HomeMy WebLinkAbout03-09-20 City Commission Packet Materials - C3. Approve Final Plat for Norton East Ranch Phase 4 App 19224Commission Memorandum
REPORT TO: Mayor and City Commission
FROM: Tim Cooper, Assistant City Attorney
Danielle Garber, Associate Planner
SUBJECT: Approve the Final Plat for the Norton East Ranch Phase 4 Subdivision and authorize
the Director of Public Works to execute the same on behalf of the City of Bozeman; the Director
of Community Development to execute the improvements agreements on behalf of the City of
Bozeman. Application 19224.
STRATEGIC PLAN: 4.2 High Quality Urban Approach. Continue to support high quality
planning, ranging from building design to neighborhood layouts, while pursuing urban approaches
to issues such as multimodal transportation, infill, density, connected trails and parks, and walkable
neighborhoods.
MEETING DATE: March 9, 2020
AGENDA ITEM TYPE: Consent
RECOMMENDATION: Approve the Final Plat for the Norton East Ranch Phase 4 Subdivision
and authorize the Director of Public Works to execute the same on behalf of the City of Bozeman;
the Director of Community Development to execute the improvements agreements on behalf of
the City of Bozeman.
BACKGROUND: On August 1, 2018, the Bozeman City Commission conducted their review
of the Preliminary Plat application for the Norton East Ranch Phase 4 Subdivision and voted
unanimously to approve the preliminary plat application.
§76-3-611(1), MCA, provides that the City Commission shall approve the plat only if:
(a) it conforms to the conditions of approval set forth on the preliminary plat and to the terms of
this chapter and regulations adopted pursuant to this chapter; and
(b) the county treasurer has certified that all real property taxes and special assessments assessed
and levied on the land to be subdivided have been paid.
The County Treasurer has certified that all real property taxes and special assessments assessed
and levied on the land to subdivide have been paid. Attached is a memorandum from Danielle
13
Garber, Associate Planner, stating the staff has concluded that all terms and conditions of the
preliminary plat approval have been met.
Improvements Agreements are required for final plat approval of this subdivision. The
improvements agreements guarantee the installation of sidewalks fronting all lots and running
through the block 11 public access easement and open spaces D3 and G1, as well as park and open
space landscaping improvements including laurel parkway medians, and the block 11 public access
easement. The sidewalks improvements agreement guarantees the sidewalks will be installed
within thirty-six (36) months of the filing of the final plat. The landscaping improvements
agreement guarantees the park and open space improvements will be installed within twelve (12)
months of the filing of the final plat. Two guarantees in the amounts of $301,916.16 for sidewalks,
and $135,082.50 for landscaping were received in the form of Letters of Credit. All other necessary
infrastructure improvements are constructed.
The signed findings of fact can be viewed at this link:
http://weblink.bozeman.net/WebLink8/0/doc/165271/Electronic.aspx
UNRESOLVED ISSUES: None identified.
ALTERNATIVES: None suggested or proposed.
FISCAL EFFECTS: Fiscal impacts are undetermined at this time, but will include increased
property tax revenues from new development, along with increased costs to deliver municipal
services to the property.
Report compiled on: February 20, 2020
Attachments: Staff Memo
Final Plat
14
MEMORANDUM
----------------------------------------------------------------------------------------------------------
TO: TIM COOPER, ASSISTANT CITY ATTORNEY
MIKE MAAS, CITY CLERK
FROM: DANIELLE GARBER, ASSOCIATE PLANNER
RE: FINAL PLAT REVIEW FOR THE NORTON EAST RANCH PHASE 4
SUBDIVISION FINAL PLAT, PLANNING FILE NO. 19224
DATE: FEBRUARY 25, 2020
----------------------------------------------------------------------------------------------------------
Norton Properties, LLC (Applicant), made application to the City of Bozeman Department of
Community Development for Final Plat review and approval for the Norton East Ranch Phase
4 Subdivision Final Plat to create nine (9) residential single-household lots, four (4)
residential multi-household lots, five (5) residential-office lots, two (2) open space lots, one
(1) city park, and two (2) restricted development lots. Attached is a copy of the Findings of
Fact and Order. The Commission approved the Findings of Fact on August 1, 2018. Major
multi-phased subdivision approvals are valid for three years plus extensions.
An Improvements Agreement is required for this subdivision for the following
improvements: the installation of sidewalks fronting all lots and running through the block
11 public access easement and open spaces D3 and G1, and park and open space
improvements including laurel parkway medians, and the block 11 public access easement.
Based on the summary review provided below, the City Engineering Department and
Department of Community Development have reviewed the application against the
conditions of preliminary plat approval; and as a result, find that the Final Plat application
may be approved by the City Commission.
Three (3) original mylars of the Final Plat, original Platting Certificate, property owner
association documents, improvements agreements and letters of credit, quitclaim deed for
transfer of the open space lots to the POA, warranty deed for transfer of the park to the City
of Bozeman, SID waiver of right to protest, parks maintenance waiver of right to protest, and
a copy of the Findings of Fact and Order are attached for your review.
To be additionally reviewed by the Commissioners are two public access easements, that
have been routed to the City Clerk directly, one temporary public access easement for T-
turnarounds where streets temporarily dead end, and a public access easement for the open
space lots. Copies have been included with this memo.
The Community Development staff respectfully requests that you prepare City Attorney's
Certificates using the attached original Platting Certificates as updated; approve the
15
Page 2 of 2
Certificates of Director of Public Works and Certificate of Completion "as to form". The
final City signatures will be obtained once the City Commission has approved the final plats.
A completed application was submitted to the Community Development Department on
January 22, 2020, it was deemed adequate on February 19, 2019. The final plat review must
complete review within a 20-day (working days) review period. The review period
begins once the signed mylars are received.
The conditions of preliminary plat approval, which are pertinent to this minor subdivision
and how they have been met, are described in the submittal materials.
Note: The Community Development Department and Engineering Department have
also reviewed the final plat application against the preliminary plat cited code
provisions and found compliance with these code requirements. The Engineering
Department has also reviewed and approved the “closure” of the final plat.
The project is scheduled for consideration by the City Commission on March 9, 2020.
Materials for the agenda will be uploaded February 27, 2020. Please let me know if this will
not work.
Attachments:
Three (3) Mylar Final Plats
Original Platting Certificate
Property Owner Association Documents
Improvements Agreements w/ Attached Original LOC’s
Quitclaim Deed Open Space
Warranty Deed Park
Findings of Fact
Public Access Easements (copies)
Applicant’s Written Narrative