Loading...
HomeMy WebLinkAbout19152 PlansTHIS PROJECT SHALL COMPLY WITH THESE CODES, OR LATER EDITIONS AS REQUIRED BY THE STATE OF MONTANA: 2012 INTERNATIONAL BUILDING CODE 2012 INTERNATIONAL MECHANICAL CODE 2012 UNIFORM PLUMBING CODE 2014 NATIONAL ELECTRIC CODE 2012 INTERNATIONAL ENERGY CONSERVATION CODE NO HAZARDOUS MATERIALS EXCEEDING THE LIMITS STATED IN THE 2012 INTERNATIONAL BUILDING CODE WILL BE STORED IN THIS BUILDING. CODE REQUIREMENTS THIS BUILDING IS NOT EQUIPPED WITH AN AUTOMATIC SPRINKLER SYSTEM PER MT ADMIN RULES MODIFICATION TO IBC 2012 903.2.8-1. 1.5 SPACES PER 1 BEDROOM DWELLING (2 UNIT)=3 SPACES 3 SPACES PER 3 BEDROOM DWELLING (1 UNIT)=3 SPACES RESIDENTIAL =6 SPACES NON RESIDENTIAL =1 SPACE PER 250 SF FLOOR AREA OFFICE 1052 SF / 250 SF=4.2 SPACES -(10% OFFICE + 10% PUD DOCS) = 20% 4.2 SPACES X 20%= .84 =3.36 SPACES COMMERICAL =4 SPACES 10 PARKING SPACES REQUIRED PARKING COUNT 14 EXTG SUBDIVISION PROVIDED ON STREET PARKING 2 OFF STREET PARKING SPACES 16 TOTAL PROVIDED BICYCLE PARKING SPOTS 10% OF 10 SPACES=1. MIN 2 PROVIDED (38.540.050.A.4) HANDICAP SPACES REQUIRED=1 (1 VAN ACCESS W/ 8' AISLE) PER UDO 38.540.050.A.1.b.(2)- RESIDENCES IN MIXED USE BUILDINGS MAY COUNT ON-STREET PARKING PER SUBSECTION 1.a.(1) AND PUD COVENANTS. ON STREET PARKING AVAILABLE FOR ALL. SEE SITE PLAN REVIEW DOCS. REQUIRED PROVIDED GROSS SQUARE FOOTAGE BUILDING SQUARE FOOTAGE (EXT F.O.F) MAIN FLOOR = 3048 SF (STAIRS INCLUDED) SECOND FLOOR = 3048 SF (STAIRS INCLUDED) TOTAL 6096 SF SPACES (EXT F.O.F.-CENTER DEMISING WALL) COMMERCIAL SPACE 1524 SF PRIVATE GARAGES 1524 SF UNIT A 681 SF UNIT B 681 SF UNIT C 1457 SF COMMON 229 SF RESIDENTIAL TOTAL 3048 SF CH. 38 UDO NOTES CHAPTER 38 UDO NOTES: COMMERCIAL ZONING DISTRICTS B-2 100% LOT COVERAGE YARDS-FRONT 0', REAR 0', SIDE 0' (REAR YARD ADJACENT TO ALLEY 5'. PER PUD BUILDING HEIGHT -over 3:12 44' 20' SETBACK OFF 30' ROW ALLEY FOR PARKING TOTAL SQUARE FOOTAGE OF LOT =6023.82 SF AREA SQUARE FOOTAGE % BUILDING FOOTPRINT 3048 SF 50.6% DRIVEWAY & PARKING AREA 840 SF 13.9% PRIVATE OPEN SPACE 350 SF 5.8% 2-1 BEDROOM UNITS 100 SF X 2=200 SF 1-3 BEDROOM UNITS 150 SF X 1=150 SF LANDSCAPING 1872 SF 31.1% SIDEWALK 264 SF 4.4 % PEDESTRIAN EASEMENT 751 SF 12.5% FAR=(3048 1ST FLR,3048 2ND) 6096=1.01 (2) 1 BDRM DWELLING DENSITY 22.8% (1) 3 BDRM DWELLING DENSITY 24.3% LOT SF PERCENTS, DENSITY, FAR FRONTAGE ELEVATION NOTES STOREFRONT FRONTAGE AWNING 60% LENGTH OF FACADE=24.9'. 29.5' PROVIDED, 5' DEEP TRANSPARENCY 313 SF BETWEEN 2' 6"-10' 0" X 60%=187.8 SF 188 SF PROVIDED (narrowed frame of doors, increased width of windows, increased width of door to second floor) SIDEWALK 12'0" MIN, 12' 9" PROVIDED SIGNAGE AREA CALCULATIONS PER SEC. 38.560.060 400 sf max LINEAR FEET OF BUILDING FRONTAGE=41'-6" 3sf x 25' (FIRST 25') = 75 sf 1.5sf x 16.5' (REMAINING FRONTAGE)=24.75 sf TOTAL ALLOWABLE SIGNAGE = 99.75 sf PROPOSED SIGNAGE AREA CALCULATIONS: TENANT SIGNS TBD PLACED ON STOREFRONT WINDOWS TOTAL PROPOSED ADDRESS SIGNAGE = 11.7 SF SIGNAGE AREA CALCULATIONS NORTH ELEVATION ONLY VICINITY MAP SITE LOCATION CNST ROUTE PUBLIC PARKLAND DEDICATION TRACKING TABLE SUBDIVISION NAME: BAXTER MEADOWS PROJECT NAME: LOT 3 BLK 18 CURRENT TOTAL THIS SUBDIVISION THIS PROPOSAL PREVIOUS PHASES PHASE 1 PHASE 2A # RESIDENTIAL UNITS PER PHASE/LOT/SITE PLAN: ACREAGE PARK LAND AND/OR CASH IN LIEU REQ'D (SHOW CALCS) VALUE OF IMPROVEMENTS IN LIEU PROPOSED $____VS VALUE OF CODE REQ'D. BASIC PARK IMPROVEMENTS: $_____ATTACH SPREADSHEET ACREAGE PARK LAND PREVIOUSLY DEEDED TO C.O.B. ACREAGE PARK LAND YET TO BE CONVEYED PARK MASTER PLAN APPROVAL DATE JULY 23, 2004 FINAL PLAT MAY 28, 2004 3 RES UNITS X .03=.09 ACRES 155,335 SF 3.57 ACRES.582 ACRES 113 DWELLING UNITS 26 LOTS 4.895 ACRES X 11%= 23455 SF, .538 ACRES 3 RES UNITS 26 LOTS JULY 23, 2004 FINAL PLAT MAY 28, 2004 Applicability to site plans. Section 38.27.020.A.2, shall not apply to subsequent site plan development located within major subdivisions which received preliminary plat approval after July 1, 1973, and which received final plat approval prior to October 1, 2005. DRAWN BY: PR O J E C T # : RE V DE S C DA T E PH A S E PR E SD DD CD DA T E 1 2 3 4 A0-1 01.31.20 CO V E R S H E E T Th e P a l o m i n o 37 6 6 E Q U E S T R I A N L N BO Z E M A N , M T 5 9 7 1 8 SI T E P L A N R E V I E W --- Author 12 - 1 4 - 1 6 - - - - - - - BAXTER MEADOWS SUB. PHASE IIA-S34, T01S,R05E, BLK 18, LOT 3, PLAT J-383 PROJECT TEAM CONTRACTOR ARCHITECTURAL SHEET INDEX A0-1 COVER SHEET 01.31.20 A0-2 ARCHITECTURAL NOTES, ADA COMPLIANCE & LEGENDS 04.10.19 C1-0 SITE GRADING, DRAINAGE, & UTILITY PLAN 01.23.20 A1-1 ARCHITECTURAL SITE PLAN & SITE DETAILS 01.31.20 A1-2 LANDSCAPE PLAN, CALCS, & LEGEND 01.31.20 A3-1 FIRST FLOOR PLAN 01.31.20 A3-2 SECOND FLOOR PLAN 04.10.19 A4-1 EXTERIOR ELEVATIONS 01.31.20 A4-2 EXTERIOR ELEVATIONS 01.31.20 A4-3 EXTERIOR ELEVATIONS 01.31.20 E1-0 EXTERIOR ELECTRICAL PLAN 04.10.19 TBD STRUCTURAL ENGINEERCIVIL ENGINEER ELS ARCHITECTS 129 N 25TH AVE BOZEMAN, MT 59718 PH. 406.581.1599 CONTACT: ERYN SCHWEHR ERYN@ELSARCH.NET WILSON ENGINEERING PLLC THREE FORKS, MT 59752 PH. 406.579.4758 CONTACT: ED WILSON ED@WILSONENGINEER.COM CADDIS ENGINEERING & SURVEYING PE & PLS PO BOX 11805 BOZEMAN, MT 59719 PH. 406.581.4097 CONTACT: MATT COTTERMAN MCOTTERMAN@CADDISENG.COM THE PALOMINO AT BAXTER MEADOWS SUB. OWNER JJM LLC 1120 DURHAM AVE BOZEMAN, MT 59718 PH. 406.579.9800 CONTACT: JILL MELLUM PR O J E C T   S P E C I F I C   N O T E S 1.   DI M E N S I O N S   A R E   S H O W N   O N   T H E   D R A W I N G S .     D O   N O T   S C A L E   T H E   D R A W I N G S. 2.   TH E   C O N T R A C T O R   I S   R E S P O N S I B L E   F O R   P R O V I D I N G   A L L   N E W   M A T E R I A L S   ( UN O ) .     A L L   WO R K   S H A L L   B E   P E R F O R M E D   B Y   S K I L L E D   &   Q U A L I F I E D   W O R K M E N   I N   A C C O R DA N C E   WI T H   T H E   B E S T   P R A C T I C E S   O F   T H E   T R A D E S   I N V O L V E D ,   &   I N   C O M P L I A N C E  W I T H   BU I L D I N G   R E G U L A T I O N S   & / O R   G O V E R N M E N T A L   L A W S ,   S T A T U T E S   O R   O R D I N A NC E S   CO N C E R N I N G   T H E   U S E   O F   U N I O N   L A B O R .   