HomeMy WebLinkAbout10 - Design Report - Safeway - Storm Storm Drainage Report Safeway Site Plan September 6, 2010 1 Introduction This summary report provides hydrologic and hydraulic calculations for sizing of storm drainage facilities for development of the Safeway site, in accordance with the City of Bozeman Design Standards. The site is an existing, abandoned retail/automotive development located at the northeast corner of 1 9th Avenue and Main Street. Pre-development topography is about 1.5 to 3 percent, sloping west, north and east away from the existing buildings. Existing ground cover is almost entirely asphalt, concrete and buildings. 2 Approach Pre-development sub-basins H1 through H4 (see Figure 1) correspond to developed sub-basins D1 through D4 (see Figure 2). Developed sub-basins H1 and H2 currently drain to South 1 g1h Avenue, and sub-basins H3 and H4 currently drain to an existing irrigation ditch located along the site's east property line. In accordance with City of Bozeman standards, post-development peak runoff from the 1 0-year storm event will be limited to pre-development rates. This criteria will be applied separately to basin H1/H2 (runoff to South 1 9th Avenue) and basin H3/H4 (runoff to the irrigation ditch). Post-development peak flows and runoff volumes were estimated using the Rational Method. Design details will be provided on the construction drawings. 3 Summary Pre- and post-development I 0-year peak runoff rates are summarized as follows. Flow rates are in cubic feet per second (cfs). Runoff to South I 9th Avenue: Runoff to Irrigation Ditch: Pre-development: Pre-development: H1 = 7.37 H3 = 3.34 H2 = 0.19 H4 = 6.15 Total = 7.56 Total = 9_49 Post-development: Post-development: D1A = 1.62 D3 = 0.19 D1B = 5.61 D413 = 7.10 D2 = 0.33 Total = —7.24 Total = 7.56 3 Detention/Retention A small detention basin will be provided west of the retail building in sub-basin D1 B (see Figure 2). The detention basin will reduce 10-year runoff to the required maximum peak rate. Due to the small reduction in peak runoff rate, the required detention volume is only 280 cubic feet. Basin discharge will be through an 18" RCP culvert, with no orifice required. N:\4660\001\Reports\Drainage\drainage report.doc 1. Record Id: HI �VDesi n Method r Rational IDF Table . ...,g i.. ..__ .. . _ Composite C Cale _ _ _. __ Descri tion ` SubArea ISub c Composite C landscape areas 0 _ 38 ac 0 30 0.82 _. avement and roofs 2.66 ac 0 90 .............. I. Directly Connected TC Cale —Type Description gth Slope Coeff Misc TT Len Sheet ;paved surfaces 90 00 ft 4 40% ,0 0120 1 20 m 1 42 min ; . _._ . �. _ -: fl Shallow paved surfaces 140 00 ft ,2.60% 0.0120 F 0 54 min Channel mterm rconcrete valley utter 280 00 ft 0 40/0 0.0120 1 74 min Channel mterm ;grass Swale 230 00 ft 1.30% 0.0300 1 98 min l. . .__._ .. c �. L- -�-^( -1- Directly Connected TC 5.68rnin 2. Record Id: II2 .......................... Design Method F— Rational 7 DF Table: Composite C Cale Description SubArea Sub c Composite C _. landscape areas 0 02 ac 0.30 0.75 i pavement and roofs jF9.96 ac 0 90 j Directly Connected TC Cale Type Dc ;j Le h Slope Coeff Misc TT esrition } I_.a....__ . _. ._. .._......