Loading...
HomeMy WebLinkAbout058 A4.2_EXTERIOR ELEVATIONSOFFICE LEVEL 1 100' - 0" OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 2 103' - 6" OFFICE LEVEL 2 103' - 6" OFFICE LEVEL 3 114' - 0" OFFICE LEVEL 3 114' - 0" A5.2 3 A5.2 3 NEW STRUCTURE EXISTING STRUCTURE A5.2 1 A5.2 1 MP1 XCONC XMP XMP XCONC XCONC 46 ' - 0 " 10 ' - 6 " 3' - 6 " 1 1 2 2 5 5 9 9 11 11 13 13 15 15 17 17 18 18 16 16 14 14 12 12 10 10 8 8 7 7 6 6 3 3 4 4 HYDROLIC DOCK LEVELER WITH PIT. 2x2x3/8" STEEL ANGLE AROUND PERIMETER OF PIT. REFER TO SPECIFICATIONS AND STRUCTURAL. 3x3x3/8" STEEL ANGLE EMBEDDED IN CONCRETE AT DOCK EDGE AT DOOR OPENING. REFER TO STRUCTURAL DOCK BUMPERS, REFER TO SPECIFICATIONS OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 2 103' - 6" OFFICE LEVEL 3 114' - 0" A5.1 2 A5.1 2 A5.1 3 A5.1 3 OFFICE PARAPET 132' - 0" NEW STRUCTURE EXISTING STRUCTURE XMP XMP MP1 XCONC XCONC W1 XCONC XCONC XMP W1 W1 A A B B C C I I K K M M N N O O Q Q R R T T U U V V X X Y Y AA AA BB BB J J L L P P S S W W Z Z H H A5.10 18 METAL PANELS - VERTICAL BY PREFABRICATED METAL BUILDING MANUFACTURER, SEE SPECIFICATIONS METAL SCREEN A. ZAHNER COMPANY PEFORATED SOLANUM STEEL FINISH: NATURAL FINISH FIBER CEMENT BOARD AMERICAN FIBER CEMENT CEMBRIT PATINA FINISH: FLINT MP1 MS FCB METAL PANELS - HORIZONTAL METAL SALES T-10A, T-10B,T-10C, T-10D WALL 24GA FINISH: SLATE GREY SEE METAL WALL PANEL LEGEND MP2 WOOD PANEL - HORIZONTAL DOUGLAS FIR, 5 1/8" X 23/32" FINISH: CLEAR COAT WP-H EXISTING BUTLER METAL WALL PANEL XMP CONCRETE CONC EXISTING CONCRETE XCONC BRICK MASONRY UNIT INTERSTATE BRICK FACE BRICK 4" X 16" FINISH: ASH BMU EXTERIOR MATERIALS LEGEND DESCRIPTION SYMBOL METAL PANEL ELEVATION LEGEND WOOD PANEL - VERTICAL DOUGLAS FIR, 5 1/8" X 23/32" FINISH: CLEAR COAT WP-V OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 2 103' - 6" OFFICE LEVEL 2 103' - 6" WP-V BB BB OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 2 103' - 6" OFFICE LEVEL 2 103' - 6" WP-V BB BB OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 2 103' - 6" OFFICE LEVEL 2 103' - 6" OFFICE LEVEL 3 114' - 0" OFFICE LEVEL 3 114' - 0" OFFICE ROOF 128' - 0" OFFICE ROOF 128' - 0" OFFICE PARAPET 132' - 0" OFFICE PARAPET 132' - 0" BMU MP2 18 18 107' - 4" METAL SALES T10-D WALL METAL SALES T10-C WALL METAL SALES T10-B WALL METAL SALES T10-A WALL 132'-0" 100'-0" 114'-0" 107'-3" 118'-0" 4" B 2' - 6 " C 2' - 6 " D 3' - 0 " A 2' - 4 " B 2' - 6 " D 3' - 0 " C 2' - 6 " A 2' - 4 " B 2' - 6 " D 3' - 0 " C 2' - 6 " D 3' - 0 " D 3' - 0 " C 2' - 6 " B 2' - 6 " A 2' - 4 " OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 2 103' - 6" OFFICE LEVEL 2 103' - 6" FOUNDATION 96' - 2" FOUNDATION 96' - 2" OFFICE LEVEL 3 114' - 0" OFFICE LEVEL 3 114' - 0" FCB AA AA BB BB Z Z OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 2 103' - 6" OFFICE LEVEL 2 103' - 6" FOUNDATION 96' - 2" FOUNDATION 96' - 2" OFFICE LEVEL 3 114' - 0" OFFICE LEVEL 3 114' - 0" FCB OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 2 103' - 6" OFFICE LEVEL 2 103' - 6" FOUNDATION 96' - 2" FOUNDATION 96' - 2" WP-H OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 2 103' - 6" OFFICE LEVEL 2 103' - 6" FOUNDATION 96' - 2" FOUNDATION 96' - 2" OFFICE LEVEL 3 114' - 0" OFFICE LEVEL 3 114' - 0" OFFICE ROOF 128' - 0" OFFICE ROOF 128' - 0" OFFICE PARAPET 132' - 0" OFFICE PARAPET 132' - 0" 18 18 MP2 BMU 107' - 4" OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 1 100' - 0" OFFICE LEVEL 2 103' - 6" OFFICE LEVEL 2 103' - 6" BB BB WP-V BILLINGS | BOZEMAN | MISSOULA project # revision date phase issue date s h e e t p r o j e c t o w n e r 2/ 9 / 2 0 1 8 2 : 4 4 : 1 2 P M EX T E R I O R E L E V A T I O N S A4.2 15141.10 2.9.2018 CONSTRUCTION DOCUMENTS BO Z E M A N , M T NO R T H W E S T E R N E N E R G Y - A D D I T I O N / R E N O V A T I O N NO R T H W E S T E R N E N E R G Y CO N S T R U C T I O N D O C U M E N T S : 1/8" = 1'-0" A4.2 1 NORTH EXTERIOR ELEVATION : 1/8" = 1'-0" A4.2 2 EAST EXTERIOR ELEVATION : 1/8" = 1'-0" A4.2 A2.1 6 WEST CANOPY WALL AT (E) ENTRANCE : 1/8" = 1'-0" A4.2 A2.1 7 WEST ELEVATION AT (E) OFFICE : 1/8" = 1'-0" A4.2 A2.1 9 NORTH ELEVATION AT WEST ENTRANCE : 1/8" = 1'-0" A4.2 A2.0 3 EAST CANOPY WALL AT (E) ENTRANCE : 1/8" = 1'-0" A4.2 A2.1 4 NORTH CANOPY WALL AT (N) OFFICE : 1/8" = 1'-0" A4.2 A2.1 5 SOUTH CANOPY WALL AT (N) OFFICE : 1/8" = 1'-0" A4.2 A2.0 10 SOUTH ELEVATION AT WEST ENTRANCE : 1/8" = 1'-0" A4.2 A2.0 8 EAST CANOPY WALL AT (E) OFFICE