3.   EA C H   T R A D E   W I L L   P R O C E E D   I N   A   F A S H I O N   T H A T   W I L L   N O T   D E L A Y   T H E   T R AD E S   FO L L O W I N G   T H E M . 4.   CO N S T R U C T I O N   D O C U M E N T S   S H O W   T H E   D E S I G N   I N T E N T   O F   T H E   P R O J E C T   &   MA Y   NO T   S H O W   M I N O R   D E T A I L S   O F   P R O P O S E D   I N S T A L L A T I O N .     T H E   I N C L U S I O N  O F   T H E S E   MI N O R   D E T A I L S   I S   I M P L I E D   T O   P R O V I D E   A   C O M P L E T E   P R O J E C T   &   A R E   T O  B E   IN C L U D E D   A S   A   P A R T   O F   A   B I D . 5.   AL L   D I M E N S I O N S   A R E   F R O M   F A C E   O F   S T U D   U N L E S S   N O T E D   O T H E R W I S E .     A LL   HE I G H T S   A R E   D I M E N S I O N E D   F R O M   T H E   T O P   O F   S U B   F L O O R   U N L E S S   N O T E D   OT H E R W I S E .     T H E   C O N T R A C T O R   S H A L L   V E R I F Y   A L L   D I M E N S I O N   C O N D I T I O N S  P R I O R   TO   C O N S T R U C T I O N . 6.   IT   I S   T H E   C O N T R A C T O R ' S   R E S P O N S I B I L I T Y   T O   I N S P E C T   E X I S T I N G   C O N D I TI O N S   P R I O R   TO   P R O C E E D I N G   W I T H   E A C H   I N S T A L L A T I O N   O R   P A R T   O F   T H E   W O R K .     D I S C RE P A N C I E S   MU S T   B E   R E P O R T E D   T O   T H E   A R C H I T E C T   P R I O R   T O   P R O C E E D I N G . 7.   AL L   W O R K   S H A L L   B E   E R E C T E D   &   I N S T A L L E D   P L U M B ,   L E V E L ,   S Q U A R E ,   T R U E  &   I N   PR O P E R   A L I G N M E N T . 8.   TH E   D E S I G N ,   A D E Q U A C Y   &   S A F E T Y   O F   E R E C T I O N   B R A C I N G ,   S H O R I N G ,   T E M PO R A R Y   SU P P O R T S   E T C   I S   T H E   S O L E   R E S P O N S I B I L I T Y   O F   T H E   C O N T R A C T O R   &   H A S  N O T   B E E N   CO N S I D E R E D   B Y   T H E   E N G I N E E R   O R   A R C H I T E C T .     T H E   C O N T R A C T O R   I S   R E S PO N S I B L E   FO R   T H E   S T A B I L I T Y   O F   T H E   S T R U C T U RE   P R I O R   T O   T H E   C O M P L E T I O N   O F   A LL   S H E A R   WA L L S ,   R O O F   &   F L O O R   D I A P H R A G M S   &   F I N I S H   M A T E R I A L S . 9.   CO N T R A C T O R   S H A L L   B E   R E S P O N S I B L E   F O R   T H E   D I S T R I B U T I O N   O F   D R A W I N G S  & / O R   SP E C I F I C A T I O N S ,   I N C L U D I N G   A L L   U P D A T E S   &   A D D E N D A ,   T O   T H E   T R A D E S   UN D E R   TH E I R   J U R I S D I C T I O N . 10 .   TH E   C O N T R A C T O R   I S   T O   C O O R D I N A T E   T H E   I N S T A L L A T I O N   O F   M A T E R I A L S   &  W O R K   O F   OT H E R S   W H O   A R E   N O T   S U B ‐CO N T R A C T O R S   T O   T H E   G C ,   Y E T   A R E   R E Q U I R E D   I N   PR O V I D I N G   A   C O M P L E T E D   P R O J E C T .     A R E A S   O F   W O R K   R E Q U I R I N G   C O O R D I N AT I O N   IN C L U D E   B U T   A R E   N O T   L I M I T E D   T O   T H O S E   I N D I C A T E D   A S   N I C   O N   T H E   CO N S T R U C T I O N   D O C U M E N T S . 11 .   RE F E R   T O   S T R U C T U R A L ,   M E C H A N I C A L   &   E L E C T R I C A L   D R A W I N G S   F O R   C O O R D IN A T I O N   OF   W O R K . 12 .   IN   T H E   C A S E   O F   C O N T R A D I C T I O N S   B E T W E E N   D R A W I N G S   O R   B E T W E E N   D R A W I NG S   &   SP E C I F I C A T I O N S ,   A S S U M E   T H E   M O R E   C O S T L Y   A P P R O A C H   F O R   B I D D I N G   P U R P O S E S .     BR I N G   A L L   C O N T R A D I C T I O N S   T O   T H E   A T T E N T I O N   O F   T H E   A R C H I T E C T 13 .   AL L   W O R K   &   M A T E R I A L S   S H A L L   B E   G U A R A N T E E D   A G A I N S T   D E F E C T S   F O R   A   PE R I O D   O F   AT   L E A S T   O N E ( 1 )   Y E A R   F R O M   A P P R O V A L   O F   F I N A L   P A Y M E N T .   14 .   ME C H A N I C A L   &   H V A C   S Y S T E M S   T O   B E   D E S I G N E D   &   I N S T A L L E D   B Y   Q U A L I F I ED   H V A C   IN S T A L L E R . 15 .   3 ‐D  V I E W S   M A Y   B E   U S E D   T H R O U G H O U T   T H E   C O N S T R U C T I O N   D O C U M E N T S .     3 ‐D  VI E W S   A R E   S H O W N   T O   C L A R I F Y   C O N D I T I O N S   T H A T   C A N N O T   B E   S H O W N   I N   O TH E R   VI E W S .     3 ‐D  V I E W S   M A Y   N O T   S H O W   A L L   D E T A I L S   R E Q U I R E D   T O   C O M P L E T E   T H E   A R E A .    RE F E R   T O   D E T A I L S   A T   A D J A C E N T   A R E A S   A S   N E C E S S A R Y   O R   A S K   T H E   A R C H IT E C T   P R I O R   TO   B I D D I N G . GE N E R A L   N O T E S 1.   D I M E N S I O N S   A R E   S H O W N   O N   T H E   D R A W I N G S .     D O   N O T   S C A L E   T H E   DR A W I N G S . 2.   T H E   C O N T R A C T O R   I S   R E S P O N S I B L E   F O R   P R O V I D I N G   A L L   N E W   M A T E R I A L S  (U . N . O . )   A L L   W O R K   S H A L L   B E   P E R F O R M E D   B Y   S K I L L E D   A N D   Q U A L I F I E D   WO R K M E N   I N   A C C O R D A N C E   W I T H   T H E   B E S T   P R A C T I C E S   O F   T H E   T R A D E S   IN V O L V E D ,   A N D   I N   C O M P L I A N C E   W I T H   B U I L D I N G   R E G U L A T I O N S   A N D / O R   GO V E R N M E N T A L   L A W S ,   S T A T U T E S   O R   O R D I N A N C E S   C O N C E R N I N G   T H E   U S E   O F   UN I O N   L A B O R .   3.   E A C H   T R A D E   W I L L   P R O C E E D   I N   A   F A S H I O N   T H A T   W I L L   N O T   D E L A Y   T H E   TR A D E S   F O L L O W I N G   T H E M . 4.   C O N S T R U C T I O N   D O C U M E N T S   S H O W   T H E   D E S I G N   I N T E N T   O F   T H E   P R O J E C T  &   MA Y   N O T   S H O W   M I N O R   D E T A I L S   O F   P R O P O S E D   I N S T A L L A T I O N .     T H E   I N C L U SI O N   OF   T H E S E   M I N O R   D E T A I L S   I S   I M P L I E D   T O   P R O V I D E   A   C O M P L E T E   P R O J E C T . 5.   