HomeMy WebLinkAbout13 - Design Report - Westbrook - Stormwater DESIGN REPORT WESTBROOK SUBDIVISION Prepared for: Four Corners Construction, LLC® 125 Central Avenue, Bozeman, MT 59718 Prepared by: C&H Engineering and Surveying, Inc. 1091 Stoneridge Drive, Bozeman, MT 5971.8 (406) 587-1.115 Project Number: 12661 NOVEMBER 2013 INTRODUCTION The Westbrook Subdivision is a proposed 63-lot subdivision located east of Laurel Parkway and south of Annie Street. The 33.57-acre development is situated in the south half of Section 4, Township 2 South, Range 5 East of P.M.M., Gallatin County, Montana. This project will require connection to existing City of Bozeman water and sanitary sewer system. STORMWATER MANAGEMENT Storm water runoff from the subdivision will be conveyed to one of four detention facilities. A plan view of the site highlighting the drainage areas and the storm water features is included in Appendix A. The western half of the site will discharge into Detention Pond 1 running south-north near the western subdivision boundary. This pond has an existing outlet structure that discharges into Baxter Creek. Detention Ponds 2, 3, and 4 are all proposed to discharge to Baxter Creek. The soutln/central section of the site will discharge to Detention Pond 2. The eastern section of the site will discharge to Detention Pond 3. The north/central portion of the subdivision will discharge to Detention Pond 4 at the north/central section of the site. DETENTION POND 1 Detention Pond 1 has a volume of 32,939 W and will service Drainage Area #1 with a total area of 13.66 acres. The existing pond has an outlet structure at the east end which pipes runoff into Baxter Creek. The pre-development release rate is first calculated to ensure that post-development discharge rates from the pond do not exceed pre-development rates. Prc-bevel rnent Release Date The time of concentration (Tc) is calculated as the flow time from the pre-developed most hydraulically remote point in the drainage to the proposed discharge point. Pre-developed flow conditions include overland flow over open land (C=0.20). The.Tc is then used to calculate the pre-development release rate. Flow line length= 1,500 ft Design Report-Page 2 of 13 Slope = 1.25% Tc= 60.51 mins, 1.008 hrs Iio=Intensity (10-yr freq.) = 0.64(Tc)(-o.65)=0.636 in/hr Q i o= CIA= (0.20) (0.636 in/hr) (13.6636 acres) = 1.74 cfs Drainage Area #I. The storm water runoff surface areas for Drainage Area 41 are calculated as follows. All runoff "C" coefficients are from the City of Bozeman's Design Standards and Specifications Policy (DSSP). Contributing Areas.- Right-of-way (C=0.73) = 171,375 f12 Open Land (C=0.20) = 191,121 ft2 Lot Area(C=0.5) = 232,741 ft2 Total = 595,237 ft2 = 13.6648 acres The composite runoff coefficient for the R/W Area is calculated as follows,this coefficient applies to all R/W areas in the subdivision: Crvw= [(0.95 x 42 ft) + (0.20 x 18 ft)] /60 ft = 0.73 The composite runoff coefficient for all of Drainage Area 41 is calculated as: Comp_ [(0.73 x 171,375 ft2) + (0.20 x 191,121 ft2)+ (0.50 x 232,741 ft2)] /595,237 112=0.47 The maximum required storage is calculated in the table shown in Appendix A by varying the storm duration with the associated storm intensity, and holding a