REPORT TO: Mayor and City Commission
FROM: Brian Krueger, Development Review Manager
SUBJECT: Cottonwood Major Subdivision
Application 19401
MEETING DATE: February 10, 2020
AGENDA ITEM TYPE: Action (Quasi Judicial)
RECOMMENDATION: The application conforms to standards and is sufficient for approval
with conditions and code provisions.
STRATEGIC PLAN: Vision Statement: 4. A Well-Planned City. We consistently improve our
community’s quality of life as it grows and changes, honoring our sense of place and the
‘Bozeman feel’ as we plan for a livable, affordable, more connected city. 4.2 High Quality Urban
Approach. Continue to support high quality planning, ranging from building design to
neighborhood layouts, while pursuing urban approaches to issues such as multimodal
transportation, infill, density, connected trails and parks, and walkable neighborhoods.4.3
Strategic Infrastructure Choices. Prioritize long-term investment and maintenance for existing
and new infrastructure.
BACKGROUND: The property owner and applicant made application to develop the vacant
property on the east side of Cottonwood Road, south of property owned by Town Pump and east
of the Loyal Garden Subdivision. The application proposes the subdivision of 28.08 acres into
seventeen lots: eight residential multi-household, four city parkland lots, three pedestrian open
space lots, two stormwater open space lots, and streets and rights of way.
The subject property was annexed to the City in October of 2017 and is zoned R-5, Residential
Mixed Use High Density District. The property is currently utilized for grazing and includes
limited natural features. A limited length of irrigation ditches and wetlands are proposed to be
filled and mitigated on site. Farmers Canal, a major regional irrigation facility, exists off site to
the south of the subdivision.
This subdivision is not required to provide affordable housing as no lots for market rate homes
are proposed. All developable lots within this subdivision will require further development
review and public notice prior to building permit issuance. It is anticipated to be primarily multi-
household development with limited mixed uses. The subdivision provides a mix of uses in
compliance with R-5 zoning.
The subdivision proposes 4.28 acres of city park lots which provides the required neighborhood
center. The Recreation and Parks Advisory Board has recommended approval of the subdivision
and the parks master plan for the development with recommended conditions of approval.
352
Commission Memorandum
The subdivision is proposed as two phases with the majority of the development occurring in
phase 1 including six lots for multi-household development and a 2.64 acre park. Phase 2
includes two multi-household lots, a linear park and a .69 acre park.
The Planning Board held a public hearing on the application on January 7, 2020. The Planning
Board is the advisory body to the City Commission on this subdivision application. The Planning
Board 7:0 recommended approval of the project with the conditions and code provisions outlined
in this staff report. No public comment was received. The Planning Board proceedings may be
viewed here under the date January 7, 2020: https://www.bozeman.net/services/city-tv-and-
streaming-audio
The final decision for a Major Subdivision Preliminary Plat with less than 50 lots must be made
within 60 working days of the date it was deemed adequate. The Development Review
Committee (DRC) deemed the application adequate for continued review on December 11, 2019.
Pursuant to BMC 38.240.130 the city commission shall approve, conditionally approve or deny
the subdivision application by February 11, 2020, unless there is a written extension from the
developer, not to exceed one year.
No public comment has been received.
UNRESOLVED ISSUES: There are no known unresolved issues.
ALTERNATIVES:
1. Approve the application with the recommended conditions;
2. Approve the application with modifications to the recommended conditions;
3. Deny the application based on the Commission’s findings of non-compliance with the
applicable criteria contained within the staff report; or
4. Open and continue the public hearing on the application, with specific direction to staff or the
applicant to supply additional information or to address specific items.
FISCAL EFFECTS: Fiscal impacts are undetermined at this time, but will include increased
property tax revenues from new development, along with increased costs to deliver municipal
services to the property. Impact fees will be collected at the time of issuance of building permits
for individual developments along with City sewer and water connection fees.
Attachment: Staff Report
Application
Report compiled on: January 31, 2020
353
Page 1 of 21
19401, Staff Report for the Cottonwood Major Subdivision
Public Hearing Dates: Planning Board January 7, 2020 at 7:00 pm in the City Commission
Room 121 N. Rouse Avenue, Bozeman, Montana
City Commission, February 10, 2020 at 6:00 pm in the City Commission Room 121 N.
Rouse Avenue, Bozeman, Montana
Project Description: A major subdivision application requesting permission for the subdivision
of 28.08 acres into seventeen lots: eight residential multi-household, four city parkland
lots, three pedestrian open space lots, two stormwater open space lots, and streets and
rights of way.
Project Location: 5500 S. Cottonwood Road. The parcels are legally described Lot 3A-1 of
Minor Subdivision 454C, S15, T02 S, R05, City of Bozeman, Gallatin County, MT.
Recommendation: The application conforms to standards and is sufficient for approval with
conditions and code provisions.
Parks Plan Recommended Motion: Having reviewed and considered the parks master plan, I
hereby adopt the findings presented in the staff report for application 19401 and move to
approve the parks master plan for the Cottonwood Subdivision with conditions and
subject to all applicable code provisions.
Commission Recommended Motion: Having reviewed and considered the application
materials, public comment, and all the information presented, I hereby adopt the findings
presented in the staff report for application 19401 and move to approve the subdivision
with conditions and subject to all applicable code provisions.
Report Date: January 31, 2020
Staff Contact: Brian Krueger, Development Review Manager
Anna Russell, Project Engineer
Agenda Item Type: Action (Quasi-judicial)
EXECUTIVE SUMMARY
Unresolved Issues
There are no known unresolved issues.
Project Summary
This report is based on the application materials submitted and any public comment received to
date.
354
19401, Staff Report Cottonwood Major Subdivision Page 2 of 21
The property owner and applicant made application to develop the vacant property on the east
side of Cottonwood Road, south of property owned by Town Pump and east of the Loyal Garden
Subdivision. The application proposes the subdivision of 28.08 acres into seventeen lots: eight
residential multi-household, four city parkland lots, three pedestrian open space lots, two
stormwater open space lots, and streets and rights of way.
The subject property was annexed to the City in October of 2017 and is zoned R-5, Residential
Mixed Use High Density District. The property is currently utilized for grazing and includes
limited natural features. A limited length of irrigation ditches and wetlands are proposed to be
filled and mitigated on site. Farmers Canal, a major regional irrigation facility, exists off site to
the south of the subdivision.
This subdivision is not required to provide affordable housing as no lots for market rate homes
are proposed. All developable lots within this subdivision will require further development
review and public notice prior to building permit issuance. It is anticipated to be primarily multi-
household development with limited mixed uses. The subdivision provides a mix of uses in
compliance with R-5 zoning.
The subdivision proposes 4.28 acres of city park lots which provides the required neighborhood
center. The Recreation and Parks Advisory Board has recommended approval of the subdivision
and the parks master plan for the development with recommended conditions of approval.
The subdivision is proposed as two phases with the majority of the development occurring in
phase 1 including six lots for multi-household development and a 2.64 acre park. Phase 2
includes two multi-household lots, a linear park and a .69 acre park.
The Planning Board held a public hearing on the application on January 7, 2020. The Planning
Board is the advisory body to the City Commission on this subdivision application. The Planning
Board 7:0 recommended approval of the project with the conditions and code provisions outlined
in this staff report. No public comment was received. The Planning Board proceedings may be
viewed here under the date January 7, 2020: https://www.bozeman.net/services/city-tv-and-
streaming-audio
The final decision for a Major Subdivision Preliminary Plat with less than 50 lots must be made
within 60 working days of the date it was deemed adequate. The Development Review
Committee (DRC) deemed the application adequate for continued review on December 11, 2019.
Pursuant to BMC 38.240.130 the city commission shall approve, conditionally approve or deny
the subdivision application by February 11, 2020, unless there is a written extension from the
developer, not to exceed one year.
No public comment has been received.
Alternatives
1. Approve the application with the recommended conditions;
355
19401, Staff Report Cottonwood Major Subdivision Page 3 of 21
2. Approve the application with modifications to the recommended conditions;
3. Deny the application based on the Commission’s findings of non-compliance with the
applicable criteria contained within the staff report; or
4. Open and continue the public hearing on the application, with specific direction to staff or the
applicant to supply additional information or to address specific items. This alternative is
requested if the Commission wishes to amend or add conditions of approval.
TABLE OF CONTENTS
EXECUTIVE SUMMARY ............................................................................................................ 1
Unresolved Issues ............................................................................................................... 1
Project Summary ................................................................................................................. 1
Alternatives ......................................................................................................................... 2
SECTION 1 - MAP SERIES .......................................................................................................... 4
SECTION 2 – REQUESTED VARIANCES ................................................................................. 8
SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL ............................................ 8
SECTION 4 - CODE REQUIREMENTS REQUIRING PLAT CORRECTIONS ...................... 10
SECTION 5 - RECOMMENDATIONS AND FUTURE ACTIONS .......................................... 12
SECTION 6 - STAFF ANALYSIS AND FINDINGS ................................................................. 12
Applicable Subdivision Review Criteria, Section 38.240.130.A.5.b, BMC. .................... 12
Primary Subdivision Review Criteria, Section 76-3-608 ................................................. 14
Preliminary Plat Supplements ........................................................................................... 17
APPENDIX A –PROJECT SITE ZONING AND GROWTH POLICY...................................... 20
APPENDIX B – NOTICING AND PUBLIC COMMENT ......................................................... 21
APPENDIX C – PROJECT BACKGROUND ............................................................................. 21
APPENDIX D - OWNER INFORMATION ................................................................................ 21
ATTACHMENTS ......................................................................................................................... 21
356
19401, Staff Report Cottonwood Major Subdivision Page 4 of 21
SECTION 1 - MAP SERIES
Zoning classification
357
19401, Staff Report Cottonwood Major Subdivision Page 5 of 21
Growth policy designation
358
19401, Staff Report Cottonwood Major Subdivision Page 6 of 21
Current land use
359
Page 7 of 21
Preliminary Plat
360
19401, Staff Report Cottonwood Major Subdivision Page 8 of 21
SECTION 2 – REQUESTED VARIANCES
There are no variances requested with this subdivision application.
SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL
Please note that these conditions are in addition to any required code provisions identified in this
report. These conditions are specific to the preliminary plat application. Additional conditions
may apply to the planned unit development being processed concurrently.
Recommended Conditions of Approval:
1. The applicant is advised that unmet code provisions, or code provisions that are not specifically
listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the
lawful requirements of the Bozeman Municipal Code or state law.
2. The final plat must conform to all requirements of the Bozeman Municipal Code and the
Uniform Standards for Monumentation, Certificates of Survey, and Final Subdivision Plats
(24.183.1101 ARM, 24.183.1104 ARM, 24.183.1107 ARM) and must be accompanied by all
required documents, including certification from the City Engineer that record drawings for
public improvements were received, a platting certificate, and all required and corrected
certificates.