A L L   D I M E N S I O N S   A R E   F R O M   F A C E   O F   S T U D   U N L E S S   N O T E D   O T H E R W I S E .  A L L   HE I G H T S   A R E   D I M E N S I O N E D   F R O M   T H E   T O P   O F   S U B   F L O O R   U N L E S S   N O T E D   OT H E R W I S E .   T H E   C O N T R A C T O R   S H A L L   V E R I F Y   A L L   D I M E N S I O N   C O N D I T I O N S   PR I O R   T O   C O N S T R U C T I O N . 6.   I T   I S   T H E   C O N T R A C T O R ' S   R E S P O N S I B I L I T Y   T O   I N S P E C T   E X I S T I N G   C O ND I T I O N S   PR I O R   T O   P R O C E E D I N G   W I T H   E A C H   I N S T A L L A T I O N   O R   P A R T   O F   T H E   W O R K .    7.   A L L   W O R K   S H A L L   B E   E R E C T E D   A N D   I N S T A L L E D   P L U M B ,   L E V E L ,   S Q U A R E ,  T R U E   AN D   I N   P R O P E R   A L I G N M E N T . 8.   T H E   D E S I G N ,   A D E Q U A C Y   A N D   S A F E T Y   O F   E R E C T I O N   B R A C I N G ,   S H O R I N G ,  TE M P O R A R Y   S U P P O R T S   E T C .   I S   T H E   S O L E   R E S P O N S I B I L I T Y   O F   T H E   C O N T R AC T O R   AN D   H A S   N O T   B E E N   C O N S I D E R E D   B Y   T H E   E N G I N E E R   O R   A R C H I T E C T .   T H E   CO N T R A C T O R   I S   R E S P O N S I B L E   F O R   T H E   S T A B I L I T Y   O F   T H E   S T R U C T U R E   P R IO R   T O   TH E   C O M P L E T I O N   O F   A L L   S H E A R   W A L L S ,   R O O F     A N D   F L O O R   D I A P H R A G M S   A ND   FI N I S H   M A T E R I A L S . 9.   C O N T R A C T O R   S H A L L   B E   R E S P O N S I B L E   F O R   T H E   D I S T R I B U T I O N   O F   D R A W IN G S   AN D / O R   S P E C I F I C A T I O N S ,   I N C L U D I N G   A L L   U P D A T E S   A N D   A D D E N D A ,   T O   T H E  TR A D E S   U N D E R   T H E I R   J U R I S D I C T I O N . 10 .   T H E   C O N T R A C T O R   I S   T O   C O O R D I N A T E   T H E   I N S T A L L A T I O N   O F   M A T E R I A LS   &   WO R K   O F   O T H E R S   W H O   A R E   N O T   S U B ‐CO N T R A C T O R S   T O   T H E   G . C . ,   Y E T   A R E   RE Q U I R E D   I N   P R O V I D I N G   A   C O M P L E T E D   P R O J E C T .     A R E A S   O F   W O R K   R E Q U I RI N G   CO O R D I N A T I O N   I N C L U D E   B U T   A R E   N O T   L I M I T E D   T O   T H O S E   I N D I C A T E D   A S   N. I . C .   ON   T H E   C O N S T R U C T I O N   D O C U M E N T S . 11 .   R E F E R   T O   S T R U C T U R A L ,   M E C H A N I C A L   &   E L E C T R I C A L   D R A W I N G S   F O R   CO O R D I N A T I O N   O F   W O R K .   12 .   I T   I S   T H E   C O N T R A C T O R ' S   R E S P O N S I B I L I T Y   T O   I N S P E C T   T H E   D R A W I N GS   A N D   BE C O M E   F A M I L I A R   W I T H   T H E   C O N S T R U C T I O N   D R A W I N G S .     E L S   A R C H I T E C T S  P C   IS   N O T   L I A B L E   F O R   I N C I D E N T A L ,   C O N S E Q U E N T I A L ,   O R   I N D I R E C T   D A M A G E S  O F   AN Y   K I N D   A R I S I N G   O U T   O F   T H E   U S E   O F   O U R   D R A W I N G S . 13 .   M E C H A N I C A L   A N D   H V A C   S Y S T E M S   T O   B E   D E S I G N E D   A N D   I N S T A L L E D   B Y   QU A L I F I E D   H V A C   I N S T A L L E R   A N D   P E R   L O C A L   R E G U L A T I O N S / C O D E S . 14 .   3 ‐D  V I E W S   M A Y   B E   U S E D   T H R O U G H O U T   T H E   C O N S T R U C T I O N   D O C U M E N T S .     3 ‐D  V I E W S   A R E   S H O W N   T O   C L A R I F Y   C O N D I T I O N S   T H A T   C A N N O T   B E   S H O W N   I N   OT H E R   V I E W S .     3 ‐D  V I E W S   M A Y   N O T   S H O W   A L L   D E T A I L S   R E Q U I R E D   T O   CO M P L E T E   T H E   A R E A .     15 .     T H E S E   D R A W I N G S   W E R E   P R E P A R E D   B Y   E L S   A R C H I T E C T S ,   P . C .   F O R   CO N S T R U C T I O N   O F   T H E   B U I L D I N G   D E S C R I B E D .     A S   S U C H ,   T H E Y   A R E   T H E   PR O P E R T Y   O F   E L S   A R C H I T E C T S ,   P . C .   A N D   M A Y   N O T   B E   R E P R O D U C E D ,   C O P IE D   O R   US E D   I N   A N Y   W A Y   W I T H O U T   P R I O R   A P P R O V A L   F R O M   E L S   A R C H I T E C T S ,   P . C .  20 1 6 . 1.   AL L   E X T E R I O R   W A L L S   T O   B E   2 X 6 ' S   @   1 6 "   O N   C E N T E R   U . N . O . 2.   AL L   I N T E R I O R   W A L L S   T O   B E   2 X 4 ' S   @   1 6 "   O N   C E N T E R   U . N . O . 3.   AL L   I N T E R I O R   W A L L S   T O   B E   F I N I S H E D   W I T H   1 / 2 "   G W B   U . N . O .   S E E   P L A N  F O R   BR A C E D   P A N E L     O R   S H E A R   W A L L   L O C A T I O N S . 4.   AL L   I N T E R I O R   C E I L I N G S   T O   B E   F I N I S H E D   W I T H   5 / 8 "   G W B   U . N . O . 5.   AL L   V E N T S ,   S T A C K S   A N D   O T H E R   R O O F   P E N E T R A T I O N S   S H A L L   B E   P A I N T E D   TO   MA T C H   T H E   R O O F I N G   M A T E R I A L . 6.   LL   P L U M B I N G   F I X T U R E S   T O   B E   O F   W A T E R   S A V I N G   T Y P E   ( L O W   F L O W ,   AE R A T O R S ,   E T C . ) 7.   IN S T A L L   W P   G W B   T O   7 '   B E H I N D   T U B   &   S H O W E R   E N C L O S U R E S   A N D   T O   4 '   BE H I N D   T O I L E T S .   8.   CO N T R A C T O R   S H A L L   P R O V I D E   B A C K I N G / B L O C K I N G   A S   R E Q U I R E D   F O R   A L L   WA L L   M O U N T E D   E Q U I P M E N T ,   F U R N I S H I N G S ,   E T C .   A N D   F I R E B L O C K I N G ,   DR A F T S T O P P I N G   A S   R E Q ' D   P E R   C O D E . 9.   EG R E S S "   W I N D O W   D E N O T E S   W I N D O W   W I T H   M I N .   O P E N I N G   W I D T H   O F   2 0 " ,   MI N   O P E N I N G   H E I G H T   O F   2 4 " ,   M I N   C L E A R   O P E N A B L E   A R E A   O F   5 . 7   s q   f t  A N D   FI N I S H E D   S I L L   N O T   T O   B E   M O U N T E D   N O   M O R E   T H A N   4 4 "   A B O V E   F L O O R .   WI N D O W   N O T A T I O N   C O N T A I N I N G   A   " T "   D E S I G N A T E S   T E M P E R E D   GL A Z I N G . ( R 3 1 0 ) 10 .   