Loading...
HomeMy WebLinkAbout3638009-C410-Erosion & Sediment Control 2020-02-26SSSSSSSSSSSSSSSSSSSSSSSSWWWWWWWWWWWWWWWWWWWWWWWWSSSSSSSSSSSSSSSSWWWWWWWWWWWWWWWWWWWWWWWWWWinfo0.25 AC.10,857 SqFt JOB SITE OFFICE 44 45 40454647474849 49 1.20%0.84%0.65%0.50% ± 484 1 48 4 0 484248404841 4841 4842484248434844484548 4 5 484548474848484948464846484748484848484748464849©2880 Technology Blvd. W.Bozeman, MT 59718Phone: (406) 587-0721Fax: (406) 922-6702SHEET NUMBERPROJECT NUMBERDRAWING NUMBERDRAWN BY:CHK'D. BY:APPR. BY:DATE:Q.A. REVIEWDATE:BY:COPYRIGHT MORRISON-MAIERLE, INC.,2020VERIFY SCALE!THESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY!REVISIONSDATEDESCRIPTIONNO.BYN:\3638\009\ACAD\Site Plans\Building-M-Aviator\Sheets\3638009-C410-Erosion & Sediment Control.dwg Plotted by celine saucier on Feb/26/2020engineerssurveyorsplannersscientists3638.009C410BOZEMANMONTANAJAUKDJJAU2/20201DRC REVISIONS 2/26/2020CMS870 HARMON STREAM BLVD.EROSION & SEDIMENT CONTROL PLANSITE M - AVIATOR BUILDINGBOZEMAN GATEWAY PUDKnow what'sbelow.before you dig.CallR11x17 HORIZONTAL SCALE: 1" = 60'GRAPHIC SCALE0(IN FEET)153015301 INCH = 30 FTPROPOSED STRAWWATTLENOTES BY SYMBOL:INSTALL TYPE D INLET PROTECTION FILTERPER DETAIL 3 ON SHEET C720 PRIOR TOTHE DISTURBANCE OF ANY PORTION OFTHE SITE.34EXISTING GRAVEL TO BE PAVED WITH THISPROJECT. THE GRAVEL SURFACE ACTS TOPREVENT THE EROSION OF THIS AREA.LEGENDEXISTING ASPHALT SURFACEEXISTING CONCRETE SURFACEEXISTING CRUSHED FINES SURFACEEROSION & SEDIMENT CONTROL NOTES:1.EROSION AN SEDIMENT CONTROL ON THIS PROJECT SHALL BE COMPLETED INACCORDANCE WITH THE CITY OF BOZEMAN'S BEST MANAGEMENT PRACTICE(BMP) MANUAL FOR CONSTRUCTION SITES. VERSION 3 - SEPTEMBER 1, 2016.2.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BEINSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING,STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROLMEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THECONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECTSCHEDULE, CONSTRUCTION PLANS, AND STORMWATER MANAGEMENT PLAN.3.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BERESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSIONINCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TOMINIMIZE WIND BLOWN SEDIMENT. THE CONTRACTOR SHALL ALSO BERESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROLFACILITIES SHOWN HEREIN.4.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINEDWHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATIONSHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTIONOPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.5.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES INADDITION TO WHAT IS SHOWN ON THESE PLANS. THE CONTRACTOR SHALLIMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY TOCONTROL ON-SITE EROSION.6.ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BYAPPROPRIATE EROSION CONTROL METHODS. ANY SOIL STOCKPILE THAT WILLBE DORMANT FOR OVER THIRTY (30) DAYS SHALL BE SEEDED.7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARENECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OFPOLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLELOCAL, STATE, AND FEDERAL REGULATIONS.8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTIONMATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS OR OTHERPUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS ARE CLEANED AT THE ENDOF EACH WORKING DAY.INSTALL TRACKOUT CONTROL SYSTEMPER DETAIL 1 ON SHEET C720 OR ASRECOMMENDED BY MANUFACTUREREXISTING MAJOR CONTOUR4820EXISTING MINOR CONTOURSTAGING AREACONSTRUCTIONLIMITSEXISTING PARKING AREA45 1EXISTINGPARKING AREAEXISTINGPARKING AREA3312INSTALL CONCRETE WASHOUT FACILITYPER DETAIL 2 ON SHEET C7202TEMPORARYSANITARYFACILITIESTEMPORARYJOB SITEDUMPSTERAREA TO BE PAVED12/10/20193333SITE PLAN RESUBMITTAL - 02.26.2020EQUIPMENT ANDWORKER PARKINGTEMPORARYJOB SITETRAILERMATERIAL33335PROPOSED ASPHALT PARKING LOT55STAGING AREAMATERIAL1