Loading...
HomeMy WebLinkAbout03-23-20 City Commission Packet Materials - C14. Amendment 3 to TO2 with AE2S Inc for Prof Engineering Services Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brian Heaston, Senior Engineer Mitch Reister, Director of Public Works SUBJECT: Authorize the City Manager to execute Amendment No. 3 to Task Order No. 2 of the Professional Services Master Task Order Agreement with the firm of AE2S, Inc. providing on-call professional engineering services for Instrumentation & Control Systems. MEETING DATE: March 23, 2020 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to execute Amendment No. 3 to Task Order No. 2 of the Professional Services Master Task Order Agreement with the firm of AE2S, Inc. providing on-call professional engineering services for Instrumentation & Control Systems. BACKGROUND: AE2S, Inc. provides professional engineering services on an on-call basis for the Bozeman Water Treatment Plant facility (WTP) under a Master Task Order Agreement entered into on April 24, 2017. Amendment No. 3 to Task Order No. 2 attached provides professional engineering services for instrumentation and controls (I&C) systems throughout various divisions of the City Public Works Department. I&C systems are critical operating elements of the City’s water treatment, water reclamation and water/sewer operations divisions that provide for supervisory control and data acquisition (SCADA) that allow for automated and remote operations of mechanical systems. Services will be provided on an as needed and requested basis by the City’s recently hired SCADA Manager, Zeb Breuckman, should he require assistance in the prosecution of duties required under the responsibilities of his position. FISCAL EFFECTS: The approved FY20 operating budgets of the water treatment plant, water reclamation facility, and water/sewer operations divisions provide for contracted services. Amendment No. 3 to Task Order No. 2 contains a fee not to exceed $10,000 to complete to be billed on a Time & Materials basis. Sufficient monies are available within operating budgets to cover costs that may arise under this task order amendment. ALTERNATIVES: As suggested by the Commission. ATTACHMENTS: Amendment No. 3 to Task Order 2 Hyperlinked: Professional Services Master Task Order Agreement Report compiled on March 12, 2020 185 BOZEMAN I&C and SCADA SUPPORT AMENDMENT NO. 3 of TASK ORDER NO. 2 for I&C SYSTEM SERVICES Contracted Under The PROFESSIONAL SERVICES MASTER TASK ORDER AGREEMENT Dated April 24, 2017 WHEREAS: Advanced Engineering and Environmental Services Inc. (CONTRACTOR) entered into a Professional Services Master Task Order Agreement on April 24, 2017 and a subsequent Task Order No. 2 on February 15, 2018 to perform I&C System Services for the City of Bozeman ("CITY"); The CITY desires to amend this Agreement in order for Contractor to perform services beyond those previously contemplated; CONTRACTOR is willing to amend the agreement and perform the additional engineering services for the additional compensation stated herein. NOW, THEREFORE, CONTRACTOR and the CITY do hereby agree: The Agreement and the terms and conditions therein shall remain unchanged other than those sections and exhibits listed below; COMPENSATION: The anticipated level of effort for the task is increased by $10,000 extendable by the CITY on a time and materials basis. Hourly billing rates for personnel assigned to work on this Task Order are provided in Attachment A of Amendment No. 3 (this amendment). Original Compensation: $5,000.00 Amendment 01 (as Task Order #3): $5,000.00 Amendment 02 of Task Order 2 $5,000.00 Amendment 03 of Task Order 2 (this amendment): $10,000.00 Total Compensation: $25,000.00 IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the day and year written below: CITY: CONTRACTOR: City of Bozeman, Montana Advanced Engineering and Environmental Services, Inc. Signature Signature By: By: Brian Viall Title: Title: Operations Manager Date: Date: March 10, 2020 186 This is Attachment A, consisting of 1 page, referred to in and part of Amendment 3 of Task Order No. 2 dated February 15, 2018 under the Professional Services Master Task Order Agreement dated April 24, 2017 ATTACHMENT A Table 1: Hourly Billing Rates and Labor Classification for Personnel to be Utilized on Task Order No. 2 Personnel Classification Hourly Labor Rate* Brian Viall Engineer IV $187.00/hr James Sletten I&C Technician IV $144.00/hr Table 2: Reimbursable Expense Rates Expense Category Reimbursable Expense Rate Transportation $0.57/mile Out of Pocket Expenses Cost x 1.15 *Labor Rates are subject to adjustment each year on January 1. Page 1 of 1 187