TECHNICAL MEMORANDUM
DOWL
Bozeman,MT
Phone(406)586-8834
TO: Bob Murray, P.E., City of Bozeman Engineering Department
FROM: Greg Underhill, P.E., Senior Geotechnical Engine r r dN A
DATE: May 5, 2016
C. Ur'DE " L a
PROJECT: West Winds Phase 7 & 8 Subdivision - E
C- F
NUMBER: 4522.11728.01
SUBJECT: On-site local street pavement design assumptions and recommended sections
CC: File
DOWL has completed pavement designs for all internal streets associated with West
Winds Phase 7 & 8 Subdivision: This report summarizes our design assumptions,
calculations and presents our recommendations. Please call if you have any questions or
concerns regarding our recommendations.
Internal (Local) Roads Pavement Section Design
Subgrade soil conditions have been described under Subsurface Conditions presented
with the geotechnical report dated February 2004. Soft to stiff lean clay is the subgrade
soil and governs for design considerations. Based on DOWL's experience with
subgrades in the West Winds Phases 7 and 8 the subgrade soils exhibit CBR values
ranging from 3.0 (resilient modulus equal to 4,500 psi, to 4.5 (resilient modulus equal to
approximately 7,350 psi). These values are indicative of a poor subgrade material. Based
on moisture data obtained from representative samples, the clay subgrade moisture
conditions are generally above optimum moisture content and may require scarifying and
drying before proper compaction can be achieved.
Page 1 of 4
QA22\11728-01\5ODesign\Pavement Design\Local Street Pavement Design.docx
o► coWI
Since the traffic volume determination is estimated, some interpretation and assumptions
are required to determine 18-Kip Equivalent Single Axle Loads required for design based
on at least a 20 year performance period traffic volume. Based on specifications
provided by the Bozeman Area Subdivision Regulations, we have assumed a 20 year
design Total Equivalent 18-Kip Single Axle Load of approximately 50,000.
A pavement design has been completed utilizing the results of the geotechnical
investigation conducted at the site, subsequent lab testing, and following AASHTO 1993
pavement design methodology. The DARWin computer program has been used to
calculate structural numbers and section thickness for the roadway sections.
Design Section:
ASSHTO 1993 design methodology has been used assuming the following
parameters:
Design Life=20 years
Design Subgrade CBR Value= 3.0
Initial Serviceability Index=4.2
Serviceability Index=2.5
Total Equivalent 18-Kip Single Axle Loads = 50,000
Reliability Level (%) = 74
Overall Standard Deviation= .45
Effective Subgrade Resilient Modulus =4,500
Required Structural Number=2.41
Design Structural Number=2.91
Page 2 of 4
QA22\11728-01\50Design\Pavement Design\Local Street Pavement Design.docx
'-�k
E L7 O W L..
Structural Component Coefficient (R-Value>70 Per Inch)*
Plant Mix Bituminous Surfacing .41
Crushed Base Course (3/4"Minus) .12
Subbase (3"Minus) .08
*Structural component coefficient values according to Montana Department
of Transportation, Pavement Design Manual 2015.
The pavement section design is based on the assumed traffic, established subgrade
conditions, utilization of AASHTO Guide for Design of Pavement Structures 1993,
and our experience with performance of surfacing sections in the Bozeman vicinity.
The recommended section is presented in the following table:
RECOMMENDED SURFACING SECTION
INTERNAL ROADS
WEST WINDS SUBDIVISION
Material Thickness (inches)
Hot Plant Mix Surface Course 3
Crushed base (1.5 inch minus) 6
Sub-base (3 inch minus) 12
Geosynthetic Separation/Stabilization Fabric
*All materials in accordance to MPW Standard Specifications
In addition to the above pavement section, geosynthetic separation/stabilization fabric
is required as a separator between the native clays and subbase gravel. The fabric
should be a Geotex 350st manufactured Propex or equal.
All paving materials should meet and be installed in accordance to Montana Public
Works Standard Specifications (MPWSS). Base and sub-base materials should be
compacted to not less than 95 percent of maximum dry density at plus or minus 2
percent of optimum moisture in accordance with ASTM D 698.
