Loading...
HomeMy WebLinkAboutF.1 Wheat Drive Improvements Line Item Budget Detail2015 Wheat Drive Improvements qty unit cost extended Division 01 — General Requirement architecture construction document prep - Jeff Thompson ThomBagg Architecture 1 4,500.00$ $4,500 Division 02 — Site Construction Demolition, Interior and Exterior 1 3,500.00$ $3,500 Division 03 — Concrete Slab demo and repair, Exterior Ramps 2620 sf 4.78$ $12,524 Division 04 — Masonry $0 Division 05 — Metals Guardrails 97 lf 55.00$ $5,335 Division 06 — Wood and Plastics Wall Framing 251 lf 28.00$ $7,028 Division 07 — Thermal and Moisture Protection Insulation and Weatherization 11000 sf 1.06$ $11,660 Division 08 — Doors and Windows Door hardware & alarms 8 300.00$ $2,400 Division 09 — Finishes Drywall, finishing, paint 5773 sf 2.85$ $16,453 Division 10 — Specialties $0 Division 11 — Equipment Heat Recovery Ventilator, remove from Industrial Dr. and re-install 1 2,500.00$ $2,500 Division 12 — Furnishings $0 Division 13 — Special Construction Fire Suppresion Sprinklers, Fire Alarm System, 4" service line per IT&M Services 1 69,784.00$ $69,784 Fire Alarm System - Per Nico Systems 1 19,936.00$ $19,936 4" water service line installation - per Trasure State Services 1 14,100.00$ $14,100 Division 14 — Conveying Systems $0 Division 15 — Mechanical/Plumbing Repair of existing, Install of new men's & women's bathrooms, upgrade water heater - 1 124,000.00$ $124,000 Division 16 — Electrical Lighting repair, emergency & exit lighting, exterior lighting 1 2,800.00$ $2,800 $296,520