HomeMy WebLinkAboutA2.1 #3 Elevations 12-30-2019 (2)INSULATED GARAGE DOORS- TYP
30 YR ASPHALT SHINGLES
CONT. RIDGE VENT- TYP
VINYL WINDOWS-
TYP
1X6 FASCIA BOARD-
PAINTED, TYP
ACCENT COLOR #2
PAINTED FIBER CEMENT SMOOTH LAP
SIDING w/ 7" EXPOSURE- TYP
ACCENT COLOR #2
PAINTED FIBER CEMENT SMOOTH LAP SIDING w/ 7"
EXPOSURE- TYP
12"
12"
12"
12"
DARK SKY COMPLIANT WALL LAMP
SEE 2/A2.1 FOR TYPICAL NOTES
5"
12"4 1/2"
12"
3"
12"
2 '-
1 0 "
TRIM BOARD PAINTED, TYP.
TRIM BOARD PAINTED, TYP.
TRIM BOARD PAINTED, TYP.
2 5 '
-
8 "
SEE 2/A2.1 FOR TYPICAL NOTES
9"
12"
9"
12"
4"
12"
4"
12"4"
12"
2 '
-
0 "
SEE SP1.0 FOR METER LOCATIONS
SEE 2/A2.1 FOR TYPICAL NOTES
PHASE:PROJECT #:
DRAWN BY:
DRAWING NUMBER:
DRAWING TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
OWNER:
0 "
1 "
2 "
DEC. 10, 2019
18-016
RER STH
95% SET
A2.1
ELEVATIONS
M
O
U
N
T
A
I
N
V
I
S
T
A
P
L
A
N
#
3
2
9
2
8
W
E
S
T
B
A
B
C
O
C
K
S
T
.
S
1
1
,
T
0
2
S
,
R
O
5
E
,
T
R
A
C
T
2
4
B
O
Z
E
M
A
N
M
T
McINTOSH
CONSTRUCTION
406.580.2668
123 DESCRIPTION 09/09/09
1/8" = 1'-0"2 BACK
1/8" = 1'-0"3 RIGHT
1/8" = 1'-0"1 STREET FRONT
1/8" = 1'-0"4 LEFT
KHAKI BROWN
MAIN COLOR #1
ACCENT COLOR #2
TRANSPARENCY CALCULATION:
1017 SF(TOTAL WALL)/ 132SF (TOTAL GLAZING)=.14 OR 14% GLAZING