Page 3 of 4
QA22\11728-01\50Design\Pavement Design\Local Street Pavement Design.docx
14
ED M W I
Construction Considerations
It is noted that the clay subgrade soils in the project area can be wet of optimum and
are moisture sensitive. Typically in warm, dry weather conditions, and using
appropriate construction methods to scarify and allow the soils to dry, proper
subgrade compaction can usually be achieved. However; if there are wet weather
conditions during construction, compaction can be problematic and over-excavation
may be required.
Prior to fill placement, all topsoil and organic matter should be stripped
(approximately 1 foot) to expose the subgrade. The existing subgrade should be
scarified to a depth of at least eight-inches; moisture conditioned and compacted to a
minimum of 95 percent of maximum dry density, at ±2 percent of optimum moisture
content according to ASTM D 698. Subgrade areas wet of optimum moisture may be
encountered. Drying of the subgrade soils may be required in order to achieve the
specified compaction. Extreme care must be taken in these areas during construction
to avoid excessive rutting prior to placement of geotextile fabric and subbase or base
gravel. If excessive rutting or "pumping" of the soil occurs in identified wet areas
then these areas should be excavated to a minimum depth of 12 inches. The specified
geosynthetic separation/stabilization fabric prior should then be placed on the
`undisturbed" subgrade prior to placement of compacted granular fill to grade. Care
should be taken when over excavating as to not disturb the subgrade. A smooth lipped
excavator bucket should be used. The first lift of subbase or crushed base gravel
should be properly moisture conditioned to within +/-2 percent of optimum moisture
and static rolled to achieve initial compaction. The pavement section is then
constructed on the improved subgrade.
Page 4 of 4
QA22\1 1728-0 1\50Design\Pavement Design\Local Street Pavement Design.docx
x m
Hill I
x
X
6
Z
SHEET
S-4 SHEET
m
Y S-4 0
o L
A w
Z U
BAX ER LANE"
_.OE- � 0E -0E -:.OE OE- — Dc �E-. nE-- —;.OE I - I - 0E--a....._....__9E✓ _ QE -.'OE.y -OE - OE-'' nr:r. nc nr
_ ........ --.r _ -.._.. G- - - G LG -G G G G G _ G
- - —u - -
_ I
--
35 FT RO J
SECTION
\ I
I \
I g
SHEET SHEET nc
\\ \\ S-1 I-- I -—S-3 j SHEET
? I I ,1
\ - ---- ----- ---- ----- ---- -- -� I s �- -- ----- ---------- ----- �
- -
w TRADE WIND LANE - -- -- — - --
�i TRADE WIND LANE
\ y
-- ----- --- ----- -- — 1 I
I I 35-FT ROAD 17 --
N I I SECTION
I
I I I L I
j
}
35-FT ROAD
o i I W SECTION
o �1 I I Q i7 40-FT ROAD
a (7I r 3 SECTION I Lc I
Juj y
I I I Z I
� I
a ,1 _
SHEET SHEET - I (Z a I SHEET
' =
I S-1 I S-2 I I S-6
\ I I
4 I I �� -------------- --- --- L— — — -- — ————— \- —J I j Z
Q ,
o I
FLURRY LANE cwn � W
Q -
REFERENCE SHEETS = z ~
------- ---- --------- ---- j --- ---- -- - -_ a_ co
F - -- 35-FT ROAD to < Q