release rate of L74 cfs with a C coefficient of 0.47 for the entire drainage area. Detention Pond 1 was originally sized in the Laurel Glen Phase I Design Report to drain an area of 15.32 acres in the area that is now being developed as Westbrook. The current area of Westbrook that is drained to the pond is now only 13.66 acres, and has less impervious area, so the size of the pond is adequate as previously designed. Design Report-.Wage 3 of 13 Inlet and Outlet Control Structure Sizing The existing design for the outlet control structure in Detention Pond 1 was designed and approved appropriately to handle a 25-year storm and limit discharge rates to below pre-development conditions. There are no proposed changes to the existing design for the inlet piping, structure or discharge piping/culvert. DETENTION POND 2 Detention Pond 2,located in the north/central area of the subdivision,is proposed to have a storage volume of 6,627 ft3, and will service Drainage Area #2 with a total area of 434,311 ft2. The detention pond will discharge to the Baxter Creek. Pre-(Development Release Date The time of concentration (Tc) is calculated as the flow time from the pre-developed most hydraulically remote point in the drainage to the proposed discharge point. Pre-developed flow conditions include overland flow over open land (C=0.20). The Tc is then used to calculate the pre-development release rate. Flow line length=990 ft Slope = 1.75% Tc=43.94 mins, 0.732 hrs I I o =Intensity(10-yr freq.) =0.64(Tc)(465)= 0.784 in/hr Qlo= CIA =(0.20) (0.784 in/hr) (9.97 acres) = 1.56 cfs Drainage Area#2 The storm water runoff surface areas for Drainage Area#2 are calculated as follows: Contributing Areas: Right-of way (C=0.73) = 89,921 ft2 Open Land (C=0.20) = 80,451 ft2 Lot Area(C=0.50) =263,939 ft2 Total =434,311 ft2 Design Report-Page 4 of 13 =9.9704 acres The composite runoff coefficient for all R/W areas is 0.73, as calculated above. The composite runoff coefficient for all of Drainage Area#2 is calculated as: Comp_ [(0.73 x 89,921 ft2)+(0.20 x 80,451 ft2)+ (0.50 x 263,939 ftz)] /434,3 l l ft2=0.49 The maximum required storage is calculated in the table shown in Appendix A by varying the storm duration with the associated storm intensity, and holding a release rate of 1.56 cfs with a C coefficient of 0.49 for the entire drainage area. Detention Pond 2 will have a volume of 6,627 ft3 which is adequate to handle the runoff from the drainage area. Inlet Pipe Sizing The storm sewer pipes are designed to handle a 25-year storm event. The post-development time of concentration is first calculated to determine the peak discharge: Overland flow(990 ft @ 1.75% slope, C=0.49) Total Time of Concentration=27.39 min (0.457 hrs) For a 25-year storm event, 125 = 0.78X-o-"= 0.78 (0 457)'0-64= 1.288 in/hr Q25 = CIA= 0.49 (1.288 in/hr) (9.97 acres) = 6.29 cfs A 14-inch PVC Schedule 40 pipe is proposed for the storm sewer pipe for Drainage Area#2. The capacity of a 14-inch PVC at the proposed slope is checked using Manning's equation: Qfau = (1.486/n)AR2/3Sl/2 Manning's n=0.013 for PVC Slope = 0.0165 ft/ft A=area= (3.14/4)d 2= (3.14/4)(14/12)2= 1.0684 ft2 P =perimeter= 2(3.14)r= 2(3.14)(7/12) =3.6633 ft R=hydraulic radius=A/P = 1.0684/3.6633 = 0.2916 ft R2/3 = 0.4380 