HomeMy WebLinkAbout17542 Staff Report B O Z E MAN MT
Staff Report
Planning Icon Apartments at Ferguson Farm MP
Thursday, May 24,2018
Project Name: Icon Apartments at Ferguson Farm MP
Application: 117542 Type: Master Site Plan
Summary: 336 unit appartment project with site amenities and public improvements
Zoning: I R-0 lGrowth Policy: lResidential
Size: 865,102
Overlay District: NA
Project Address: 4555 Fallon Street, Bozeman, MT 59718
Legal Description: MINOR SUB 365, S10, T02 S, R05 E, Lot 3A
Owner: Delaney and Company, Inc Ken LeClair
101 E Main Street 2422 Highland Blvd
Bozeman, MT 59715 Bozeman, MT 59715
Applicant: Bozeman Apartment Group, LLC
PO Box 11890 406-582-8100
Bozeman, MT 59719 wralph@blackridgeco.com
Representative: Sanderson Stewart Attn: Lauren Waterton
106 East Babcock 406-922-4313
Bozeman, Montana 59715 Waterton@sandersonstewart.com
Staff: Planner: Johnson Engineer: Kohtz
Noticing: Public Comment Period: Site Posted: Adjacent Owners Mailed:
4/26/2018 5/11/2018 4/26/2018 4/26/2018
Advisory Boards: Board: Date: Recommendation:
Recommendation Approval with conditions
Decision Authority Director of Community Development Date 5/24/2018
Full application and file of record. Community Development Department; 20 E. Olive St.; Bozeman; MT 59715
Page 1 of 10
B O Z E MAN MT
Staff Report
Planning Icon Apartments at Ferguson Farm MP
Thursday, May 24, 2018
FINDINGS OF FACT AND APPEAL PROVISIONS CERTIFICATE
A. PURSUANT to Chapter 38,Article 19, Bozeman Municipal Code(BMC), and other applicable sections of Ch.38, BMC, public
Notice was given, opportunity to submit comment was provided to affected parties, and a review of the preliminary site plan
described in this report was conducted. The applicant proposed to the City a Master Site Plan to allow the proposed building
along with related site improvements, parking and circulation on a 19.86 acres site.The purposes of the Master Site Plan
review were to consider all relevant evidence relating to public health, safety,welfare,and the other purposes of Ch. 38, BMC;
to evaluate the proposal against the criteria of Sec. 38.19.100 BMC, and the standards of Ch. 38, BMC; and to determine
whether the plan should be approved, conditionally approved, or denied.
B. It appeared to the Director that all parties and the public wishing to examine the proposed site plan and offer comment were
provided the opportunity to do so.After receiving the recommendation of the relevant advisory bodies established by Ch. 38,
Art. 33, BMC, and considering all matters of record presented with the application and during the public comment period defined
by Ch. 38, BMC,the Director has found that the proposed site plan would comply with the requirements of the BMC if certain
conditions were imposed.Therefore, being fully advised of all matters having come before him/her regarding this application,
the Director makes the following decision.
C. The Master Site Plan has been found to meet the criteria of Ch. 38, BMC, and is therefore approved, subject to the conditions
listed in this report and the correction of any elements Not in conformance with the standards of the Title.The evidence
contained in the submittal materials,advisory body review, public testimony, and this report,justifies the conditions imposed on
this development to ensure that the site plan and subsequent construction comply with all applicable regulations, and all
applicable criteria of Ch. 38, BMC. Martin Matsen, Director of Community Development, approved with conditions this Site Plan
for and on behalf of the City of Bozeman as authorized by Sec. 38.34.010, BMC. The approval of the final master site plan is
effective for not less than three but not more than five years with the initial duration to be specified during the final
action of the review authority.At the end of this period the Director may, at the request of the developer, extend the approval
in accordance with Ch. 38 Art.19, BMC.
D. This Director of Community Development's project decision may be appealed by filing a documented appeal with and paying an
appeal fee to the Clerk of the Commission for the City of Bozeman within 10 working days after the date of approval as
evidenced by the Director's signature,following the procedures of Sec. 38.35.030, BMC.
Director of Community Development
Martin at�CP Thursday, Y Ma 24 2018
CONDITIONS OF APPROVAL
1.0 The applicant is advised that unmet code provisions, or code provisions that are Not specifically listed as conditions of approval,
does Not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state
law.
