Loading...
HomeMy WebLinkAboutA3.1_Exterior Elevations 03-16-1818 A8.2 SCALE : 2 West Elevation 1/4" = 1'-0" SCALE :1 South Elevation 1/4" = 1'-0" A3.1 Bo z e m a n M o n t a n a A C O M M E R C I A L / M I X E D U S E P R O J E C T F O R : TH E M O N A R C H Lo t 1 - A - 2 10-11-17 17.115ev2 Job #: CONCEPT REVIEW 11-21-17SITE PLAN REVIEW T.B.D.95% PERMIT SET 1535 liberty lane suite 110b missoula, montana 59808 phone: 406.540.4437 design inc GRADE 100'-0" T.O. SHEATHING MAIN FLOOR 106'-0" T.O. SHEATHING 2ND FLOOR 120'- 8 3/4" GRADE 100'-0" T.O. SHEATHING MAIN FLOOR 106'-0" T.O. SHEATHING 2ND FLOOR 120'- 8 3/4" MTL1 MTL1 MTL1 MTL1 MTL1 MTL3 WD2 WD2 WD2 H-1 H-1 H-2 H-3 H-1 H-1 H-1 MTL2 MTL3 MTL3 MTL3 MTL3 MTL3 BFC BFC BFC RLG RLG RLG RLG RLG RLG RLG RLG RLG RLG RF1 RF2RF212 2 12 2 RF3 RF3 RF3 RF3 RF3 RF3 PRPTPRPT PRPT WDW1 TYP WDW1 TYP WDW1 TYP WDW1 TYP WDW1 TYP WDW2 TYP WDW2 TYP WDW2 TYP WDW2 TYP WDW2 TYP WDW2 TYP STN SFT STN SFT STN SFT MTL1 MTL1 RLG H-2H-2 T.O. ROOF SHEATHING 131'- 6 5/8" T.O. ROOF SHEATHING 131'- 6 5/8" 3 A8.3 8 A8.4 7 A8.3 6 A8.4 13 A8.2 15 A8.2 14 A8.2 = = HORIZONTAL METAL SIDING - MIXED PROFILES T10-A & TLC-1. INSTALL PER MFR REQS. FINISH - COPPER PENNY. Materials Legend - Building Elevations MTL1 = = HORIZONTAL WOOD RAINSCREEN SIDING, STAIN/SEAL. INSTALL PER MFR REQS. FINISH - T.B.D. WD2 = = HARDI PANEL SIDING W/ REGLET BATTS. INSTALL PER MFR REQS. FINISH - DARK YELLOW PAINT T.B.D. H-1 = = HORIZONTAL CORRUGATED METAL PANEL SIDING W/ J-CHANNEL PERIMETER TRIM. INSTALL PER MFR REQS. FINISH - BLACK. MTL3 = = HOT ROLLED METAL PANEL SIDING OVER RAIN SCREEN. INSTALL PER MFR REQS. FINISH - T.B.D. MTL2 = = BOARD FORM CONCRETE. FINISH - T.B.D.BFC = = SQUARE STEEL TUBE RAILING FRAME WITH WELDED WIRE MESH PANELS. FRAME FINISH - BLACK. RLG = TPO ROOFING WITH TAPERED INSULATION SLOPED TO ROOF DRAINS. SEE ROOF PLAN. RF1 = STANDING SEAM METAL ROOF & FLASHING, INSTALL PER MFR INSTRUCTIONS, SEE ROOF PLAN. PRE-FINISHED - BLACK. RF2 = PARAPET FLASHING. FINISH - BLACK.PRPT = STEEL FRAMED AWNING. STEEL FRAME FINISH - BLACK. RF3 = WINDOWS @ BASEMENT, MAIN FLOOR & STAIR. STOREFRONT FRAME FINISH - BLACK. WDW1 = WINDOWS @ 2ND FLOOR RESIDENTIAL. FIBERGLASS FRAME FINISH - BLACK. WDW2 = EXPOSED RAFTER TAILS, FASCIA, BEAMS & COLUMNS, STAIN/SEAL. FINISH - T.B.D. STN = T&G WOOD SOFFIT - STAIN/SEAL, T.B.D.SFT = = NOT USEDWD1 = = HARDI PANEL SIDING W/ REGLET BATTS. INSTALL PER MFR REQS. FINISH - LIGHT YELLOW PAINT T.B.D. H-2 = = HARDI PANEL SIDING W/ REGLET BATTS. INSTALL PER MFR REQS. FINISH - ORANGE PAINT T.B.D. H-3 = STEEL FRAMED AWNING WITH METAL ROOF. STEEL FRAME FINISH - BLACK. METAL ROOFING - PRE-FINISHED - RUST. RF4 (E)(E) T.O. SHED ROOF 139'- 9" ± T.O. PARAPET 133'- 1" ± T.O. PARAPET 136'- 7" ± T.O. SHED ROOF 139'- 9" ± T.O. PARAPET 133'- 1" ± T.O. PARAPET 136'- 7" ± (E) HOLD RAILING POST 2" MINIMUM FROM SIDING, TYP RF4 Keyed Notes - Elevations GUTTER WITH DOWN SPOUT. DOWN SPOUT INTEGRATED WITH COLUMN & RAILING SYSTEM. SEE ROOF PLANS. SEE CIVIL FOR DRAINAGE. 1 2 THIS SHEET IS INTENDED TO BE PRINTED IN COLOR TO FULLY UNDERSTAND THE INFORMATION BEING PRESENTED. 1 1 2 A8.4 2 A8.4 5 SIM A8.4 4 A8.4 4 SIM A8.4 16 A8.2 A A D DEE F G H I O O P Q S T T SEE A3.3 FOR MORE INFORMATION REGARDING FACADE TRANSPARENCY. LANDSCAPING IS NOT SHOWN FOR CLARITY. SEE CIVIL FOR LANDSCAPING PLAN. LANDSCAPING IS NOT SHOWN FOR CLARITY. SEE CIVIL FOR LANDSCAPING PLAN. G.C. TO PROVIDE SHOP DRAWINGS OF LAYOUT OF METAL PANELS & HARDIE TO ARCHITECT FOR APPROVAL PRIOR TO FABRICATION & ORDERING. 2 2 2 2 2 2 2 2 3 ROOF DRAIN OVERFLOW DISCHARGE. SEE PLUMBING DRAWINGS. 3 7 A8.3 7 A8.3 6 A8.3 7 SIM A8.3