3. The final plat must contain the following notation on the conditions of approval sheet in the
final plat: “The responsibility of maintenance for the stormwater facilities, stormwater open
space lots, pedestrian open space lots and street frontage landscaping for the perimeter streets
must be that of the property owners’ association. Maintenance responsibility must include, all
vegetative ground cover, boulevard trees and irrigation systems in the public right-of-way
boulevard strips along all external perimeter development streets. The property owners’
association must be responsible for levying annual assessments to provide for the
maintenance, repair, and upkeep of all perimeter street frontage landscaping and stormwater
facilities and all open space landscaping.”
4. Documentation of compliance with the parkland dedication requirements of Section 38.420,
BMC must be provided with the final plat. A table showing the parkland requirements for the
subdivision and the method of meeting the parkland dedication must be included on the final
plat conditions of approval sheet. The table shall explicitly state how much parkland credit
was allocated for each lot within each phase. This table must include but not be limited to
listing all dedicated parkland requirements, parkland or parkland credits and areas not
credited towards parkland (i.e., detention/retention areas, watercourse setbacks, wetlands,
common open space, parking facilities) and the total area of each.
5. The final plat must provide all necessary utility easements and they must be described,
dimensioned and shown on each subdivision block of the final plat in their true and correct
location.
6. The existing 20’ wide utility easement per Minor subdivision Number 454 along the east
property boundary of the subdivision must receive approval from affected utilities for
abandonment prior to final plat approval.
361
19401, Staff Report Cottonwood Major Subdivision Page 9 of 21
7. All stormwater facilities not on property dedicated to the City of Bozeman require public
utility easements for storm water facility maintenance.
8. A 1 foot no access strip shall be placed along all lots fronting on Cottonwood Road.
9. If not already provided the applicant must provide and file with the County Clerk and
Recorder's office executed Waivers of Right to Protest Creation of Special Improvement
Districts (SID’s) on all parcels within the project for the following:
a. Street improvements to Alpha Drive including paving, curb/gutter, sidewalk,
and storm drainage
b. Street improvements to Stafford Drive including paving, curb/gutter, sidewalk,
and storm drainage
c. Street improvements to Garfield Street including paving, curb/gutter, sidewalk,
and storm drainage
d. Intersection improvements to Garfield Street and Cottonwood Road
The document filed must specify that in the event an SID is not utilized for the completion of
these improvements, the developer agrees to participate in an alternate financing method for
the completion of said improvements on a fair share, proportionate basis as determined by
square footage of property, taxable valuation of the property, traffic contribution from the
development, or a combination thereof. The applicant must provide a copy of the filed SID
waiver prior to final site plan approval.
10. The forty foot street and utility easement for Stafford Avenue extending north of the
subdivision must be executed and recorded prior to final plat approval.
11. The local street section for Stafford Drive must be constructed or financially guaranteed prior
to final plat approval. The portion required to be improved or guaranteed is Stafford Drive
extending north to the northern limit of the alley north of Lot 1, Block 2 of the subdivision.
12. The applicant must pay the Loyal Gardens Subdivision Sewer Payback for the subject
property prior to final plat approval. The applicant must contact the City Engineering
Division for an analysis of the payback amount.
13. No crawl spaces or basements may be constructed. Sump pumps are not allowed to be
connected to the sanitary sewer system. Sump pumps are also not allowed to be connected to
the drainage system unless capacity is designed into the drainage system to accept the
pumped water. Water from sump pumps may not be discharged onto streets, such as into the
curb and gutters where they may create a safety hazard for pedestrians and vehicles. This
note must appear on the final plat.
14. Park improvements required by BMC 38.420.080 and the PROST Plan must be completed
prior to final plat approval or an improvements agreement is required. Applicants may not
financially guarantee the requirements from BMC 38.420.080.A.1 and 2.
15. Perimeter fencing of the park at boundary with land outside the subdivision must be installed
prior to final plat approval.
16. The drive access serving the pavilion on City Park Lot 1, Block 4 must be signed as a loading
zone and requires the approval by the Engineering Division for separation from the
intersection.
362
19401, Staff Report Cottonwood Major Subdivision Page 10 of 21
17. Any significant changes to the park plan must be reviewed by the Subdivision Review
Committee prior to final plat approval.
18. The parks must use City standard signage in all development and must be reflected in the
final park plan.
SECTION 4 - CODE REQUIREMENTS REQUIRING PLAT CORRECTIONS
The following are procedural requirements not yet demonstrated by the plat and must be satisfied
at the final plat.
1. BMC 38.220.300 and 310. The Property Owners’ Association (POA) documents must be
finalized and recorded with the final plat. The POA documents must include the requirements
of Section 38.220.300 and 320.
2. BMC 38.240.150.A.3.d Transfer of ownership of public land, off-site land, private land,
personal property, improvements and water rights; documents required.
a. (1) For the transfer of real property in satisfaction of required or offered dedications
to the city, and required or offered donations or grants to the property owners'
association (POA), the subdivider or owner of the property must submit with the
application for final plat a warranty deed or other instrument acceptable to the city
attorney transferring fee simple ownership to the city or the POA.
b. (2) For the transfer of personal property installed upon dedicated parkland or city-
owned open space, or POA-owned parkland or open space, the subdivider must
provide the city an instrument acceptable to the city attorney transferring all its rights,
title and interest in such improvements including all applicable warranties to such
improvements to the city or the POA.
c. (3) The subdivider or owner of the property must record the deed or instrument
transferring ownership or interests at the time of recording of the final plat with the
original of such deed or instrument returned to the city or POA as applicable.
d. (4) For the transfer of ownership interest in water, the subdivider or owner of the
property must submit with the application for final plat a deed or other instrument
acceptable to the city attorney transferring ownership to the city or POA, along with
all required state department of natural resources and conservation documentation,
certification and authorization.
3. BMC 38.240.450 requires a certificate of completion of improvements. The certificate must
specifically list all installed improvements and financially guaranteed improvements.
4. BMC 38.240.520 requires a certificate of completion of non-public improvements.
Certificate must specifically list all installed improvements and financially guaranteed
improvements.
5. BMC 38.240.520 Where non-public improvements are to be installed prior to final plat
approval, the final plat of subdivision must contain a certificate of completion of non-public
improvements. A certificate for all improvements related to the perimeter street landscaping
and irrigation, stormwater improvements and open space lot landscaping and irrigation. must
be provided on the final plat.
6. BMC 38.240.530 When irrigation of public facilities are to be installed prior to final plat
approval, the final plat of subdivision must contain a certificate of completion of water-
363
19401, Staff Report Cottonwood Major Subdivision Page 11 of 21
related improvements. The certificate must list all completed and accepted improvements,
including but not limited to all irrigation system record drawings. The subdivision proposes
irrigation of public street frontage and city parkland. This certificate must be provided on the
final plat.
7. BMC 38.270.030.B.3. Completion of Improvements, Lighting. Subdivision lighting must be
installed or financially guaranteed prior to final plat approval. If an SILD is utilized for the
lighting the Subdivision lighting SILD information shall be submitted to the Clerk of
Commission after Preliminary Plat approval in hard copy and digital form. The final plat
application will not be deemed complete until the resolution to create the SILD has been
approved by the City Commission.
8. BMC 38.270.090 Waiver of Park Maintenance District. Executed waivers of right to protest
the creation of special improvement districts (SIDs) for a park maintenance district will be
required to be filed and of record with the Gallatin County Clerk and Recorder, unless
already filed with annexation or prior development.
9. BMC 38.400.010.A.7. A half street is proposed along a portion of Lot 1, Block 2. Half
streets are prohibited except when they are essential to the development, are beneficial to the
city, or when the review authority is satisfied that the half street will be dedicated to the
public after the adjoining property is developed. When an existing half street is adjacent to a
tract to be developed, the undeveloped half of the street must be provided with the new
development. No half streets will be accepted with this subdivision. Provide through access
via a public street for this situation or consider restricted development lots until such time
that a street extension can be coordinated. The forty foot easement must be recorded and the
street constructed to be equal to the north property boundary of alley north of Lot 1, Block 2.
10. BMC 38.410.040.D and 38.410.060.E. The pedestrian rights of way in lieu of streets
through Blocks 1, 2, and 3 are required to be public access and must be shown and noted on
the final plat.
11. BMC 38.410.060.B.1.c. A City alley, park and right of way is proposed overtop of an
existing utility easement. If a utility easement is placed in a city right-of-way, easement must
be in a location required by and agreed upon in writing by all of the appropriate utility
companies and the review authority. This approval must be provided prior to final plat
approval.
12. BMC 38.410.120 Mail Delivery. A cluster mail box location approved by the United States
Post Office must be identified with the final plat application and infrastructure plans.
13. BMC 38.410.130. The transfer of water rights or the payment of cash-in-lieu (CILWR) of
water rights shall be provided. The applicate must contact the Engineering Division, for a
determination of payment. The payment of CILWR is required prior to final plat approval.
14. BMC 38.420.030.C. The currently adopted fair market value of cash in-lieu of land
dedication for parkland is $1.60 per square foot. The park plan must be updated to reflect the
fair market value at the time of final plat approval. The next appraisal is scheduled for March
2020.
15. BMC 38.420.030.D. Where a cash donation has been accepted in-lieu of land dedication for
parkland, the amount of cash donation must be paid prior to final plat approval and stated on
the final plat or plan as appropriate.
364
19401, Staff Report Cottonwood Major Subdivision Page 12 of 21
16. BMC 38.420.080.B. The park boundary bordering all private lots must be delineated at the
common private/public corner pins in accordance with this section. Delineation is required
between linear parks and private lots prior to final plat approval.
17. BMC 38.550.070. In accordance with the requirements of this section, installation by the
developer of vegetative ground cover, boulevard trees, and irrigation system in the public
right-of-way boulevard strips on perimeter streets and in and adjacent to City park lots and
all open space lots is required prior to final plat approval.
18. BMC 38.570.030. The applicant must construct street lights per the DSSP and setup a special
improvement lighting district (SILD) for maintenance of the lights with the City Finance
Department prior to final plat approval.
SECTION 5 - RECOMMENDATIONS AND FUTURE ACTIONS
The DRC determined that the applications are adequate for continued review and found that
application conforms to standards and is sufficient for approval with conditions and code
provisions on December 11, 2019.
The Recreation and Parks Advisory Board reviewed and recommends approval of the proposed
subdivision and parks master plan as outlined in the application and with the conditions and code
provisions in this report.
The Planning Board held a public hearing on the application on January 7, 2020. The Planning
Board is the advisory body to the City Commission on this subdivision application. The Planning
Board 7:0 recommended approval of the project with the conditions and code provisions outlined
in this staff report. No public comment was received. The Planning Board proceedings may be
viewed here under the date January 7, 2020: https://www.bozeman.net/services/city-tv-and-
streaming-audio.
Public hearing date for the City Commission is February 10, 2020. The hearing will be held in
the City Commission chamber, 121 N Rouse Avenue at 6 pm.
SECTION 6 - STAFF ANALYSIS AND FINDINGS
Analysis and resulting recommendations are based on the entirety of the application materials,
municipal codes, standards, and plans, public comment, and all other materials available during
the review period. Collectively this information is the record of the review. The analysis is a
summary of the completed review.
Applicable Subdivision Review Criteria, Section 38.240.130.A.5.b, BMC.
