Design and Construction Project
Project Name: Midtown TO
City of Bozeman #M I D20-001-Aspen St.
Economic Development Department Project No: 18098.06
and the Midtown Urban Renewal Board
IL
AGREEMENT
Between and Among
GREAT NORTHWEST CONSTRUCTION, INC.
AND
THE CITY OF BOZEMAN
For West Aspen Street Design and Construction Project
This Agreement is hereby made and entered into by, between, and among Great Northwest
Construction, Inc. ("Great Northwest"), a Montana Corporation, the owners of the south 45 feet of
Lot 4 and all of Lot 5 in Block 2 of North Seventh Addition (the "Property"), and the City of
Bozeman, with a mailing address of P.O. Box 1230, Bozeman Montana 59771 ("City"). As used
in this Agreement, "City" includes the City's employees, agents, and contractors and "Great
Northwest" includes Great Northwest's employees, agents, and contractors.
A. BACKGROUND
The City has undertaken planning and design to construct new sidewalks, boulevards, and a
decorative street section on the West Aspen Street corridor in the Midtown Urban Renewal District
in Bozeman, Montana (the "Project").
B. PURPOSE
The purpose of this Agreement is to document the Project roles and responsibilities of each of
the parties in relation to portions of the Project that will be conducted on and adjacent to the
Property owned by Great Northwest. This Agreement will describe which party will be responsible
of these aspects of the Project including construction efforts, oversight, maintenance, funding,
and impacts to private property features.
C. PROJECT
The Project area is generally defined as incorporating West Aspen Street from North 7th Avenue
to North 5`h Avenue and a portion of North 51h Avenue from West Tamarack Street to the south
line of the BMX Park. The goal of the Project is to provide improvements to create a street festival
corridor while providing a safe and visible access route for pedestrians and consumers. This
Project will impact both the actual street elements within the confines of the existing curb
and/gutter, driveway approaches, on-street parking, pedestrian ramps, roadside fixtures, and
other similar improvements.
D. PROJECT HISTORY
The City initiated the first steps in the process to create the street festival by working with public
officials and local property owners to develop a corridor plan. The Midtown Urban Renewal Board
Midtown TO#MID20-001
Page 1 of 5 Aspen Street
18098.06
Agreement between The City of Bozeman and Great Northwest Construction, Inc. for West Aspen Street
Design and Construction Project
(MURB) is in the process of completing the Project construction plans, due to be completed in the
spring of 2020.
E. DETAILED PROJECT INFORMATION
Project Improvements
The City plans to reconstruct West Aspen Street to include a new paved roadway surface, water
main, on-street parallel parking, sidewalks, boulevards and landscaping improvements. The new
boulevards will be installed with a mix of planter boxes, trees, brick pavers and concrete.
The City plans to complete intersection improvements at the intersection of West Aspen Street
and North 5th Avenue with this Project. Planned Improvements include a new paved roadway
surface, pedestrian ramps, concrete crosswalks, storm drainage system, and curb/gutter.
North 51h Avenue will mostly remain intact with improvements consisting mainly of creating on-
street back-in angled parking. The new parking will be installed on the east side of the road
adjacent to the BMX Park to increase parking in the festival corridor for all users.
Project Improvements on the Property
The proposed Project improvements necessitate modifications to adjacent property features to
facilitate a functional street corridor on West Aspen Street. The Property owned by Great
Northwest is currently undergoing reconstruction for a commercial business. The Property
incorporates two main approaches, one each to North 71h Avenue and West Aspen Street. The
Property also has the potential to access an alley way along its east side. The approach to the
Property on West Aspen Street conflicts with the Project improvements and its removal would
significantly enhance the quality of the Project.
In an effort to complete the Project and to enhance off-site drainage, the City has requested Great
Northwest authorize removal of to the access to the Property from West Aspen Street in exchange
for the City designing and constructing off-site storm drainage improvements. These
improvements to the Property are referred to herein as the "Property Improvements.") The
proposed storm drainage improvements to the Property include installation of surface collection
drainage ways and a sub-surface infiltration dry well to capture and safely release surface runoff
from the Property. Mitigating the surface drainage on the Property will reduce drainage impacts
to adjacent properties and provide adequate infiltration that currently does not exist, reducing the
risk of water damage to adjacent private improvements and stormwater encroachment into the
public right-of-way. The Property Improvements to be completed by the City are defined in Exhibit
"A",
F. OBLIGATIONS OF THE CITY RELATED TO THE PROPERTY IMPROVEMENTS
1. Except as otherwise provided herein, the City agrees to furnish all plans, engineering,
supervision, labor, material, supplies and equipment necessary for construction of the
Property Improvements.
2. The City agrees to submit and pay the cost associated with the required Site Plan
Modification application to the Department of Community Development detailing the
proposed Property Improvements.
3. The City agrees to construct the Property Improvements and contract for and administer
the construction of the Property Improvements as defined in Exhibit "A".
