INTRODUCTION
The Cornerstone Condos Site Plan project proposes to develop the northern half of Lot 1, Block
17 of Cattail Creek Subdivision Phase 2B into one 3-plex and one 4-plex condominium building.
The property is located in the City of Bozeman and is zoned as R-3. A combination of site
grading, curb and gutter, and the proposed retention pond will be used to manage stormwater
runoff on the site. Supporting stormwater calculations are enclosed herein for reference.
CATTAIL CREEK SUBDIVISION, PHASE 2B — STORMWATER BACKGROUND
INFORMATION
Cattail Creek Subdivision Phase 2B included the construction of regional detention ponds that
handle the entire Phase 2B runoff by curb and gutter and underground stormwater infrastructure
designed by TD&H, Inc. Lot 7, Block 17 was assigned a Rational Method Runoff Coefficient of
0.40 per Bozeman Design Standards and Specifications Policy (DSSP) in that original design. A
Runoff Coefficient of 0.40 is an inadequate estimation for the proposed development of this lot.
The actual Runoff Coefficient for the proposed Cornerstone Condos on Lot 1, Block 3 is 0.85 (See
enclosed calculations). This original underestimation of the future development of this lot means
that the regional detention ponds for Phase 2B are inadequate to handle the entire runoff
contribution of Lot 7, Block 17 as proposed.
LOT 1, BLOCK 17 STORMWATER DESIGN
The footprint of the proposed development for Cornerstone Condos site (on the northern portion
of the lot) consisted of approximately 0.22 acres. For a 10-year, 2-hour storm a total of 559 cubic
feet (cf) of stormwater will be generated at the site using the weighed coefficient of 0.85.
However,a total of 265 cf is allowed to be discharged from the site using the subdivision weighted
coefficient of 0.40. This means that 294 cf of stormwater will need to be retained on the site. The
proposed retention pond in the northern portion of the property is designed to have a volume of
294.73 cf. This retention pond is designed to be 1.5 feet deep with 4:1 side slopes per Bozeman
Design Standards and is adequately sized to retain the stormwater.
DRAINAGE AREAS
The proposed development consists of four drainage areas, which are shown on the drainage area
exhibit included in this application. the allowable off-site drainage will come from drainage area
1. This area consists of the western portion of the site along Fen Way as well as the northern
portion. Drainage area 1 is the only portion of the site that will discharge stormwater off site
within the allowable amount to be discharged to the Cattail Creek Subdivision,which is 265 cubic
feet.
The central portion of the site consisting of drainage areas 2 and 3, will be served by the proposed
retention pond. This stormwater will flow toward the central valley gutter and continue
northward into the retention pond. A curb cut has been proposed at the southern portion of the
retention pond so that stormwater and flow easily from the valley gutter into the pond. All runoff
within drainage areas 2 and 3 will be retained on site.
The eastern portion off the site consists of drainage area 4, which stormwater runoff will flow
eastward and be retained on site with an earthen berm. This berm will direct stormwater into the
proposed drywell. All runoff within drainage area 4 will be retained on site.
RETENTION POND
Stormwater Design Calculations
Calculate required volume Hardscape 8405
Q=CiA Landscape 1332
V=7200Q
Drainage Area Area(acre) C FACTOR
Hardscape 0.19 0.95
Landscape 0.03 0.20
Total 0.22
Weighted C= 0.85
Retention Pond Summary(ALL STORMWATER GENERATED ON SITE
Total Area= 0.22 acres
Weighted C= 0.85
Rainfall intensity= 0.41 in./hr. (C.O.B Design Standards 10-yr,2-hr storm)
Runoff, Q= 0.08 cfs
Volume,V= 559 ftj 20.70995715 yards
Pond#1 Volume= 10.9 ft
Proportion of allowable l 0.4 Alternative C from TD and H stormwater report
Retention Pond Summary(VOLUME OF STORMWATER ALLOWED TO BE DISCARGED OFF SITE INTO SUBD.)
