Loading...
HomeMy WebLinkAboutEastlake Professional Center ZMA Narrative 11-05-2019EASTLAKE PROFESSIONAL CENTER Zone Map Amendment Application November 2019 2 November 2019 ZMA: Eastlake Professional Center Table of Contents 1. Application Forms & Checklists………………………………………………………………..3 (Applications included in Appendix B - Zone Map Amendment (ZMA) Application, A1 Development Review Application, & N1 Noticing Materials) 2. Project Team……………………………………………………………………………..……...4 3. Narrative I. Project Overview…………………………………………………………………………....5 II. Relevant Project History…………………………………………………………………...6 III. Response to Zone Map Amendment Approval Criteria……………………………...…6 IV. Response to Spot Zoning Criteria………………………………………………………15 Appendices Appendix A: Legal Description and Associated Attachment..……………………………18 Appendix B: Application Forms…………………………………………………………...…20 Appendix C: Exhibits Exhibit A: Vicinity Map………………………………………………………………..27 Exhibit A.1: Vicinity Map and Site Boundaries…………………………………….28 Exhibit A.2: Current Zoning Map…………………………………………………….29 Exhibit A.3: Site Survey………………………………………………………………30 Exhibit B: Future Land Use Designation……………………………………………31 Exhibit C: Proposed Zoning………………………………………………………….32 3 November 2019 ZMA: Eastlake Professional Center 1. Application Forms & Fees Attached please find the A1, ZMA, and N1 forms for the Eastlake Professional Center Zone Map Amendment (ZMA) application. The calculated fee totals $2,378.70 as outlined below, and is calculated based upon the gross site area (not inclusive of Rights of Way) impacted by the proposed ZMA application. COMPONENT FEE QUANTITY TOTAL ZMA Base Fee $1,935.00 1 $1,935.00 Scaled Fee per Acre $58 7.65 $443.70 TOTAL $ 2,378.70 4 November 2019 ZMA: Eastlake Professional Center 2. Project Team APPLICANT East Lake Professional Center LLC Randy Scully 5073 Patterson Road Bozeman, MT 59718 p. 914-450-8803 PROJECT CONSULTANTS Planning Civil Engineering Intrinsik Architecture, Inc. Attn: Ryan Krueger, AICP CFM 111 N. Tracy Avenue Bozeman, MT 59715 p. 406.582.8988 TD& H Engineering 234 East Babcock Street, Suite 3 Bozeman, MT 59715 p. 406.586.0277 5 November 2019 ZMA: Eastlake Professional Center 3. Narrative I. Project Overview The subject property consists of 7.65 gross acres (not inclusive of Rights of Way impacted by the ZMA), and is located in the NW portion of Bozeman at the SE corner of the intersection of North 27th Avenue and East Valley Center Road. The property is currently zoned Community Business District (B-2). Given its location and proximity to other, regional sized services as well as medium density residential districts, this property is a practical location for the proposed zone change to the more cotemporary urban designation of Community Business District - Mixed (B-2M) as described through this application. The project site is bordered by both a collector (North 27th Avenue) and a principal arterial (Valley Center Road), which, when coupled with its proximity to I-90, provides the site with a highly visible and accessible location. The site is currently undeveloped, vacant land designated as Community Commercial Mixed Use (CCMU) in the current Future Land Use Map (FLUM) outlined in the effective Bozeman Community Plan (2009). Significant commercial projects are planned or already in existence adjacent to this ZMA subject parcel. The Billings Clinic Campus project to the west completed a Growth Policy Amendment in June to change its future land use designation from CCMU to Regional Commercial and Services. To the east and south, large-scale retail and commercial services have been constructed or are under development. Taken as whole, this area of the city is ripe for additional dense commercial development that offers complimentary services in proximity to one another. Therefore, the B-2M zoning district proposed through this application fosters flexible and creative solutions that address both current market demands and long term land use goals on the subject property, including the ability to provide support services for Billings Clinic Campus. The intent of B-2M is to function as a vibrant mixed-use district, accommodating smart growth and enhancing the character of the city. The project site’s proximity to major transportation corridors, neighborhoods, parks, and a regional shopping center make it an ideal candidate for this change. An amendment to B-2M zoning in this area will foster a community commercial area consistent with the desired development pattern of the underlying CCMU area. Serving the adjacent (future) Billings Clinic Campus and area neighborhoods within approximately a one-mile radius, this area will be well 6 November 2019 ZMA: Eastlake Professional Center suited to provide a distinct focal area and a visible identity to the district. The B-2M designation will allow for more flexibility in design and attract development to provide support services for the Billings Clinic and adjacent neighborhoods. II. Relevant Project History The applicant submitted for a concept review in July of 2018 (18-343), seeking to develop a 5-lot subdivision at this site. However, since that time, the new Billings Clinic has been proposed to the west and additional development has also begun to materialize on several adjacent