Page 2 of 10
B O Z E MAN MT
Staff Report
Planning Icon Apartments at Ferguson Farm MP
Thursday, May 24, 2018
ST
1 r
C F i
T ,
C
z
Legend
Q Planning Projects selection
Parcels
Roads
Alleys
City Limits
Land Use(111115)
Mixed Use
RestaurenflBar
Commerolal Retail Sales.Services,Banks
Hotel\Motel
Commerclal Auto
AdministratWelProfesslonai e
Light Manufacturing
Golf Course
Perk or Open Space
Conservelan Easement
Church
Public Faclitty,
SchoollEducalionai Facility
Single-Household Resldential _
DupleATdpiex Residential fA1.LU\ Sl
Mu"Ploucehold Rewdentai
MobWle H.—IMohiia Pnr1,
Right-of-Way
Undeveloped
Vacant
Thomas Weeaer dbyttro
Gay a Bozeman
Icon at Ferguson Farm
Proposed Site Plan
Application 17379 BOZEMANMT
In -167 fad A Submitted 07/26/2017 Planning
Page 3 of 10
B O Z E MAN MT Staff Report
Planning Icon Apartments at Ferguson Farm MP
Thursday, May 24, 2018
ANALYSIS AND FINDINGS
Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, plans,
public comment, and all other materials available during the review period. Collectively this information is the record of the review.The
analysis in this report is a summary of the completed review.
Plan Review, Section 38.19.100, BMC
In considering applications for plan approval under this title,the advisory boards and City Commission shall consider the following:
1.0 Conformance to and consistency with the City's adopted growth policy Meets Code?
(38.01.040 C)
Growth Policy Land Use Residential Yes
Zoning R-0 Yes
Comments:The project site is zoned R-0,which is a permitted use as long as it is completely enclosed with a building.The property is
within the City's municipal service area and otherwise complies with the goals and objectives of the growth policy. Staff did not identify
any conflicts between the proposed use,the zoning, and the growth policy.
2.0 Conformance to this chapter, including the cessation of any current violations(38.34.160) Meets Code?
Current Violations I None JYes
Comments:The applicant is advised that unmet code provisions, or code provisions that are Not specifically listed as conditions of
approval, does Not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state
law.
3.0 Conformance with all other applicable laws,ordinances, and regulations(38.01.080) Meets Code?
Conflicts None Yes
Condominium ownership NA _ INA
Comments:The City will evaluate the plans against the requirements of the International Building Code(IBC)during building permit
review.The applicant must provide professional services for construction inspection and post-construction certifications from their
project professionals that the project was constructed according to plan and specification. The applicant must prepare plans and
specifications for any fire service line in accordance with the City's Fire Service Line Policy. The plans must be prepared by a
Professional Engineer and be provided to and approved by the City Engineer prior to initiation of construction of the fire service or fire
protection system. The applicant must also provide Professional Engineering services for construction inspection, post-construction
certification and preparation of mylar record drawings. Fire service plans, and domestic services 4"or larger, must be a standalone
submittal, separate from the site plan application. City of Bozeman applications for service must be completed by the applicant.
4.0 Relationship of site plan elements to conditions both on and off the property(38.19.100) Meets Code?
Neighborhood Compatibility Yes
Design and arrangement of plan to produce an efficient,functionally organized and cohesive Yes
development
Design and arrangement of plan in harmony with topography,water bodies,vegetation, contributing to Yes
the overall aesthetics
Conform with local historical or landmark designation requirements, including the Neighborhood NA
Conservation Overlay District (NCOD)
Page 4 of 10
B ® Z E MAN MT
Staff Report
Planning Icon Apartments at Ferguson Farm MP
Thursday, May 24, 2018
Relationship to other plans (subdivision/master site plan, PUD,etc.) Yes
Comments:The proposed building is compatible with the general pattern of development in the area.The architecture and building
elements are high quality and conform. The site design provides appropriate parking and denotes proper circulation.The landscaping
and Non-vegetative landscape elements provide screening for the parking and circulation areas.The site plan addresses the Non-
motorized transportation network through the provision of direct and efficient pedestrian connections to future public sidewalks and
shared use pathways.
5.0 The impact of the proposal on the existing and anticipated traffic and parking conditions Meets Code?
(38.24.010 and 38.25.010)
Street vision Yes
Snow storage Yes
Traffic Impact Study 1 LOS Required ITransportation grid adequate to Yes
Comments:The Engineering Division did require a Traffic Impact Study. No additional mitigation was identified for this project.