_. ,._P._. _ Sheet jpayed surfaces 14 00 ft 25 0000% 0 0120 F1.200 in 0 16 mm Shallow paved surfaces �22.00 ft 2 00% 0.0120 `0 10 min IDirectly Connected TC 0.26min 3. Record Id: II3 Design Method Rational IDF Table Composite C Calc Description ; SubArea Sub c Composite C landscape areas 0.03 ac 0 30 0.88 pavement and roofs 1.15 ac 10.90 Directly Connected TC .. Calc....... lop � TTType Description Se th Sheet aved surfaces 26 00 ft 25 00% 0 0120 � 1.20 in 0.26 min gip_.. .. . .; ._.. ._._..__ � .....__ : Shallow paved surfaces 1240.00 ft 2 20% 0 0120 ? 1.01 min ff Directly Connected TC 1 27mm 4. Record Id: H4 Design Method Rational IDF Table: ,F— Composite C Calc Description SubArea Sub c Composite C landscape areas 0.34 ac 0 30 ' 0.81 ... __ . pavement and roofs ;2.02 ac 0.90 _._...... ......................... Directly Connected TC Calc escri .t.i.o_n TT engthTyPe +' Sheet paved surfaces 170.00 ft 5 70% 0.0120 1.20 in 1.05 min [Shallow t paved surfaces 170.00 ft 1 $0% 0 0120 0.79 min Channel (mterm) irrigation ditch 1480.00 ft 1 00% 0 0300 4.71 min Directly Connected TC F6.SSmin 5. Record Id: DIA Design Method Rational F Table. ...... . Composite C Cale Deser J§ubArea Sub c Composite C landscape areas 0.09 ac 0 30 0.81 __. _ pavement and roofs 0 53 ac 0 90 Directly Connected TC Cale �— Type Description Length Slope Coeff Misc TT Sheet paved surfaces 70 00 ft 2 20% OA120 1.20 in 1 54 rnm Channel mterm concrete gutter 260 00 ft L50% 0.0120 0.83 min _ . Directly Connected TC 6. Record Id: D1D Design Method Rational IDF Table Composite C Calc �Descnption SubArea Sub c Composite C �_.._.. ilanddssca a areas ;0.69 ac 0.30 0.76 liavement and roofs 2.22 ac 0.90 .... _ .. _ Directly Connected TC Cale i __ .. . I Type Description Length Slope Coeff Misc TT } r - r Sheet Ipaved surfaces 70 00 ft 3.70% 0.0120 11 25 min Shallow aved surfaces 120 00 ft 3 30% 0.4120 0 41 mm Channel (mtenn) concrete gutter 130 00 ft 0 70% 0.0120 �— 0 61 min ` Channel (interm) `Concrete pipe 200.04 ft 0.50% 0.0120 1.11 min Directly Connected TC -T-3.381] min 7. Record Id: D2 Design Method Rational IDF Table Composite C Calc Description SubArea Sub c ;Composite C _. _ _. . landscape areas [0.04 ac 0.30 0.73 pavement and roofs 0 10 ac 0 90 Directly Connected TC Calc .IFType F Description Length Slope Coeff 1Vlisc I TT Sheet paved surfaces 85 00 ft 3A0% 0 0120 v 1 20 in 1 58 min Directly Connected TC 1 58min 8. Record Id: D3 Design Method, _.... Rational^ IDF Table.. Composite CI-Calc Description SubArea Sub c Composite C .... _ _ landscape areas 0.16 ac 0.30 0.34 spa ent and roofs 0.01 ac 0 90 --- . I ..._...... . Directly Connected TC Calc Description Length Slope Coeff 1Vlisc TT Sheet rass surfaces 35 00 ft 5.70/a 0.0300 1.20 in 1.25 min 1.25mm Directly Connected TC 9. Record Id: D4 Design Method Rational j IDF Table: Composite C Calc Description A SubArea Sub c Composite C I landscape areas 0.56 ac 0.30 0.78 ipavement and roofs i2.2 ac — 0.90 -- j Directly Connected TC Calc Type F Description � I.en th �S—slope I Coeff Misc � TT _ g I P , Sheet paved surfaces 170.00 ft 2.00% 0.0120 1 1.20 in 3.24 min —� 1 hannel Onterm) —Concrete pipe 350.00 ft �l 00% 0.0120 F 1.37 min I I Directly Connected TC 4.62min Licensed to: Morrison Maierle Inc NA4660\001\Reports\Drainage\StormShed\coeff