SECTION ��" SS-0: SANITARY SEWER MASTER PLAN p W
I I W-0: WATER MASTER PLAN Z z / S-D: SIGNING MASTER PLAN O (D
1-0: INTERSECTION DETAILa,M ASTER PLAN m z_
a I'- - '--_-_: ___- ----- ----=__ - -- - - -- - --- - ---- - ur� ,ut,nuMnesa��ov �N PROJECT 4582.11728.D7
i�
— GATE MARCH 2O16
roI` ° TSCHACHE LANE
I ODOl7LHKN 2016
50
t ___ _ _-_ ,<—_•—..:...r-. - _ --_ _ ......._..,—L _-.:._: _...:- - -—_ _ _-_ _ \.0 50 100 SHEET
FEET
}
x m
X
X
O
Z
J
Y_ Z
F
3 a
0 N U
Z N
� W
5 �
I W
I
No-' -
PARKING
� 3
ANY 5
} TIME w
—► 1O zrz
STA: 0+93.77, 20.51' (L)
I I TA: 1+79.44, 20.62' (R)
INSTALL NEW R7-1 12'X18"
ALL NEW R7-1 12'X18"
I FLURRY ur[
3
I N I STA: 1+05.26, 20.76' (L)
L
C� ,IN``dII��//JJ I INSTALL NEW R7-1 12"X18"
JNI/IOVU I I STA: 0+76.41, 20.57' (L) 0+ - oo -
t+oo TRADE WIND LANE 2+00
O INSTALL NEX(4) O >--w
-z�l
STA: 1+32.00, 21.09' (L)
INSTALL NEW R7-1 12"X18" ew I U
t W
� STA: 1+01.29, 21.39' (R)
6i (7 I CURB PAINT INSTALL NEW R7-1 12"X18"
30' (TYP.) I I (TYP.)of
0+00 1+00 2+00 I I co
�Z
N I FLURRY LANE
1
o U O
m �Ni I > — — — — I oo I INSTALL ALL NEW5, 20.77' (R)
v �Nl�l�fb'd I Z I STA: 0+93.95, 20.B6' (R) I M
N O N U I I CURB PAINT INSTALL NEW R7-1 12"X18" I N O
(TYP.) I V �
N I z I PARKING w z
STA; 0+77.01, 21.05' (L) Llm:j
Z I ANY — — — — J
o INSTALL NEW R7-1 12"x18" I �ZO T = z a
o G7
' U��j can < (D
z I I I I zZ N ''znn
> Co V
STA: 0+64.54, 20.57' (R)
m' I INSTALL NEW R7-1 12'X18" SIGN AND PAVEMENT MARKING NOTES: W
z
1. SIGNS, INSTALLATIONS, POSTS AND MOUNTING
N 0 SHALL BE IN CONFORMANCE NTH CITY OF
a o BOZEMAN STANDARD DRAWING NO. 09B10-1 AND
I•. I PARKING NO. 0981D-4 AND THE MANUAL ON UNIFORM
o III TRAFFIC CONTROL DEVICES.
ANY 2. PAVEMENT MARKING SHALL BE INLAID
a III TIME THERMOPLASTIC OR PRE-FORMED PLASTIC TAPE,
j �'� ,- AND SHALL BE IN CONFORMANCE WITH THE
l 4.:
N MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. N
U II
0 3. CURB MARKINGS SHALL BE YELLOW PAINT, IN fly■
0 II CONFORMANCE WITH SECTION 02581 OF THE I. PROJECT 4422.11265.01
MONTANA PUBLIC WORKS STANDARD
V DATE JANUARY 2015
/ I I SPECIFICATIONS.
0 Ih
I zo o zo 40 4. DESIGN SPEED OF 30 MPH USED FOR ROAD 20 0 20 4o ODO LHKMSHEET 2015
j SCALE IN FEET DESIGN SCALE IN FEET sH�r
N
" S-1
d
x }
x m
x
x
Hill
w
J
Y 2
S O
3 F
a
N U
O N
5 �
NO
I I I
O
PARKING
3J,Nd
9N10d I I TIME ANY
qw ;
LLNJ I I STA: 2+12.00, 20.67' (R)
INSTALL NEW R7-1 12"X18"
STA: 2+22.13, 20,60' (L)
INSTALL NEW R7-1 12"X18" tl
I j FLURRY uc
Q �
cD _
> 3
O�Z�� > � Z Qz>-LLJ
z0- ► I I �
r Z STA: 5+57.12, 20.67' (L) Z-:::c¢~
INSTALL NEW 137-1 12"X18"
d STA: 4+70.33, 20.94' (L) o J
INSTALL NEW R7-1 12"X18" + STA: 5+85.06, 20.76 (L)
tTcl4INSTALL NEW R7-1 12"X18"
�A
SIGN AND PAVEMENT MARKING NOTES:
o
N 3 0+0 - 1 4+00 I 5+00 ~ - 1 - - — 1. SIGNS, INSTALLATIONS, POSTS AND MOUNTING
ITY OF
�Nt/l.laam� I 6+00 7+00 BOZEMAN STANDARD DRAWING NO.SHALL BE IN CONFORMANCE WITH CO 81D-1 AND
NO. 09810-4 AND THE MANUAL ON UNIFORM
a
TRAFFIC CONTROL DEVICES.