Parking Required 662 Provided (Total) 671 Yes
Total Existing: NA
On-site 555
Off-site 116
ADA Required 13.24 Provided (Total) 17
Reduction Yes
Bicycle Required 66.2 Provided (Total) 96 Yes
Comments:
The site provides all required parking off-street, bicycle parking, and ADA parking located as close as possible to the primary entrance.
(See Sheet C3.1 for full parking calculations)
6.0 Pedestrian and vehicular ingress and egress(38.19.100) Meets Code?
Safe and easy movement Yes
Pedestrian access location(s) Yes
Site vision triangles Yes
Fire lanes,curbs,signage and striping Yes
Vehicle access to site East access from Resort Drive, South from Fallon and Yes
West South Stafford Avenue access
Special Improvement Districts NA lWaiver INA NA
Comments:
Non-automotive transportation and circulation systems design features to enhance safety and Yes
convenience
Adequate connection and integration of the pedestrian and vehicular transportation systems Yes
Comments:The site plan provides pedestrian connection from the buildings to the public right of way, site amenities and park.
Dedication of right-of-way or easements necessary for streets and similar transportation facilities INA
Comments: South Stafford Avenue,with be constructed within Phase A and will have a public access easement provided
Page 5 of 10
B O Z E MAN MT Staff Report
Planning Icon Apartments at Ferguson Farm MP
Thursday, May 24, 2018
7.0 Landscaping,including the enhancement of buildings,the appearance of vehicular use, open Meets Code?
space,and pedestrian areas,and the preservation or replacement of natural vegetation
(38.26.010-100)
Submittal requirements for landscape plans(38.41.100) Yes
Mandatory landscaping Yes
Yard Yes
Additional screening Yes
Parking lot screening Yes
Off-street loading spaces screening Yes
Street frontage Yes
Street median island Yes
Acceptable landscape materials Yes
Protection of landscape areas Yes
Irrigation: plan,water source, system type: Municipal water, high efficiency drip&spray
Trees for residential adjacency na Yes
Performance points R-0 123 Yes
City-rights-of-way-and parks Yes
Tree plantings for boulevard ROW, drought-resistant seed Yes
Public ROW boulevard strips Yes
Irrigation and maintenance provisions for ROW Yes
State ROW landscaping Yes
Additional None NA
Fencing and walls Yes
Comments: The applicant submitted a complete landscape and irrigation with the site plan application as required by Bozeman
Municipal Code(BMC)the plans DOES comply with the landscape performance points and the plan complies with all applicable
landscape standards.
8.0 Open space(38.27.020) Meets Code?
Enhancement of natural environment Yes
Wildlife habitat or feeding area preservation Yes
Maintenance of public park or public open space access Yes
Recreational area design Yes
Open space Yes
Parkland Cash-in-lieu for maximum known density not to exceed 12 units/acre(ac.). Yes
Cash donation in-lieu Yes
Comments: On April 16,2018 the City Commission approved by consent the Applicant's Park Proposal for the 1.61 acre park and the
Cash in-lieu payment of$126,981.76,The Park is privately maintained with a public access easement.
Page 6 of 10
B O Z E MAN MT
Staff Report
Planning Icon Apartments at Ferguson Farm MP
Thursday, May 24, 2018
E9.0 Building location and height(38.19.100) Meets Code?
R-0 Requirements (38.10.010-060) Yes
Lot coverage Allowed 50% Proposed: 23.0% Yes
Lot Size Gross SF: 865,102 Gross Building SF: 199,253 Yes
Height Allowed 42' Proposed: See Below Yes
Comments:
Building Type A, B, and C:Slope 6/12 Height 32'-3"
Building Type D: Slope 6/12 Height 31'-3"
Building Type E and E-S: Slope 6/12 Height 38'-6"
Club House: 8/12 Height 36'-9"
10.0 Setbacks (38.19.100) Meets Code?
Zoning R-0 Yes
Setbacks Yards (feet) Structures Parking 1 Loading
Front 15/20* 5 Yes
Rear 20 5 Yes
Side 5 5 Yes
Alley NA NA NA
Watercourse NA NA NA
Entryway corridor NA NA NA
Block Frontage NA NA NA NA
Comments:
The proposal request does comply with all applicable setbacks.The subject development complies with applicable setbacks.
