HomeMy WebLinkAboutA-207 - EXTERIOR PERSPECTIVES - 12-17-2019Project Number:
Drawn By:
Reviewed By:
Approved By:
Issue Date
ThinkOne Architects
101 E Main St. Studio 1
Bozeman, MT, 59715
T: 406-586-7020
Architect MEP Engineer Associate Architect
Landscape Architect
Information Technology
Civil Engineer
Seal
Project Number
Acoustical Engineer
TCA Architecture + Planning
6211 Roosevelt Way Ne
Seattle, WA 58115
T: 206-522-3830
Associated Construction Engineering Inc.
12 N Broadway
Belgrade, MT, 59714
T: 406-388-3320
Morrison-Maierle, Inc.
2880 Technology Blvd.
Bozeman, MT 59715
T: 406-587-0721
Design 5 Landscape Architecture
37 E Main St
Bozeman, MT, 59715
T: 406-587-4873
BCER Engineering
10807 New Allegiance Dr., Suite 400
Colorado Springs, CO 80921
T: 719-533-1112
Big Sky Acoustics
PO BOX 27
Helena, MT 59624
T: 406-457-0407
City of Bozeman
121 N Rouse Ave.
Bozeman, MT 59715
T: 406-582-2300
F: 406-582-2301
901 N. ROUSE AVE. & 300 E. OAK ST.,
BOZEMAN MT
AndersonMasonDale Architects, P.C.
3198 Speer Boulevard
Denver, CO 80211
T: 303-294-9448
Associate Architect Structural Engineer
Morrison-Maierle, Inc.
2880 Technology Blvd.
Bozeman, MT 59715
T: 406-587-0721
SITE PLAN APPLICATION DECEMBER 17, 2019
12
/
1
0
/
2
0
1
9
4
:
1
7
:
1
6
P
M
A-207
EXTERIOR PERSPECTIVES
1825
SH
SH
JT
BOZEMAN PUBLIC
SAFETY CENTER
1825
CITY OF BOZEMAN
ROUSE AVE. ELEVATION
SOUTHEAST PERSPECTIVE - MAIN ENTRY FROM ROUSE AVE.
SOUTH PERSPECTIVE - MAIN ENTRY PLAZA NORTHEAST PERSPECTIVE - CORNER OF ROUSE AVE. AND OAK ST.
NORTHWEST PERSPECTIVE - FIRE DEPARTMENT SERVICE ENTRY
SOUTHWEST PERSPECTIVE - WITHIN SECURE POLICE DEPT. YARD
NORTHEAST PERSPECTIVE - FIRE DEPARTMENT BUILDING IDENTITY AND MAIN ENTRY
NORTH PERSPECTIVE - FIRE DEPARTMENT MAIN ENTRY
EAST PERSPECTIVE - FIRE DEPT. APPARATUS BAY FROM ROUSE AVE.