EX T E R I O R   D O O R S   S H A L L   H A V E   A   M I N   O F   3 6 "   ( W I D E   O R   W I D T H   O F   D R )   B Y  4 4 "   DE E P   L A N D I N G   O N   E A .   S I D E .   N O   M O R E   T H A N   2 %   S L O P E .   F O R   A L L   I N S W I N GI N G   DO O R S ,   T H E   T H R E S H O L D   S H A L L   N O T   B E   M O R E   T H A N   1 / 2 "   H I G H E R   T H A N   T H E  LA N D I N G . 11 .   EG R E S S   W I N D O W S   W I T H   A N   O P E N I N G   H I G H E R   T H A N   6 '   0 "   O F F   T H E   G R O U N D   SH A L L   H A V E   T H E   T O P   O F   S I L L   2 4 "   O F F   T . O . F I N . F L R .     O P E R A B L E   W I N D O WS   A T   TH I S   H E I G H T   C A N N O T   O P E N   M O R E   T H A N   4 "   W I T H   C O N T R O L   D E V I C E S . 12 .   VA P O R   B A R R I E R S   T O   B E   C L A S S   I ,   M I N   6   M I L   T H I C K N E S S   A N D   1   P E R M   R A TI N G   OR   L E S S . 13 .   VA P O R   R E T A R D E R   T O   B E   A   M I N   O F   C L A S S   I I   O N   T H E   I N T E R I O R   S I D E   O F   WA L L S .   CL A S S   I I   C O N S I S T S   O F   K R A F T   F A C E D   F I B E R G L A S S   B A T T S .   C L A S S   I   S H E E T  PO L Y E T H Y L E N E . 14 .   GE N E R A L   C O N T R A C T O R   S H A L L   B E   R E S P O N S I B L E   F O R   E L E C T I N G   T H E   S I N G L E  O R   CO M B I N A T I O N   O F   M A T E R I A L S   T H A T   M A K E   U P   T H E   B U I L D I N G   E N V E L O P E S   A I R  BA R R I E R . 15 .   PR O J E C T   S H A L L   B E   E Q U I P P E D   W I T H   R A D O N   C O N T R O L .     G . C .   T O   E L E C T   P A SS I V E   OR   A C T I V E   C O N T R O L   M E A S U R E S . 16 .   AR C H I T E C T   N O T   H E L D   R E S P O N S I B L E   F O R   F A I L E D   B L O W E R   D O O R   T E S T I N G .    A L L   BL O W E R   D O O R   T E S T I N G   G . C .   R E S P O N S I B I L I T Y . CO N S T R U C T I O N   N O T E S 1 Vi e w N a m e 1/ 8 " = 1 ' - 0 " SC A L E 10 1 A 5 A3 - 8 3 A5 - 2 A 0 0 Ro o m n a m e 20 2 BU I L D I N G   S E C T I O N S SE E   D R A W I N G S EX :   S H E E T   A 3 ‐8,   D E T A I L   5 WA L L   S E C T I O N S SE E   D R A W I N G S EX :   S H E E T   A 5 ‐2,   D E T A I L   3 EX T E R I O R   E L E V A T I O N SE E   D R A W I N G S EX :   S H E E T   A 7 ‐1,   D E T A I L   4 CO N S T R U C T I O N   D E T A I L SE E   D R A W I N G S EX :   S H E E T   A 6 ‐3,   D E T A I L   2 IN T E R I O R   E L E V A T I O N SE E   D R A W I N G S EX :   S H E E T   A 7 ‐1,   D E T A I L   4   &   5 DO O R   S Y M B O L SE E   D O O R   S C H E D U L E WI N D O W   S Y M B O L SE E   W I N D O W   T Y P E S RO O M   S Y M B O L EX :   2 0 2   ‐ SE C O N D   F L O O R GR I D   L I N E S : LE T T E R S   L E F T   T O   R I G H T NU M B E R S   B O T T O M   T O   T O P SP E C I F I C   F R A M I N G   M E M B E R     RE F E R E N C E S Y M B O L S 5 A3 - 8 1 A1 0 1 SI M A7 ‐1 4 A7 ‐1 4 5 A 1 AB B R E V I A T I O N S ASSEMBLY PENETRATION SCHEDULE MARK TYPE OF ASSEMBLY FIRE RESISTANCE RATED WALLSTYPE OF PENETRATIONITEM PENETRATING THROUGH PENETRATIONPVC PIPE, 4" OR SMALLER3M BRAND SYSTEM C ‐AJ ‐2637,2 HOUR RATINGUL 1479 FIRE RESISTANCE RATED WALLS THROUGH PENETRATIONCOPPER OR STEEL PIPE, 4" OR SMALLER3M BRAND SYSTEM C ‐AJ ‐1337,2 HOUR RATINGUL 1479 FIRE RESISTANCE RATED WALLS HORIZONTAL ASSEMBLIESTHROUGH PENETRATIONPVC PIPE, 4" OR SMALLER3M BRAND SYSTEM F ‐C ‐2024,1 HOUR RATINGUL 1479 THROUGH PENETRATION3M BRAND SYSTEM F ‐C ‐1002,1 HOUR RATINGUL 1479 THROUGH PENETRATIONPVC PIPE, 4" OR SMALLER (BRANCH PIPING)3M BRAND SYSTEM F ‐C ‐2129,1 HOUR RATINGUL 1479F1F2F3F4 F5 THROUGH PENETRATIONDUCT MAIN, DUCT TO AIR DEVICE CONNECTIONRUSKIN CFD7T RADIANT CEILING FIRE DAMPERUL 555C R8039F6 THROUGH PENETRATIONPEX PIPE, 24 ”OR SMALLER3M BRAND SYSTEM F ‐C ‐2391,1 HOUR RATINGUL 1479 F7FIRE RESISTANCE RATED WALLS HORIZONTAL ASSEMBLIES FIRE RESISTANCE RATED WALLS HORIZONTAL ASSEMBLIES FIRE RESISTANCE RATED WALLS HORIZONTAL ASSEMBLIES FIRE RESISTANCE RATED WALLS HORIZONTAL ASSEMBLIESCOPPER OR STEEL PIPE, 4" OR SMALLERPROTECTION TO BE USEDPROVIDED (UL LIST)DRAWN BY:PROJECT #:REVDESCDATEPHASEPRE SD DD CDDATE 1 2 3 4 A0‐2 04.10.19ARCHITECTURAL NOTES, ADA COMPLIANCE & LEGENDSThe Palomino 3766 EQUESTRIAN LN BOZEMAN, MT 59718 SITE PLAN REVIEW‐‐‐Author12‐14‐16 ‐‐‐‐‐‐‐SPEC SPECIFICATIONS SS STAINLESS STEEL STD STANDARD STL STEEL STOR STORAGE STRUCT STRUCTURAL SUB FLR SUBFLOOR T TT R E A D T ALUM TUBULAR ALUMINUM T&G TONGUE AND GROVE TB TEST BORE THRU THROUGH TJI TRUSS JOIST INCORPORATED TO TOP OF TO FTG TOP OF FOOTING TOB TOP OF BEAM TOP TOP OF PLATE TOS TOP OIF STEEL TOSL TOP OF SLAB TOW TOP OF WALL TP DISP TOILET PAPER DISPENSER TS TUBULAR STEEL TYP TYPICAL U UG UNDERGROUND UNO UNLESS NOTED OTHERWISE V FV FIELD VERIFY VAC VACUUM OUTLET VB VAPOR BARRIER VCT VINYL COMPOSITION TILE VERT VERTICAL VFY/VER VERIFY VIF VERIFY IN FIELD W W/WITH W/O WITHOUT W/R WATER RESISTANT WC WATER CLOSET WD WOOD WNDW WINDOW WP WATERPROOF WT WEIGHT WWF WELDED WIRE FABRICMECHMECHANICALMINMINIMUMMIRMIRRORMISCMISCELLANEOUSMOMASONRY OPENING MTL METAL N #N U M B E R N/A NOT APPLICABLE NIC NOT IN CONTRACT NTS NOT TO SCALE O OC ON CENTER OH OVERHEAD OPNG OPENING OPP OPPOSITE P PAF POWER ACTUATED FASTENER PART BD PARTICLE BOARD PERP PERPENDICULAR PL PLATE PLAM PLASTIC LAMINATE PLWD PLYWOOD PNL PANEL PRE PREFINISHED PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCHES PSL PARALLEL STRAND LUMBER PT POINT PVC POLYVINYL CHLORIDE Q QTY QUANTITY R R RADIUS, RISERS RD ROOF DRAIN RDWD REDWOOD RE REGARDING REF REFERENCE REFG REFRIGERATOR REINF REINFORCING REQD REQUIRED RES RESILENT RM ROOM RO ROUGH OPENING S SACT SUSPENDED ACOUSTICAL CEILING TILE SCHED SCHEDULE SF SQUARE FEET SG SUPPLY GRILLE SHT SHEET SHTG SHEATHING SHWR SHOWER SIM SIMILAR SIP STRUCTURAL INSULATED PANELEJEXPANSION JOINT ELEC ELECTRICAL ELEV ELEVATION ‐ HEIGHT EQ EQUAL ETR EXISTING TO REMAIN EW/EWA EXTERIOR WALL ASSEMBLY EWC ELECTRIC WATER COOLER EXT EXTERIOR F FD FLOOR DRAIN FDN FOUNDATION FEC FIRE EXTINGUISHER CABINET FF FINISHED FLOOR FIN FLR FINISHED FLOOR FLR FLOOR FO FACE OF FT FOOT FTG