*Babcock Frontage for Babcock(Collector street classification)is 20 feet
11.0 Lighting (38.23.150) Meets Code?
Building-mounted lighting (cutoff and temperature) Yes
Site lighting (supports, cutoff and temperature) Yes
Minimum light trespass at property line Yes
Comments:
Site lighting does comply. The project employs LED technology,the City's recommended bulb type.
Page 7 of 10
g p z E MAN MT Staff Report
Planning Icon Apartments at Ferguson Farm MP
Thursday, May 24, 2018
12.0 Provisions for utilities, including efficient public services and facilities(38.21.030,38.23.050, Meets Code?
38.23.060, 38.23.070)
Municipal infrastructure requirements Yes
Easements(utility rights-of-way etc.) Yes
Water,sewer, and storm water Yes
Other utilities(electric, natural gas, communications) Yes
CIL of water Yes
Comments: Municipal infrastructure serves the subject property.A four-inch fire service line will be constructed to the building for fire
protection.The Engineering Division reviewed the utility layout from the public right-of-way and on-site and found compliance with the
City's standards.
13.0 Site surface drainage(38.23.080) Meets Code?
Drainage design Yes
Stormwater maintenance plan (38.23.030.A) Yes
Stormwater feature: landscaping amenity, native species, curvilinear,75%live vegetation Yes
Comments: The Engineering Division approved the drainage plan. Low Impact Development(LID) retention systems will capture much
of the surface runoff from the parking areas and a common retention pond, designed as a landscape amenity, and will capture excess
runoff from the site and buildings.
14.0 Loading and unloading areas(38.23.140) Meets Code?
Loading and unloading NA
First Berth (min.70 feet length, 12 feet in width and 14 feet in NA
height)
Additional Berths (min.45 feet length) NA
Comments:
15.0 Grading (38.23.080) Meets Code?
Grading Yes
On-site retention/detention Yes
Comments:
16.0 Signage(38.28.010) Meets Code?
Allowed (sq.ft)Ibuilding INA
Proposed(sq.ft)
Comments: Not submitted with this application.The City requires a sign permit for the on-premises signs that demonstrates
compliance with R-0 zoning standards prior to installation of any signage.
Page 8of10
B O Z E MAN MT
Staff Report
Planning Icon Apartments at Ferguson Farm MP
Thursday, May 24, 2018
17.0 Screening(38.21.050 and 38.26.050) Meets Code?
Mechanical equipment screening Yes
Additional screening Yes
Comments:Trees and shrubs provide screening of the parking and mechanical equipment from public rights-of-way.
18.0 Overlay district provisions(38.16.010, 38.17.010,38.18.010) Meets Code?
Neighborhood Conservation NA
Entryway NA Class: NA NA
Overlay: NA Community Plan Residential NA
Casino NA
Comments:
19.0 Other related matters,including relevant comment from affected parties(38.40.010) Meets Code?
Public Comment Yes
Comments: Staff publicly Noticed this project and deviation request in accordance with UDC Chapter 38, Article 40. Refer to Noticing
dates on page 1 of this report.
Public Comments was received for this project from 25 neighbors, all opposed the proposed application.
20.0 If the development includes multiple lots that are interdependent for circulation or other means Meets Code?
of addressing requirement of this title,whether the lots are either: Configured so that the sale of
individual lots will Not alter the approved configuration or use of the property or cause the
development to become Nonconforming OR Are the subject of reciprocal and perpetual
easements or other agreements to which the City is a party so that the sale of individual lots will
Not cause one or more elements of the development to become Nonconforming. (38.23.060)
Required Easements Yes
Shared access easement Yes
Number of lots served 1
Comments:This site plan has the following easements documents:
Public Park Easement, Public Street and Utility Easement, Sewer and Water Pipeline and Access Easement and Agreement.
21.0 Compliance with article 43 of chapter 38 of the Bozeman Municipal Code(38.43.010) Meets Code?
Affordable Housing INA
Comments:This requirement is Not applicable to the subject application.
Page 9 of 10
B O Z E MAN MT
Staff Report
Planning Icon Apartments at Ferguson Farm MP
Thursday, May 24, 2018
122.0 Phasing of development(38.41.080) Meets Code?
Phasing INA
Number of phases 2 site/19 construction
Comments:The master site plan proposes 2 phases, phase A and B to accommodate continuous expansion of the building and site
development.Within Phase A,there will be 12 construction phases. Prior to obtaining Certificate of Occupancy for any buildings within
Phase A the park improvements must be completed.The DRC supports the proposed phasing.
Page 10 of 10