In considering applications for subdivision approval under this title, the advisory boards and City
Commission shall consider the following:
1) Compliance with the survey requirements of Part 4 of the Montana Subdivision and
Platting Act
The preliminary plat has been prepared in accordance with the survey requirements of the Montana
Subdivision and Platting Act by a Professional Engineer registered in the State of Montana. As
365
19401, Staff Report Cottonwood Major Subdivision Page 13 of 21
noted in recommended condition of approval 2, the final plat must comply with State statute,
Administrative Rules of Montana, and the Bozeman Municipal Code. A conditions of approval
sheet must be included and updated with the required notations can be added as required by
conditions or code.
2) Compliance with the local subdivision regulations provided for in Part 5 of the
Montana Subdivision and Platting Act
The final plat must comply with the standards identified and referenced in the BMC. The applicant
is advised that unmet code provisions, or code provisions that are not specifically listed as a
condition of approval, does not, in any way, create a waiver or other relaxation of the lawful
requirements of the Bozeman Municipal Code or State law. Sections 3 and 4 of this report identify
conditions and code corrections necessary to meet all regulatory standards. Staff recommends
conditions no. 1-5, 8, and code requirements 1-7 to address necessary documentation and
compliance with adopted standards. Therefore, upon satisfaction of all conditions and code
corrections the subdivision will comply with the local subdivision regulations.
3) Compliance with the local subdivision review procedures provided for in Part 6 of
the Montana Subdivision and Platting Act
The application was received on August 28, 2019 and was deemed inadequate for further review
on September 25, 2019. Revised application materials were received on November 4, 2019 and
December 4, 2019. The City deemed the application acceptable for review on December 11, 2019.
Public hearings were scheduled for January 7, 2020 and February 10, 2020.
The hearings before the Planning Board and City Commission have been properly noticed as
required by the Bozeman UDC. Based on the recommendation of the DRC and other applicable
review agencies, as well as any public testimony received on the matter, the Planning Board must
forward a recommendation in a report to the City Commission who will make the final decision
on the applicant’s request.
The Planning Board held a public hearing on the application on January 7, 2020. The Planning
Board is the advisory body to the City Commission on this subdivision application. The Planning
Board 7:0 recommended approval of the project with the conditions and code provisions outlined
in this staff report. No public comment was received. The Planning Board proceedings may be
viewed here under the date January 7, 2020: https://www.bozeman.net/services/city-tv-and-
streaming-audio
The final decision for a Major Subdivision Preliminary Plat with less than 50 lots must be made
within 60 working days of the date it was deemed adequate. Pursuant to BMC 38.240.130 the city
commission shall approve, conditionally approve or deny the subdivision application by February
11, 2020, unless there is a written extension from the developer, not to exceed one year.
Public notice for this application was given as described in Appendix B and no comment was
received as of the issuance of this staff report.
366
19401, Staff Report Cottonwood Major Subdivision Page 14 of 21
On January 31, 2020 this major subdivision staff report was completed and forwarded with a
recommendation for consideration by the City Commission.
4) Compliance with Chapter 38, BMC and other relevant regulations
Based on review of the Development Review Committee and the Department of Community
Development all applicable regulations are met if all code requirements are satisfied. Pertinent
code provisions and site specific requirements are included in this report for City Commission
consideration in Sections 3 and 4.
5) The provision of easements to and within the subdivision for the location and
installation of any necessary utilities
The final plat will provide and depict all necessary utilities and required utility easements.
Condition of approval 5 requires that all easements, existing and proposed, must be accurately
depicted and addressed on the final plat and in the final plat application. Public utilities will be
located within dedicated street right of ways. Condition of approval 6 requires that an existing
easement be receive approval to be abandoned prior to final plat approval in order for the
subdivision to be in compliance with BMC 38.410.060.b.1.c.
Ten foot front yard utility easements are depicted on the preliminary plat and are proposed to be
granted with the final plat in accordance with standards.
6) The provision of legal and physical access to each parcel within the subdivision and
the notation of that access on the applicable plat and any instrument transferring the
parcel
The final plat will provide legal and physical access to each parcel within the subdivision. Local
streets (Stafford Avenue, Park Boulevard, Loyal Drive, and Resort Drive) and collector streets
(West Garfield Street) are proposed to provide access to all lots within the subdivision. South
Cottonwood Road, an arterial, provides access to the subdivision from Huffine Lane. All of the
proposed lots have frontage to a public street. Physical access to each lot is proposed via public
streets and/or a city alley located adjacent to Lot 1 and Lot 2, Block 2. The final plat musts contain
a statement requiring lot accesses to be built to the standards contained in this section, the city
design standards and specifications policy, and the city modifications to state public works
standard specifications per BMC requirements.
Primary Subdivision Review Criteria, Section 76-3-608
1) The effect on agriculture
This subdivision will not impact agriculture. The subject property is designated as a residential
according to the City of Bozeman Community Plan. The area is zoned for residential mixed use
high density development. The site is currently used for grazing during the summer months. The
forage quality is low.
367
19401, Staff Report Cottonwood Major Subdivision Page 15 of 21
2) The effect on Agricultural water user facilities
This subdivision will not impact agricultural water user facilities. Two irrigation facilities exist
on the site. There are two existing ditches that come from the Farmers Canal located off site of
the property. The ditches only serve this property and no other downstream users exist. The
ditches are proposed to be abandoned and filled with this subdivision. A wetland exists adjacent
to one of the ditch facilities and is jurisdictional according to the Army Corps of Engineers. The
City of Bozeman wetland regulations do not identify wetlands related to manmade irrigation
facilities as requiring additional mitigation or subject to other regulatory restrictions beyond
Army Corps of Engineers requirements. The Army Corps of Engineers has approved the
facilities to be filled including the wetlands with the mitigation for the wetland fill occurring
offsite.
3) The effect on Local services
Water/Sewer – Water and sewer capacity exists to serve the subdivision. Municipal water and
sewer mains must be extended south down Cottonwood Road in order to provide service into the
subdivision. The subdivider proposes to extend water and sewer mains within all local and
collector streets within the subdivision. In order to meet water system requirements a water main
loop must be constructed to connect to a water main to the north in the Stafford Avenue
alignment. The existing water system and downstream sanitary sewer mains have adequate
capacity to serve the subdivision. No water rights exist for the subject property. Cash in lieu of
water rights is proposed and must be provided per code provision in order to provide a long term
water supply for the project. The site lies within a sewer payback district for infrastructure
already constructed and the development must pay its proportionate share of the costs at the time
of final plat. Condition of approval 12 and Code provision 12 are related to this issue.
Streets – The Growth Policy and subdivision standards require adequate connectivity of the
street grid to ensure sufficient infrastructure to serve the needs of the public and alleviate
congestion. The preliminary plat layout extends local streets (Stafford Avenue, Park Boulevard,
Loyal Drive, and Resort Drive) throughout the subdivision in accordance with block length
standards and provisions to extend streets to undeveloped land. A small portion of Garfield
Street, a collector street, is extended east/west through the subdivision to provide a future
connection to Garfield Street construction from the Fowler Avenue intersection east to South 19th
Avenue. South Cottonwood Road has been upgraded to full arterial standards adjacent to the
western project boundary. The certificate of dedication for the final plat will list specific duties
for maintenance. All streets are proposed to be constructed to city standards and the City accepts
maintenance for all streets.
Three blocks, Blocks 1, 2, and 3, are bisected by pedestrian rights of way in lieu of streets. The
corridors are proposed as open space lots including a five foot wide concrete sidewalk and
landscaping. The open space lots are to be owned and maintained by the property owners’
association, but must be provided with a public access easement per BMC 38.410.040.D.
368
19401, Staff Report Cottonwood Major Subdivision Page 16 of 21
No intersections within the required analysis distance to this subdivision are operating under a
level of service required by the code. No intersection improvements are required with the
subdivision.
Street lighting is a component of the required street improvements. A special improvement
lighting district is proposed to maintain these facilities.
Conditions of approval 3 and 8-11 are related to these findings. Code provisions 1-6, 8, 9, and 16
apply to this issue.
Police/Fire – The area of the subdivision is within the service area of both these departments. No
concerns on service availability have been identified.
Stormwater - The subdivision will construct storm water control facilities to conform to
municipal code. Surface stormwater facilities are proposed on open space lots and within city
parkland. Inspection of installed facilities prior to final plat will verify that standards have been
met. Maintenance of the storm water facilities is an obligation of the property owners’
association. This responsibility is addressed in the covenants proposed with the subdivision.
Conditions 3 and 7 and code provisions 1-5 ensure this will be satisfied according to standards
with the final plat.
Parklands - The proposal meets the required park dedication and improvement standards if the
parks master plan is approved by the Commission. The parkland required at the time of
subdivision for the development at the required eight dwelling units to the acre is 4.05 acres. The
subdivision proposes 4.28 acres of city parkland within four separate lots which will result in a
positive balance for the subdivision of .23 acres. Two lots are proposed as parkland with street
frontage. The City Park Lot 1 in Block 4 is 2.644 acres and will be developed with phase 1 of the
subdivision. Two lots are proposed as a linear park on the north side of the Farmers Canal. The
linear park is proposed to include a ten foot wide shared use pathway within the park that will
provide a future transportation pathway that can be continued to the east and to the west along
Farmers Canal to provide off street east/west bicycle and pedestrian infrastructure within the
City. The current eastern terminus of Farmers Canal before it becomes mostly piped through the
City is at the intersection of Technology Boulevard and Fowler Avenue at the west side of the
Bozeman Gateway development. A final park plan will be completed and approved with the
final plat. The proposed park plan includes dedication of land with improvements to meet the
obligation for the subdivision. Future development will be required to pay cash in lieu of
parkland once the density is known on the multi-household lots with further development. Plan
and specification review by the Parks Department will occur before construction of parkland.
The Recreation and Parks Advisory Board reviewed the subdivision parks proposal and parks
master plan and recommends approval with conditions of approval 14-18 and code provisions 1-
5 and 13-15 are related to this issue.
BMC 38.270.090 authorizes the City to require waivers of right to protest creation of park
maintenance districts. The new development will create two new parks and open spaces with
369
19401, Staff Report Cottonwood Major Subdivision Page 17 of 21
public access with associated maintenance requirements. The residents will also be able to use
other public parks throughout the City. A park maintenance district facilitates maintenance in a
manner that is proportionate to demand. The state recently changed the laws regarding creation
of special districts. A waiver recorded with the final plat will ensure that the waiver is correctly
drafted to meet state law requirements. Code provision 7 is related to this issue.
4) The effect on the Natural environment
The subdivision will not significantly impact the natural environment. Manmade wetlands exist
as part of a ditch within the property and are proposed to be filled and mitigated for offsite per
Army Corps of Engineers approval. No other impacts to the natural environment are identified.
BMC 38.550.070 requires use of wells or surface water rights to irrigate parks and open spaces
rather than municipal water supply. The application will irrigate parkland, open space or other
public lands landscaping with a well.
The site is in an area of high groundwater which may negatively impact future structures or
cause illicit discharges into the sanitary sewer and over burden the surface drainage system.