and Tc calcs.dou Safeway Site Flan Sub-Basin # MMI#: 4660.001.010.000318 DATE: 9/6/10 ENGINEER: Mike Hickman MODIFIED RATIONAL METHOD Q9=CiA PRE-DEVELOPMENT,BASIN 111 RAINFALL FREQ= 10 yr, I hr. BASIN AREA PRE= 3.04 acres STORM EVENT STORM i COEFF INTENSITY YR A B INfHR PRE-DEV Tc= 5.7 min. 2 0.36 -0.60 1.48 5 0.52 -0.64 2.35 PRE-DEV C= 0.82 10 0.64 -0.65 2.96 25 0.78 -0.64 3.52 STORM A= 0.64 50 0.92 -0.66 4.35 B = -0.65 100 1.01 -0.67 4.89 STORM INTENSITY= 2.96 IN/HR (Source: City of Bozeman Design Standards,March 2004) PRE-DEV Qp = 7.37 CFS N:\4660\001\Reports\Drainage\sub-basin#1.xlsx Safeway Site Plan Sub-Basin #1 MODIFIED RATIONAL METHOD Qp=CiA POST-DEVELOPMENT,BASIN D1A BASIN AREA POST= 0.b2__, ,AC POST-DEV Tc= 5.0 MIN POST-DEV C= 0.81 STORM INTENSITY= 3.22 IN/HR POST-DEV Qp= 1.62 CFS POST-DEVELOPMENT,BASIN D1B PRE-DEVEL. BASIN AREA POST= ,2,91 AC Qp(Basin H1) = 7.37 cfs POST-DEV Tc= 5.0 MIN MATCHING Qp 5.61 cfs POST-DEV C= 0.76 STORM INTENSITY= 3.22 IN/HR TIME STEP POST-DEV Qp= 7.12 CFS DURATION= 0.5 min. T is 3 ?3' A POND VOLUME CALCULATIONS: Triangle Release Constant Release DURATION INTENSITY Qp POND VOLUME POND VOLUME (MIN) (IN/HR) (CFS) (CF) (CF) 3.00 4.49 9.92 439.38 44.66 3.50 4.06 8.98 454.23 75.65 4.00 3.72 8.23 460.25 92.92 4.50 3.45 7.62 459.22 99.03 5.00 3.22 7.12 452.38 95.84 5.50 3.03 6.69 440.67 84.75 6.00 2.86 6.32 424.79 66.83 6.50 2.71 6.00 405.30 42.95 7.00 2.59 5.72 382.66 13.79 7.50 2.47 5.47 357.23 -20.08 8.00 2.37 5.24 329.30 -58.19 8.50 2.28 5.04 299.13 -100.15 9.00 2.20 4.86 266.94 -145.61 9.50 2.12 4.69 232.90 -194.27 10.00 2.05 4.54 197.17 -245.89 10.50 1.99 4.39 159.90 -300.25 11.00 1.93 4.26 121.20 -357.15 11.50 1.87 4.14 81.17 416.41 12.00 1.82 4.03 39.91 477.88 12.50 1.77 3.92 -2.49 -541.42 13.00 1.73 3.82 45.97 -606.91 13.50 1.69 3.73 -90.45 -674.24 14.00 1.65 3.65 -135.87 -743.30 Safeway Site Plan Peak Flows for 5-yr and 100-yr Storms Sub-Basin D1A MODIFIED RATIONAL METHOD Qp=CiA POST-DEVELOPMENT,25-YEAR PEAK RUNOFF: RAINFALL FREQ= 25 yr, I hr. i=A*(Tc/60)B BASIN AREA POST= 0.62 acres STORM EVENT STORM i COEFF INTENSITY YR A B IN/HR POST-DEV Tc= 5.0 min. 2 0.36 -0.60 1.60 5 0.52 -0.64 2.55 POST-DEV C= 0.81 10 0.64 -0.65 3.22 25 0.78 -0.64 3.83 STORM A= 0.78 50 0.92 -0.66 4.74 B= -0.64 100 1.01 -0.67 5.34 STORM INTENSITY= 3.83 INIHR (Source: City of Bozeman Design Standards,March 2004) POST-DEV Qp= 1.92 CFS POST-DEVELOPMENT, 100-YEAR PEAK RUNOFF: RAINFALL FREQ= 100 yr, I hr. i=A*(Tc/60)B BASIN AREA POST= 0.62 acres STORM EVENT STORM i COEFF INTENSITY YR A B IN/HR POST-DEV Tc= 5.0 min. 2 0.36 -0.60 1.60 5 0.52 -0.64 2.55 POST-DEV C= 0.81 10 0.64 -0.65 3.22 25 0.78 -0.64 3.83 STORM A= 1.01 50 0.92 -0.66 4.74 B= -0.67 100 1.01 -0.67 5.34 STORM INTENSITY= 5.34 INIB R (Source: City of Bozeman Design Standards,March 2004) POST-DEV Qp= 2.68 CFS Safeway Site Plan Peak Flows for 25-yr and 100-yr Storms Sub-Basin D1B MODIFIED RATIONAL METHOD QP=CiA POST-DEVELOPMENT,25-YEAR PEAK RUNOFF: RAINFALL FREQ= 25 yr, 1 hr. BASIN AREA POST= 2.91 acres STORM EVENT STORM i COEFF INTENSITY YR A I B IN/HR POST-DEV Tc= 5.0 min. 2 0.36 -0.60 1.60 5 0.52 -0.64 2.55 POST-DEV C= 0.76 10 0.64 -0.65 3.22 25 0.78 -0.64 3.83 STORM A= 0.78 50 0.92 -0.66 4.74 B= -0.64 100 1.01 -0.67 5.34 STORM