Loading...
HomeMy WebLinkAbout04-20-20 City Commission Packet Materials - C8. PSA with Confluence Conslting for Front St Interceptor Wetland Monitoring Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Shawn Kohtz, City Engineer SUBJECT: Front Street Interceptor Sewer Main Replacement Project – Professional Services Agreement for Wetland Monitoring. MEETING DATE: April 20th, 2020 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve and authorize City Manager to sign the Professional Services Agreement with Confluence Consulting, Inc. BACKGROUND: Attached is a copy of the partially executed Professional Services Agreement with Confluence Consulting, Inc. for wetland monitoring associated with the Front Street Interceptor Sewer Main Replacement Project. The document is in the City’s standard format. The installation of the Front Street Sewer Main will impact wetlands on the Montana Department of Transportation (MDT) property adjacent to East Main Street near the interstate off ramp. This is a wetland mitigation site that MDT has used to offset wetland impacts on other projects. Because of this, the Army Corps of Engineers is requiring that the City prepare a restoration plan and provide 2 years of monitoring of the area as a condition of the 404 permit. Two quotes were received for the work, and the one from Confluence was the lowest. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission FISCAL EFFECTS: $3,144.25 from the Wastewater Impact Fee Fund (WWIF11). Attachments: Professional Services Agreement Report compiled on: 3/31/20 98 99 100 101 102 103 104 105 106 107 108 109 110