0
2. PAVEMENT MARKING SHALL BE INLAID
a — — — — — — — — I — — — — — — — AND SHALLTHERMOPLASTIC
PLSTICIN CONFORPRE-FMANCE MED P HSTIICIETAPE,
STA: 4+60.67, 20.98' (R) 1 MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
N INSTALL NEW 137-1 12"X18" I STA: 5+75.63, 20.86' (R) 3. CURB MARKINGS SHALL BE YELLOW PAINT, IN
INSTALL NEW R7-1 12"X18" CONFORMANCE WITH SECTION 02581 OF THE
CURB PAINT MONTANA PUBLIC WORKS STANDARD00
o �Z Z o (TYP.) _0 SPECIFICATIONS. z
rT1�— +w I �D Z 4. DESIGN SPEED OF 30 MPH USED FOR ROAD uJ F J
F ^ c) DESIGN
o STA: 1+06.32, 21.14' (L) I 0 Q
a INSTALL NEW R7-1 12"X18" Ix (n :�i
3
Q 0 N z
Z_
m
,lNV I STA: 0+97.14, 20.09' (R) (n
0
GN10d I I INSTALL NEW R7-1 12"X18" Lu
a
ON I I I NO
PARKING
ANY
U
TIME
� ggg N
O I, PROJECT 4482,11265.01
++ U DATE JANUARY R015
I;Io ,
N it I 20 0 20 40 O DOWLHKM 2015
SHEET
i SCALE IN FEET c
S-2
ci
X }
m
X
X
z
J
CL
Y z
O
o m
o w
Z U
O w
Io 0 I Wo
-_ - --- I cD
]All I PARING -
- - - -
GNI�i��d TM: — — —
I
ONSTA: 4+92.20, 20.95' (R)
INSTALL NEW R7-1 12"X1B"
STA: 5+02.14, 20.81' (L)
INSTALL NEW R7-1 12"X1B"
Z '" ONIM 30ViI1
TRADE WIND�
Zo
C—D
z�w oZ z w
�+ zQ¢~i
`� STA: 5+61.23, 20.83' (L)
CL-
I INSTALL NEW R7-1 12'X18"
STA: 4+74.37, 20.95' (L) TA: 5+89.59, 20.96' (L)
INSTALL NEW R7-1 12"X18" INSTALL NEW R7-1 12"X18"
L 3
N I
SIGN AND PAVEMENT MARKING NOTES:
1. SIGNS, INSTALLATIONS, POSTS AND MOUNTING
1 - 4+00 5+00 6+00 7+00 -
TRADE WIND LANE SHALL BE IN CONFORMANCE WITH CITY OF
TRADE WIND LANE BOZEMAN STANDARD DRAWING NO. 09810-1 AND
N NO. 09810-4 AND THE MANUAL ON UNIFORM
< TRAFFIC CONTROL DEVICES.
0
2. PAVEMENT MARKING SHALL BE INLAID
a - — — — — — — — — — — — — AND THERMOPLASTI IN CONFORMANMED CE PLASWITH TIC
TAPE,
STA: 4+64.89, 20.77' (R) +o MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
INSTALL NEW R7-1 12"X78" STA: 5+80.62, 21.07' (R) 3. CURB MARKINGS SHALL BE YELLOW PAINT, IN
N
t
rTl�z CURB PAINT INSTALL NEW R7-1 12"X18" CONFORMANCE WITH SECTION 02581 OF 1HE
00
�D z (TMP) MONTANA SPECIFICATIONS.PUBLIC WORKS STANDARD 06
w O I 4. DESIGN SPEED OF 30 MPH USED FOR ROAD W E J
G7 I I -< O DESIGN U) a
rn az: + . , . ( )
Q
INSTALL NEW R7-1 12"X18"
I w z
W
Q N Z
z LD ]WIl ❑ m C�
z
ml �N\\�II/�/J Q TA: 3+76.91, 20.79' (R) � U)
z
GNI/I❑V U I I O I INSTALL NEW R7-1 12"X18"
IL
ON i I N0
PARKING
ANY
TIME
I N
0
a
U
PROJECT 4422.11265.01
DATE JANUARY 2015
2D 2D 40 C DOWLHKM 2015
SHEET
N SCALE IN FEET
N S-3
0
x >-
x mHill
x
0
w I
J
BARTER '"'a31XV® o
a
3 BARTER we
0
Z I cm
t x
I
STOP STOP
STA: 6+90.12. 20.01' (R) o
INSTALL NEW R1-1 30"X30" / \ TA: 54+88.81, 22.62' (R) w
INSTALL NEW D3-1 (4) / \ / INSTALL NEW R1-1 30"X30"
i
INSTALL NEW D3-1 (4)
M I