properties, prompting an adjustment of project direction and this application for a Zoning Map Amendment (ZMA). No development is proposed concurrently with this ZMA application. III. Responses to ZMA Approval Criteria Below are responses to the ZMA approval criteria (Section 76-2-304, MCA) that address how the project relates to and meets the criteria outlined for the approval of a zone change. A. Is the new zoning designed in accordance with the growth policy? Yes, therefore this criterion has been met. The zone amendment to B-2M is in compliance with the growth policy. The future land use designation for this area is currently Community Commercial Mixed Use (CCMU) and the proposed ZMA will reinforces the future land use patterns anticipated in this area. Construction of this project under the proposed B-2M will assuredly advance additional growth policy goals, objectives, policies, and actions, however this application does not speak to those proposed outcomes. The intent of the B-2M zoning district aligns with the description and uses outlined for CCMU in the City’s Growth Policy. While still under consideration, the pattern for future activities at this site is envisioned as one of a variety of multi -story employment services that support a broad range of functions. The area is currently adjacent to significant transit corridors and future site development will necessitate 7 November 2019 ZMA: Eastlake Professional Center the creation on non-automotive transit routes. This site is in proximity to several existing high density residential areas. This site is most closely characterized as a Smaller Community Commercial area, as detailed in the Growth Policy. The site is located at the intersection of an arterial (East Valley Center Rd) and a collector (North 27th Ave). Moreover, the proposed zoning map amendment advances a multitude of applicable goals, objectives, policies, and actions of the City ’s current Community Plan (2009) as described below: Land Use Objective - 1.4: Provide for and support infill development and redevelopment which provides additional density of use while respecting the context of the existing development which surrounds it. Respect for context does not automatically prohibit difference in scale or design. RESPONSE: This land use objective lies at the crux of this ZMA application to B-2M. B-2M fosters infill that is more complementary of existing and City of Bozeman Future Land Use Designation (See also Exhibit B) 8 November 2019 ZMA: Eastlake Professional Center proposed surrounding development by allowing for a higher and better future land use development pattern respectful of the surrounding future neighborhood. Land Use Goal - 2: Designate centers for commercial development rather than corridors to encourage cohesive neighborhood development in conjunction with non-motorized transportation options. RESPONSE: This area is currently developing into a commercial center, one that compliments adjacent neighborhoods and provides alternative transit options from these surrounding areas. The ZMA will advance these ongoing development patterns and activities. Land Use Objective - 2.1: Locate high density community scale service centers on a one mile radius, and neighborhood service centers on a one-half mile radius, to facilitate the efficient use of transportation and public services in providing employment, residential, and other essential uses. RESPONSE: Potential job creation as well as the possible commercial services that can be created through future development of this site under B- 2M zoning could serve significant existing residential development within one mile of this site. Land Use Objective - 2.2: Provide for a limited number of carefully sited regional service centers which are appropriately sized and serviced by adequate infrastructure. RESPONSE: The proposed ZMA to B-2M provides complimentary services to regional centers that have been previously established by the City of Bozeman, such as the Billings Clinic Campus. Housing Objective 3.4 - Encourage development of education and employment opportunities which increase incomes so that the cost of housing and ability to pay for housing are more closely matched. RESPONSE: Future development under the B-2M zone offers additional profitable employment opportunities that can assist city residents in their ability to pay for housing, including employment in the healthcare sector in industries complimentary to the proposed Billings Clinic Campus. 