HomeMy WebLinkAboutDRC Response 12-10-2019Page 1 of 2 FROM: DEVELOPMENT REVIEW COMMITTEE RE: BUILDING M (AVIATOR BUILDING) IN BOZEMAN GATEWAY CONCEPT REVIEW, APPLICATION 18462 DATE: OCTOBER 29, 2018 Planning Division, Sarah Rosenberg, srosenberg@bozeman.net, 406-582-2297 1. The subject property is zoned B-2. Acknowledged 2. This proposal is must follow the Site Plan Development Proposal requirements. Acknowledged 3. The project is required to be reviewed by the Design Review Board per Conditions of Approval adopted by the City Commission when the PUD was adopted. Acknowledged 4. Approval from the Property Association will be required for amenities in the open space and clarification of who will be responsible for the maintenance of it. Acknowledged 5. There is concern how water runoff will occur on the architectural elements of the building. North of the property, there is typically stormwater runoff that builds up and can cause hazards to pedestrians. Clarify how this will be mitigated through the stormwater design. Acknowledged – to be address in stormwater report 6. Section 38.510.030: The property must follow Mixed Use block frontage standards. Acknowledged 7. Section 38.530.060: Any façade directly adjacent to a sidewalk, there must be 18” of impact resistant materials. Glass is not considered an impact resistant material.  Please provide building sections in formal submittal. Acknowledged. Detailed building elevations are located in Section 5, Appendices C – Building Design and Signage Plan. 8. Section 38.540.050: A parking table is required to determine parking calculations for the area. The parking lot to the south will be required to be developed. See Cover Sheet in Section 5, Civil Site Plan for details. 9. Section 38.550: The proposed site must meet 15 landscaped points. Please provide landscape plan and display how points are met. See Landscape Plan located in Section 5 for details. Engineering Division, Anna Russell, arussell@bozeman.net 406-582-2279 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Page 2 of 2 1. Please see attached memo dated October 29, 2018 NorthWestern Energy; Cammy Dooley, cammy.dooley@northwestern.com  An easement will be required across the open space to the north of the property Acknowledged an easement is provided to the north of the property and an Easement – Underground Electric form has been submitted to Northwestern Energy. Building Division; Bob Risk brisk@bozeman.net, 406-582-2377  Sprinklers will be required. A detailed fire suppression plan is located in Section 4, Appendices C – Building Design and Signage Plan. Fire Department; Scott Mueller smueller@bozeman.net, 406-582-2353 .0  Fire Alarm System, Fire Sprinkler System with Standpipes will be required. Acknowledged  There may be a requirement for an emergency generator for the elevator Acknowledged Solid Waste Division; Russ Ward, rward@bozeman.net, 406-582-3235  Need detailed plan for the refuse enclosure A detailed trash enclosure plan is located in Section 5, Appendices C – Building Design and Signage Plan.  Must have 50 feet of straight approach to the refuse enclosure Acknowledged  Refuse enclosure will need to be covered Acknowledged These Divisions did not provide comment. Contact reviewers directly with individual questions. 1. Parks and Recreation; Carolyn Poissant, cpoissant@bozeman.net, 406-582-2908 2. Sustainability Division; Natalie Meyer, nmeyer@bozeman.net, 406-582-2317 3. Water Conservation; Jessica Ahlstrom, jahlstrom@bozeman.net, 406-582-2265 4. Stormwater Division; Kyle Mehrens, jkmehrens@bozeman.net, 406-582-2270 5. Water and Sewer Division; John Alston, jalston@bozeman.net, 406-582-3200 6. Forestry Division; Alex Nordquest, anordquest@bozeman.net, 406-582-3205 Future Impact Fees - Please note that future building permit applications will require payment of the required transportation, water, sewer and fire impact fees according to the City of Bozeman adopted impact fee schedule in place at the time of building permit issuance. If you desire an estimate of the required impact fees according to current rates please contact the Department of Community Development and/or visit. You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)