REPORT TO: Honorable Mayor and City Commission
FROM: Bob Murray, Project Engineer
Shawn Kohtz, City Engineer
SUBJECT: Davis Lane Lift Station and Norton Sewer Project - Amendment No. 2.
MEETING DATE: February 10th
, 2020
AGENDA ITEM TYPE: Consent
RECOMMENDATION: Approve and authorize City Manager to sign Amendment No. 2 with
HDR Engineering.
BACKGROUND: Attached is a copy of the partially executed Amendment No. 2 with HDR
Engineering for the Davis Lane Lift Station and Norton Sewer Project. The document is in the
City’s standard format.
During the course of the design completed to date, there have been a number of items that came
up that were not included in the original scope. The largest of the items was that the Baxter
Meadow homeowners association was unwilling to provide an easement for the sewer main to be
installed in the open space between Kimberwicke and Equestrian. This required a complete
redesign of the sewer main in this area including all of the required additional field work. There
were also some redesign required for the connections of the utilities to the Nelson subdivision,
adding fiber to the I-90 and rail crossing, and adding dewatering requirements associated with
the solvent site plume. This amendment covers the compensation for these additional items.
UNRESOLVED ISSUES: None
ALTERNATIVES: As suggested by the City Commission
FISCAL EFFECTS: $61,300.00 from the Wastewater Impact Fee Fund.
Attachments: Amendment No.2
Report compiled on: 1/30/20
61
»
y
v
0 ?^ .<
7<^s^@ss'^ s^ «
SECOND AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT
THIS SECOND AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT
FOR Davis Lane Lift Station and Norton Sewer Project dated February 25, 2019 (the
"Agreement") is made and entered into this _ day of' , 2020, by and between
the CITY OF BOZEMAN, MONTANA, a self governing municipal corporation organized and
existing under its Charter and the laws of the State of Montana, 121 North Rouse Street, Bozeman,
Montana, with a mailing address ofPO Box 1230, Bozeman, MT 59771, hereinafter referred to as
"City," HDR Engineering, Inc., hereinafter referred to as "Contractor." "
In consideration of the mutual covenants and agreements herein contained, the receipt and
sufficiency whereof being hereby acknowledged, the parties hereto agree to amend the Agreement
as follows:
1. Scope of Services. Section 2 of the Agreement is revised to include the attached Exhibit
A.
2. Payment. Section 4 of the Agreement is revised to include the amount specified in the
attached Exhibit B. The additional design services are to be lump sum.
Original Fee: $ 841,714.00
Amendment 01: $ 39,834.00
Amendment 02: $ 61.300.00
Total: $ 942,848.00
3. Agreement still valid. All remaining terms and provisions of the Agreement remain valid.
**** END OF AGREEMENT EXCEPT FOR SIGNATURES ****
Second Amendment to Professional Services Agreement for Davis Lane Lift Station and Norton Sewer Project
FY2019-FY2020
Page 1 of 2
62
IN WITNESS WHEREOF, the parties hereto have executed this instmment the day and
year first above written.
CITY OF BOZEMAN, MONTANA HDR ENGINEERING, INC.
By_ By_
Pi^rft Nami
<4^^_
Dennis M. Taylor, Interim City IVIanager Prirft Name: Jared R. Harris
Title: Vice President
APPROVED AS TO FORM
By_
Greg Sullivan, Bozeman City Attorney
Second Amendment to Professional Services Agreement for Davis Lane Lift Station and Norton Sewer Project
FY2019-FY2020
Page 2 of 2
63
Exhibit B
Davis Lane Lift Station Amendment No. 2
Scope of Services
Task 100. Project Management
Objective:
Manage the constmction administration contract and prepare monthly invoices.
Subtasks:
101 Project MEanagement and Invoicing. Manage subcontracts and construction
administration tasks. Prepare monthly invoices for submittal to the City of
Bozeman.
Task 400. Final Design Revisions
Objective:
Complete design of alternate sewer route in Arabian Avenue in lieu of the Baxter
Meadows HOA sewer route and shift sewer alignment east of the Maynard Border Ditch
through the City Park from Baxter Lane to Equestrian Lane. Also includes miscellaneous
design revisions not included in the original scope of work.
Subtasks:
412 Misc. Final Design Revisions (Fiber, Nelson Sub, GW Plume)
Revise final plans to include items not in the original project scope of work,
including: adding fiber optic conduit and associated appurtenances at the 1-90
crossing and forcemain route; update plans to include connections to the water
main and sewer forcemain for the Nelson Meadows Subdivision; address
groundwater dewatering associated with the solvent plume; and prepare
deviations and coordinate with DEQ on permitting to include the water and sewer
main in a single casing at the 1-90 crossing and setbacks from wells along the
project corridor.
413 Review As-builts and Existing Information for Arabian Route.
The existing as-built drawings for the Arabian Avenue sewer route include the
Baxter Meadows Subdivision Phase 3 record drawings from 2007. These record
drawings will be reviewed with respect to the existing sewer and water main
depth in Equestrian Lane, Arabian Avenue, Kimberwicke Street, and the existing
water and sewer service locations in Arabian Avenue. Other existing information
includes private utility maps, aerial imagery, and the City ofBozeman GIS
mapping.
414 Topographic Surrey, Control, & Locates for Arabian Route.
The existing control network will be expanded to include the Arabian route and a
limited search for property comers along the east side of Arabian Avenue will
1 of 3
64
done to update the existing base drawing sheets and show the existing lots along
Arabian Avenue. The topographic survey limits will be an average of 60 feet
wide and extend from the original Norton sewer route located on the south side of
Equestrian Lane on the west side of the Maynard Border Ditch, then northeast to
the intersection of Equestrian Lane and Arabian Avenue, then north in Arabian
Avenue to the north side ofKimberwicke Street, and then west approximately 100
feet to the original Norton sewer route. Additional survey will also be completed
for the revised route through the City Park on the east side of the Maynard Border
Ditch from Baxter Lane to Equestrian Lane. Utility locates will be requested for
the Arabian route and survey measure downs will be conducted on existing water
valves and sewer manholes along the Arabian route. The existing survey base
map will be updated based on the additional topographic survey.