INTENSITY= 3.83 INM (Source: City of Bozeman Design Standards,March 2004) POST-DEV Qp= 5.46 CFS POST-DEVELOPMENT, 100-YEAR PEAK RUNOFF: RAINFALL FREQ= 100 yr, 1 hr. i=A *(Tc/60)s BASIN AREA POST= 2.91 acres STORM EVENT STORM i COEFF INTENSITY YR A B IN/HR POST-DEV Tc= 5.0 min. 2 0.36 -0.60 1.60 5 0.52 -0.64 2.55 POST-DEV C= 0.76 10 0.64 -0.65 3.22 25 0.78 -0.64 3.83 STORM A= 1.01 50 0.92 -0.66 4.74 B= -0.67 100 1.01 -0.67 5.34 STORM INTENSITY= 5.34 IN/FIR (Source: City of Bozeman Design Standards,March 2004) POST-DEV Qp= 11.81 CFS Culvert Calculator Report Pond 1 outlet pipe (10-yr) Solve For:Headwater Elevation Culvert Summary Allowable HW Elevation 94.30 ft Headwater Depth/Height 0.93 Computed Headwater Elevi 93.79 ft Discharge 5.61 cfs Inlet Control HW Elev. 93.76 ft Tailwater Elevation 93.20 ft Outlet Control HW Elev. 93.79 ft Control Type Outlet Control Grades Upstream Invert 92.40 ft Downstream Invert 92.20 ft Length 40.00 ft Constructed Slope 0.5000 % Hydraulic Profile Profile M1 Depth,Downstream 1.00 ft Slope Type Mild Normal Depth 0.97 ft Flow Regime Subcritical Critical Depth 0.91 ft Velocity Downstream 4.48 ft/s Critical Slope 0.6040 % Section Section Shape Circular Mannings Coefficient 0.013 Section Material Concrete Span 1.50 ft Section Size 18 inch Rise 1.50 ft Number Sections 1 Outlet Control Properties Outlet Control HW Elev. 93.79 ft Upstream Velocity Head 0.33 ft Ke 0.20 Entrance Loss 0.07 ft Inlet Control Properties Inlet Control HW Elev. 93.76 ft Flow Control N/A Inlet Type Groove end projecting Area Full 1.8 ft2 K 0.00450 HDS 5 Chart 1 M 2.00000 HDS 5 Scale 3 C 0.03170 Equation Form 1 Y 0.69000 Title:Safeway Project Engineer:mhickman n:\4660\001\reports\drainage\pipes.cvm CulvertMasterv3.3[03.03.00.04) 09/08/10 03:09:585'Erentley Systems, Inc. Haestad Methods Solution Center Watertown,CT 06795 USA +1-203-755-1666 Page 1 of 1 Culvert Calculator Report Pond 1 outlet pipe (25-yr) Solve For:Headwater Elevation Culvert Summary Allowable HW Elevation 94.30 ft Headwater Depth/Height 1.21 Computed Headwater Elev; 94.21 ft Discharge 8.46 cfs Inlet Control HW Elev. 94.16 ft Tailwater Elevation 93.20 ft Outlet Control HW Elev. 94.21 ft Control Type Outlet Control Grades Upstream Invert 92.40 ft Downstream Invert 92.20 ft Length 40.00 ft Constructed Slope 0.5000 % Hydraulic Profile Profile M2 Depth,Downstream 1.13 ft Slope Type Mild Normal Depth N/A ft Flow Regime Subcriticai Critical Depth 1A3 ft Velocity Downstream 5.94 ft/s Critical Slope 0.7775 % Section Section Shape Circular Mannings Coefficient 0.013 Section Material Concrete Span 1.50 ft Section Size 18 inch Rise 1.50 ft Number Sections 1 Outlet Control Properties Outlet Control HW Elev. 94.21 ft Upstream Velocity Head 0.41 ft Ke 0.20 Entrance Loss 0.08 ft Inlet Control Properties Inlet Control HW Elev. 94.16 ft Flow Control Transition Inlet Type Groove end projecting Area Full 1.8 ft' K 0.00450 HDS 5 Chart 1 M 2,00000 HDS 5 Scale 3 C 0.03170 Equation Form 1 Y 0.69000 Title:Safeway Project Engineer:mhickman n:\4660\001\reports\drainage\pipes.cvm Morrison Maierle CulvertMaster v3.2[03.02.00.01] 09/06/10 04:06:31WUentley Systems, Inc. Haestad Methods Solution Center Watertown,CT 06795 USA +1-203-755-1666 Page 1 of 1 Safeway Site Plan