Condition 13 prohibits use of basements or crawl spaces and requires addition of a notation of
this restriction on the condition of approvals sheet. This requirement will protect both future
structure owners from future hazards of flooding and lessen burden on the public from illicit
discharges.
5) The effect on Wildlife and wildlife habitat
The subdivision will not significantly impact wildlife and wildlife habitat. The site has been
substantially impacted by grazing which has reduced wildlife habitat. There are no known
endangered or threatened species on the property. Comment from state Montana Fish Wildlife
and Parks found no immediate negative effects.
6) The effect on Public health and safety
With the recommended conditions of approval and required plat corrections, the subdivision will
not significantly impact public health and safety. The intent of the regulations in Chapter 38 of
the Bozeman Municipal Code is to protect the public health, safety and general welfare. The
subdivision has been reviewed by the DRC which has determined that it is in general compliance
with the title with conditions and code provisions. Any other conditions deemed necessary to
ensure compliance have been noted throughout this staff report. Condition of approval 1 requires
full compliance with all applicable code requirements.
All subdivisions must be reviewed against the criteria listed in 76-3-608.3.b-d, Mont Code Ann.
and as a result, the Department of Community Development has reviewed this application
against the listed criteria and further provides the following summary for submittal materials and
requirements.
Preliminary Plat Supplements
A subdivision pre-application plan review was completed by the DRC on November 1, 2017.
370
19401, Staff Report Cottonwood Major Subdivision Page 18 of 21
Staff offers the following summary comments on the supplemental information required with
Article 38.220.060, BMC.
38.220.060.A.1 Surface Water
This subdivision will not significantly impact surface water. No naturally flowing surface water
is on site. Two irrigation facilities that do not serve any other properties are proposed to be
abandoned and filled with the development of the infrastructure of the subdivision. Manmade
wetlands exist as part of a ditch within the property. The Army Corps of Engineers has approved
the filling of these wetlands with mitigation to be provided off site.
38.220.060.A.2 Floodplains
No mapped 100-year floodplains impact the subject property. There are no designated
floodplains on the site.
38.220.060.A.3 Groundwater
With the recommended conditions of approval and required plat corrections, the subdivision will
not significantly impact groundwater. The geotechnical investigation report is included in the
application submittal. Groundwater was encountered in all test pit excavations. Groundwater
depth minimum depth shown in test pits ranges between 1 to 5 feet. Condition 13 is proposed to
restrict basements and crawl spaces due to high groundwater.
BMC 38.550.070 requires use of wells or surface water rights to irrigate parks and open spaces
rather than municipal water supply. The application requests to irrigate parkland, open space or
other public lands landscaping with a well per code requirements.
38.220.060.A.4 Geology, Soils and Slopes
This subdivision will not significantly impact the geology, soils or slopes. The site is a majority
loam with slopes ranging from 0-4%. There are no hazardous features associated with this soil
type, however it is recommended that a geotechnical engineer certify any foundation design prior
to construction. Additionally, due to high groundwater levels in the area it is advised against
constructing buildings with full or partial basements A condition of approval is recommended to
address this issue.
38.220.060.A.5 Vegetation
This subdivision will not significantly impact vegetation. No substantial native vegetation was
identified. Comment from state Montana Fish Wildlife and Parks found no immediate negative
effects. The area has been substantially disturbed by animals and grazing which has displaced
most original plants.
38.220.060.A.6 Wildlife
This subdivision will not significantly impact wildlife. See comments above under primary
review criteria 5.
371
19401, Staff Report Cottonwood Major Subdivision Page 19 of 21
38.220.060.A.7 Historical Features
No notable features are on the site.
38.220.060.A.8 Agriculture
This subdivision will not significantly impact agriculture. See discussion above under primary
review criteria.
38.220.060.A.9 Agricultural Water User Facilities
This subdivision will not significantly impact agricultural water user facilities. See discussion
above under primary review criteria.
38.220.060.A.10 Water and Sewer
The subdivision will not significantly impact city water and sewer infrastructure. See discussion
above under primary review criteria. The required design report has been provided. Formal plans
and specifications will be prepared and reviewed after action on the preliminary plat.
38.220.060.A.11 Stormwater Management
The subdivision will not significantly impact stormwater infrastructure. See discussion above
under primary review criteria. Permits from the State for stormwater control will be required
prior to any onsite construction.
38.220.060.A.12 Streets, Roads and Alleys
The subdivision will not significantly impact the City’s street infrastructure and will provide
adequate improvements to support the development. See discussion above under primary review
criteria.
38.220.060.A.13 Utilities
This subdivision will not significantly impact utilities. All private utilities servicing the
subdivision will be installed underground. See discussion above under primary review criteria
regarding extension of water and sewer. All private utilities are available in the area.
38.220.060.A.14 Educational Facilities
Required materials are provided. The Bozeman School District has identified that adequate
capacity is available.
38.220.060.A.15 Land Use
The use proposed is mixed use residential which conforms to the future land use designation and
zoning purposes. The property has a future land use designation of Residential and is zoned R-5,
Residential Mixed Use High Density. Table C-16 of the Bozeman Community Plan shows R-5
zoning as implementing districts of the Residential land use designation.
38.220.060.A.16 Parks and Recreation Facilities
See discussion above under primary review criteria.
372
19401, Staff Report Cottonwood Major Subdivision Page 20 of 21
38.220.060.A.17 Neighborhood Center Plan
Provided by the proposed parkland within the development including the new City Park lots with
street frontage, the linear park north of the Farmers Canal and the publicly accessible open space
mid block crossings provided by this development.
38.220.060.A.18 Lighting Plan
Subdivision or street lighting is required pursuant to BMC 38.570.030. All street lights installed
must use LED light heads and must conform to the City’s requirement for cut-off shields as
required by the City’s specifications. A Special Improvement Lighting District (SILD) will be
created prior to final plat application. Code provision 16 is related to this issue.
38.220.060.A.19 Miscellaneous
The proposed subdivision will improve the access to public lands by including additional City
parkland. No known potential hazards are related to this subdivision. The proposed subdivision
is outside of the Wildland Urban Interface (WUI).
38.220.060.A.20 Affordable Housing
The subdivision application is not subject to affordable housing requirement as no market rate
homes are proposed.
APPENDIX A –PROJECT SITE ZONING AND GROWTH POLICY
Zoning Designation and Land Uses: The property is zoned R-5, Residential Mixed Use High
Density District. The intent of the R-5 residential mixed-use high density district is to provide for
high-density residential development through a variety of compatible housing types and
residentially supportive commercial uses in a geographically compact, walkable area to serve the
varying needs of the community's residents. These purposes are accomplished by: 1. Providing for
a mixture of housing types, including single and multi-household dwellings to serve the varying
needs of the community's residents. 2. Allowing offices and small scale retail and restaurants as
secondary uses provided special standards are met. Use of this zone is appropriate for areas
adjacent to mixed-use districts and/or served by transit to accommodate a higher density of
residents in close proximity to jobs and services.
Adopted Growth Policy Designation: The property is designated as “Residential” in the Bozeman
Community Plan. The “Residential” classification designates places where the primary activity is
urban density dwellings. Other uses which complement residences are also acceptable such as
parks, low intensity home based occupations, fire stations, churches, and schools. High density
residential areas should be established in close proximity to commercial centers to facilitate the
provision of services and employment opportunities to persons without requiring the use of an
automobile. Implementation of this category by residential zoning should provide for and
coordinate intensive residential uses in proximity to commercial centers. The residential
373
19401, Staff Report Cottonwood Major Subdivision Page 21 of 21
designation indicates that it is expected that development will occur within municipal boundaries,
which may require annexation prior to development.
The dwelling unit density expected within this classification varies between 6 and 32 dwellings
per net acre. A higher density may be considered in some locations and circumstances. A variety
of housing types can be blended to achieve the desired density. Large areas of single type housing
are discouraged. In limited instances the strong presence of constraints and natural features, such
as floodplains, may cause an area to be designated for development at a lower density than
normally expected within this category. All residential housing should be arranged with
consideration of compatibility with adjacent development, natural constraints, such as
watercourses or steep slopes, and in a fashion which advances the overall goals of the Bozeman
growth policy. The residential designation is intended to provide the primary locations for
additional housing within the planning area.
APPENDIX B – NOTICING AND PUBLIC COMMENT
Notice was provided at least 15 and not more than 45 days prior to the Planning Board and City
Commission public hearings. BMC 38.220.420, Notice was provided by posting the site, mailing
by certified mail to adjacent property owners and by first class mail to all other owners within
200 feet on December 20, 2019. The site was posted with a notice on December 22, 2019, and a
legal advertisement was published in the Bozeman Daily Chronicle on December 22, 2019.
Content of the notice contained all elements required by Article 38.220., BMC. No public
comment has been received.
APPENDIX C – PROJECT BACKGROUND
The subject property was annexed to the City in October of 2017 and is zoned R-5, Residential
Mixed Use High Density District. A subdivision pre-application plan was reviewed by the
Development Review Committee in November of 2017. This subdivision application began its
review process on August 28, 2019.
APPENDIX D - OWNER INFORMATION
Owner/Applicant: Cottonwood Project LLC, 1109 Main St. Suite 670 Boise, ID 83702
Representatives: Madison Engineering, 895 Technology Blvd. Suite 203 Bozeman, MT 59718
Report By: Brian Krueger, Development Review Manager
ATTACHMENTS
The full application and file of record can be viewed at the Community Development
Department at 20 E. Olive Street, Bozeman, MT 59715.
Application materials – Available through the Laserfiche archive linked agenda materials.
Public Comment: None to date
374
A1
DEVELOPMENT REVIEW APPLICATION
PROJECT IMAGE
PROJECT INFORMATION
Project name:
Project type(s):
Description:
Street address:
Zip code:
Zoning:
Gross lot area:
Block frontage:
Number of buildings:
Type and Number of dwellings:
Non-residential building size(s):
(in stories)
Non-residential building height(s):
Number of parking spaces:
Afordable housing (Y/N):
Cash in lieu of parkland (Y/N):
VICINITY MAP
CITY USE ONLY
Submittal date:
Application fle number:
Planner:
DRC required (Y/N): Revision Date:
Development Review Application A1 Page 1 of 3 Revision Date: 5.16.18
REQUIRED FORMS: Varies by project type, PLS 375
DEVELOPMENT REVIEW APPLICATION
1. PROPERTY OWNER
Name:
Full address (with zip code):
Phone:
Email:
2. APPLICANT
Name:
Full address (with zip code):
Phone:
Email:
3. REPRESENTATIVE
Name:
Full address (with zip code):
Phone:
Email:
4. SPECIAL DISTRICTS
Overlay District: Neighborhood Conservation None
Urban
Renewal District: Downtown North 7th Avenue Northeast North Park None
5. CERTIFICATIONS AND SIGNATURES
This application must be signed by both the applicant(s) and the property owner(s) (if diferent) for all application types before the
submittal will be accepted. The only exception to this is an informal review application that may be signed by the applicant(s) only.