ft Design Report-Page 5 of 13 S12= 0.1285 ft/ft Qfull = (1.486/0.013)(1.0684)(0.4380)(0.1285) =6.87 cfs The 14-inch PVC will be adequate to handle the stormwater discharge rates to the detention pond. Outlet Control Structqre Sizing The outlet control structure in Detention Pond 2 needs to limit the release rate to the predevelopment runoff rate of 1.56 cfs. The slot width is sized using the following equation: Q= CLI-13/2 The maximum pond depth is 1.5 ft which represents the maximum head. Therefore: L = (1.56 cfs)/(3.33 x 1.5312) = 0.255 ft The weir needs to be 3.06" wide in order to limit the release rate to 1.56 cfs. Outlet Structure Pine Sizing The outlet structure discharge pipe must be sized to handle the maximum flow of 1.56 cfs into the structure. A 10-inch PVC pipe is proposed for the discharge pipe. The capacity of a 10-inch PVC line is calculated as follows: Qfuil = (1.486/n)AR2/3S1r2 Manning's n = 0.013 for PVC Pipe Minimum Slope= 0.0165 ft/ft A =area= (3.14/4)d 2= (3.14/4)(10/12)2= 0.5451 ft2 P =perimeter=2(3.14)r= 2(3.14)(5/12) = 2.6180 ft R=hydraulic radius =A/P =0.5451 /2.6180=0.2082 ft R2/3 =0.3513 ft S =0.0165 ft/ft S v2= 0.1285 ft/ft Qf,,n= (1.486/0.013)(0.5451)(0.3496)(0.1285) =2.80 cfs The 10-inch PVC pipe will be adequate to handle the discharge rates from the outlet structure. Design Report-Page 6 o f 13 DETENTION POND 3 Detention Pond 3 is proposed to have a storage volume of 4,900 ft3,and will service Drainage Area #3 with a total area of 294,628 112. The detention pond will discharge to Baxter Creek. There is a proposed storm drain discharging to Detention Pond 3 on Annie Street. Pre-Development Release hate The time of concentration (Tc) is calculated as the flow time from the pre-developed most hydraulically remote point in the drainage to the proposed discharge point. Pre-developed flow conditions include overland flow over open land (C=0.20). The Tc is then used to calculate the pre-development release rate. Flow line length= 1,130 ft Slope= 1.20% Tc = 53.24 mins, 0.887 hrs I i o = Intensity (10-yr freq.)=0.64(Tc)t"o-61>=0.692 in/hr Quo= CIA =(0.20) (0.692 in/hr) (6.76 acres) = 0.94 efs Drainne Area 93, The stormwater runoff surface areas for Drainage Area#3 are calculated as follows: Contributing Areas: Right-of-way (C=0.73) =25,820 ft2 Open Land (C=0.20) =0 ft2 Lot Area (C=0.50) =209,887 ft2 Total =294,628 ft2 = 6.7637 acres The composite runoff coefficient for all R/W areas is 0.73, as calculated above. The composite runoff coefficient for all of Drainage Area#3 is calculated as: Ccomp= [(0.73 x 25,820 ft2)+(0.50 x 209,887 ft2)] /294,628 ft2=0.53 Design Report-Page 7 of 13 The maximum required storage is calculated in the table shown in Appendix A by varying the storm duration with the associated storm intensity, and holding a release rate of 0.94 efs with a C coefficient of 0.53 for the entire drainage area. Detention Pond 3 will have a volume of 4,900 ft3 which is adequate to handle the runoff from the drainage area. Inlet Pipe Sizing The storm sewer pipes are designed to handle a 25-year storm event. The post-development time of concentration is first calculated to determine the peak discharge: Overland flow(1130 ft cr 1.20% slope, C=0.37) Total Time of Concentration=40.99 min(0.683 