Sub-Basin #D1B Storm Drain MODIFIED RATIONAL METHOD Qp=C i A RASIN TO PIPE DIB-1,25-YEAR PEAK RUNOFF: RAINFALL FREQ= 25 yr, I hr. i=A (Tc/60)B J BASIN AREA= 2.33 acres STORM EVENTM i COEFF INTENSITY (YR A B IN/HR) PRE-DEV Tc= 5.0 min. 2 0.36 -0.60 1.60 5 0.52 -0.64 2.55 PRE-DEV C= 0.75 10 0.64 -0.65 3.22 25 0.78 -0.64 3.83 STORM A= 0.78 50 0.92 -0.66 4.74 B= -0.64 100 1.01 -0.67 5.34 STORM INTENSITY= 3.83 IN/HR (Source: City of Bozeman Design Standards,March 2004) Qp = 6.69 CFS BASIN TO PIPE DIB-2,25-YEAR PEAK RUNOFF: BASIN AREA POST= AC POST-DEV Tc= 5.0 MIN POST-DEV C= 0.93 STORM INTENSITY= 3.83 IN/HR POST-DEV Qp = 2.42 CFS BASIN TO PIPE D111-3,25-YEAR PEAK RUNOFF: BASIN AREA POST=i AC POST-DEVTc= 5.0 MIN POST-DEV C= 0.72 STORM INTENSITY= 3.83 IN/HR POST-DEVQp = 4.55 CFS N:\4660\001\Reports\Drainage\sub-basin#DIB storm drain.x1sx Culvert Calculator Report 12" storm drain ®1B-1 Solve For:Headwater Elevation Culvert Summary Allowable HW Elevation 94.50 ft Headwater Depth/Height 1.06 Computed Headwater Elev, 94.50 ft Discharge 6.69 cfs Inlet Control HW Elev. 94.41 ft Tailwater Elevation 93.80 ft Outlet Control HW Elev. 94.50 ft Control Type Outlet Control Grades Upstream Invert 92.90 ft Downstream Invert 92.50 ft Length 100.00 ft Constructed Slope 0.4000 % Hydraulic Profile Profile M1 Depth,Downstream 1.30 ft Slope Type Mild Normal Depth 1.24 ft Flow Regime Subcritical Critical Depth 1.00 ft Velocity Downstream 4.11 ft/s Critical Slope 0.6588 % Section Section Shape Circular Mannings Coefficient 0.013 Section Material Concrete Span 1.50 ft Section Size 18 inch Rise 1.50 ft Number Sections 1 Outlet Control Properties Outlet Control HW Elev. 94.50 ft Upstream Velocity Head 0.27 ft Ke 0.20 Entrance Loss 0.05 ft Inlet Control Properties Inlet Control HW Elev. 94.41 ft Flow Control Unsubmerged Inlet Type Groove end projecting Area Full 1.8 ftz K 0.00450 HDS 5 Chart 1 M 2.00000 HDS 5 Scale 3 C 0.03170 Equation Form 1 Y 0.69000 Title:Safeway Project Engineer: mhickman n:\4660\001\reports\drainage\pipes.cvm Morrison Malerle CulvertMaster v3.2[03.02.00.01j 09/06/10 04:10:47®Blentley Systems, Inc. Haestad Methods Solution Center Watertown,CT 06795 USA +1-203-755-1666 Page 1 of 1 Culvert Calculator Report 12" storm drain ®1 -2 Solve For:Headwater Elevation Culvert Summary Allowable HW Elevation 94.80 ft Headwater Depth/Height 1.72 Computed Headwater Elevi 94.72 ft Discharge 2.42 cfs Inlet Control HW Elev. 94.50 ft Tailwater Elevation 94.50 ft Outlet Control HW Elev. 94.72 ft Control Type Outlet Control Grades Upstream Invert 93.00 ft Downstream Invert 92.90 ft Length 10.00 ft Constructed Slope 1.0000 % Hydraulic Profile Profile PressureProfile Depth, Downstream 1.60 ft Slope Type N/A Normal Depth 0.60 ft Flow Regime N/A Critical Depth 0.67 ft Velocity Downstream 3.08 ft/s Critical Slope 0.7528 % Section Section Shape Circular Mannings Coefficient 0.013 Section Material Concrete Span 1.00 ft Section Size 12 inch Rise 1.00 ft Number Sections 1 Outlet Control Properties Outlet Control HW Elev. 94.72 ft Upstream Velocity Head 0.15 ft Ke 0.20 Entrance Loss 0.03 ft Inlet Control Properties Inlet Control HW Elev. 94.50 ft Flow Control Unsubmerged Inlet Type Groove end projecting Area Full 0.8 ft2 K 0.00450 HDS 5 Chart 