415 Prepare Plan and Profile of Arabian Route for City and DEQ Review.
Design sewer alignment and depth in Arabian Avenue based on following the
existing sewer alignment in Arabian Avenue at a depth necessary to reconnect the
existing sewer services into the new 27-inch sewer main and cross under the
existing water services. It is assumed that the revised sewer main route will
connect back into the original Norton sewer design at Baxter Lane and north of
Kimberwicke Street without redesigning the sewer main upstream or downstream
of these tie-in locations. Prepare plan and profile drawings of the Arabian route
for the City ofBozeman and DEQ review.
416 Prepare Opinion of Probable Cost for Arabian Route.
Provide Engineer's Opinion of Probable Cost for the Arabian sewer route.
417 Quality Control Review for Arabian Route.
Provide quality control review of the Arabian sewer route.
418 Finalize Plans and Specs Based on City/DEQ Comments for Arabian Route.
Address City and DEQ review comments and produce final plans and
specifications for the Arabian sewer route. Update the original specifications and
bid form to incorporate the Arabian sewer route.
419 Update Wetland Permitting Applications for Arabian Route
Update the Joint Application permit to reflect new wetland impacts. Perform
desktop wetland delineation of new impacted area. Provide functional assessment
of the covenant wetland using MDT WMAM method. Coordinate mitigation
credits and develop wetland mitigation memo.
Items Not Included:
The following items are not expected to be needed for this project and are therefore
specifically excluded from this scope of work:
2 of 3
65
Preparation of separate bidding packages if the City decides to split the project
into two or more separate projects. It is assumed there will be one construction
contract for the entire project.
3 of 3
66
s s
&i
8
^
|2 5
w
!3 s s
^
£
2
s
a 8 ac £
u
0 s s
0
y
Wl «»
a:
n
pjEM aile^i g
-fU^unooov-SS
^ •<t
13!M3S
uor-^jeuuejd
IBIU3LUUOJIAU3
-ei
g
s
n.
isag UOQ -
ig uoi^eiusujn^sui
jaauiBug - a
s
UJ
JSASLUJI^
soue-i - ie3Up9|3
jsauiBua - o 1,
s
d
UJ
J8AOJO p31
(JEIIUES 113 - s
5 0
i3
siAsy
ejoo-jesuiBua
jsB&uei/y
psfoJd - £ 2
I
&
I
s.
•c
s
^ ?
p :1
? a
£ CD
Ill .1
"Is I
33d WlOJj
8|8|8|S|
1-1 111!]
5|»|8|£|
8| II
5»|
81
§
51
8|§1
is
s|SI
S3SN3dX3| I
5|
33J U08V1 WlOij
B I
wl
8| I8|
I
%1
I8
»1
8]11-S|S|%11 1i| 8|
s
s
I
I
I
uoivyisiNiwav loaroadlI C^ICM
I U33N19N3 jjVJ-Sl
8|
il T s
iiyoA3Aans ddvislI s
ao^aAans a^\n joad uoiNasl
8
s
»
(aavo) i a3N9is3a|I sTsSSi s|^
I U33NIQN3 103rOU< I
5
g T s 00
I y33N19N3 UOIN3S|I
»
s (D ns•<r tO
1Vdl3Niad|
iir
|i|
Ill
Ill
I! I cd I
Is!
Ill
151
1111 l"l2!
8
I C\J| -^ CO
lilil
1»1111 fi
|l|i|l
liJ.Xl:
I'l'D'l
Sl
la.la.a.II
^
a.II :
il
i 1\
II
I
ll
II
CN
5
Ill
5 Ill
£
I
Q-
00
a
Ill LLJi o<
IS il
I
I
0
^1
^
s\
I D:
•s I
il
r
I
I
I
s\ II
I 's I
I
Ill1
II
Ul
iiw Ill
i
ml 5|^5|t-1 5| uii £
0
11111
ill
ill ml
ill II II
0| ii-1
^-1 ^-
8
s
s
S|
^r
s|s
S|!S
r^|i^
s'
68
£
I
Xli s s
•£• 2-1
Q. 10-3,
g
^
I"
I"
Is-!ll!51ilBlll!9li2|
1^-1
?s-! 1
|w|w|w|w|»|w|<e|w| w
^f§1 s
|W(W|W|W|W-|W|<»|W[ <ft
§|s| 13|S|
§151^-1
|<ft|W|W|W|W|W|W|W| W
s-iII 51
g
I
w
s|s|
nl II
W[W|W|W[
0
Iss
OJ N
<^ 8
c<<|< N
I
1^li'1-111 2
lill
81
Sl{
ISI
Ill
ill! lilt
I !illl^ Ifli li
Ill a IL-
till 1111 Ill \&\
s\M
llilll
<\s\s\
filllll
11^1^111
1111111
SM
l1illl<l
llllllll
^111^1.11
1S;1%1'S|
llil=l^l
m|5|
ll^Sllltl ltli
Slllll IQ-IO-
II
ill
llil u \&\
s|Ill '
il
00
sill Ill
£111
^111
llll
il&l
^1
sl
OlLLlDl
II
tl
II
!-1
s
s
•°
s
II
s
N
s
9 1c.:
1Sl?l
nI?
'<t
10]?1
1^1 ^
67