hrs) For a 25-year storm event, 125 = 0.78X-0.64=0.78 (0.683)-0.64= 0.995 in/hr Q25 = CIA = 0.53 (0.995 in/hr) (6.76 acres) = 3.57 efs A 12-inch PVC Schedule 40 pipe is proposed for the storm sewer pipe for Drainage Area#3. The capacity of a 1.2-inch PVC is checked using Manning's equation: Qnuil= (1.486/n)AR2i3Sv2 Maiming's n= 0.013 for PVC Slope = 0.0165 ft/ft A=area= (3.14/4)d 2=(3.14/4)(12/12)2=0.7850 ft2 P=perimeter= 2(3.14)r= 2(3.14)(6/12) =3.14 ft R=hydraulic radius=A/P =0.7850/3.14 =0.2499 ft R2'3 = 0.3967 ft 51/2= 0.1285 ft/ft Qf,,Il = (1.486/0.013)(0.7850)(0.3467)(0.1285) =4.5725 cfs The 12-inch PVC will be adequate to handle the storm water discharge rates to the detention pond. Design Report-Page 8 of 13 Outlet Control Structure Sizing The outlet control structure in Detention Pond 3 needs to limit the release rate to the predevelopment runoff mate of 0.94 cfs. The slot width is sized using the following equation: Q=CLH3/2 The maximum pond depth is 1.5 ft which represents the maximum head. Therefore: L= (0.94 cfs)/(3.33 x 1.5"2) = 0.153711 The weir needs to be 1.84" wide in order to limit the release rate to 0.94 cfs. Outlet Structure Pipe Sizing The outlet structure discharge pipe must be sized to handle the maximum flow of 0.94 cfs into the structure. An 8-inch PVC line is proposed for the discharge pipe. The capacity of an 8-inch PVC line is calculated as follows: Qfuii = (1.486/n)AR213S U2 Manning's n= 0.013 for PVC Pipe Minimum Slope=0.0165 ft/ft A=area= (3.14/4)d 2=(3.14/4)(8/12)2= 0.3489 ft2 P =perimeter=2(3.14)r= 2(3.14)(4/12) =2.0933 ft R=hydraulic radius =A/P =0.3489 /2.0933 = 0.3011 ft R2/3 = 0.3011 ft Sv2=0.1285 ft/ft Qf,,u = (1.486/0.013)(0.3489)(0.3011)(0.1285) = 1.5431 cfs As calculated above, the capacity of an 8-inch PVC line flowing full is 1.5431 cfs, which is adequate to handle the anticipated discharge rate. DETENTION POND 4 Detention Pond 4 is proposed to have a storage volume of 5,342 ft3,and will service Drainage Area ##4 with a total area of 166,241 ft2. The detention pond will discharge to Baxter Creek directly east of the detention pond. Design Report-Page 9 of 13 Pre-Development Release Date The time of concentration (Tc) is calculated as the flow time from the pre-developed most hydraulically remote point in the drainage to the proposed discharge point. Pre-developed flow conditions include overland flow over open land (C=0.20). The Tc is then used to calculate the pre-development release rate. Flow line length=450 ft Slope =3.00% Tc=24.75 mins, 0.413 hrs Iio=Intensity (10-yr freq.) = 0.64(Tc)(-0.61) = 1.138 in/hr Qto=CIA = (0.20) (1.138 in/hr) (3.8164 acres) = 0.87 cfs brain Area #4 The stormwater runoff surface areas for Drainage Area#4 are calculated as follows: Contributing Areas: Right-of-way(C=0.73) = 41,866 ft2 Open Land (C=0.20) = 115,980 ft2 Lot Area(C=0.50) = 8,395 112 Total = 166,241 ft2 = 3.8164 acres The composite runoff coefficient for all R/W areas is 0.73, as calculated above. The composite runoff coefficient for all of Drainage Area 44 is calculated as: Ceo,,,p_ [(0.73 x 41,866 ft2) + (0.20 x 115,980 ft)+ (0.50 x 8,395 ft2) / 166,241 ft2= 0.35 The maximum required storage is calculated in the table shown in Appendix A by varying the storm duration with the associated