As indicated by the signature(s) below, the applicant(s) and property owner(s) submit this application for review under the terms
and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development
approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special
conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may
be assessed for my project. Further, I agree to grant City personnel and other review agency representative’s access to the subject
site during the course of the review process (Section 38.34.050, BMC). I (We) hereby certify that the above information is true
and correct to the best of my (our) knowledge.
Certifcation of Completion and Compliance – I understand that conditions of approval may be applied to the application and that
I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with
municipal code provisions.
Statement of Intent to Construct According to the Final Plan – I acknowledge that construction not in compliance with the approved
fnal plan may result in delays of occupancy or costs to correct noncompliance.
continued on next page
Development Review Application A1 Page 2 of 3 Revision Date: 5.16.18
REQUIRED FORMS: Varies by project type, PLS 376
DEVELOPMENT REVIEW APPLICATION
Applicant Signature:
Printed Name:
Owner Signature:
Printed Name:
Owner Signature:
Printed Name:
If signing as a corporation or LLC, please provide the title and position of the individual signing on behalf of the corporation/LLC.
Attach separate sheets for additional owner signatures.
6. APPLICATION TYPES
Check all that apply, use noted forms.
1. Pre-application Consultation
2. Master Site Plan
3. Site Plan
4. Subdivision pre-application
5. Subdivision preliminary plan
6. Subdivision fnal plan
7. Subdivision exemption
8. Condominium Review
9. PUD concept plan
10. PUD preliminary plan
11. PUD fnal plan
12. Annexation and Initial Zoning
13. Administrative Interpretation Appeal
14. Administrative Project Decision Appeal
. Commercial Non-residential COA
16. Historic Neighborhood
Conservation Overlay COA
17. Informal Review
18. Zoning Deviation/Departure
. Zoning or Subdivision Variance
. Conditional Use Permit
21. Special Temporary Use Permit
22. Special Use Permit
23. Regulated Activities in Wetlands
24. Zone Map Amendment (non-Annexation)
25. UDC Text Amendment
26. Growth Policy Amendment
27. Modifcation/Plan Amendment
. Extension of Approved Plan
. Reasonable Accommodation
30. Comprehensive Sign Plan
31. Other:
CONTACT US
FORM FORM
None INF
MSP None
SP 19 Z/SVAR
PA 20 CUP
PP STUP
FP SUP
SE WR
CR ZMA
PUDC ZTA
PUDP GPA
PUDFP MOD
ANNX 28 EXT
AIA 29 RA
APA CSP
15 CCOA
378
379
380
TREES
SYMBOL SIZE TYPE SPACING # MATURE
HEIGHT
MATURE
SPREAD
BOTANICAL NAME
COMMON NAME
PLANTING SCHEDULE - MARY LONG ALDERSON PARK
GLEDESTIA TRICANTHOS 'HAVRE'
NORTHERN ACCLAIM HONEYLOCUST
ACER PLATANOIDES 'HELENA'
HELENA MAPLE 2" CAL B&B PER PLAN 12 40'-50' 30'-40'
2" CAL B&B PER PLAN 9 40'-50' 30'-40'
ULMUS AMERICANA 'LEWIS AND CLARK'
PRAIRIE EXPEDITION ELM 2.5" CAL B&B PER PLAN 13 55'-60' 35'-40'
BIKE RACK
SYMB. PRODUCT QTY. DESCRIPTION CONTACT
SITE AMENITY SCHEDULE
MARY LONG ALDERSON PARK
SHADE
STRUCTURE
PICNIC TABLE
1
4
STUDIO H - COMMUNITY CENTER SHADE
STRUCTURE
1 TBD
PARK BENCH 4
UTILITY TABLE
TRASH
RECEPTACLE
PILOT ROCK - UTILITY TABLE . MODEL Utl-3
COLOR- BLACK
SURFACE MOUNT
PILOT ROCK
R.J. THOMAS MFG.CO.INC.
1-800-762-5002
www.pilotrock.com
2
THEPARK - MODEL 398-1206, 6' WOODEN
U-FRAME PARK BENCH . PRESSURE TREATED
WOOD . FRAME - POWDERCOAT COLOR TO BE
BLACK. SURFACE MOUNT
NOTE:
1. ALL AMENITIES TO BE AS SPECIFIED OR APPROVED EQUAL.
2. ALL AMENITIES TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL
BUILDING PERMITS RELATED TO THE CONSTRUCTION OF THE PAVILIONS AND CONFIRMATION OF STRUCTURAL FOOTING
REQUIREMENTS
3. PLAYGROUND EQUIPMENT TO BE INSTALLED OVER ENGINEERED SAFETY SURFACING. DEPTH OF SURFACING MATERIAL TO BE
DETERMINED BY A CERTIFIED PLAYGROUND SAFETY INSPECTOR BASED ON THE REQUIREMENTS OF THE PLAY EQUIPMENT
THAT IS SELECTED.
THEPARK
1-866-293-8528
www.theparkcatalog.com
2
PLAY
STRUCTURE
1
W IRRIGATION
WELL
60'
40'
R28'
R20'
R20'-6"
10'
21'
47'-9"
55'-8"
5'-1"
52'-8"
52'-8"
10'
17'-1"
52'-8"
47'-4"
TR
7'-6"
GAS GAS
SS SS SS SS
W W W W
UE UE UE UE
LINE TYPE LEGEND
GAS LINE
SEWER LINE
WATER LINE
UNDERGROUND POWER
PROPERTY LINE
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
BIKE RACK
SYMB. PRODUCT QTY. DESCRIPTION CONTACT
SITE AMENITY SCHEDULE
MARY LONG ALDERSON PARK
SHADE
STRUCTURE
PICNIC TABLE
1
4
STUDIO H - COMMUNITY CENTER SHADE
STRUCTURE
1 TBD
PARK BENCH 4
UTILITY TABLE
TRASH
RECEPTACLE
PILOT ROCK - UTILITY TABLE . MODEL Utl-3
COLOR- BLACK
SURFACE MOUNT
PILOT ROCK
R.J. THOMAS MFG.CO.INC.
1-800-762-5002
www.pilotrock.com
2
THEPARK - MODEL 398-1206, 6' WOODEN
U-FRAME PARK BENCH . PRESSURE TREATED
WOOD . FRAME - POWDERCOAT COLOR TO BE
BLACK. SURFACE MOUNT
NOTE:
1. ALL AMENITIES TO BE AS SPECIFIED OR APPROVED EQUAL.
B
B
B
NOTE:
PARK BOUNDARY SIGN. LABEL "PARK BOUNDARY"
1) COLOR : BROWN POST, WHITE REFLECTIVE LETTERING
2) HEIGHT: 60"
NOTE:
MAIN PARK SIGN CONCEPT.
1) 4"x4" STEEL POSTS
2) RUSTED STEEL PANEL
3) M L ALDERSON: 4" LETTERING TO BE BRUSHED STEEL
18"
54"
4"
60"
Park Signage
Master Plan
0 5 10 20 L 201
N
1
L201 1" = 10'-0"
M.L. Alderson Park Boundry
PARK BOUNDARY PIN .
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l000_mary long alderson park_landscape.dwg
Mary Long Alderson Park
The Cottonwood Project
Bozeman, Montana
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
MAIN PARK SIGN
2
L201 NTS
M.L. Alderson Park Boundry Sign 3
L201 NTS
M.L. Alderson Park Sign
383
PARK BLVD.
PARK BLVD.
TR
B
B
B
PARK BLVD.
SPR
SYMBOL SEED MIXES
COMMON NAME (BOTANICAL NAME) MIX % QUANTITY
RECOMMENDED STORMWATER SEED MIX
WESTERN WHEATGRASS (AGROPYRON SMITHII)
"SODAR" STREAMBANK WHEATGRASS (AGROPYRON RIPARIUM)
"CRITANA" THICKSPIKE WHEATGRASS (ELYMUS LANCEOLATUS)
SHEEP FESCUE (FESTUCA OVINA)
BLUEBUNCH WHEATGRASS (PSUEDOROGNERIA SPICATA)
"SHERMAN" BIG BLUE (PAO SECUNDA)
140 SF
SEED SCHEDULE
MARY LONG ALDERSON PARK
PARK, OPENSPACE AND BOULEVARD SEED MIX
PERENNIAL RYEGRASS
GLADE KENTUCKY BLUEGRASS
BARON KENTUCKY BLUEGRASS
PENN CREEPING RED FESCUE
30%
30%
30%
10%
***NOTE:CURRENT SF #'S ARE APPROXIMATIONS AND MAY CHANGE
SLIGHTLY. ANY AREAS OF DISTURBANCE DURING CONSTRUCTION
ARE TO BE RESEEDED.
40%
20%
10%
10%
10%
10%
*** SEED RATE=.75#/sq/ft
TREES 114,407 SF
SYMBOL SIZE TYPE SPACING # MATURE
HEIGHT
MATURE
SPREAD
BOTANICAL NAME
COMMON NAME
PLANTING SCHEDULE - MARY LONG ALDERSON PARK
GLEDESTIA TRICANTHOS 'HAVRE'
NORTHERN ACCLAIM HONEYLOCUST
ACER PLATANOIDES 'HELENA'
HELENA MAPLE 2" CAL B&B PER PLAN 12 40'-50' 30'-40'
2" CAL B&B PER PLAN 9 40'-50' 30'-40'
ULMUS AMERICANA 'LEWIS AND CLARK'
PRAIRIE EXPEDITION ELM 2.5" CAL B&B PER PLAN 13 55'-60' 35'-40'
LANDSCAPE INSTALL NOTES
1. PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT.
2. PLACE ALL BOULDERS WITH LANDSCAPE ARCHITECT PRESENT.
3. ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERY STOCK.
4. VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.
5. NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT.
SYMBOL SEED MIXES
COMMON NAME (BOTANICAL NAME) MIX %
RECOMMENDED STORMWATER SEED MIX
WESTERN WHEATGRASS (AGROPYRON SMITHII)
"SODAR" STREAMBANK WHEATGRASS (AGROPYRON RIPARIUM)
"CRITANA" THICKSPIKE WHEATGRASS (ELYMUS LANCEOLATUS)
SHEEP FESCUE (FESTUCA OVINA)
BLUEBUNCH WHEATGRASS (PSUEDOROGNERIA SPICATA)
"SHERMAN" BIG BLUE (PAO SECUNDA)
SEED SCHEDULE
MARY LONG ALDERSON PARK
PARK, OPENSPACE AND BOULEVARD SEED MIX
PERENNIAL RYEGRASS
GLADE KENTUCKY BLUEGRASS
BARON KENTUCKY BLUEGRASS
PENN CREEPING RED FESCUE
30%
30%
30%
10%
***NOTE:CURRENT SF #'S ARE APPROXIMATIONS AND MAY CHANGE
SLIGHTLY. ANY AREAS OF DISTURBANCE DURING CONSTRUCTION
ARE TO BE RESEEDED.
40%
20%
10%
10%
10%
10%
*** SEED RATE=.75#/sq/ft
LANDSCAPE INSTALL NOTES
1. PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT.
2. PLACE ALL BOULDERS WITH LANDSCAPE ARCHITECT PRESENT.
3. ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERY STOCK.
4. VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.
5. NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT.
ALL REQUESTS SHOULD BE SUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE. 406-587-4873 OR
TROY@DESIGN5LA.COM.
6. LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINED
INTERVALS TO DISCUSS PROGRESS, QUESTIONS, AND PRODUCT PLACEMENT.
7. TURF GRASS SEED AREAS TO HAVE 6" MINIMUM TOPSOIL.
8. NATIVE SEED AREAS SHALL HAVE A MINIMUM OF 3" TOPSOIL.
9. ALL NATIVE SOIL IN PLANTING BEDS SHALL BE TILLED TO A DEPTH OF AT LEAST 12" AND GRADED
SMOOTHLY.
10. ALL TREES SHALL BE STAKED FOR A MINIMUM OF 2 YEARS. REMOVE STAKES AFTER 2 YEARS.
11. ALL TREES AND OTHER SIGNIFICANT LANDSCAPING FEATURES MUST BE PLANTED A MINIMUM OF 10' OF
SEPARATION FROM WATER AND SEWER SERVICES. VERIFY IN FIELD.
12. ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLAN ARE
TO BE RECLAIMED AND RE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, VERIFY DISTURBANCE AREA IN
FIELD.
13. PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPE
INSTALLATION VIA WATER EFFICIENT HEADS. IRRIGATION TO BE INSTALLED IN ACCORDANCE WITH ALL
STATE AND LOCAL CODES AND ORDINANCES. ALL TREES AND SHRUBS TO RECEIVE DIRECT IRRIGATION VIA
DRIP OR BUBBLERS.
14. EACH TREE IS TO BE MULCHED IN A 3' DIAMETER RING WITH SHREDDED CEDAR MULCH AS PER CITY
STANDARDS.
15. ALL DECIDUOUS SHRUBS TO BE FENCED
PER
PLAN
3 6'-12' 6'-8'
PRUNE TREE TO REMOVE
DEAD OR DAMAGED LIMBS AND
BRANCHES
TREE STAKES AND TIES
AS SHOWN. STAKES SHALL
BE DRIVEN INTO EXISTING,
UNDISTURBED SOIL AND
SHALL NOT PENETRATE THE
ROOT BALL. STAKES TO BE
REMOVED AFTER TWO YEARS.
FINISHED ELEVATION OF TREE
CROWN TO BE MIN 3" AND
MAX 6" ABOVE FINISHED GRADE
CIRCULAR SWALE TO RING TREE,
3' DIAMETER WITH 3" HIGH
MOUNDED RING OF SOIL
BURLAP TO BE REMOVED
FROM TOP 1
3 OF ROOT BALL.
REMOVE WIRE CAGE FOLLOWING
PLANTING.
1
3 NATIVE SOIL WITH
1
3 SANDY LOAM
AND 1
3 DEBRIS FREE TOPSOIL.
EXCAVATE HOLE
2X DIAMETER OF ROOT BALL
Coniferous Ball and Burlap Planting
L500 3/8"=1'
1
PRUNE TREE TO REMOVE
DEAD OR DAMAGED LIMBS AND
BRANCHES
TREE STAKES AND TIES
AS SHOWN. STAKES SHALL
BE DRIVEN INTO EXISTING,
UNDISTURBED SOIL AND
SHALL NOT PENETRATE THE
ROOT BALL. STAKES TO BE
REMOVED AFTER TWO YEARS.
FINISHED ELEVATION OF TREE
CROWN TO BE MIN 3" AND
MAX 6" ABOVE FINISHED GRADE
CIRCULAR SWALE TO RING TREE,
4' DIAMETER WITH 3" HIGH
MOUNDED RING OF SOIL
BURLAP TO BE REMOVED
FROM TOP 1
3 OF ROOT BALL.
REMOVE WIRE CAGE FOLLOWING
PLANTING.
1
3 NATIVE SOIL WITH
1
3 SANDY LOAM
AND 1
3 DEBRIS FREE TOPSOIL.
EXCAVATE HOLE
2-3/8 "TUBE STEEL
FASTENERS (BOLT OR
HILTI)
BENCH SURFACE MOUNT
3/8" CIRCULAR SURFACE
MOUNT PLATE WITH (4)
25/32" DIA HOLES FOR
BOLT OR HILTI
FASTENERS
Bench Detail
L501 1"=1'
2
4'-6"
5'-0"
2'-0"
2'-0"
LOADING ZONE
1 U RACK 18" SPACING
2'-0"
Bike Rack Detail
L501 1"=1'
1
1'
2"
1' 6"
1
2" EXP JT
1
2" RAD TOP OF COMPACTED
PLAY SURFACING
4"
SLAB
#4 REBAR
12" O.C.
SECTION-
CURB
MIN. 4" DEPTH 3
4" (-)
CRUSHED STONE
COMPACTED TO 95%
RADIUSED CURB
(20' RAD. CURB FACE)
(EXP. JTS. @1
4" PTS.)
NOTE:
DEPTH OF PLAY SURFACING
TO BE 12"-16" WITHIN PLAY
FALL ZONE
Curb Detail
L501 1"=1'
3
Landscape Details
L 501
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l500 m.l. alderson park_details.dwg
Mary Long Alderson Park
The Cottonwood Project
Bozeman, Montana
WES
HIG
SNO
POPULUS TREMULOIDES
QUAKING ASPEN 2" CAL B&B 11 40'-50' 20'-30'
TREES
SYMBOL SIZE TYPE SPACING # MATURE
HEIGHT
MATURE
SPREAD
BETULA NIGRA
RIVER BIRCH 2" CAL B&B 9 40'-70' 40'-60'
BOTANICAL NAME
COMMON NAME
PINUS PONDEROSA
PONDEROSA PINE 2" CAL B&B PER PLAN 5 60'-100' 25'-30'
CRATAEGUS X MORDENENSIS 'SNOWBIRD'
SNOWBIRD HAWTHORN 2" CAL B&B PER PLAN 3 15'-20' 10'-15'
PLANTING SCHEDULE - LINEAR PARK
PER PLAN
PER PLAN
POPULUS ' HIGHLAND'
HIGHLAND POPLAR 2" CAL B&B PER PLAN 7 40'-50' 20'-30'
SALIX X. 'PRAIRIE CASCADE'
PRAIRIE CASCADE WILLOW 2" CAL B&B PER PLAN 8 40'-50' 30'-40'
PRA
ACER PLATANOIDES 'HELENA'
HELENA MAPLE 2" CAL B&B PER PLAN 5 40'-50' 30'-40'
NOTE:
1. TREES TO BE PLANTED EVERY 50' TO CITY STANDARDS. CLUSTER FOR VISUAL INTEREST AND SHADE.
PROJECT DATA
THE COTTONWOOD PROJECT
LINEAR PARK
PROJECT OWNER
Local Construct
Patrick Boel
3112 Los Feliz Blvd.
Los Angeles, CA 90039
(310) 997 - 2373
ENGINEER
Madison Engineering, LLC
Chris Budeski
895 Technology Blvd. Suite 203
Bozeman, MT 59718
(406) 586-0262
ARCHITECT
Studio H Design Inc.
Dean Burgess
81211 Gallatin Road, Suite E
Bozeman, MT 59718
(406) 587-9968
LANDSCAPE ARCHITECT
Design 5, LLC
Troy Scherer
37 East Main Street, Suite 10
Bozeman, MT 59715
(406) 587 - 4873
SHEET INDEX
L100- Landscape Site Plan
L200- Hardscape Plan
W
SYMB. PRODUCT QTY. DESCRIPTION CONTACT
SITE AMENITY SCHEDULE
LINEAR PARK
PARK BENCH 4 THEPARK - MODEL 398-1206, 6' WOODEN
U-FRAME PARK BENCH . PRESSURE TREATED
WOOD . FRAME - POWDERCOAT COLOR TO BE
BLACK. SURFACE MOUNT
NOTE:
1. ALL AMENITIES TO BE AS SPECIFIED OR APPROVED EQUAL.
2. ALL AMENITIES TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
W IRRIGATION
WELL
IRRGATION WELL TO BE SELECTED BY
OWNER AND IRRIGATION CONTRACTOR, MUST
COMPLY WITH STATE AND LOCAL
REGULATIONS.
1 BY OWNER
THEPARK
1-866-293-8528
www.theparkcatalog.com
GAS GAS
SS SS SS SS
W W W W
UE UE UE UE
LINE TYPE LEGEND
GAS LINE
SEWER LINE
WATER LINE
UNDERGROUND POWER
PROPERTY LINE
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
Linear Park
Hardscape Plan
0 10 20 40 L 200
N
3
L200 1"=20'-0"
Linear Park Hardscape Plan
MATCHLINE L300:2
MATCHLINE L300:1
MATCHLINE L300:3
0 10 20 40
N
2
L200 1"=20'-0"
Linear Park Hardscape Plan
0 10 20 40
N
1
L200 1"=20'-0"
Linear Park Hardscape Plan
MATCHLINE L300:2
PROPERTY LINE
PARK BENCH,
SEE SHEET L501,
DETAIL 1
8' ASPHALT TRAIL,
SEE SHEET L500,
W
HIG
HIG
HIG
8'
WES
WES
WES
HIG
WES
WES
SNO
WES
HIG
PRA
PRA
PRA
PRA
WES
HIG
SNO
WES
WES
HIG
SNO
PRA
PRA
PRA
PRA
WES
HIG
SNO
POPULUS TREMULOIDES
QUAKING ASPEN
TREES
SYMBOL
BETULA NIGRA
RIVER BIRCH
BOTANICAL NAME
COMMON NAME
PINUS PONDEROSA
PONDEROSA PINE
CRATAEGUS X MORDENENSIS 'SNOWBIRD'
SNOWBIRD HAWTHORN
PLANTING SCHEDULE - LINEAR PARK
POPULUS ' HIGHLAND'
HIGHLAND POPLAR
SALIX X. 'PRAIRIE CASCADE'
PRAIRIE CASCADE WILLOW
PRA
ACER PLATANOIDES 'HELENA'
HELENA MAPLE
NOTE:
SYMBOL SEED MIXES
COMMON NAME (BOTANICAL NAME) MIX % QUANTITY
RECOMMENDED STORMWATER SEED MIX
WESTERN WHEATGRASS (AGROPYRON SMITHII)
"SODAR" STREAMBANK WHEATGRASS (AGROPYRON RIPARIUM)
"CRITANA" THICKSPIKE WHEATGRASS (ELYMUS LANCEOLATUS)
SHEEP FESCUE (FESTUCA OVINA)
SYMBOL SEED MIXES
COMMON NAME (BOTANICAL NAME) MIX % QUANTITY
RECOMMENDED STORMWATER SEED MIX
WESTERN WHEATGRASS (AGROPYRON SMITHII)
"SODAR" STREAMBANK WHEATGRASS (AGROPYRON RIPARIUM)
"CRITANA" THICKSPIKE WHEATGRASS (ELYMUS LANCEOLATUS)
SHEEP FESCUE (FESTUCA OVINA)
BLUEBUNCH WHEATGRASS (PSUEDOROGNERIA SPICATA)
"SHERMAN" BIG BLUE (PAO SECUNDA)
140 SF
SEED SCHEDULE
LINEAR PARK
LINEAR PARK SEED MIX
PERENNIAL RYEGRASS
GLADE KENTUCKY BLUEGRASS
BARON KENTUCKY BLUEGRASS
PENN CREEPING RED FESCUE
30%
30%
30%
10%
***NOTE:CURRENT SF #'S ARE APPROXIMATIONS AND MAY CHANGE
SLIGHTLY. ANY AREAS OF DISTURBANCE DURING CONSTRUCTION
ARE TO BE RESEEDED.
