DEVELOPMENT REVIEW APPLICATION
PROJECT IMAGE
PROJECT INFORMATION
Project name:
Project type(s):
Description:
Street address:
Zip code:
Zoning:
Gross lot area:
Block frontage:
Number of buildings:
Type and Number of dwellings:
Non-residential building size(s):
(in stories)
Non-residential building height(s):
Number of parking spaces:
Afordable housing (Y/N):
Cash in lieu of parkland (Y/N):
VICINITY MAP
CITY USE ONLY
Submittal date:
Application fle number:
Planner:
DRC required (Y/N): Revision Date:
Development Review Application A1 Page 1 of 3 Revision Date: 5.16.18
REQUIRED FORMS: Varies by project type, PLS
DEVELOPMENT REVIEW APPLICATION
1. PROPERTY OWNER
Name:
Full address (with zip code):
Phone:
Email:
2. APPLICANT
Name:
Full address (with zip code):
Phone:
Email:
3. REPRESENTATIVE
Name:
Full address (with zip code):
Phone:
Email:
4. SPECIAL DISTRICTS
Overlay District: Neighborhood Conservation None
Urban
Renewal District: Downtown North 7th Avenue Northeast North Park None
5. CERTIFICATIONS AND SIGNATURES
This application must be signed by both the applicant(s) and the property owner(s) (if diferent) for all application types before the
submittal will be accepted. The only exception to this is an informal review application that may be signed by the applicant(s) only.
As indicated by the signature(s) below, the applicant(s) and property owner(s) submit this application for review under the terms
and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development
approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special
conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may
be assessed for my project. Further, I agree to grant City personnel and other review agency representative’s access to the subject
site during the course of the review process (Section 38.34.050, BMC). I (We) hereby certify that the above information is true
and correct to the best of my (our) knowledge.
Certifcation of Completion and Compliance – I understand that conditions of approval may be applied to the application and that
I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with
municipal code provisions.
Statement of Intent to Construct According to the Final Plan – I acknowledge that construction not in compliance with the approved
fnal plan may result in delays of occupancy or costs to correct noncompliance.
continued on next page
Development Review Application A1 Page 2 of 3 Revision Date: 5.16.18
REQUIRED FORMS: Varies by project type, PLS
ITEM 4 – NCOA NARRATIVE
PROJECT BACKGROUND
The project, proposed within this application, involves the demolition of an existing shed and
the construction of a new two story accessory structure. The structure will include a garage
on the ground level and an ADU on the 2nd level. No changes to the existing 3 bedroom
residence, located on the south portion of the lot are proposed.
The project will be constructed in a single phase with construction anticipated to begin in the
spring of 2020.
The subject property shown on 1891 Sanborn Map of Bozeman
ZONING REGULATION DISCUSSION
The proposed site is within the R2 zoning district. Per UDC Table 38.310.030.A - Permitted
General and Group Residential Uses In Residential Zoning Districts, ADUs are a principal
use within this zoning district.
Per UDC Table 38.320.030.A Minimum and Maximum Lot Area, the lot size, 7492 square
feet, is of sufficient size for a single family residence and an ADU.
The footprint of the proposed accessory structure is 600 square feet. As such, the structure
is allowed, by the UDC, to be located 6’-0” from the rear property line. The alley right-of-way
from which the accessory structure is accessed is approximately 20 feet wide and no parking
will be located between the accessory structure and the alley right-of-way.
The ADU about 7 ½” from both the east and west property lines. The roof is sloped to meet
the requirements of UDC figure 38.360.030.G. Angled setback plane for accessory buildings
alongside setbacks.
A total of four parking spaces are required for the ADU and the existing 3 bedroom residence.
Two parking spaces will be provided within the new accessory structure. The remaining
requirement for two parking spaces is met with on-street parking on Olive Street.
Appropriateness Discussion
The proposed accessory structure is stylistically appropriate within its neighborhood. The
massing of the structure is similar to that seen in both modern ADU structures and the larger
historic accessory buildings that are common in the Bozeman neighborhoods south of Main
Street.
The primary exterior material to be used on the proposed structure is painted wood drop
siding. (Please see the cut sheets included in this application for illustrations of this material).
Drop siding was often used historically as a siding material on barns and accessory buildings
adjacent to Bozeman’s Alleys.