FOOTING G GA GAUGE GALV GALVANIZED GC GENERAL CONTRACTOR GL GLASS GLU LAM or GLBGLUE LAMINATED BEAM GWB GYPSUM WALL BOARD H HD BD HARD BOARD HM HOLLOW METAL HORIZ HORIZONTAL HP HIGH POINT HR HOUR HT HEIGHT HTG HEATING HVAC HEATING, VENTILATING, AIR CONDITIONING I IN INCH INFO INFORMATION INSUL INSULATION INT INTERIOR IWA INTERIOR WALL ASSEMBLY J JST JOIST JT JOINT L LB POUND LF LINEAL FEET LTWT LIGHTWEIGHT LVL LAMINATED VENEER LUMBER M MANUF MANUFACTURER MAT MATERIAL MAX MAXIMUM MDF MEDIUM DENSITY FIBER BOARD A &A N D @A T A/ C A I R   C O N D I T I O N I N G AB A N C H O R   B O L T AC T A C C O U S T I C A L   C E I L I N G   T I L E AD D M A D D E N D U M AD J A D J A C E N T AF F A B O V E   F I N I S H E D   F L O O R AH U A I R   H A N D L I N G   U N I T AL T A L T E R N A T E AL U M A L U M I N U M AR C H A R C H I T E C T U R A L AS P H A S P H A L T B BL D G B U I L D I N G BL K G B L O C K I N G BO B O T T O M   O F BO W B O T T O M   O F   W A L L BT W N B E T W E E N BU B U I L T   U P C CB C A T C H   B A S I N CC C E N T E R   T O   C E N T E R CD X E X T E R I O R   G R A D E   P L Y W O O D CF C U B I C   F E E T CH C H A N N E L CJ C O N T R O L   J O I N T CL C E N T E R L I N E CL G C E I L I N G CL R C L E A R CM U C O N C R E T E   M A S O N R Y   U N I T CO L / C O L S C O L U M N / C O L U M N S CO N C C O N C R E T E CO N S T C O N S T R U C T I O N CO N T C O N T I N U O U S CO O R D C O O R D I N A T E CT C E R A M I C   T I L E CT R C E N T E R CT R D C E N T E R E D D DB L D O U B L E DF D R I N K I N G   F O U N T A I N DI A D I A M E T E R DI M D I M E N S I O N DN D O W N DR D O O R DS D O W N S P O U T DT L / D E T D E T A I L DW G D R A W I N G E (E ) E X I S T E X I S T I N G EA E A C H EI F S E X T E R I O R   I N S U L A T I O N   F I N I S H SYSTEM A4-2 2 A4-3 A4-12 1A EQ U E S T R I A N L A N E ( 1 0 2 ' R O W P R I V A T E L Y MA I N T A I N E D ) AL L E Y ( 3 0 ' R O W P R I V A T E L Y M A I N T A I N E D ) H 1' - 0"79' - 0" 1 ASPHALT A1-1 4 6 20' - 1 9/16" BAXTER MEADOWS PHASE IIA LOT 3 BLK 18 ZONING B-2 (100% LOT COVERAGE ALLOWED) 6023.82 SF .14 AC 13 ' - 9 2 9 / 3 2 " 41 ' - 6 " 4' - 1 0 " A4-1 1 13 ' - 9 2 9 / 3 2 " 41 ' - 6 " PER IBC 12' X60%=7.2' MAX AWNING ENCROACHMENT ON RIGHT OF WAY 21' - 5 9/16" 7' - 6 " 7' - 6 " ASPHALT CONC SIDEWALK 5' - 0" 20' - 1 9/16" CONC SIDEWALK LOT 4 BLK 18 LOT 2 BLK 18 EXTG 4"SEWER 1 (N) GAS (N) ELEC/DATA PROPERTY LINE 100.13' N 00DEG 18'03"W PR O P E R T Y L I N E 6 0 . 1 6 ' N 8 9 D E G 4 1 ' 5 7 " E PR O P E R T Y L I N E 6 0 . 1 6 ' N 8 9 D E G 4 1 ' 5 7 " E PROPERTY LINE 100.13' N 00DEG 18'03"W 1 OFFSTREET PARKING SPACE 1 OFFSTREET PARKING SPACE 7' - 6 " 15 ' - 1 2 9 / 3 2 " 7' - 7 2 9 / 3 2 " 7' - 6 " 15 ' - 1 2 9 / 3 2 " 2 2 3 4 4 6 9 2 4 6 9 3 P G C P C G 4 6 9 2 P P P G P PC PG C G P P 5 6 7 EXISTING PARKING SPACES EDGE IF EXISTING ASPHALT 8 REAR SETBACK 5' - 0" 9 101010104' - 1 0 " 6' - 2 " 13 ' - 1 0 " 28' - 6"7' - 0" GARAGE SETBACK 20' - 0"SEE CIVIL SITE PLAN FOR ADDT'L INFO A1-2 2 1" / 12" roof outline above 6' - 0 " 29 ' - 6 " 6' - 0 " 4' - 1 0 " 11 7' - 6 " 7' - 6 " 1 5 ' U T I L I T Y & P E D E S T R I A N T R A I L E A S E M E N T 1 5 ' - 0 " 1 2 ' - 8 " 1 28' - 6"7' - 0" EXTG 2" WATER SL O P E 1 / 8 " : 1 2 " ASPHALT PAD 6 CU. YD CONTAINER HEAVY DUTY HINGE W/ 225 DEGREE OPERATIONS, DESIGNED TO CARRY GATE WEIGHT 8"X 8" X 16" SPLIT FACE CMU-GRAY 3" DIA. x 36" HIGH STL PIPE BOLLARDS 6" 5' - 0 " 6" 6' - 0 " PIVOTING LATCH CHANNEL FORMED FROM SQ. TUBE. LOOP HANDLE AND BOLT PIVOT MIN BETWEEN JAMBS 10' - 0" 1 0 ' - 0 " 4' - 0" 6 " 4" TAPERED PRECAST CONC CAP METAL TO MATCH BLDG'S SECOND FLR 12' - 0" BLACK 2X2 HSS FRAMEWORK DARK GRAY CORRUG METAL SHED ROOF MATCH BLDG 1:12 PITCH *COLOR-BLACK DESIGN BASED ON SALISBURY INDUSTRIES REGENCY DECORATIVE CBU-3312R. 12 MAIL COMPARTMENTS W/ 1 PARCEL LOCKER AND OUTGOING MAIL SLOT. TYP OF 2 COLOR BRONZE. FRONT ACCESS MAILBOXES TO BE ADDED IF NO VACANT BOXES AT SUBDIVISION MAIL DROP. 3"W x 6'L x 4" THICK CONCRETE PAD. OVER ENG. GRAVEL GENERAL SITE NOTES SITE NOTES: 1. SUBDIVISION MAILBOX LOCATED AT XXXX 2. LESS THAN ONE ACRE NO SWP REQ'D. ok BY MT DEQ IN FINAL PUD 3. TEMPORARY CONSTRUCTION FACILITIES AND STAGING WILL TAKE PLACE IN PARKING STALL AREAS WITH DRIVE AISLE TO REMAIN OPEN 4. A ROLL OFF DUMPSTER WILL BE PROVIDED FOR ALL CONSTRUCTION DEBRIS AND WASTE MATERIALS TO GO IN. 5. PER CITY OF BOZEMAN PLANNING DEPT ON 8/11/2016 RE: STATUS OF 2A P.U.D. "HOMEOWNERS DOCUMENTATION AND DESIGN GUIDELINES CONTAIN ALL ELEMENTS IN PUD ON RECORD IN THEIR OFFICE. FOLLOW THOSE GUIDELINES TO BE IN COMPLIANCE." SEE SITEPLAN REVIEW BINDER DRAWN BY: PR O J E C T # : RE V DE S C DA T E PH A S E PR E SD DD CD DA T E 1 2 3 4 A1-1 01.31.20 AR C H I T E C T U R A L S I T E P L A N & SI T E D E T A I L S Th e P a l o m i n o 37 6 6 E Q U E S T R I A N L N BO Z E M A N , M T 5 9 7 1 8 SI T E P L A N R E V I E W --- Author 12 - 1 4 - 1 6 - - - - - - -3/16" = 1'-0"A1-1 1 SITE PLAN 1/4" = 1'-0"A1-1 4 TRASH ENCLOSURE 1/2" = 1'-0"A1-1 2 BIKE RACK 1/4" = 1'-0"A1-1 3 ELEVATION @ MAILBOXES SITE KEY NOTES # CONTENT 1 BIKE RACK. SEE DETAIL 2 FLUSH CHANNEL DRAIN, HIGH HEEL RATED 3 361 SF PROVIDED. SIZE FOR "350 SF (2) 1 BEDROOM, (1) 3 BEDROOM UNITS" 4 GAS/ELEC METERS SEE C1-0 FOR INFO 5 36" TREE GRATE, TYP OF (2) SEE DETAIL ON A1-2 6 (3) OUTDOOR AC UNITS 7 TRASH ENCLOSURE, SEE DETAIL THIS SHEET 8 6X6 TRANSFORMER PAD 9 EXISTING RAMP & SIDEWALK, SEE C1-0 10 PROVIDE SPLASH BLOCK AT THE BOTTOM OF EACH DOWNSPOUT, TYP. OF 8 11 SIDEWALK N 1. IRRIGATION PROVIDED WITH AUTOMATIC DRIP SYSTEM @ PLANTINGS 2. TREES NOT PLANTED IN SHRUB OR PLANTING BEDS SHALL HAVE A 18" DIAMETER ORGANIC MULCH RINGS AROUND BASE AND REQUIRE MINIMUM 1 GALLON OF WATER/WEEK 3. ALL NEW LAWN AREAS SHALL BE SOD FROM A LOCALLY GROWN SOURCE AND REQUIRES 1/2"-1" OF WATER/WEEK 4. NO TREE SHALL BE PLANTED WITHIN 10' OF WATER OR SEWER LINES. 