40%
20%
10%
10%
10%
10%
*** SEED RATE=.75#/sq/ft
48,300 SF
LANDSCAPE INSTALL NOTES
1. PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT.
2. PLACE ALL BOULDERS WITH LANDSCAPE ARCHITECT PRESENT.
3. ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERY STOCK.
4. VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.
5. NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT.
ALL REQUESTS SHOULD BE SUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE. 406-587-4873 OR
TROY@DESIGN5LA.COM.
6. LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINED
INTERVALS TO DISCUSS PROGRESS, QUESTIONS, AND PRODUCT PLACEMENT.
7. TURF GRASS SEED AREAS TO HAVE 6" MINIMUM TOPSOIL.
8. NATIVE SEED AREAS SHALL HAVE A MINIMUM OF 3" TOPSOIL.
9. ALL NATIVE SOIL IN PLANTING BEDS SHALL BE TILLED TO A DEPTH OF AT LEAST 12" AND GRADED
SMOOTHLY.
10. ALL TREES SHALL BE STAKED FOR A MINIMUM OF 2 YEARS. REMOVE STAKES AFTER 2 YEARS.
11. ALL TREES AND OTHER SIGNIFICANT LANDSCAPING FEATURES MUST BE PLANTED A MINIMUM OF 10' OF
SEPARATION FROM WATER AND SEWER SERVICES. VERIFY IN FIELD.
12. ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLAN ARE
TO BE RECLAIMED AND RE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, VERIFY DISTURBANCE AREA IN
FIELD.
13. PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPE
INSTALLATION VIA WATER EFFICIENT HEADS. IRRIGATION TO BE INSTALLED IN ACCORDANCE WITH ALL
STATE AND LOCAL CODES AND ORDINANCES. ALL TREES AND SHRUBS TO RECEIVE DIRECT IRRIGATION VIA
DRIP OR BUBBLERS.
14. EACH TREE IS TO BE MULCHED IN A 3' DIAMETER RING WITH SHREDDED CEDAR MULCH AS PER CITY
STANDARDS.
15. ALL DECIDUOUS SHRUBS TO BE FENCED
PER
PRUNE TREE TO REMOVE
DEAD OR DAMAGED LIMBS AND
BRANCHES
TREE STAKES AND TIES
AS SHOWN. STAKES SHALL
BE DRIVEN INTO EXISTING,
UNDISTURBED SOIL AND
SHALL NOT PENETRATE THE
ROOT BALL. STAKES TO BE
REMOVED AFTER TWO YEARS.
FINISHED ELEVATION OF TREE
CROWN TO BE MIN 3" AND
MAX 6" ABOVE FINISHED GRADE
CIRCULAR SWALE TO RING TREE,
3' DIAMETER WITH 3" HIGH
MOUNDED RING OF SOIL
BURLAP TO BE REMOVED
FROM TOP 1
3 OF ROOT BALL.
REMOVE WIRE CAGE FOLLOWING
PLANTING.
1
3 NATIVE SOIL WITH
1
3 SANDY LOAM
AND 1
3 DEBRIS FREE TOPSOIL.
EXCAVATE HOLE
2X DIAMETER OF ROOT BALL
Coniferous Ball and Burlap Planting
L500 3/8"=1'
1
PRUNE TREE TO REMOVE
DEAD OR DAMAGED LIMBS AND
BRANCHES
TREE STAKES AND TIES
AS SHOWN. STAKES SHALL
BE DRIVEN INTO EXISTING,
UNDISTURBED SOIL AND
SHALL NOT PENETRATE THE
ROOT BALL. STAKES TO BE
REMOVED AFTER TWO YEARS.
FINISHED ELEVATION OF TREE
CROWN TO BE MIN 3" AND
MAX 6" ABOVE FINISHED GRADE
CIRCULAR SWALE TO RING TREE,
4' DIAMETER WITH 3" HIGH
MOUNDED RING OF SOIL
BURLAP TO BE REMOVED
FROM TOP 1
3 OF ROOT BALL.
REMOVE WIRE CAGE FOLLOWING
PLANTING.
1
3 NATIVE SOIL WITH
1
3 SANDY LOAM
AND 1
3 DEBRIS FREE TOPSOIL.
EXCAVATE HOLE
2-3/8 "TUBE STEEL
FASTENERS (BOLT OR
HILTI)
BENCH SURFACE MOUNT
3/8" CIRCULAR SURFACE
MOUNT PLATE WITH (4)
25/32" DIA HOLES FOR
BOLT OR HILTI
FASTENERS
Bench Detail
L501 1"=1'
1
Landscape Details
L 501
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l500 linear park_details.dwg
Linear Park
The Cottonwood Project
Bozeman, Montana
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
393
LP
PHN
PHN
PHN
MINOR SUB 454B
ZONING: B2
LP
PHN
PHN
PHN
MINOR SUB 454B
ZONING: B2
TR
W
W
B B B B
B
B
B B B B B B
B B
B
B
LP
PHN
PHN
PHN
MINOR SUB 454B
ZONING: B2
LP
PHN
PHN
PHN
MINOR SUB 454B
ZONING: B2
AMU
AMU
AMU
AMU
AMU
AMU
AMU
WES
HIG
SNO
WES
WES
HIG
WES
WES
WES
HIG
WES
WES
HIG
HIG
HIG
SNO
BAI
SPR
BAI
NOTE:
MOUNT CONTROLLER LCD SCREEN AT EYE LEVEL,
CONTROLLER SHALL BE HARD-WIRED TO
GROUNDED 110 VAC POWER SOURCE
LEGEND:
IRRIGATION CONTROLLER (12C-800-PL) PER PLAN
IRRIGATION CONTROL WIRE IN CONDUIT
SIZE AND TYPE PER LOCAL CODES
ELECTRICAL SUPPLY CONDUIT
CONNECT TO POWER SOURCE, J-BOX INSIDE
CONTROLLER
ADJACENT SURFACE TO MOUNT CONTROLLER PER PLAN
13"
5"
1
2
3
4
1
L700 NTS
Irrigation Controller Detail- Hunter ICC2 or Equivalent
1
2
3
4
4
2
L700 NTS
Backflow Preventer
(1)
FINISHED GRADE
NOTES
1. 1 1
2" BACKFLOW ASSEMBLY, PER LOCAL CODES AND ORDINANCES
2. PRESSURE VACUUM BREAKERS MUST BE INSTALLED AT LEAST 12" ABOVE
DOWNSTREAM PIPING
3. ALL NIPPLES AND VALVES TO BE COPPER OR BRASS
MANUAL BRASS SHUTOFF
BALL VALVE
MANUAL BRASS
SHUTOFF
BALL VALVE
WINTERIZATION ASSEMBLY TO BE
INSTALLED AS CLOSE TO BACKFLOW
PREVENTER AS POSSIBLE.
1"x4" CEDAR PANEL BACKFLOW
ENCLOSURE
ADJACENT SURFACE TO MOUNT CONTROLLER PER PLAN
NOTE:
FOR MOST ACCURATE TEMPERATURE
SENSING, ROTATE THE MWS SO THAT THE
THERMOSTAT PORTION POINTS SOUTH.
THE MWS IS DESIGNED TO MOUNT ON A
POST OF 2" PIPE, ANY COMBINATION OF
PIPE AND FITTINGS MAY BE USED.
2" PIPE
MOUNT TO POST OR WALL
WITH CONDUIT CLAMPS
MODEL MWS-FR OR SIMILAR
OPTIMUM MOUNTING
MODEL PROS-04 OR EQUIVALENT
LATERAL PIPE
FINISH GRADE
LATERAL TEE OR ELL
SWING JOINT:
RAINBIRD SA125050 OR EQUIVALENT
1
L701 NTS
Hunter Pro Spray or Equivalent
NOTE:
FINISH GRADES AT VALVE BOXES MUST BE AT A
LEVEL SUCH THAT THE ESTABLISHED TURF OR
MULCH SURFACE WILL FLUSH WITH THE TOP OF THE
BOX.
RAINBIRD SJ127575 PRE-FAB SWING
JOINT OR EQUIVALENT
LATERAL PIPE
LATERAL TEE OR ELL
FINISH GRADE
MODEL I20-04 ROTOR HEAD OR
EQUIVALENT
2
L701 NTS
Rotor Detail
NOTE:
FINISH GRADES AT VALVE BOXES MUST BE AT A
LEVEL SUCH THAT THE ESTABLISHED TURF OR
MULCH SURFACE WILL FLUSH WITH THE TOP OF
THE BOX.
2
3
4
5
1 TREE BUBBLER
TREE LOCATION
SWING PIPE
LATERAL TEE
LATERAL PIPE
7
8
9
10
6 TREE ROOT ZONE
HUNTER PCB-50 BUBBLER
FINISH GRADE
SWING JOINT:
HUNTER 'PRO-FLEX' TUBING 24" - 36",
HSBE-050 ELBOWS (2), & MARLEX
STREET ELBOW (1)
LATERAL TEE OR ELL
4
L701 NTS
Tree and Shrub Bubbler
SECTION
PLAN
1 2
3
3
6
4
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
Cottonwood Subdivision
Preliminary Plat Application
Roads, Streets, and Alleys
Included in this section is a 2018 Traffic Impact Study for Cottonwood Subdivision by Marvin &
Associates. Please note that throughout the report “West Garfield Street” is referred to as “Club
House Lane”.
Streamline does not serve the project area currently. However, a discussion has started between
the project owners, Madison Engineering and HRDC Board Chair, David Kack, regarding a
potential stop on Cottonwood Road that would serve this part of town.
Please see the responses below to the items requested in Section 38.220.060 – Additional
Subdivision Preliminary Plat Supplements in the Bozeman Municipal Code:
a. Description. Describe any proposed new public or private streets, roads or alley, or
substantial improvements of existing public or private streets, roads or alleys. The
developer must demonstrate that the land to be subdivided has access onto a legal street.
Response: Access will be provided to the subdivision from two intersections with Cottonwood
Road; West Garfield Street and Loyal Drive. Cottonwood Road is being widened along the entire
western border of the subject parcel (from Town Pump south to the Farmers Canal crossing) and
infrastructure improvements for that project have been approved. Construction has begun in
summer 2019. West Garfield is a collector and will have a 90-foot wide Right of Way (ROW).
All other streets within the subdivision will be local streets with 60-foot wide ROWs. Upon
acceptance of road improvements, these roads will be maintained by the City of Bozeman.
