Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A-203B - EXTERIOR ELEVATIONS - ENLARGED - WEST -12-17-2019
GENERAL NOTES 1. ALL EXPOSED STEEL TO BE GALVANIZED AND FINISHED WITH A HIGH PERFORMANCE COATING. 2. ARCHITECTURAL ELEVATIONS DO NOT INIDICATE ALL LOCATIONS OF MISC SITE ELEMENTS. REFER TO SITE PLAN FOR FENCING, TRASH ENCLOSURES, MISC EQUIPMENT AND PV CANOPIES AT PARKING WORK NOTES EXTERIOR WALL MATERIAL LEGEND BRICK VENEER CMU VENEER ALUMINUM METAL PANEL FORMED METAL PANEL -VERTICAL ORIENTATION FORMED METAL PANEL -HORIZONTAL ORIENTATION AL-1 BRK-1 CMU-1 MP-13. BRICKS PROTRUDING FROM MASONRY VENEER WALLS TO BE BRK -2, UON 4. BRICKS RECESSED IN MASONRY VENEER WALL TO BE BRK -3, UON MP-2 INSULATED METAL WALL PANEL MP-3a INSULATED METAL WALL PANEL, FIRE ENGINE RED MP-3b T.O. PARAPET -PD 120' -8" 312 4 5 6 7 8 9 10 11 3.5 T.O. PARAPET -COURTS 132' -0" 12 T.O. PARAPET -APARATUS BAY 126' -0" T.O. PARAPET -FD 115' -4" LEVEL 1 -NORTH 99' -0" SF-21 CW-5CW-6 CMU-1 BRK-1 CMU-1 BRK-1 MP-3a 803 803 803 803 803 403 403 403 403 403 403 403 403 403 403 702 702 702 1006 TYP MP-3a TYP 2605 TYP 407 716 405 405 405 TYP TYP 405 405 405 405 LEVEL 1 -SOUTH 100' -0" ROOF BEARING -COURTS 128' -8" LEVEL 2 114' -8" T.O. PARAPET -PD 120' -8" MECH. PENTHOUSE BEARING 140' -8" T.O. PARAPET -COURTS 132' -0" 12 13 14 15 16 17 18 19 20 21 22 23 24 ROOF BEARING -PD 117' -4" LEVEL 3 -PENTHOUSE 129' -4" ROOF BEARING -COURTS SKYLIGHT 137' -4" LEVEL 1 -NORTH 99' -0" SF-12 SF-10 SF-14 AW-2SF-15 AW-2SF-16 SF-17 SF-10 SF-18 SF-19 SF-8SF-8SF-8SF-8SF-8SF-8SF-8SF-8SF-8SF-8SF-20 AL-1 TYP BRK-1 CMU-1 TYP MP-2 702 408 408 TYP MP-3a MP-3a MP-3a MP-3a 2605 TYP Project Number: Drawn By: Reviewed By: Approved By: Issue Date ThinkOne Architects 101 E Main St. Studio 1 Bozeman, MT, 59715 T: 406-586-7020 Architect MEP Engineer Associate Architect Landscape Architect Information Technology Civil Engineer Seal XXX Acoustical Engineer TCA Architecture + Planning 6211 Roosevelt Way Ne Seattle, WA 58115 T: 206-522-3830 Associated Construction Engineering Inc. 12 N Broadway Belgrade, MT, 59714 T: 406-388-3320 Morrison-Maierle, Inc. 2880 Technology Blvd. Bozeman, MT 59715 T: 406-587-0721 Design 5 Landscape Architecture 37 E Main St Bozeman, MT, 59715 T: 406-587-4873 BCER Engineering 10807 New Allegiance Dr., Suite 400 Colorado Springs, CO 80921 T: 719-533-1112 Big Sky Acoustics PO BOX 27 Helena, MT 59624 T: 406-457-0407 City of Bozeman 121 N Rouse Ave. Bozeman, MT 59715 T: 406-582-2300 F: 406-582-2301 901 N. ROUSE AVE. BOZEMAN MT AndersonMasonDale Architects, P.C. 3198 Speer Boulevard Denver, CO 80211 T: 303-294-9448 Associate Architect Structural Engineer Morrison-Maierle, Inc. 2880 Technology Blvd. Bozeman, MT 59715 T: 406-587-0721 DESIGN DEVELOPMENT DECEMBER 04, 2019 12 / 9 / 2 0 1 9 1 2 : 4 7 : 2 6 A M A-203 B EXTERIOR ELEVATIONS - WEST 1825 WL SH JT BOZEMAN PUBLIC SAFETY CENTER 1825 CITY OF BOZEMAN 702 METAL COPING 716 2 PIECE COUNTER FLASHING 803 REMOTE ACCESS, SECTIONAL DOOR 1006 BOLLARD, RE: SPECS 2605 LIGHT FIXTURE - RE: ELECTRICAL 403 OVER POUR AT SLAB ON GRADE 405 1/2" MASONRY RECESS, 1 COURSE 407 BRICK FIN. EXTENDS 2" FROM FACE OF ADJACENT FACE OF WALL TYP U.N.O, CUT FROM 12" SOLID NORMAN SOLID BRICK 408 5/8" MASONRY PROTRUSION, 1 COURSE (EVERY 3RD COURSE) 4' 16'2' 8'A-203 B 1/8" = 1'-0" 2ENLARGED ELEVATION - WEST - AREA C&D 4' 16'2' 8'A-203 B 1/8" = 1'-0" 1ENLARGED ELEVATION - WEST - AREA B