Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
F.1 Wheat Drive Improvements Line Item Budget Detail
2015 Wheat Drive Improvements qty unit cost extended Division 01 — General Requirement architecture construction document prep - Jeff Thompson ThomBagg Architecture 1 4,500.00$ $4,500 Division 02 — Site Construction Demolition, Interior and Exterior 1 3,500.00$ $3,500 Division 03 — Concrete Slab demo and repair, Exterior Ramps 2620 sf 4.78$ $12,524 Division 04 — Masonry $0 Division 05 — Metals Guardrails 97 lf 55.00$ $5,335 Division 06 — Wood and Plastics Wall Framing 251 lf 28.00$ $7,028 Division 07 — Thermal and Moisture Protection Insulation and Weatherization 11000 sf 1.06$ $11,660 Division 08 — Doors and Windows Door hardware & alarms 8 300.00$ $2,400 Division 09 — Finishes Drywall, finishing, paint 5773 sf 2.85$ $16,453 Division 10 — Specialties $0 Division 11 — Equipment Heat Recovery Ventilator, remove from Industrial Dr. and re-install 1 2,500.00$ $2,500 Division 12 — Furnishings $0 Division 13 — Special Construction Fire Suppresion Sprinklers, Fire Alarm System, 4" service line per IT&M Services 1 69,784.00$ $69,784 Fire Alarm System - Per Nico Systems 1 19,936.00$ $19,936 4" water service line installation - per Trasure State Services 1 14,100.00$ $14,100 Division 14 — Conveying Systems $0 Division 15 — Mechanical/Plumbing Repair of existing, Install of new men's & women's bathrooms, upgrade water heater - 1 124,000.00$ $124,000 Division 16 — Electrical Lighting repair, emergency & exit lighting, exterior lighting 1 2,800.00$ $2,800 $296,520