1 M 2.00000 HDS 5 Scale 3 C 0.03170 Equation Form 1 Y 0.69000 Title:Safeway Project Engineer:mhickman n:\4660\001\reports\drainage\pipes.cvm Morrison Maierle CulvertMaster v3.2[03.02.00.01) 09/06/10 04:10:58W&bntley Systems,Inc. Haestad Methods Solution Center Watertown,CT D6795 USA +1-203-755-1666 Page 1 of 1 Culvert Calculator Report 12" storm drain ®1 -3 Solve For:Headwater Elevation Culvert Summary Allowable HW Elevation 96.10 ft Headwater Depth/Height 1.43 Computed Headwater Elevt 95.29 ft Discharge 4.55 cfs Inlet Control HW Elev. 94.82 ft Tailwater Elevation 94.50 ft Outlet Control HW Elev. 95.29 ft Control Type Outlet Control Grades Upstream Invert 93.50 ft Downstream Invert 92.90 ft Length 108.00 ft Constructed Slope 0.5556 % Hydraulic Profile Profile PressureProfile Depth,Downstream 1.60 ft Slope Type N/A Normal Depth 0.97 ft Flow Regime N/A Critical Depth 0.86 ft Velocity Downstream 3.71 ft/s Critical Slope 0.7304 % Section Section Shape Circular Mannings Coefficient 0.013 Section Material Concrete Span 1,25 ft Section Size 15 inch Rise 1.25 ft Number Sections 1 Outlet Control Properties Outlet Control HW Elev. 95.29 ft Upstream Velocity Head 0.21 ft Ke 0.20 Entrance Loss 0.04 ft Inlet Control Properties Inlet Control HW Elev. 94.82 ft Flow Control Unsubmerged Inlet Type Groove end projecting Area Full 1.2 ft' K 0.00450 HDS 5 Chart 1 M 2.00000 HDS 5 Scale 3 C 0.03170 Equation Form 1 Y 0.69000 Title:Safeway Project Engineer:mhickman n:\4660\001\reports\drainage\pipes.cvm Morrison Maierle CuivertMaster v3.2[03.02.00.01) 09/06/10 04:11:09Vffentley Systems, Inc. Haestad Methods Solution Center Watertown,CT 06795 USA +1-203-755-1666 Page 1 of 1 Safeway Site Plan Sub-Basin #2 MMI#: 4660.001-010-000318 DATE: 9/6/10 ENGINEER: Mike Hickman MODIFIED RATIONAL METHOD Qp CiA PRE-DEVELOPMENT, BASIN H2 RAINFALL FREQ= 10 yr, I hr. BASIN AREA PRE= 0.08 acres STORM EVENT STORM i COEFH INTENSITY (YR A B (IN/HR) PRE-DEV Tc= 5.0 min. 2 0.36 -0.60 1.60 5 0.52 -0.64 155 PRE-DEV C= 0.75 10 0.64 -0.65 3.22 25 0.78 -0.64 3.83 STORM A= 0.64 50 0.92 -0.66 4.74 B = -0.65 100 1.01 -0.67 5.34 STORM INTENSITY= 3,22 IN/HR (Source: City of Bozeman Design Standards,March 2004) PRE-DEV Qp= 0.19 CFS POST-DEVELOPMENT, BASIN D2 BASIN AREA POST 0.14 AC POST-DEV Tc= 5.0 MIN POST-DEV C= 0.73 STORM INTENSITY= ').22 IN/HR POST-DEV Qp = 0.33 CFS N:\4660\001\Reports\Drainage\sub-basin#2.xlsx Safeway Site Plan Sub-Basin D2, Peak Flows for 25-yr and 10-yr Storms MODIFIED RATIONAL METHOD Qp=CiA POST-DEVELOPMENT,BASIN D2,25-YEAR PEAK RUNOFF: RAINFALL FREQ= 25 yr, 1 hr. BASIN AREA POST= 0.14 acres STORM EVENT STORM i COEFF INTENSITY YR A B IN/HR POST-DEV Tc= 5.0 min. 2 0.36 -0.60 1.60 5 0.52 -0.64 2.55 POST-DEV C= 0.73 10 0.64 -0.65 3.22 25 0.78 -0.64 3.83 STORM A= 0.78 50 0.92 -0.66 4.74 B= -0.64 100 1.01 -0.67 5.34 STORM INTENSITY= 3.83 IN/HR (Source: City of Bozeman Design Standards,March 2004) POST-DEV Qp= 0.39 CFS POST-DEVELOPMENT,BASIN D2, 100-YEAR PEAK RUNOFF: RAINFALL FREQ= 100 yr, 1 hr. i=A*(Tcl60)s BASIN AREA POST= 0.14 acres STORM EVENT STORM i COEFF INTENSITY YR FA B IN&IR POST-DEV Tc= 5.0 min. 2 0.36 -0.60 1.60 5 0.52 -0.64 2.55 POST-DEV C= 0.73 10 0.64 -0.65 3.22 25 0.78 -0.64 3.83 STORM A= 1.01 50 0.92 -0.66 4.74 B= -0.67 100 