storm intensity, and holding a release rate of 0.87 cfs with a C coefficient of 0.35 for the entire drainage area. Detention Pond 4 will have a volume of 5,342 ft3 which is adequate to handle the runoff from the Design Report-Page 10 of 13 drainage area. Inlet Pike Sizing The storm sewer pipes are designed to handle a 25-year storm event. The post-development time of concentration is first calculated to determine the peak discharge: Overland flow (450 ft @ 3.00% slope, C=0.35) Total Time of Concentration = 19.67 min (0.328 hrs) For a 25-year storm event, Its = 0.78X`0.64=0.78 (0.328)-0.64= 1.59 in/hi Q25 = CIA=0.35 (1.59 in/hr) (3.8164 acres) =2.13 cfs A 10-inch PVC Schedule 40 pipe is proposed for the storm sewer pipe for Drainage Area#4. The capacity of a 10-inch PVC is checked using Manning's equation: Qfull = (1.486/n)AR2/3S1/2 Manning's n= 0.013 for PVC Slope =0.0165 ft/ft A=area= (3.14/4)d 2= (3.14/4)(10/12)2=0.5451 f12 P =perimeter=2(3.14)r=2(3.14)(5/12) =2.6167 ft R=hydraulic radius =A/P = 0.5451 /2.6167 = 0.2083 ft R213 = 0.3496 ft S1/2= 0.1285 ft/ft Qfu11 = (1.486/0.013)(0.5451)(0.3496)(0.1285) =2.80 cfs The I0-inch PVC will be adequate to handle the storm water discharge rates to the detention pond. Outlet Control Structure Sizing The outlet control structure in Detention Pond 4 needs to limit the release rate to the predevelopment runoff rate of 0.87 cfs. The slot width is sized using the following equation: Q=CLI43/2 The maximum pond depth is 1.5 ft which represents the maximum head. Therefore: L= (0.87 cfs)/(3.33 x 1.5"2) = 0.1422 ft Design Report- Page 11 of 13 The weir needs to be 1.71" wide in order to limit the release rate to 0.87 cfs. Outlet Structure Pipe Siziai The outlet structure discharge pipe must be sized to handle the maximum flow of 0.87 cfs into the structure. An 8-inch PVC line is proposed for the discharge pipe for Detention Pond 4. The capacity of an 8-inch PVC line is calculated as follows: Qrull = (1.486/n)AR2/3Sv2 Manning's n=0.013 for PVC Pipe Minimum Slope = 0.0165 ft/ft A = area= (3.14/4)d 2= (3.14/4)(8/12)2= 0.3489 {12 P =perimeter=2(3.14)r=2(3.14)(4/12) =2.0933 ft R=hydraulic radius=A/P = 0.3489/2.0933 = 0.3011 ft R2/3 =0.3011 It Si/2 = 0.1285 ft/ft Qfuu = (1.486/0.013)(0.3489)(0.3011)(0.1285) = 1.5431 efs The 8-inch PVC pipe will be adequate to handle the discharge rates from the outlet structure. Design Report-Page 12 of 13 Design Report-Page 13 of 13 AREA 1 -DETENTION POND Pre-Developed Conditions Overland Flow Time Flow Length= 1500.00 Slope(%)= 1.25 C coeficient= 0.20 Cf = 1.00 Tc=(1.87`(1.1-C`Cf)(L)("))/(s)(v3) Tc(min)= 60.5099 Total Basin Tc(hr)= 1.008 Rational Method For.Calculating Flow Rate Storm Return Interval= 10 I(in/hr)for 10 year storm 1=0.64t(-o.65) 0.636 Rational Method: Q=C`I*A C coefficient= 0.20 1(in/hr)= 0.64 Area(ft2)= 595187.00 Area(ac)= 13.6636 Total Runoff For 10yr Storm(cfs)= 1.74 cfs Post Developed Weighted C Calculations Landscaped C= 0.2 ROW C= 0.73 Lot C= 0.5 Area(ft)= 191121 Area(fe)= 171375 Area(ft)= 232741 Area(ac)= 4.39 Area(ac)= 3.93 Area(ac)= 5.34 Weighted C= 0.47 Weighted C= 0.47 Total Area= 13.66 acres Release Rate = 1.74 cfs Storm Storm Runoff Release Required Length(min) Length(hrs) Intensity Q future Volume Volume Storage 24 0.40 1.16 