Total Area= 0.22 acres
Weighted C= 0.40
Rainfall intensity= 0.41 in./hr. (C.O.B Design Standards 10-yr,2-hr storm)
Runoff, Q= 0.04 cfs
Volume,V= 265 ft 9.814814815 yards
Pond#1 Volume= 10.9 ft
j �d
TOTAL VOLUME TO BE RETAINED ON SITE 1 294 ft
EXHIBIT C
STORMWATER MAINTENANCE PLAN FOR CORNERSTONE CONDOMINIUM
I. Storm Water Facilities(Components):
1. Retention Ponds collect storm water runoff and store the water until it evaporates and/or
infiltrates into the ground.
2. Drywells are underground storm water collection facilities that collect and temporarily
store runoff from roof tops before allowing storm water to slowly infiltrate into the
ground.
H. Post Construction Inspection Obligations of Successor Declarant or its assigns when
Constructing Additional Units within Cornerstone Condominium:
1. Observe drain time in retention ponds for a storm event after completion of the facility to
confirm that the desired drain time has been obtained. If excessively slow infiltration
rates are observed then,Declarant shall excavate a minimum 5 ft by 5 ft drain to native
well-draining material and backfill with well-draining material(pit-run).
2. Observe that drywells are clear of any material or obstructions in the drainage slots.
Inspect these structures to insure proper drainage following a storm event. Immediately
identify and remove objects responsible for clogging if not draining properly.
III. Semi-Annual Inspection by Cornerstone Condominium Owners Association After
Issuance of Certificates of Occupancy for Additional Units within Cornerstone
Condominium:
1. Check retention ponds and dry wells three days following a storm event exceeding'/a
inch of precipitation.
2. Check for grass clippings,litter,and debris in dry well and retention pond.The
Cornerstone Condominium Owners Association shall flush and/or vacuum drywells or
storm water pipes if excessive material is observed in the facilities.
IV. Standard Maintenance by Cornerstone Condominium Owners Association After
Issuance of Certificates of Occupancy for Additional Units within Cornerstone
Condominium:
1. Remove sediment and oil/grease from retention pond.
2. Inspect and remove debris
3. Monitor health of vegetation and revegetate as necessary to maintain full vegetative
cover.
4. Inspect for the following issues: differential accumulation of sediment,drain time,signs of
petroleum hydrocarbon contamination (odors, oil sheen in pond water), standing water,
trash and debris.
5. Sediment accumulation: In most cases, sediment from a retention pond does not contain
toxins at levels posing a hazardous concern. However, sediments should be tested for
toxicants in compliance with current disposal requirements and if visual or olfactory
indications of pollution are noticed. Sediments containing high levels of pollutants should
be disposed of in accordance with applicable regulations and the potential sources of
contamination should be investigated and contamination practices terminated.
ACCEPTED BY CORNERSTONE CONDOMINIUM OWNERS ASSOCIATION,INC.,by
I�v Brent Nagy prAsident
August 28, 2017
`fi e Treasurer August 28, 2017
i
INSTALL CONCRETE
STORM DRAINAGE
OUTLET PER COB STD. [S89-46'08"E]
DWG. NO 02529-14 184.95 090.13'52" INSTALL CURB CUT a o Sheet 1 of 1
92.6 Ark
95.00
III II X St II IjI IIII
Nm92iI 23 t� I
s w01
N
.6 2:� r ——————— ——————— —
S (94.6 4.59
4.
S (95.5 4.82) �
S — t(E. 557, 'o
N
I mgq m 04. 7% EDa9.65 94.93)95.5 5.75) 8.29%
I95.04) (94.96 4.1
I /L�jj
`LL
dy�
I I i
I
/ C. I 3.29% 9
94.0� ; D A 1 D A 2 i 94 83) A 3 4
4.09 I .90% m
I I �
95.30)
9 5.39) ---
z
�
5% I
ip 0)
88� o
7 )c.o. 55
1 94 5.52)
Z gg5
W ON
6.13 ap z ol�
ooP�
[�
� - -- :96.74 3
08
r-rn
v N
O V
IW u
d'
N
c.o. 4"S 4"SS 4"SS c.o. .o.
m
3
11 Drnwing Date: 8/10/17
Scale In Feet 1 r-
20 0 60
6 0 6 1 DRAINAGE AREA EXHIBIT ElmO
Scale In Meters
E1 .0 SCALE: 1 "=20'
#170220