1.01 -0.67 5.34 STORM INTENSITY= 5.34 INIHR (Source: City of Bozeman Design Standards,March 2004) POST-DEV Qp= 0.55 CFS Safeway Site Plan Sub-Basin #3 MMI#: 4660.001-010-000318 DATE: 9/6/10 ENGINEER: Mike Hickman MODIFIED RATIONAL METHOD QP CiA PRE-DEVELOPMENT, BASIN H3 RAINFALL FREQ= 10 yr, I hr. BASIN AREA PRE= 1.18 acres STORM EVENT STORM INTENSITY- (YR) A B IN/HR) PRE-DEV Tc= 5.0 min. 2 0.36 -0.60 1.60 5 0.52 -0.64 2.55 PRE-DEV C= 0.88 10 0.64 -0.65 3.22 25 0.78 -0.64 3.83 STORM A= 0.64 50 0.92 -0.66 4.74 B = -0.65 100 1.01 -0.67 5.34 STORM INTENSITY= 3.22 IN/HR (Source: City of Bozeman Design Standards,March 2004) PRE-DEV Qp = 3.34 CFS POST-DEVELOPMENT,BASIN D3 BASIN AREA POST QJ7 AC POST-DEVTc= 5.0 MIN POST-DEV C= 0.34 STORM INTENSITY= 3.22 IN/HR POST-DEV Qp = 0.19 CFS N:\4660\001\Reports\Drainage\sub-basin#3.xlsx Safeway Site Plan Sub-Basin D3, Peak Flows for 25-yr and 100-yr Storms MODIFIED RATIONAL METHOD Qp=CiA POST-DEVELOPMENT,-BASIN D3,25-YEAR PEAK RUNOFF• RAINFALL FREQ= 25 yr, 1 hr. BASIN AREA POST= 0.17 acres STORM EVENT L STORM i COEFF INTENSITY YRI A B IN/HR POST-DEV Tc= 5.0 min. 2 0.36 -0.60 1.60 5 0.52 -0.64 2.55 POST-DEV C= 0.34 10 0.64 -0.65 3.22 25 0.78 -0.64 3.83 STORM A= 0.78 50 0.92 -0.66 4.74 B= -0.64 100 1.01 -0.67 5.34 STORM INTENSITY= 3.83 IN/FIR (Source: City of Bozeman Design Standards,March 2004) POST-DEV Qp= 0.22 CFS POST-DEVELOPMENT,BASIN D3, 100-YEAR PEAK RUNOFF• RAINFALL FREQ= 100 yr, I hr. i=A*(Tc160)a BASIN AREA POST= 0.17 acres STORM EVENT STORM i COEFF INTENSITY YR A B POST-DEV Tc= 5.0 min. 2 0.36 -0.60 1.60 5 0.52 -0.64 2.55 POST-DEV C= 0.34 10 0.64 -0.65 3.22 25 0.78 -0.64 3.83 STORM A= 1.01 50 0.92 -0.66 4.74 B= -0.67 100 1.01 -0.67 5.34 STORM INTENSITY= 5.34 IN/HR (Source: City of Bozeman Design Standards,March 2004) POST-DEV Qp= 0.31 CFS Safeway Site Plan Sub-Basin # MMI#: 4660.001.010.000318 DATE: 9/6/10 ENGINEER: Mike Hickman MODIFIED RATIONAL METHOD Qp=CiA PRE-DEVELOPMENT,BASIN H4 RAINFALL FREQ= 10 yr, 1 hr. i=A* (Tc160)a BASIN AREA PRE= 2.36 acres STORM EVENT STORM i COEFF INTENSITY YR A B IN/HR PRE-DEV Tc= 5.0 min. 2 0.36 -0.60 1.60 5 0.52 -0.64 2.55 PRE-DEV C= 0.81 10 0.64 -0.65 3.22 25 0.78 -0.64 3.83 STORM A= 0.64 50 0.92 -0.66 4.74 B= -0.65 100 1.01 -0.67 5.34 STORM INTENSITY= 3.22 IN/HR (Source: City of Bozeman Design Standards,March 2004) PRE-DEV Qp = 6.15 CFS POST-DEVELOPMENT, BASIN D4 BASIN AREA POST= 2.83 AC POST-DEV Tc= 5.0 MIN POST-DEV C= 0.78 STORM INTENSITY= 3.22 IN/HR POST-DEV Qp = 7.10 CFS Safeway Site Plan Peak Flows for 25-yr and 100-yr Storms Sub-Basin D4 MODIFIED RATIONAL METHOD Qp=C i A POST-DEVELOPMENT, 25-YEAR PEAK RUNOFF: RAINFALL FREQ= 25 yr, 1 hr. i=A* (Tc/60)B BASIN AREA POST= 2.83 acres STORM EVENT STORM i COEFF INTENSITY (YR) A _�B (IN/HR) POST-DEV Tc= 5.0 min. 2 0.36 -0.60 1.60 5 0.52 -0.64 2.55 POST-DEV C= 0.78 10 0.64 -0.65 3.22 25 0.78 -0.64 3.83 STORM A= 0.78 50 0.92 -0.66 4.74 B= -0.64 100 1.01 -0.67 5.34 STORM INTENSITY= 3.83 IN/HR (Source: City of Bozeman Design Standards,March 2004) POST-DEV Qp = 8.45 CFS POST-DEVELOPMENT, 100-YEAR PEAK RUNOFF: RAINFALL FREQ= 100 yr, 1 hr. BASIN AREA POST= 2.83 acres STORM EVE i COEFF INTENSITY (YR) (IN/HR) Ti�� POST-DEV Tc= 5.0 min. 2 0.36 0.60 1.60 5 0.52 -0.64 2.55 POST-DEV C= 0.78 10 0.64 -0.65 3.22 25 0.78 -0.64 3.83 STORM A= 1.01 50 0.92 -0.66 4.74 B = -0.67 100 1.01 -0.67 5.34 STORM INTENSITY= 5.34 fN/HR (Source: City of Bozeman Design Standards,March 2004) POST-DEV Qp = 11.78 CFS _EGEND k' T— — BASIN BOUNDARY UB —BASIN BOUNDARY PRE—DEVELOPMENT ADJACENT — DESIGNATION j^I`'r-OPFtil Y % SUB BASIN DESIGNA i i-. X.XX Ac. _ SUB BASIN AREA (AC RES) ) `c —� FLOW DIRECTION 18.5' WIDE H2.1II - Ij �!