7.45 10734.14 2504.65 8229.49 25 0.42 1.13 7.26 10888.61 2609.01 8279.60 26 0.43 1.10 7.08 11039.11 2713.37 8325.74 27 0.45 1.08 6.90 11185.90 2817.73 8368.16 28 0.47 1.05 6.74 11329,19 2922.09 8407.09 29 0.48 1.03 6.59 11469.19 3026,45 8442.74 30 0.50 1.00 6.45 11606.09 3130,82 8475.27 31 0.52 0.98 6.31 11740.05 3235,18 8504.88 32 0.53 0.96 6.18 11871.24 3339.54 8531.70 33 0.55 0.94 6.06 11999.78 3443.90 8555.89 34 0.57 0.93 5.94 12125.82 3548,26 8577.56 35 0.58 0.91 5.83 12249A7 3652.62 8596.85 36 0.60 0.89 5.73 12370.85 3756.98 8613.87 37 0.62 0.88 5.63 12490.05 3861.34 8628.71 38 0.63 0.86 5.53 12607.17 3965.70 8641.48 39 0.65 0.85 5.44 12722.31 4070.06 8652.25 40 0.67 0.83 5.35 12835.55 4174.42 8661.13 41 0.68 0.82 5.26 12946.96 4278.78 8668.18 42 0.70 0.81 5.18 13056.62 4383.14 8673.48 43 0.72 0.79 5.10 13164.59 4487.50 8677.09 44 0.73 0.78 5.03 13270.95 4591.86 8679.09 45 0.76 0.77 4.95 13375.74 4696.22 8679.52 46 0.77 0.76 4.88 13479.03 4800.58 8678.45 47 0.78 0.75 4.82 13580.88 4904.94 8675.93 48 0.80 0.74 4.75 13681.32 5009.30 8672.01 49 0.82 033 4.69 13780.41 5113.67 8666.74 AREA 2-DETENTION POND Pre-Developed Conditions Overland Flow Time Flow Length= 990.00 Slope(%)= 1.75 C coeficient= 0.20 Cf = 1.00 Tc=0.87*(1.1-C*Cf)(L)t1r2>)l(s)(113) Tc(min)= 43.94293 Total Basin Tc(hr)= 0.732 Rational Method For Calculating Flow Rate Storm Return Interval= 10 1(inlhr)for 10 year storm 1=0.64t("0 65) 0.784 Rational Method: Q=C*I*A C coefficient= 0.20 1(in(hr)= 0.78 Area(ft)= 434311.00 Area(ac)= 9.9704 Total Runoff For 10yr Storm(cfs)= 1.56 cfs Post Developed Weighted C Calculations Landscaped C= 0.2 ROW C= 0.73 Lot C= 0.5 Area(ft)= 80451 Area(ft)= 89921 Area(ft)= 263939 Area(ac)= 1.85 Area(ac)= 2.06 Area(ac)= 6.06 Weighted C= 0.49 Weighted C= 0.49 Total Area= 9.97 acres Release Rate = 1.56 cfs Storm Storm Runoff Release Required Len thq (min) Lenath(hrs; Intensity Q future Volume Volume Storage 18 0.30 1.40 6.87 7416.41 1687.58 5728.83 19 0.32 1.35 6.63 7558.09 1781.34 5776.76 20 0.33 1.31 6.41 7695.01 1875.09 5819.91 21 0.35 1.27 6.21 7827.54 1968.85 5858.69 22 0.37 1.23 6.03 7956.03 2062.60 5893.43 23 0.38 1.19 5.86 8080.78 2156.36 5924.42 24 0.40 1.16 5.70 8202.05 2250.11 5951.94 25 0.42 1.13 5.55 8320.08 2343.87 5976.21 26 0.43 1.10 5.41 8435.08 2437.62 5997.46 27 0.45 1.08 5.28 8547.24 2531.38 6015.86 28 0.47 1.05 5.15 8656,73 2625.13 6031.60 29 0.48 1.03 5.04 8763.71 2718.89 6044.82 30 0.50 1.00 4.93 8868.31 2812.64 6055.67 31 0.52 0.98 4.82 8970.68 2906.39 6064.28 32 0.53 0.96 4.72 9070.91 3000.15 6070,77 33 0.55 0.94 4.63 9169.14 3093.90 6075.23 34 0.57 0.93 4.54 9265.44 3187,66 6077.78 35 0.58 0.91 ;' 4.46 9359,93 3281 Al` 6078 51 36 0.60 0.89 4.38 9452.67 3375.17 6077.50 37 0.62 0.88 4.30 9543.75 3468.92 6074.83 38 0.63 0.86 4.23 9633.25 3562.68 6070.57 39 0.65 0.85 4.15 9721,23 3656.43 6064.80 \ / ' AREA 3 - DETENTION POND Pre-Developed Conditions Overland Flow Time Flow Length 1130�00 Slope (96) = 1.20 C coeficiend= 0.20 {X = 1.00 To= (1.87^(1.1-C°Cf)(L)("2)VYe>(//3) To (m/n)= 63.23896 Total Basin Tc(hr) = 0,887 Rational Method For Calculating Flow Rate Storm Return Interval = 10 | (in/hh for 1O year storm |=0.04t(-0a5) 0.682 Rational Method: O = C^/*4 C coefficient= 0.20 | /in/hh = 8.69 Area (ft) = 294628.00 