(minutes) 63' 4. Calculate Rainfall Intensity(Duration =Pre-Development Tc) i = 0.64x o.ss (10-yr Storm, Fig. 1-3, COB Design Standards) x= storm duration (hrs) 1.06 (Tc Pre-Development) i=rainfall intensity(in.1hr.) 0.62' 5. Calculate Runoff Rate(Pre-Development) Q = CiA C = Rational Method Runoff Coefficient 0.2;(open land) i = rainfall intensity(in./hr.) 0.62 (calculated above) A=Area (acres) 26.65'(calculated above) Q=Runoff Rate (Pre-Development) (cfs) 3.29 6. Calculate Required Pond Volume Total Area (acres) = 26.65 acres Weighted C = 0.52 Discharge Rate (cfs) = 3.29 cfs (Equal to Pre-Development Runoff Rate) Intensity Q. Runoff Release Required Duration(min) Duration(hrs) (in/hr) i (cfs)n Volume Volume Storage(ft) 50 0.83 0.72 9.99 29960 9884 20076 51 0.85 0.71 9.86 30168 10081 20087 52 0.87 0.70 9.74 30374 10279 20095 53 0,88 0.69 9.62 30577 10477 20100 54 0.90 0.69 9.50 30778 10674 20103 55 0.92 0,68 9.39 30976 10872 20104 56 0.93 0.67 9.28 31172 11070 20102 57 0.95 0.66 9.17 31366 11268 20098 58 0.97 0.65 9.07 31557 11465 20092 59 0.98 0.65 8.97 31746 11663 20084 OUTLET STRUCTURE SLOT Q=CLH 112 Q = Discharge (cfs) 3.29 C =Weir Coefficient 3.33 (per COB Design Standards) H = Head (ft) 1.5 L= Horizontal Length (ft) 0.54 L =Slot Width(inches) 6.5