/ , VALLEY GUTTER : s'; Q 08"Ac. I � / \ / 1 u C ` - 4 r ` I 77 a i - [ ,. .'I:/'!/:Y'r !> ✓.:/ Y J! i y. is I i „ 5' WIDE I " : �' V ALLEY GUTTER t / >' -r�. Acri�r I I 6' WIDE _ PROPER!Y !I .' VALLEY GUTTER qi­ I N4 2.36 i f / Fey / Ei..y .. _..._ 1 / r For JACENI r ' PROt'E �1-y i : r / \ .... ... _ T .. .. ..... ... ... ...... O 80 �...rl ,.. / ... ._ ...._ ... .... .. ..... ._ j WEST MAIN STREET IN FEET } (US HIGHWAY 191) /( c �T PROJECT NO. { LA lV1�RRI►J�1V Engh"s� 901 TethnologyBlW. DRAWN BY: JCH BOZEMAN SAFEWAY-DRAINAGE REPORT 4 Smv°yor, Bozeman MT 59718 CHK'D.BY; NIGH 4660.001 INC. scanfists BOZEMAN MONTANA MAIERLE,INC P/8^^°rs phone:(406)587-0721 APPR.8Y: MGH FIGURE NUMBER Fax:(406)587.1176 DATE: 0912010 An Employee-0—dCompany PRE-DEVELOPMENT DRAINAGE BASINS FIG. 1 covraicrrt c uowuso.+wffwe.ax.,w:o N:\466010011ACAO1ExhibhslPRE-OEVELOPMENT DRAINAGE BASINS,dft plo0d by jon hockatlay on Sep1372010 16 ADJACENT ' / PROPERTY \ _ ^; �I� / ✓� el RETWolotalo! _ I( ' CO/P/0 S / I I BASIN C V I I WE S /11 CURB CURB CUTWRB WT WRB WT ',//I I��.LLG�////i/!i%!/%/'!!/i GLlil ,�i, RE,TENTI°N CUT TRENCH TRENCH DRAIN TRENCH DRAIN 9 ROOFTREATUENT IIr VAULT EI R°ENOCNY nl J� ` I .-..- _' w9°>•4-.- .-.-..-. �._L- .--.-1 �+ II L N T C • AT _ 11. I {' I� aA .sac� �� CURB to P� \ -- .----.-...— r.yi�..._��.��.�.— —.._---- Vol a0 I y y _ \ Ii 5p Te01 o-s.°o °ET e N 0 12 IE(5)-92.40 9\ i • �i(F � /i / / \\ ( � / ADJACENT �AR BU'" CURB CUT ---. .— -������ PROPERTY SAFEWAY� r. 5. N.I.C.F.F-4798.00 I�I � \ v � 1 TING 12'R �As� /L i.:.:.'"� '� S Ma ET 12- t RCA O D.SOX ,. A, \ 1 f2 1 ,79 O .SOX L r StORM MHJI5,50 -)t I /- 7--o.7aR- f_ -9550 IV TI �a yC T 0 0.� \ �- 6 N RA I ♦ AT ST MDR NIMN 3 -T{)fiA !uN RNA-95.5 M. 12'IE(E)-12'O(N)-92.9 2-IE(N)-12'iE(M)-92.6 p - � � tom. 1.40X iiy :• � �\ ADJACENT 9 a PROPERT�-` - - - - of - - -- m I.C. i doe o�I., :. -- -� - , °e _ = / 40 0 20 40 IN FEET) / WE T MAIN STREET _— ——— -_--»> (U HIGHWAYi191)' / A m ummm E WAY I ( I Y a LEGEND II I J6 D3 0.17 cc 4 SUB-BASIN BOUNDARY ADJACENT / .� 4 \� ! i I DETENTION POND PROPERTY W.C. / / r POST—DEVELOPMENT SUB-BASIN DESIGNATION DI 3.52 cc j I SUB-BASIN AREA (ACRES) WIDE FLOW DIRECTION W lVaEY GUTTER E CURB C T1 0 R CUT1 00 ................ D EN ION l 9 71 B SIN ADJACENT PROPERTY 2.91 cc N.I.C. u 4795 oADJACENT PROPERTY/ -3 L 480 -4800 4502 4802 480 0 80 Oft WEST MAR4 ST IN FEET 'MS-HWAAVikff 19 1) PROJECT NO. Eron"m 901 TechnoloW BI'd- DRAWN BY: JCH BOZEMAN SAFEWAY DRAINAGE REPORT 46W.001 Ll MORRISON sunwym Sozernan MT 59718 CHKTI.BY: MGH BOZEMAN MONTANA Phone:(406)587-0721 APPR.BY: MGH FIGURE NUMBER L&MAIER INC. planners PFax:(406)587-1176 DATE: 0910`10 - An copmw 0 ORRISO�Vte.MG.,mia POST-DEVELOPMENT DRAINAGE BASINS FIG. 2 !N:\466MO01%ACAD\Exhibits\POST-DEVELOPMENT DRAINAGE_BAb'N5-*" plotted by)on n hockamy on sep/8=10