Area (uo) = 6,7637 Total Runoff For 1OyrStorm (cfs) = 0.94 cfo Post Developed We�ghted C Calculations Landscaped = 0.2 ROW C = 0.73 Lot = 0.5 Area (*) = O Area (ft) = 2S82O Area mz\ = 208887 Area /an\ = 0.00 Area (eo) = 0.59 Area (ac) = 4.82 Weighted C = 0.53 Weighted C = 0-53 Total Area = 6.78 acres Release Rate = 0'94 cfn Storm 8hornn Runoff Release Required Length(min) jq9_qjh(hrs Intensity Q(future) Volume Volume Storage 44 0.73 0.78 2.78 7342.48 2470.29 4872.19 45 0.75 0,77 2.74 7400.40 2526.43 4874.03 46 0.77 0.76 3.70 7457.61 2582.67 4875.84 E:==��0.8P�O74�2 W�7569 W 7694.8P48046P 48 40 0.82 0.73 2.59 7624.35 2751.00 4873.35 50 0.83 0.72 2.58 7678,46 2807.14 4871.31 } 51 0.85 8.71 2.53 7731.88 2863.20 4868.57 -/ 52 0.87 8.70 2.50 7784.59 2919.43 4865.16 AREA 4-DETENTION POND Pre-Developed Conditions Overland Flow Time Flow Length = 450.00 Slope (%) = 3.00 C coeficient= 0.20 Cf = 1.00 Tc= (1.87*(1.1-C*Cf)(L)(v2))/(s)(1/3) Tc(min)= 24.75426 Total Basin Tc (hr) = 0.413 Rational Method For Calculatinq Flow Rate Storm Return Interval = 10 (in/hr)for 10 year storm 1=0.64t(-0.65) 1.138 Rational Method: Q = C*I*A C coefficient= 0.20 1 (in/hr) = 1.14 Area (ft) = 166241.00 Area (ac) = 3.8164 Total Runoff For 10yr Storm (cfs) = 0.87 cfs Post Developed Weighted C Calculations Landscaped C = 0.2 ROW C = 0.73 Lot C = 0.5 Area (ft) = 115980 Area (ft) = 41866 Area (ft) = 8395 Area (ac) = 2.66 Area (ac) = 0.96 Area (ac) = 0.19 Weighted C= 0.35 Weighted C= 0.35 Total Area = 3.82 acres Release Rate = 0.87 cfs Storm Storm Runoff Release Required Len.qth(min) Length(hrs) Intensity Q future Volume Volume Storage 4 0.07 3.72 4.95 1188.11 208.45 979.66 5 0.08 3.22 4.28 1284.62 260.56 1024.06 6 0.10 2.86 3.80 1369.27 312.67 1056.60 7 0.12 2.59 3.44 1445.17 364.78 1080.39 8 0.13 2.37 3.15 1514.32 416.89 1097.43 9 0.15 2.20 2.92 1578.05 469.01 1109.04 10 0.17 2.05 2.73 1637.33 521.12 1116.21 11 0.18 1.93 2.56 1692.87 573.23 1119.64 12 0.2t�. 1.82 2. 2 1745.22 625.34 111988. 13 0.22 1.73 2.30 1794.80 677.45 1117.35 14 0.23 1.65 2.19 1841.96 729.56 1112.40 DRAINAGE PLAN WESTBROOK SUBDIVISION LOCATED IN THE S 112 OF SECTION 4, T. 2 S., R. 5 E. OF P.M.M., CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA LEGEND L01 10 LOT 12 1 1-01' LOT 7 nnJJ M M DRAINAGE AREA BOUNDARY • opo t 41-ft R LOT 1 P R K LOT 8 LOT 8 DRAINAGE ARROW PUBLIC PA K -0.f �N LOT I LOT -1�-- L01 10 • LOT PAR' -AN R VT ET #A VV� -A, LOT 9B LOT 1 C ♦ rur7w,— --LOT 88 LOT I I tj LOT 8A 4ztl ------ 41110 WN1, qC: LOT 7B I LOT A, PUB RK LOT 12 DhAINA- LOT ifi, LOT 1 -.00 g�r1011 LOT 5B #4 ci LOT 13 .......... LOT t,OT GA —LOT LOT F, LOT 14 ■ LOT 4 I`- -A PARK 8 P 0 ARK I LOT/I' ....... LOT Q `7 LOT (Dt CIALOT 3-` ... ....... Uff ,R L 0 it Ai LOT 3 Nei9 it - V- I — 'E� [LOT (0e I �!d�v og- o p 9;i�: f L�l 2B LOT 17 LOT 2 I—L(;T L01 LOT 3 )e. gx e LOT 1B LOT 18 ON 4A� o. Ogg Ogg IVATE,90MMON I LOT 1 2z 0 -;a� d SPACE D LOT 1A 4 Aq G P, 0 1 VL 0 rp I LOT 2D rn C a 3 Vq e ?�F. -el LOT 2C -6im I- F- 0 9 ko e d A w�D -e! eL LOT -1 jr 01F LOT 1 Sff w [TrT —dj 04 e e 10 rn LCIT/fl 41 !.v 1,11- e p e LOT 11 % .......... 4;: , it -111— � 04. ".9 i �s Scale In Feet 80 0 80 m beed 24 0 24 v Scale In Meters 9L DRAWING DATE- 1/28/14 3211, w. .......... --------- r"g." u-q­J Su Ning Inc.