5. STANDARD TREE PROTECTION MEASURES, INCLUDING 4' HIGH ORANGE BARRIER FENCING INSTALLED AT TREE'S DRIP LINE. 6. ALL SHRUB PLANTING WILL BE ROCKED WITH 2-4" OF 2" LANDSCAPE ROCK INSTALLED OVER WEED FABRIC 7. TREES TO BE DRIP IRRIGATED AT 5 GAL. PER TREE 3 TIMES/WEEK. TOTAL WEEKLY WATER REQUIREMENT IS 75 GAL/WEEK 8. ALL SHRUBS TO BE DRIP IRRIGATED WITH 2 GAL. PER SHRUB 3 TIMES/WEEK. TOTAL WEEKLY WATER REQUIREMENT IS 36 GAL/WEEKGALLONS PER WEEK 9. ALL LANDSCAPE BEDS ARE TO BE EDGED WITH STEEL LANDSCAPE EDGING UNLESS BORDERED BY HARDSCAPE (CONCRETE, ASPHALT). LANDSCAPING NOTES: LANDSCAPE POINTS REQUIRED = 23 PER TABLE 38.550.060.I BLVD TREES 1 PER 50' =1 TREES (38.550.050.E.1) P.U.D. MASTER PLAN 2" caliper 2 SETBACK YARDS LANDSCAPED TABLE 38.550.060-2 10 POINTS 75% OF PLANTINGS DROUGHT TOLERANT FOLLOWING 38.26.060 B.1.C 5 POINTS(38.550.060.B.I.c) 2 PTS PER 1 % OF LOT COVERED IN PEDESTRIAN FACILITIES 8 POINTS (261 sf/ 6024sf=4.3% 4 x2=8 max OPEN SPACE SEATING AREA) 23 POINTS LANDSCAPING POINTS: HONEYLOCUST -LARGE CANOPY (GLEDITSIA TRIACANTHOS VAR. INERMIS) LANDSCAPING LEGEND COMMON NAME (SCIENTIFIC NAME) SYMBOL PLANTING SIZE MATURE HGT. KARL FOERSTER FEATHER REED GRASS (CALAMAGROSTIS ACUTIFLORA 'KARL FOERSTER') AMUR MAPLE -ORNAMENTAL TREE (ACER GINNALA) 10-15' FT.1" CALIPER # JAPANESE ROSE (ROSA RUGOSA 'ALBA' ) 2 GAL. POT 3'-5' FT. COTONEASTER (COTONEASTER FRIGIDUS) 2 GAL POT 4' FT. 3' FT. 1.5-2" CALIPER 50 FT.1 FLOWERING CRABAPPLE -ORNAMENTAL TREE (MALEUS FLORIBUNDA 'SNOWWHITE' FRUITLESS) 1" CALIPER 2 GAL POT 20' FT.2 DROUGHT TOLERANT NO 2 8 4 11 NO YES YES YES YES BIG BLUESTEM (ANDROPOGON GERARDII VITMAN) 2 GAL. POT 3' FT.12 YES HONEYSUCKLE (ORANGE) (LONICERA CILIOSA) 2 GAL. POT 15' FT.2 YES JUNIPER 'MEDORA' (JUNIPERUS SCOPULORUM 1 GAL. POT 10'10 YES 3 F E E T 3 FEET TERRA FIRMA CAST IRON TREE GRATE-TF8-2011 EQ U E S T R I A N L N PROPERTY LINE 100.13' PR O P E R T Y L I N E 6 0 . 1 6 ' PR O P E R T Y L I N E 6 0 . 1 6 ' PROPERTY LINE 100.13' BAXTER MEADOWS PHASE IIA LOT 3 BLK 18 ZONING B-2 (100% LOT COVERAGE ALLOWED) 6023.82 SF .14 AC 1 2 3 4 5 5 5 66 6 (N) GAS (N) ELEC/DATA P G C P C G P P P G P PC PG C G P P EXTG 4"SEWER EXTG 2" WATER 16 ' - 1 2 5 / 3 2 " 7 7 5' - 0" NOTE: SNOW REMOVAL WILL BE HAULED OFF SITE 4 6 9 2 4 6 9 3 UTILITY & PEDESTRIAN TRAIL EASEMENT (15') REAR SETBACK 5' - 0" GARAGE SETBACK 20' - 0" 11 1 1 1 AL L E Y ( 3 0 ' R O W P R I V A T E L Y M A I N T A I N E D ) LOT 2 BLK 18 PR O P E R T Y L I N E 6 0 . 1 6 ' N 8 9 D E G 4 1 ' 5 7 " E PR O P E R T Y L I N E 6 0 . 1 6 ' N 8 9 D E G 4 1 ' 5 7 " E PROPERTY LINE 100.13' N 00DEG 18'03"W T.O.SUB. FLR @ MAIN FLR 100' -0" PLANT PER LANDSCAPE LEGEND 2"X2" TUBE STL PAINT BLK 4" STANDOFFS FROM WALL 14 ' - 0 " 6' - 0" 3' - 0 " 2' - 1 0 " 2' - 1 0 " 2' - 1 0 " 2' - 6 " DRAWN BY: PR O J E C T # : RE V DE S C DA T E PH A S E PR E SD DD CD DA T E 1 2 3 4 A1-2 01.31.20 LA N D S C A P E P L A N , C A L C S , & LE G E N D Th e P a l o m i n o 37 6 6 E Q U E S T R I A N L N BO Z E M A N , M T 5 9 7 1 8 SI T E P L A N R E V I E W --- Author 12 - 1 4 - 1 6 - - - - - - - 1/2" = 1'-0"A1-2 1 Tree Grate 3/16" = 1'-0"A1-2 3 LANDSCAPE PLAN N LANDSCAPING KEY NOTES # CONTENT 1 PEDESTRIAN TRAIL. 5' WIDE CONC SIDEWALK TO BE CONSTRUCTED BY OWNER TO CITY STANDARDS. BUILDER TO OBTAIN NECESSARY CITY OF BOZEMAN PERMITS. 2 RANDOM CONCRETE PAVERS W/ CRUSHED GRANITE BETWEEN. SIZE FOR "350 SF (2) 1 BEDROOM, (1) 3 BEDROOM UNITS" 3 MIN 1.5" CALIPER BOULEVARD TREE TYP OF (2) PER UDO 38.26.050 4 60" OUTDOOR BENCH TYP OF 2 5 2-4" LANDSCAPE ROCK OVER WEED FABRIC, TYP. 6 STEEL LANDSCAPE EDGING 7 TRELLIS-BLACK PAINTED STEEL AND HONEYSUCKLE VINE 1/4" = 1'-0"A1-2 2 TRELLIS ELEVATION LANDSCAPE DESIGN ELS ARCHITECTS 129 N 25TH AVE BOZEMAN, MT 59718 PH. 406.581.1599 CONTACT: ERYN SCHWEHR ERYN@ELSARCH.NET LANDSCAPE DESIGNER FOR 16 YEARS OWNER JJM LLC 1120 DURHAM AVE BOZEMAN, MT 59718 PH. 406.579.9800 CONTACT: JILL MELLUM A4-2 2 A4-3 A4-12 1 A 79' - 0" H 1 1' - 4 " 4' - 8 " 29 ' - 6 " 4' - 8 " 1' - 4 " 1 A4-5 1 A4-5 6 2 GAS/ELEC METERS A4-1 1 37' - 5 3/4" G 1' - 4" 4' - 8 " 5' - 2 3 / 4 " 5' - 3 1 / 2 " 8' - 5 1 / 4 " 8' - 5 1 / 4 " 5' - 3 1 / 2 " 5' - 2 3 / 4 " 1' - 4"4' - 8"4' - 8"1' - 4" 41 ' - 6 " 1' - 4"4' - 8"28' - 6"10' - 0"28' - 6"4' - 8"1' - 4" 524 SF OFFICE 'A' 102 522 SF OFFICE 'B' 101 708 SF GARAGE 'B' 104 710 SF GARAGE 'A' 103 48 SF RR 'A' 106 38 SF MECH 'A' 105 NOTE: ROOM SQ FT ARE TO FIN. F.O.W. 148 SF STAIRS 100 5' - 1 1 / 4 " 14' CLG 14' CLG 14' CLG 14' CLG 5 B 6' - 9 3/16" 3 C F 4 D E 6' - 5 1/4" 48 SF RR 'B' 107 37 SF MECH 'B' 108 13 ' - 0 " 3' - 6 " 1' - 1 1 3 / 4 " 11 ' - 0 1 / 4 " 5' - 0"6' - 0"6' - 6"6' - 0"5' - 0"6' - 6"3' - 0"9' - 6"3' - 0"6' - 6" 6' - 0 " 29 ' - 6 " 6' - 0 " 1' - 6 " 3' - 0 " 1' - 6 " 2' - 0 " 10 ' - 0 " 5' - 6 " 10 ' - 0 " 2' - 0 " 1' - 6 " 3' - 0 " 1' - 6 " 18 ' - 8 3 / 4 " 6' - 10"30' - 4 1/4" 100 10 7 10 8 10 3 O H D 10 4 O H D 2' - 8"1' - 0" 5' - 0" G6 G6 RISERS @ TREADS @ 6 31/32"27 11"19 2 A4-4 2 A4-4 28' - 6"10' - 0"28' - 6" 5' - 1 1 / 4 " 4' - 1 0 3 / 4 " 30' - 4 1/4" E E G G 10 6 103A 104A 104 103 10 5 101 1 1 2 3 2 3 4 SLOPE 1/8":12" SLOPE 1/8":12" 6' - 6"3' - 0"9' - 6"3' - 0"6' - 6"5' - 0"6' - 0"6' - 6"6' - 0"5' - 0" E E G G E3 I1 I8 I6 I4 I2 I1 E4E4 E4 E3E4E3 E4 E3 E4 E3 E1 E4 E1 E4 E1 E4 E1 E4 E1 E3 E4 E3 E4 E3 I1 I1 I8 I6 I4 I1 I1 2 A4-5 2 A4-5 T.O. SUB FLR = 100'-0" 3 A5-0 2 A6-1 A1-2 2 10 2 A F2 2' - 9 1/16" GROSS SQUARE FOOTAGE BUILDING SQUARE FOOTAGE (EXT F.O.F) MAIN FLOOR = 3048 SF (STAIRS INCLUDED) SECOND FLOOR = 3048 SF (STAIRS INCLUDED) TOTAL 6096 SF SPACES (EXT F.O.F.-CENTER DEMISING WALL) COMMERCIAL SPACE 1524 SF PRIVATE GARAGES 1524 SF UNIT A 681 SF UNIT B 681 SF UNIT C 1457 SF COMMON 229 SF RESIDENTIAL TOTAL 3048 SF DRAWN BY: PR O J E C T # : RE V DE S C DA T E PH A S E PR E SD DD CD DA T E 1 2 3 4 A3-1 01.31.20 FI R S T F L O O R P L A N Th e P a l o m i n o 37 6 6 E Q U E S T R I A N L N BO Z E M A N , M T 5 9 7 1 8 SI T E P L A N R E V I E W --- Author 12 - 1 4 - 1 6 - - - - - - - 1/4" = 1'-0"A3-1 1 MAIN FLOOR PLANN ROOM SCHEDULE (NET SF, FIN. FACE OF WALL) Number Name Occupancy Area 100 STAIRS COMMON 148 SF 101 OFFICE 'B'COMMERCIAL 'B' 522 SF 102 OFFICE 'A'COMMERCIAL 'B' 524 SF 103 GARAGE 'A'PRIVATE GARAGE 'S2' 710 SF 104 GARAGE 'B'PRIVATE GARAGE 'S2' 708 SF 105 MECH 'A'MECHANICAL 38 SF 106 RR 'A'COMMERCIAL 'B' 48 SF 107 RR 'B'COMMERCIAL 'B' 48 SF 108 MECH 'B'MECHANICAL 37 SF 201 UNIT 'A'RESIDENTIAL 'R' 614 SF 202 UNIT 'B'RESIDENTIAL 'R' 614 SF 203 UNIT 'C'RESIDENTIAL 'R' 1351 SF 204 HALL 119 SF Grand total: 13 PLAN KEY NOTES # CONTENT 1 CEILING MOUNTED HEATERS ON T-STAT 2 2 HR SEPERATION WALL W/ 2X4 PLUMBING FUR WALL, TO RUN LINES DOWN INTO CRAWL SPACE FROM SECOND FLOOR 3 24" X 30" CRAWL SPACE ACCESS 4 (3) OUTDOOR AC UNITS, SEE SITE PLAN A4 -2 2A4 -3 A4 -1 2 1 A H 1 1 A4 ‐ 5 1 A4 ‐ 5 1'   ‐   4 " 4'   ‐   8 " 28 '   ‐   6 " 10 '   ‐   0 " 28 '   ‐   6 " 4' ‐ 8"1' ‐ 4" 62A4 -1 1 G 20 '   ‐   7   1 / 1 6 " 6'   ‐   5   1 / 2 " 3 '   ‐   8 " 12 '   ‐   1 0 " 1 3 '   ‐   4   1 / 4 " 5'   ‐   1 " 29 '   ‐   5 " 4'   ‐   3   3 / 4 " 61 4   S F UN I T   ' B ' 20 2 1351 SFUNIT 'C'203 5'   ‐   0 " 66 " PR O J E C T   N O T E S : 1.   