BARTER LANE i , i y � >'T'
BA
4
_ -
J I _
--
.OE ..........--OE _._ ._ E l/ OE .�\ �-. OE-_.�E___r_. ....._.OE. _.. GE_ OE OE _ �.- OE _'— E OE OE
G G C G G .� G G G ( G — ....... G __G
-•-
._.__..-- - -
—C C C C C C C C � ��C C C C C C C C C—
STA: 11+03 70 28.70' (R)
STA 9+86.82, 30.86' (R I STA: 15+69.05 28 85' (R)
INSTALL NEW R7-1 12"X18" STA: 14+48.72, 30.91' (R)
s INSTALL NEW R7-1 12"X18" INSTALL NEW R7-1 12"X18" 11 INSTALL NEW R7-1 12"X18"
CURB PAINT �
(TYP.) CURB PAINT
Wz�z t
am' Q (TYP.) I ���z O
�0
trT1-<z0 I Q 1rn m��0 m��� E
o
N Z
1O STA: 6+72.86, 19.92' (L) I Z STA: 6+62.87. 20,32' (R) STA: 54+70.96, 22.84' (L) I =
STA: 54+60.87, 22.84' (R)
N INSTALL NEW R7-1 12"X18" INSTALL NEW R7-1 12"X18" INSTALL NEW R7-1 12"X18"
INSTALL NEW R7-1 12"X18"
a
�Nd �+ NO ~ NO
GNI�INb'd � PARKING PARKING
TIME LL
GN10d ANY
LN I �— O N T 00
—.
N Z
W w
a STA: 54+40.96, 22.84' (L) U g
0
INSTALL NEW D11-1 24"X18" �
aI & M7-2 12"X19" < Ur
z t Z O z
iinod im
SIGN AND PAVEMENT MARKING NOTES: U) U)
LLI
0 1. SIGNS, INSTALLATIONS, POSTS AND MOUNTING f,�E
< SHALL BE IN CONFORMANCE WITH CITY OF
BOZEMAN STANDARD DRAWING NO. 09810-1 AND
a NO. 09810-4 AND THE MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES.
U
I
2. PAVEMENT MARKING SHALL BE INLAID
THERMOPLASTIC OR PRE-FORMED PLASTIC TAPE,
AND SHALL BE IN CONFORMANCE WITH THE
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
3. CURB MARKINGS SHALL BE YELLOW PAINT, IN
�N
CONFORMANCE a WITH SECTION 02581 OF THE O PROJECT 4482.11865.01
MONTANA PUBLIC WORKS STANDARD DATE JANUARY 8015
SPECIFICATIONS.
0
N 4. DESIGN SPEED OF 30 MPH USED FOR ROAD 20 0 20 qp O DOWLHKM 2015
DESIGN mommommila SHEET
i SCALE IN FEET
0
S-4
�x m
m
x
x
x
z
Y Z
S O
BIKE ROUTE
Z U
O to
it
TA: 53+16.58, 23.45' (R)
INSTALL NEW D11-1 24"X18"
M7-2 12"X19"
�NV I N
GN10d
PARKING
O N �
'"ONIM 30V2ll
TIME NY (� TRADE WINDu¢ _
STA: 52+88.17, 23.13' (L) �,
INSTALL NEW R7-1 12"X18" TA: 10+30.73, 20.02' (L)
STA: 52+86.47, 22.78' (R) INSTALL NEW R1-1 30"X30"
INSTALL NEW R7-1 12"X18" INSTALL NEW D3-1 (4)
�_ C-D
U) r �p
DJ STA: 10+54.98, 19.10' (L) #
STA: 9+34.97, 21.02' (L) H 1 INSTALL NEW R7-1 12"X18"
INSTALL NEW R7-1 12"X18" Z
S
8+00 9+00 10+00 I / 0/5 (3 INDjL
" TRADE WIND LANE
N _ / SIGN AND PAVEMENT MARKING NOTES:
o �{�BE INN CONFORMANCE WITH AND pO NTING
w STA: 9+22.95, 20.77' (R) STA: 10+44.96, 19.83' (R) BOZEMAN STANDARD DRAWING NO. 09810-1 AND
INSTALL NEW R7-1 12"X78" ` NO. 09810-4 AND THE MANUAL ON UNIFORM
o INSTALL NEW R7-1 12"X16" TRAFFIC CONTROL DEVICES.
o STA: 9+51.85, 21.01' (R) -�
il
> INSTALL NEW R1-1 30"X30" � 2. PAVEMENT MARKING SHALL BE INLAID
N �D y CURB PAINT =1��Z THERMOPLASTIC OR PRE-FORMED PLASTIC TAPE.