9 November 2019 ZMA: Eastlake Professional Center Economic Development Goal - 1: Promote and encourage the continued development of Bozeman as a vital economic center. RESPONSE: The Billings Clinic Campus envisioned for this area has the potential to encourage expansion of the healthcare sector within the city. This ZMA will allow for the development of denser complimentary healthcare services to be constructed on this site to enhance the city’s position as a vital healthcare economic center. Economic Development Objective - 2.4: Foster a diverse economy that will protect the economic climate for existing businesses and maintain opportunities for business expansion. RESPONSE: The ZMA will allow for diversity of services in densities and within proximity to neighborhoods of prospective employees supportive of Bozeman businesses looking to expand, specifically within the healthcare sector. Economic Development Objective - 2.5: Participate in the growing regional economy in a manner that minimizes conflict between jurisdictions and that maximizes natural market strengths. RESPONSE: The healthcare sector depends on complimentary, ancillary services in proximity to one another in order to bolster the market position of this sector. The ZMA will offer the ability of this site to be used in a higher and better fashion, offering additional opportunities for improvement of the natural market strength of the healthcare sector in Bozeman. Economic Development Objective - 2.6: Maintain a strong financial position for the City of Bozeman. RESPONSE: Complimentary, dense development of commercial services will assist the City of Bozeman maintaining its strong financial position for the healthcare sector, an objective supported by the ZMA application for this site. B. Will the new zoning secure safety from fire and other dangers? Yes, therefore this criterion has been met. The subject property is currently located within the jurisdiction of the City of Bozeman Fire and Police Departments, 10 November 2019 ZMA: Eastlake Professional Center and the service area of American Medical Response ambulances. Additionally, the subject site is located across the street from what will be the future Billings Clinic Campus. Site and building development will be in compliance with the UDC and all applicable building codes to help secure safety from fire and other dangers. B -2M zoning will have no adverse impact on these types of services. C. Will the new zoning promote public health, public safety and general welfare? Yes, therefore this criterion has been met. This area, due to its proximity to principal arterials, a diverse array of adjacent residential densities, parks, the future Billings Clinic Campus, and a regional commercial center, has multiple elements conducive to public health, safety, and the general welfare. A B -2M designation will further encourage non-automotive uses by placing customers closer to businesses and institutions. B-2M allows for flexibility and higher densities than the current B-2 zoning designation, and construction consistent with this proposed zone change will promote a cohesive neighborhood pattern through the updating of available services and the expansion of a consistent sidewalk pattern. Additionally, the provisions of the UDC as well as applicable building codes will ensure public health, safety and general welfare on a project by project basis for this site. D. Will the new zoning facilitate the adequate provision of transportation, water, sewerage, schools, parks, and other public requirements? Yes, therefore this criterion has been met. The project site lies within the sewer, storm water and water facility plan boundaries. The applicant is aware and understands that future development of the site is reliant on the Davis Lane Lift Station and East Valley Center Road Extension projects being completed. Future expansions of adjacent residential neighborhoods, the Billings Clinic Campus, and additional ancillary commercial/retail development in the general vicinity of the project site area will further facilitate the update and extension of municipal services. Moreover, such improvement will allow for increased connectivity in an area of 11 November 2019 ZMA: Eastlake Professional Center newer development within the city. This includes incremental additions of sidewalks and public improvements providing pedestrian access and non -automotive transit options that encourage connectivity to adjacent neighborhoods, shopping, and parks. Future site development proposals for this project location will be required to demonstrate the adequate provision of public services, parkland development, natural resource protection, and other required improvements in accordance with applicable City standards and practices. E. Will the new zoning provide reasonable provision of adequate light and air? Yes, therefore this criterion has been met. The UDC has multiple standard’s that address height restrictions, lot coverage, setbacks, landscaping, and buffers related to the provision of adequate light and air. B-2M uses have an acute focus on non-automotive users, access, and connectivity that will further aid in the provision of adequate light and air. The property site does not directly abut any residential uses, and is bordered on the northeast by Interstate 90. Additionally, future site development will require compliance with all applicable City codes and standards to assure the provision of adequate light and air. F. Will the new zoning have an effect on motorize and non-motorized transportation systems? Yes, therefore this criterion has been met. Although the proposed zone change brings the potential of increased traffic, its proximity to interstate highways, major thoroughfares, and regional service centers will establish the area as a walkable neighborhood commercial center. All future development will be in compliance with the UDC and applicable engineering standards. Additionally, subsequent submittals will include appropriate traffic impact analysis that include