EL E C   B A S E B O A R D   H E A T I N G   T Y P   @   R E S I D E N T I A L   U N I T S 2.   LO O K   A T   Q U A K E R   W I N D O W S   W /   P T A C   U N I T   I N   T H E M   A S   O P T I O N 3.   RO O M   S Q .   F O O T A G E   I S   F R O M   I N S I D E   F A C E   O F   F I N   G W B 2 '   ‐   0 " 1 2 '   ‐   1   1 / 4 " 4'   ‐   0 " 6'   ‐   0 " 4'   ‐   9 " RI S E R S   @ TR E A D S   @ 6  3 1 / 3 2 " 27 11 " 19 2 0 2 A 2 0 2 D 20 2 B 2 0 3 B 20 3 20 2 F 61 4   S F UN I T   ' A ' 20 1 1 8 '   ‐   8   3 / 4 " 10 '   ‐   1 " 13 '   ‐   1 " 5 B 3 C F 4 D E 2'   ‐   1 0 " 4'   ‐   3   3 / 4 " 1 1 '   ‐   9   7 / 8 " 8'   ‐   1   1 / 2 " 5'   ‐   0 " 66 " 2 0 1 A 2 0 1 D 20 1 B 2'   ‐   1 0 " 1 2 '   ‐   1   1 / 4 " 2 '   ‐   0 " 4 1 '   ‐   6 " 79 '   ‐   0 " 2 '   ‐   0 " 9 '   ‐   0 " 7 '   ‐   6 " 9 '   ‐   0 " 2 '   ‐   0 " 1'   ‐   4 " 4'   ‐   8 " 28 '   ‐   6 " 10 '   ‐   0 " 28 '   ‐   6 " 4' ‐ 8"1' ‐ 4" 1'   ‐   6 " 4'   ‐   0 " 2'   ‐   9 " 3'   ‐   0 " 4'   ‐   0 " 3'   ‐   0 " 5'   ‐   9 " 3'   ‐   0 " 1'   ‐   6 " 2'   ‐   6 " 4'   ‐   0 " 6'   ‐   3 " 3'   ‐   0 " 6' ‐ 3"4' ‐ 0"2' ‐ 6"1' ‐ 4"4' ‐ 8"29' ‐ 6"4' ‐ 8"1' ‐ 4"2' ‐ 0"9' ‐ 0"7' ‐ 6"9' ‐ 0"2' ‐ 0" 1 '   ‐   4 " 4 '   ‐   8 " 2 9 '   ‐   6 " 4 '   ‐   8 " 1 '   ‐   4 " 1'   ‐   6 " 4'   ‐   0 " 2'   ‐   9 " 3'   ‐   0 " 4'   ‐   0 " 3'   ‐   0 " 5'   ‐   9 " 3'   ‐   0 " 1'   ‐   6 " 1'   ‐   6 " 3'   ‐   0 " 24' ‐ 0" 5 '   ‐   1   1 / 4 " 5  1 / 2 " 3'   ‐   3   1 / 2 " 3 '   ‐   1 0 " 1 1 '   ‐   9   7 / 8 " 3 '   ‐   7   3 / 4 " 3 '   ‐   0 " 3 '   ‐   4 " 2 '   ‐   1   5 / 8 " 13' ‐ 4 1/4" 10 '   ‐   5   1 / 2 " 9' ‐ 0"4' ‐ 11 3/4" 2 0 3 A 5'   ‐   0 " 5' ‐ 0"6' ‐ 6"2' ‐ 1 5/8"5' ‐ 0"3' ‐ 8"4' ‐ 8"3' ‐ 0"3' ‐ 6 3/4"PANTRY 5'   0 "   x   2 '   8 " 5' 0" x 2' 8" DE S K   A R E A DE S K   A R E A 11 '   ‐   1 1 " 11 '   ‐   1 1 " 13' ‐ 7 3/4" 5 '   ‐   6   1 / 8 " 1 4 '   ‐   1   1 / 8 " 2 '   ‐   0 " VAULTED CLG 9'   C L G 9'   C L G 7'   ‐   6 " 2 0 3 C 203D 203E 20 3 L 2 0 3 K 203I 2 0 3 J 2 0 3 H 203F 2 0 3 G E Q E Q D B G2 B H D B G2 H HHCAC C F C 11 9   S F HA L L 20 4 14 8   S F ST A I R S 10 0 6'   ‐   0 " 2 '   ‐   8 " 2'   ‐   1   1 / 2 " 3'   ‐   0 " 3'   ‐   0 " G 2 A4 ‐ 4 G G 20 1 F E4E3 E3 E3 E4 E4 E3 E4 E3 E4 E4 E3 E3 E2 E2E4E4E3 I2 I2 I2 I2 I2 I2 I5 I7 I7 I2 I2 E4 E4 E4 E4 I5 I7 I7E3E3 E2 E2 I5 I5 I7 I5 I5 I8I7 I7 I8 E2 I8I8 I8 I8 I7 I7 2 0 2 E 20 2 C 20 2 20 1 20 1 C 2 0 1 E 11 2 2 2 33 4 2' ‐ 10" 2 A4 ‐ 5 2 A4 ‐ 5 3 A5‐0 A1 -2 2 GR O S S   S Q U A R E   F O O T A G E BU I L D I N G   S Q U A R E   F O O T A G E   (E X T   F . O . F )          MA I N   F L O O R   =        30 4 8   S F       ( S T A I R S   I N C L U D E D )          SE C O N D   F L O O R   =   3 0 4 8   S F       ( S T A I R S   I N C L U D E D )          TO T A L                                60 9 6   S F SP A C E S   ( E X T   F . O . F . ‐CE N T E R   D E M I S I N G   W A L L ) CO M M E R C I A L   S P A C E 15 2 4   S F PR I V A T E   G A R A G E S 15 2 4   S F UN I T   A 68 1   S F UN I T   B 68 1   S F UN I T   C 14 5 7   S F CO M M O N 22 9   S F RE S I D E N T I A L   T O T A L 30 4 8   S F 1 -HO U R F I R E B A R R I E R O R P A R T I T I O N 30 M I N U T E F I R E P A R T I T I O N 2 -HO U R F I R E B A R R I E R O R H O R I Z O N T A L B A R R I E R WA L L   T Y P E   L E G E N D DRAWN BY:PROJECT #:REVDESCDATEPHASEPRE SD DD CDDATE 1 2 3 4 A3‐2 04.10.19SECOND FLOOR PLANThe Palomino 3766 EQUESTRIAN LN BOZEMAN, MT 59718 SITE PLAN REVIEW‐‐‐Author12‐14‐16 ‐‐‐‐‐‐‐ N 1/ 4 "   =   1 ' ‐ 0 " A3 ‐ 21 S E C O N D   F L O O R   P L A N RO O M   S C H E D U L E   ( N E T   S F ,   F I N .   F A C E   O F   W A L L ) Nu m b e r N a m e O c c u p a n c y A r e a 10 0 S T A I R S C O M M O N 1 4 8   S F 10 1 O F F I C E   ' B ' C O M M E R C I A L   ' B ' 5 2 2   S F 10 2 O F F I C E   ' A ' C O M M E R C I A L   ' B ' 5 2 4   S F 10 3 G A R A G E   ' A ' P R I V A T E   G A R A G E   ' S 2 ' 7 1 0   S F 10 4 G A R A G E   ' B ' P R I V A T E   G A R A G E   ' S 2 ' 7 0 8   S F 10 5 M E C H   ' A ' M E C H A N I C A L 3 8   S F 10 6 R R   ' A ' C O M M E R C I A L   ' B ' 4 8   S F 10 7 R R   ' B ' C O M M E R C I A L   ' B ' 4 8   S F 10 8 M E C H   ' B ' M E C H A N I C A L 3 7   S F 20 1 U N I T   ' A ' R E S I D E N T I A L   ' R ' 6 1 4   S F 20 2 U N I T   ' B ' R E S I D E N T I A L   ' R ' 6 1 4   S F 20 3 U N I T   ' C ' R E S I D E N T I A L   ' R ' 1 3 5 1   S F 20 4 H A L L 1 1 9   S F Gr a n d   t o t a l :   1 3 PLAN KEY NOTES #C O N T E N T 1 CEILING MOUNTED HEATERS ON T‐STAT 2 2 HR SEPERATION WALL W/ 2X4 PLUMBING FUR WALL,TO RUN LINES DOWN INTO CRAWL SPACE FROM SECOND FLOOR 3 24" X 30" CRAWL SPACE ACCESS 4 (3) OUTDOOR AC UNITS, SEE SITE PLAN T.O.SUB. FLR @ MAIN FLR 100' -0" T.O.SUB FLR @ SECOND FLR 115' -6 3/4" HGT LIMIT 143' -6" T.O. PL @ MAIN FLR 114' -0" T.O.PL. @ SECOND FLR 124' -9 3/8" 1 62534 41' - 6" 9' - 2 5 / 8 " 1' - 6 3 / 4 " 14 ' - 0 " 2' - 0"1' - 4"4' - 8"29' - 6"4' - 8"1' - 4"2' - 0" 7' - 9"26' - 0"7' - 9"B.O.CLG MIN 113' -0" 7' - 6 " 2' - 6 " C FF C 100 E3 E3 EXTERIOR LIGHT FIXTURE 2, SEE CUT SHEET & EXTERIOR ELECTRICAL PLAN 1 2 3 4 7 10 8 6 5 BU I L D I N G H G T 33 ' - 6 3 / 3 2 " 1 1/2" / 12" T.O.SUB. FLR @ MAIN FLR 100' -0" T.O.SUB FLR @ SECOND FLR 115' -6 3/4" T.O. PL @ MAIN FLR 114' -0" T.O.PL. @ SECOND FLR 124' -9 3/8" 162534 9' - 2 5 / 8 " 14 ' - 0 " 1' - 6 3 / 4 " 1' - 4"4' - 8"29' - 6"4' - 8"1' - 4" 41' - 6" C A C 103OHD104OHD E3 E3 E3 EXTERIOR LIGHT FIXTURE 1, SEE CUT SHEET & EXTERIOR ELECTRICAL PLAN EXTERIOR LIGHT FIXTURE 1, SEE CUT SHEET & EXTERIOR ELECTRICAL PLAN T. O . F N D T O C T R . 