( •) m-<T O AND SHALL BE IN CONFORMANCE WITH THE
m-<z O Q MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
N O 3. CURB MARKINGS SHALL BE YELLOW PAINT, IN
�j MONTANA PUBLIC WORKS STANDARD THE
06
SPECIFICATIONS. r` Z
w W
STA: 51+79.15, 23.21' (L) STA: 51+87.48, 23.34' (R) 4. DESIGN SPEED OF 30 MPH USED FOR ROAD ~ g
o INSTALL NEW R7-1 12"X18" = INSTALL NEW R7-1 12"X18" DESIGN Q 0-
o I
�� No z
�lNb I P o
3 ARKING m
WNW ' ANY
ONE �'
o I
Z
a
a STA: 51+48.81, 22.83' (L)
INSTALL NEW D11-1 24"X18" I
I
& M7-2 12"X19"
U
31�0� �1f18 N
a PROJECT 4422.11265.01
DATE JANUARY 2015
i
0
I 20 0 20 40 ODO LHKM
ma SHEET 2015
i SCALE IN FEET
0
S-5
X }
X O]
X '
X
O I
Z
J
Y Z
= I O
3 F
a
I A V
O to
� 5 �
ANV
3WI' I o_
ON%yd I
ON I BI�E ROUTE
0
STA: 50+11.26, 23.41' (L) I l
INSTALL NEW R7-1 12"X18 I STA: 50+05.48, 22.91' (R)
INSTALL NEW D11-1 24"X18"
I & M7-2 12"X19"
C)
co
zQQI— 3I
NO
STA: 8+98.85, 20.82' (L) J I uJ
PARKING
INSTALL NEW R7-1 12"X18" 2I i ANY
TIME
t I I STA: 49+52.68, 22.86' (R) `
I I INSTALL NEW R7-1 12"X18" S
- ~ s+00 9+00 I 10+00 Y
FLURRY LANE I ¢ Q
O_ m
I I
SIGN AND PAVEMENT MARKING NOTES:
N
1. SIGNS.
° SHALL BE INSTALLATIONS,N CONFORMAN CONFORMANCE
NTH ND CITY
O MOUNTING
STA: 8+80.12, 20.72' (R)----- I URB PAINT BOZEMN STANDARD DRAWING NO. 09810-1 AND
( ) NO. D9810-4 AND THE MANUAL ON UNIFORM
INSTALL NEW R7-1 12"X18" TYP'
o I TRAFFIC CONTROL DEVICES.
2. PAVEMENT MARKING SHALL BE INLAID
R PRE-FORMED PLASTIC
N t
Fllz z I AND SHALL S ECINO CONFORMANCE NTH THETAPE,
z I MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
N � r
3. CURB MARKINGS SHALL BE YELLOW PAINT, IN
�f� ! CONFORMANCE WITH SECTION 02581 OF THE 00
STA: 9+11.31, 20.72' (R) I i j MONTANA PUBLIC WORKS STANDARD 08 z
INSTALL NEW Rl-1 30"X3p TA: 49+04.01, 22.97' (R)
'� SPECIFICATIONS.
�. II
INSTALL NEW D3-1 (4) I � I i INSTALL NEW R7-1 12"X18" LLI f-
o STA: 48+95.82, 23.28' (L) it I (I DESIGN DESIGN SPEED OF 30 MPH USED FOR ROAD Q a
x (f� INSTALL NEW R7-1 12"X18"
� maa N O PARKING z� Nb Z ANY TIME
w U)
ON iJ j "i II I Z
a STA: 48+65,82, 23.27' (L)
INSTALL NEW D11-1 24"X18" r
0 & M7-2 12"X19"
r, 1
1l no� N
3�18
o I
PROJECT 4482.11865.07
DATE JANUARY 8015
4I II 20 D 20 40 ®OOWLHKM 2015
I
N ( SHEET
SCALE IN FEET
a
S-6