Midtown TO#MID20-001
Page 2 of 5 Aspen Street
18098.06
Agreement between The City of Bozeman and Great Northwest Construction, Inc. for West Aspen Street
Design and Construction Project
G. OBLIGATIONS OF GREAT NORTHWEST
1. Great Northwest hereby grants the City permission, terminable as provided herein, to use
the Property for purposes of completing the Property Improvements, during the term listed
herein and only on the terms and conditions set forth or reasonable orders of the Great
Northwest's authorized representatives made from time to time, which City promises
to comply with and abide by. City agrees to comply with all City ordinances and other
rules and regulations regarding permits and approvals related to City's operations on the
Property related to the Project as well as those of any other governmental entity having
jurisdiction.
2. Great Northwest agrees to allow the City to remove the private driveway approach to West
Aspen Street to the Property and to install a new storm drainage system on the subject
property to mitigate storm water run-off from the subject property only.
3. Great Northwest agrees to maintain the sidewalk and boulevard areas adjacent to their
property as required by Bozeman Municipal Code, Sections 34.04.020, 34.06.020, and
38.550.070. Such maintenance activities include replacing damaged sidewalk, snow
removal, and maintaining damaged boulevard brick pavers.
H. GENERAL
1. TERM/AMENDMENT/TERMINATION. This Agreement is effective ��
20')�' and will expire on January 1, 2022. This Agreement may be amended only in writing,
signed by the two parties. If either party fails to comply with any term of this Agreement,
the non-defaulting party may, at its option, terminate this Agreement and the parties shall
be released from all obligations if default is not cured within thirty (30) calendar days after
written notice of the default is provided to the non-defaulting party. Within thirty(30) days
of expiration or termination of this Agreement, City agrees to remove all of City's personal
property from the Property and restore the Property to the original condition existing at the
time the City commenced its use of the Property, but only to the extent changes in the
condition of the Property were caused by the City's use.
2. PRINCIPAL CONTACTS. The principal contacts for this instrument are:
City of Bozeman Great Northwest Construction, Inc.
c/o Brit Fontenot c/o Steven Schlegel
121 N Rouse 1929 Bozeman Trail
P.O. Box 1230 Bozeman, MT 59715
Bozeman, MT 59771-1230 Phone: (406) 570-4898
Phone: (406) 582-2321
3. AUTHORIZED REPRESENTATIVES. By signature below, each party certifies that the
individuals listed in this document as representatives of their respective party are
authorized to act in their respective areas for matters related to this agreement.
Midtown TO#MID20-001
Page 3 of 5 Aspen Street
18098.06
Agreement between The City of Bozeman and Great Northwest Construction, Inc. for West Aspen Street
Design and Construction Project
4. INDEPENDENT CONTRACTORS. The Parties agree and acknowledge that in the
performance of this Agreement City shall not be considered an agent, representative,
subcontractor, or employee of Great Northwest and Great Northwest shall not be
considered an agent, representative, subcontractor or employee of City.
5. INTEGRATION. This Agreement constitutes the entire agreement of the Parties.
Covenants or representations not contained therein or made a part thereof by reference,
are not binding upon the parties. There are no understandings between the parties other
than as set forth in this Agreement.
signature page to follow
Midtown TO#MID20-001
Page 4 of 5 Aspen Street
18098.06
Agreement between The City of Bozeman and Great Northwest Construction, Inc. for West Aspen Street
Design and Construction Project
THE PARTIES HERETO have executed this instrument.
CITY OF BOZEMAN
^ kDate:
l
Name: Der4mts 11K"rAy oR
Title: )qy-mgi M C Cty M &Y446vER
ATTEST:
31 Date: a
Name: N1A#*r5
Title: C C.`e 9-'A-
GREAT NORTHWEST CONSTRUCTION INC.
i
Date:
Na e:
Title:
Date:
Name:
Title:
Midtown TO#MID20-001
Page 5 of 5 Aspen Street
18098.06
n � a xVazos do AID HHL (U mmuaad xsc
(ILL HIMOx `Z 7LWM `s UM T V Un do St
g_� o I
I � 8E-1 OgOg I I § 1 1,- �
I $ $ I
—`�9t JI �E rV iz-3 tvidJ ^.'lLIt70V H.C HltJ<I;
d" rVTV6 oN•royo ��� ~I' _ _ I r
I
9 / I
gY to
� I
p
I tt y w u a yg� I 4 a a b? Ae
u o v y
00
e
v;
c `m E c E ai
a` `I I
-movND or rn � - 2
_ G! N OO a qq W •
'C C' t3
E o O�n v m o
5�
VN
o 9= e
m o n a�i mJ o c m N y18 QspppCyyy \ M �p V!O D y y
m a E 3 c E o_ � o Ei 043a
T ya U Q0@ I Y
`o E c w .m-0 rn
c o d `m c =� m 8 ■
m2yE
C y O jAf
o N c Esd rn`m v 3 2, \ 2 �. 9 b pe lie?
�� z o ' Zo rn� I F is ti Ig #I
NNE
O NL..U pNp t O N a O
N > CI p > N > J O Of io� \ I 1
N O�W YOy OC mL01
«N EE 'NO C
Ol L D) U E J U T U d 2
I- n n f6 E ri of E v c — —44
-------------------------- -
x lIQ•1.111J
� plp%w/:�� .� e
e § arra3Av ROGA a►odor+
Y k!le—Q�rj sg tlu b_
il g