13 ' - 0 " T. O . F N D T O C T R . 7' - 1 0 " 1 2 3 4 5 9 7 10 FRONTAGE ELEVATION NOTES STOREFRONT FRONTAGE AWNING 60% LENGTH OF FACADE=24.9'. 29.5' PROVIDED, 5' DEEP TRANSPARENCY 313 SF BETWEEN 2' 6"-10' 0" X 60%=187.8 SF 188 SF PROVIDED (narrowed frame of doors, increased width of windows, increased width of door to second floor) SIDEWALK 12'0" MIN, 12' 9" PROVIDED SIGNAGE AREA CALCULATIONS PER SEC. 38.560.060 400 sf max LINEAR FEET OF BUILDING FRONTAGE=41'-6" 3sf x 25' (FIRST 25') = 75 sf 1.5sf x 16.5' (REMAINING FRONTAGE)=24.75 sf TOTAL ALLOWABLE SIGNAGE = 99.75 sf PROPOSED SIGNAGE AREA CALCULATIONS: TENANT SIGNS TBD PLACED ON STOREFRONT WINDOWS TOTAL PROPOSED ADDRESS SIGNAGE = 11.7 SF SIGNAGE AREA CALCULATIONS NORTH ELEVATION ONLY ELEVATION LEGEND HARDIE LAP CEMENT BD SIDING SMOOTH COLOR-PEARL GRAY 8 1/4" WIDTH, 7" EXP 7/8" 22 GA CORRUGATED METAL WALL PANEL OR EQ COLOR-SLATE GRAY MASONRY DARK GRAY, SPLIT FACE HONED, DARK GRAY GROUT CEDAR R.S. SIDING -CLEAR STAIN FINISH 1X8 WIDTH, 7" EXP 7/8" 22 GA CORRUGATED METAL ROOF PANEL OR EQ COLOR-SLATE GRAY BLACK VINYLE WINDOW DBL PANE, LOWe, CLEAR GLAZING METAL SHEET PANEL-SLATE GRAY STOREFRONT WDW/DR SYSTEM ALUMINUM BLACK FRAME 2" PROFILE, DBL PANE, LOWe, CLEAR GLAZING OVERHEAD DOOR-FLUSH PANEL 1 2 3 4 5 9 8 7 6 HIDDEN BOX GUTTER SYSTEM, DOWNSPOUTS WITHIN CORNER BUILD OUTS 10 NOTE:SEE PLANS AND 3D VIEWS FOR LOCATIONS DRAWN BY: PR O J E C T # : RE V DE S C DA T E PH A S E PR E SD DD CD DA T E 1 2 3 4 A4-1 01.31.20 EX T E R I O R E L E V A T I O N S Th e P a l o m i n o 37 6 6 E Q U E S T R I A N L N BO Z E M A N , M T 5 9 7 1 8 SI T E P L A N R E V I E W --- Author 12 - 1 4 - 1 6 - - - - - - - 1/4" = 1'-0"A4-1 1 NORTH ELEVATION A4-1 3 NORTHEAST VIEW 1/4" = 1'-0"A4-1 2 SOUTH ELEVATION T.O.SUB. FLR @ MAIN FLR 100' -0" T.O.SUB FLR @ SECOND FLR 115' -6 3/4" T.O. PL @ MAIN FLR 114' -0" T.O.PL. @ SECOND FLR 124' -9 3/8" A HG 9' - 2 5 / 8 " 1' - 6 3 / 4 " 14 ' - 0 " B C FDE 79' - 0" 1' - 0"1' - 4"4' - 8"28' - 6"10' - 0"28' - 6"4' - 8"1' - 4"2' - 0" 79'X27'=2133 X .1=213.3 SF OPENINGS ALLOWED B.O.CLG MIN 113' -0" T .O .W D W F R A M E T Y P 2 N D F L R 8 ' - 0 " T .O .O P E R A T I N G W D W T Y P 7 ' - 0 " D G2 B H G H E2 E2 E2 E2 E2 1054 sf 2nd story 105 sf openings UP, NS 104 sf shown 1104 sf 1st story 110 sf openings UP, NS 101 sf shown G AC AC AC G G E1 E E E1 E1 E1 E1 1 2 3 4 5 7 10 82' - 0" FRONTAGE ELEVATION NOTES STOREFRONT FRONTAGE AWNING 60% LENGTH OF FACADE=24.9'. 29.5' PROVIDED, 5' DEEP TRANSPARENCY 313 SF BETWEEN 2' 6"-10' 0" X 60%=187.8 SF 188 SF PROVIDED (narrowed frame of doors, increased width of windows, increased width of door to second floor) SIDEWALK 12'0" MIN, 12' 9" PROVIDED SIGNAGE AREA CALCULATIONS PER SEC. 38.560.060 400 sf max LINEAR FEET OF BUILDING FRONTAGE=41'-6" 3sf x 25' (FIRST 25') = 75 sf 1.5sf x 16.5' (REMAINING FRONTAGE)=24.75 sf TOTAL ALLOWABLE SIGNAGE = 99.75 sf PROPOSED SIGNAGE AREA CALCULATIONS: TENANT SIGNS TBD PLACED ON STOREFRONT WINDOWS TOTAL PROPOSED ADDRESS SIGNAGE = 11.7 SF SIGNAGE AREA CALCULATIONS NORTH ELEVATION ONLY ELEVATION LEGEND HARDIE LAP CEMENT BD SIDING SMOOTH COLOR-PEARL GRAY 8 1/4" WIDTH, 7" EXP 7/8" 22 GA CORRUGATED METAL WALL PANEL OR EQ COLOR-SLATE GRAY MASONRY DARK GRAY, SPLIT FACE HONED, DARK GRAY GROUT CEDAR R.S. SIDING -CLEAR STAIN FINISH 1X8 WIDTH, 7" EXP 7/8" 22 GA CORRUGATED METAL ROOF PANEL OR EQ COLOR-SLATE GRAY BLACK VINYLE WINDOW DBL PANE, LOWe, CLEAR GLAZING METAL SHEET PANEL-SLATE GRAY STOREFRONT WDW/DR SYSTEM ALUMINUM BLACK FRAME 2" PROFILE, DBL PANE, LOWe, CLEAR GLAZING OVERHEAD DOOR-FLUSH PANEL 1 2 3 4 5 9 8 7 6 HIDDEN BOX GUTTER SYSTEM, DOWNSPOUTS WITHIN CORNER BUILD OUTS 10 NOTE:SEE PLANS AND 3D VIEWS FOR LOCATIONS DRAWN BY: PR O J E C T # : RE V DE S C DA T E PH A S E PR E SD DD CD DA T E 1 2 3 4 A4-2 01.31.20 EX T E R I O R E L E V A T I O N S Th e P a l o m i n o 37 6 6 E Q U E S T R I A N L N BO Z E M A N , M T 5 9 7 1 8 SI T E P L A N R E V I E W --- Author 12 - 1 4 - 1 6 - - - - - - - 1/4" = 1'-0"A4-2 2 WEST ELEVATION A4-2 3 SOUTHEAST VIEW T.O.SUB. FLR @ MAIN FLR 100' -0" T.O.SUB FLR @ SECOND FLR 115' -6 3/4" T.O. PL @ MAIN FLR 114' -0" T.O.PL. @ SECOND FLR 124' -9 3/8" T.O.C 99' -9 3/4" AH 79' - 0" 14 ' - 0 " 1' - 6 3 / 4 " 9' - 2 5 / 8 " G BCFDE B.O.CLG MIN 113' -0" H H B G2 B D G E3 E3 E3 E3E3 1' - 4"4' - 8"28' - 6"10' - 0"28' - 6"4' - 8"1' - 4" G G E E MIN SEPARATION 3' - 0" 1 2 3 4 5 7 82' - 0" FRONTAGE ELEVATION NOTES STOREFRONT FRONTAGE AWNING 60% LENGTH OF FACADE=24.9'. 29.5' PROVIDED, 5' DEEP TRANSPARENCY 313 SF BETWEEN 2' 6"-10' 0" X 60%=187.8 SF 188 SF PROVIDED (narrowed frame of doors, increased width of windows, increased width of door to second floor) SIDEWALK 12'0" MIN, 12' 9" PROVIDED SIGNAGE AREA CALCULATIONS PER SEC. 38.560.060 400 sf max LINEAR FEET OF BUILDING FRONTAGE=41'-6" 3sf x 25' (FIRST 25') = 75 sf 1.5sf x 16.5' (REMAINING FRONTAGE)=24.75 sf TOTAL ALLOWABLE SIGNAGE = 99.75 sf PROPOSED SIGNAGE AREA CALCULATIONS: TENANT SIGNS TBD PLACED ON STOREFRONT WINDOWS TOTAL PROPOSED ADDRESS SIGNAGE = 11.7 SF SIGNAGE AREA CALCULATIONS NORTH ELEVATION ONLY ELEVATION LEGEND HARDIE LAP CEMENT BD SIDING SMOOTH COLOR-PEARL GRAY 8 1/4" WIDTH, 7" EXP 7/8" 22 GA CORRUGATED METAL WALL PANEL OR EQ COLOR-SLATE GRAY MASONRY DARK GRAY, SPLIT FACE HONED, DARK GRAY GROUT CEDAR R.S. SIDING -CLEAR STAIN FINISH 1X8 WIDTH, 7" EXP 7/8" 22 GA CORRUGATED METAL ROOF PANEL OR EQ COLOR-SLATE GRAY BLACK VINYLE WINDOW DBL PANE, LOWe, CLEAR GLAZING METAL SHEET PANEL-SLATE GRAY STOREFRONT WDW/DR SYSTEM ALUMINUM BLACK FRAME 2" PROFILE, DBL PANE, LOWe, CLEAR GLAZING OVERHEAD DOOR-FLUSH PANEL 1 2 3 4 5 9 8 7 6 HIDDEN BOX GUTTER SYSTEM, DOWNSPOUTS WITHIN CORNER BUILD OUTS 10 NOTE:SEE PLANS AND 3D VIEWS FOR LOCATIONS DRAWN BY: PR O J E C T # : RE V DE S C DA T E PH A S E PR E SD DD CD DA T E 1 2 3 4 A4-3 01.31.20 EX T E R I O R E L E V A T I O N S Th e P a l o m i n o 37 6 6 E Q U E S T R I A N L N BO Z E M A N , M T 5 9 7 1 8 SI T E P L A N R E V I E W --- Author 12 - 1 4 - 1 6 - - - - - - - 1/4" = 1'-0"A4-3 1 EAST ELEVATION A4-3 2 NORTHEAST ARIAL A4-3 3 SOUTHWEST ARIAL