review of current and future transportation capacity. The installation of required road improvements will further offset negative traffic impacts. Future development offers the ability to modernize and streamline multi-modal transit options, including pedestrian connections and bicycle routes, in close proximity to both existing residential areas and parkland as well as the future Billing Clinic Campus. The area is bounded to the north by East Valley Center Road, a principal arterial and less than one mile away from the 19th Avenue 12 November 2019 ZMA: Eastlake Professional Center (principal arterial) regional shopping center that includes Costco, Target, and other retails shops and restaurants. The property is bounded to the west and south by local and collector streets. G. Does the new zoning promote compatible urban growth? Yes, therefore this criterion has been met. Commercial development with a focus on multi-modal access in mixed use areas is imperative to desirable urban growth patterns. The project site lies directly east of the future Billings Clinic Campus site, and is adjacent to ongoing commercial and retail development along the Valley Center Road Corridor. A B-2M designation allows for flexibility and an increased density of quality development that will contribute to positive urban growth patterns in the area. The flexibility offered by B-2M zoning will allow the site to respond to and meet the demands of the surrounding neighborhoods, complement and support commercial development, and encourage smart growth. A higher intensity of use and flexibility in future site design represents a progressive method to plan for long term growth and extend the development pattern currently being experienced in this area. The community plan reinforces this concept and highlights that a concentration of persons and activities is fundamental to urban services envisioned for the City of Bozeman (Chapter 3 of the Bozeman Community Plan). H. Does the new zoning promote the character of the district? Yes, therefore this criterion has been met. B-2M zoning will continue to promote the desired character of the project site, surrounding area, and its associated district. This is a rapidly expanding area of northwest Bozeman adjacent to multiple established or planned residential neighborhoods of varying densities. Public improvements resulting from future development of this site will assist connections throughout the Valley Center Road trail system. The intersection of East Valley Center Road and North 27th Avenue is a “high visibility corner”, and it will be a vital future node of the city given its location and proximity to a proposed major healthcare center. This location continues to see positive commercial development to the south, southeast, and southwest that includes large-scale retail, dining, hotels, and medium density residential. As previously described, the B-2M zoning district is consistent with the Future Land Use Map. The proposed zone change will therefore complement the character of the CCMU district as well as adjacent 13 November 2019 ZMA: Eastlake Professional Center districts. I. Does the new zoning address the affected area’s peculiar suitability for particular uses? Yes, therefore this criterion has been met. The proposed zone change does not represent a significant change from the current B -2 zone and it is consistent with adjacent zoning, current and proposed uses in the area, and the Bozeman Community Plan for future land uses. Multiple commercial and residential uses currently exist within proximity to the subject site. Additionally, a B-2M zoning designation will encourage support services and employment opportunities correspondent to possible uses within the site and between adjacent sites. This property site will have flexibility to promote a cohesive neighborhood pattern that will connect adjacent roadways and corridors, and extend existing public infrastructure. J. Was the new zoning adopted with a view to conserving the values of buildings? Yes, therefore this criterion has been met. As this site is currently undeveloped, B-2M zoning will allow for new and diverse development patterns on the subject parcel that compliment development on adjacent sites. Such development is likely to contribute to increased property values for adjacent properties that will benefit from the proximity and access to a walkable, mixed commercial and support service district. In addition, adjacent properties will benefit from increased visibility and visits associated with new commercial and support services. All future site development will comply with the requirements outlined in the applicable City codes and standards. Accordingly, the B-2M will ensure consistency with the existing and planned adjacent development types, and in turn, aid in a cohesive development pattern that conserves the value of buildings, both current and proposed. K. Does the new zoning encourage the most appropriate use of land throughout the jurisdictional area? Yes, therefore this criterion has been met. The proposed zone change is consistent with the future land uses outlined in the Bozeman Community Plan, which has designated the adjacent areas under a variety of compatible commercial 14 November 2019 ZMA: Eastlake Professional Center classifications. Increased mixed use density is appropriate at this location due to the proximity to major arterial streets, public transportation, a major (future) healthcare facility, residential neighborhoods, and parks based on the “center- based” land use pattern. Therefore, the proposed B-2M zoning will further encourage development that is of the highest and best use of this site. 15 November 2019 ZMA: Eastlake Professional Center IV. Response to Spot Zoning Criteria A. Are the requested zoning designation and potential uses significantly different from the prevailing uses in the area? No, therefore this criterion has been met. B-2M is not significantly different from the current B-2 designation. Both B-2M and B-2 are appropriate for arterial corridors, corridors, and commercial nodes, and several sites to the west, south, and southeast are all currently zoned B-2. Both districts encourage multi- household residential as a secondary use and support a range of commercial uses. B-2M, however, allows for more flexibility with respect to height and parking standards, and therefore encourages denser development that supports the highest, best use of the project site. The subject parcel is within a large, regional node of CCMU as described in the current Community Plan. The Billings Clinic Campus has recently received a Growth Policy Amendment from CCMU to Regional Commercial and Services to support the Billings Clinic. Both CCMU and Reginal Commercial and Services are the two plan categories that support the B-2M zoning district in the Community Plan. B. Does the requested zoning designation benefit a small area and only one or a few landowners, or does the requested zoning benefit the surrounding neighborhood, community and general public? This criterion has been met. A zone change on this 7.65 acre parcel has the potential to benefit both the surrounding neighborhood and the community as a whole. This change will conceivably prove to be a beneficial asset to the surrounding area by providing flexibility to enrich future area growth and transit options, offer support services to a burgeoning healthcare center, provide additional lucrative employment opportunities, and contribute to the neighborhood fabric in areas adjacent to this site. Furthermore, a change from B-2 to B-2M does not promote a change in development programming, nor inhibit the potential on adjacent properties. 16 November 2019 ZMA: Eastlake Professional Center C. Is the requested zoning designation compatible with the zoning district’s plan or is it special legislation designed to benefit only one or a few landowners at the expense of the surrounding land owners? This criterion has been met. This ZMA does not represent special legislation designed to benefit the land owner at the expense of the adjacent property owners. Both the current and proposed zoning allow the same uses at a similar scales, and therefore it is difficult to foresee this proposed change to B -2M negatively impacting the surrounding land owners. Additionally, the proposed zone change is compatible with City policies (i.e. Bozeman Community Plan) and state statute governing the approval of such requests. This is a request, simply, is to move from one commercial zoning district to subtly different and more contemporary commercial district. The requested B-2M zoning thus proposes more compact future development opportunities that will meet the needs of the neighborhood and the community, not negatively impact surrounding land owners. APPENDICES 18 November 2019 ZMA: Eastlake Professional Center APPENDIX A - Legal Description of Subject Site EASTLAKE PROFESSIONAL CENTER ZONE MAP AMENDMENT Zoning B-2M LEGAL DESCRIPTION A tract of land, said tract being Lot 1A of Minor Subdivision Number 221E, and the adjoining portion of East Valley Center Road, said tract being located in the Southwest Quarter of Section 26, Township 1 South, Range 5 East, Principal Meridian Montana, City of Bozeman, Gallatin County, Montana and being further described as follows: Beginning at northeast corner of Lot 1A of Minor Subdivision Number 221E; thence South 00° 55'05" West, on the east line of said lot, a distance of 608.81 feet; thence South 89°50'55" West, on the south line of said lot, a distance of 462.52 feet; the following three courses are on westerly line of Lot 1A: thence North 00°54'39" East, a distance of 486.42 feet; thence on a non-tangent curve to the right with a radius of 430.00 feet, a central angle of 35°39'21", an arc length of 267.59 feet, having a chord which bears North 18° 44'59" East, 263.30 feet; thence North 36°34'58" East, a distance of 125.33 feet to the northerly corner of said lot; thence North 36°34’58” East, on the northeasterly extension of the said westerly line, a distance of 75.00 feet to the centerline of East Valley Center Road; thence South 53°26’10” East, on said centerline, a distance of 326.19 feet, thence South 00°55'05" East, on the northerly extension of the east line of said Lot 1A, a distance of 92.29 feet to the Point of Beginning. The described tract has an area of 8.26 acres, more or less. The described tract is as shown on the accompanying exhibit and is along with and subject to any existing easements. EXHIBITS