Where Stafford Avenue terminates at the north property line requires further explanation. A 40-
foot wide roadway easement is being obtained along the west side of the east property line of the
adjacent lot to the north owned by Major Brands Distributing Co. Inc. (Town Pump). It is
understood that the future development of the Town Pump property will require the construction
of a partial street section for Stafford Avenue within said easement to continue from the
Cottonwood Subdivision north to Huffine Lane to tie into the existing approach for the Town
Pump. The adjacent property owner to the east of Town Pump has indicated that they are not
interested in providing a roadway easement for Stafford Avenue on their property at this time.
It is proposed to build the full Stafford Avenue road section with Cottonwood Subdivision and
for 99.27 linear feet within said 40-foot roadway easement to our northern-most property line.
The transition between the full 60-foot ROW for Stafford Avenue to the 40-foot ROW on Town
Pump’s property is clarified with three drawings attached to this section. The first drawing,
Figure A, shows the two proposed road sections for Stafford Avenue; the future partial section to
be constructed on Town Pump’s property and the full road section to be constructed on the
Cottonwood Subdivision and within the 40-foot easement for 99.27 linear feet. The second
drawing, Figure B, shows the area of the transition from 60-foot ROW to 40-foot ROW in plan
460
Cottonwood Subdivision
Preliminary Plat Application
view. The third drawing is a preliminary easement exhibit showing the 40-foot Public Roadway
Easement to be obtained on the Town Pump property.
b. Access to arterial. Discuss whether any of the individual lots or tracts have access
directly to arterial streets or roads, and if so, the reason access was not provided by
means of a street within the subdivision and how the access complies with section
38.400.090.
Response: Cottonwood Road is a Principal Arterial and none of the proposed lots have direct
access to it. Access to Cottonwood Road will be achieved through the intersections of W.
Garfield Street and Loyal Drive.
c. Modification of existing streets, roads or alleys. Explain any proposed closure or
modification of existing streets, roads or alleys.
Response: The only proposed modification to an existing street is the widening of Cottonwood
Road as previously mentioned. The improvements to Cottonwood Road are a separate project
that has been approved by the MDT and City and will be starting construction in summer 2019.
All other roads constructed within this subdivision will be contained on the subject property
and will not cause road closures for any existing streets.
d. Dust. Describe provisions considered for dust control on alleys.
Response: If alleys are constructed on site they will be paved, which will mitigate any potential
problems associated with dust.
e. Pollution and erosion. Explain how street, road and alley maintenance will be provided
to meet the department of environmental quality guidelines for prevention of water
pollution and erosion.
Response: The roads will be dedicated to the City and will be maintained like the rest of the
roads in the City. The boulevards and other disturbed areas will be seeded and stabilized,
which is a best management practiced outlined by the MDEQ as a means to reduce pollution
and erosion control, and reducing sediment from running into the roads and inlets. Temporary
erosion control will also be provided at the dead ends of streets between phases of construction.
f. Traffic generation. Discuss how much daily traffic will be generated on existing local
and neighborhood streets, roads and alleys, when the subdivision is fully developed, and
provide the following information:
1. The report format must be as follows:
a. Trip generation, using the Institute of Transportation Engineers Trip
Generation Manual;
461
Cottonwood Subdivision
Preliminary Plat Application
b. Trip distribution;
c. Traffic assignment;
d. Capacity analysis;
e. Evaluation; and
f. Recommended access plan, including access points, modifications and any
mitigation techniques.
2. The report must include the following information:
a. Land use and trip generation in the form of a table of each type of land
use, the number of units or square footage, as appropriate, the trip rates
used (daily and peak) and resulting trip generation.
b. Traffic graphics, which show:
i. A.M. peak hour site traffic;
ii. P.M. peak hour site traffic;
iii. A.M. peak hour total traffic;
iv. P.M. peak hour total traffic; and
v. Total daily traffic (with site-generated traffic shown separately).
c. A.M. and P.M. capacity analysis with an A.M. and P.M. peak-hour
capacity analysis provided for:
i. All major drive accesses that intersect collector or arterial streets
or roads; and
ii. All arterial-arterial, collector-collector and arterial-collector
intersections within one-half mile of the site, or as required by the
city engineer during the pre-application review, concept plan review,
or informal project review.
d. For two-way stop controlled intersections, analysis of whether the intersection
would satisfy signalization warrants if the two-way stop control was removed.
Response: Please see Traffic Impact Study performed by Marvin & Associates that includes the
requested information.
462
Cottonwood Subdivision
Preliminary Plat Application
g. Capacity. Indicate the levels of service (before and after development) of existing and
proposed streets and roads, including appropriate intersections, to safely handle any
increased traffic. Describe any anticipated increased maintenance that will be necessary
due to increased traffic and who will pay the cost of maintenance.
Response: Please see Traffic Impact Study performed by Marvin & Associates that includes the
requested information.
h. Bicycle and pedestrian pathways, lanes and routes. Describe bicycle and pedestrian
pathways, lanes or routes to be developed with the development.
Response: Bike lanes are included with the improvements to Cottonwood Road. All the roads
within the subdivision will have sidewalks on both sides for pedestrians. West Garfield Street
is considered a collector so it is likely to include bike lanes. However, it is unclear from the
Bozeman Transportation Master Plan (TMP) and Appendix K: Corridor Striping Plans of said
TMP whether the long-range plan for this section of West Garfield Street will include bikes
lanes or not. At this time, it is assumed that bike lanes will be required on West Garfield Street.
i. Traffic calming. Detailed drawings of any proposed traffic calming installations,
including locations and turning radius templates.
Response: No traffic calming installations are proposed on any of the new roads through the
site.
463
FUTURE TWO-THIRDS STAFFORD AVE. STREET SECTION
(NORTH OF COTTONWOOD SUBDIVISION)
STAFFORD AVE. STREET SECTION
FIGURE A
MADISON ENGINEERING
895 TECHNOLOGY BLVD, SUITE 203
BOZEMAN, MT 59718
PHONE (406) 586-0262
COTTONWOOD SUBD.
STAFFORD ROAD CROSS SECTION
464
ALLIED
WASTE
New Paving Line (curb and gutter)
LOT L,
MINOR SUB 313
TRACT 1,
COS 2229
LOT 2,
MINOR SUB 454B
STAFFORD AVE.
TOWN PUMP
ALPHA DR. (FUTURE)
COTTONWOOD SUBD.
HUFFINE LANE
ALLEY
MADISON ENGINEERING
895 TECHNOLOGY BLVD SUITE 203
BOZEMAN, MT 59718
(406) 586-0262
FIGURE
B
Stafford Ave. R.O.W.
COTTONWOOD SUBDIVISION Cottonwood Subd.
BOZEMAN, MT
40' R.O.W. ALIGNMENT
STAFFORD AVE. NORTH OF SUBD.
1 inch =
0
SCALE
1000'
500 1000 2000
465
466
467
Cottonwood Subdivision
Preliminary Plat Application
Utilities
Northwestern Energy has been notified that electricity and natural gas service will need to be
provided to the subdivision and has confirmed that they can provide service, as seen in the
attached letter. It has been requested from Northwestern to work concurrently and in
cooperation with other utilities and services, including telephone, internet, and cable TV
providers to provide for their respective infrastructure in joint utility trenches. Gas, electricity,
and information utilities will be phased and will be installed after completion of roads but prior
to construction of dwellings. All utilities will be located underground and per the City of
Bozeman Standards. Please see the responses below to the items requested in Section
38.220.060 – Additional Subdivision Preliminary Plat Supplements in the Bozeman Municipal
Code:
a. Affected utilities. Indicate which affected utilities the subdivision plat has been
submitted to for review, and include a copy of responses.
Response: Northwestern Energy has been contacted. Please see the comments included in this
section.
b. Include a description of:
1. The method of furnishing electric, natural gas, cable TV, internet or telephone
service, where provided.
2. Estimated timing of each utility installation.
3. The developer must provide a written statement from the utility companies that
the proposed subdivision can be provided with service.
Response: Northwestern Energy has been contacted. Please see the comments included in this
section. Typically, the other utility companies that supply cable TV, internet, or telephone
services piggyback on the scheduling and installation with Northwestern Energy.
468
469
Cottonwood Subdivision
Preliminary Plat Application
Roads, Streets, and Alleys
Included in this section is a 2018 Traffic Impact Study for Cottonwood Subdivision by Marvin &
Associates. Please note that throughout the report “West Garfield Street” is referred to as “Club
House Lane”.
Streamline does not serve the project area currently. However, a discussion has started between
the project owners, Madison Engineering and HRDC Board Chair, David Kack, regarding a
potential stop on Cottonwood Road that would serve this part of town.
Please see the responses below to the items requested in Section 38.220.060 – Additional
Subdivision Preliminary Plat Supplements in the Bozeman Municipal Code:
a. Description. Describe any proposed new public or private streets, roads or alley, or
substantial improvements of existing public or private streets, roads or alleys. The
developer must demonstrate that the land to be subdivided has access onto a legal street.
Response: Access will be provided to the subdivision from two intersections with Cottonwood
Road; West Garfield Street and Loyal Drive. Cottonwood Road is being widened along the entire
western border of the subject parcel (from Town Pump south to the Farmers Canal crossing) and
infrastructure improvements for that project have been approved. Construction has begun in
summer 2019. West Garfield is a collector and will have a 90-foot wide Right of Way (ROW).
All other streets within the subdivision will be local streets with 60-foot wide ROWs. Upon
acceptance of road improvements, these roads will be maintained by the City of Bozeman.
Where Stafford Avenue terminates at the north property line requires further explanation. A 40-
foot wide roadway easement is being obtained along the west side of the east property line of the
adjacent lot to the north owned by Major Brands Distributing Co. Inc. (Town Pump). It is
understood that the future development of the Town Pump property will require the construction
of a partial street section for Stafford Avenue within said easement to continue from the
Cottonwood Subdivision north to Huffine Lane to tie into the existing approach for the Town
Pump. The adjacent property owner to the east of Town Pump has indicated that they are not
interested in providing a roadway easement for Stafford Avenue on their property at this time.
It is proposed to build the full Stafford Avenue road section with Cottonwood Subdivision and
for 99.27 linear feet within said 40-foot roadway easement to our northern-most property line.
The transition between the full 60-foot ROW for Stafford Avenue to the 40-foot ROW on Town
Pump’s property is clarified with three drawings attached to this section. The first drawing,
Figure A, shows the two proposed road sections for Stafford Avenue; the future partial section to
be constructed on Town Pump’s property and the full road section to be constructed on the
Cottonwood Subdivision and within the 40-foot easement for 99.27 linear feet. The second
drawing, Figure B, shows the area of the transition from 60-foot ROW to 40-foot ROW in plan
470
Cottonwood Subdivision
Preliminary Plat Application
view. The third drawing is a preliminary easement exhibit showing the 40-foot Public Roadway
Easement to be obtained on the Town Pump property.
b. Access to arterial. Discuss whether any of the individual lots or tracts have access
directly to arterial streets or roads, and if so, the reason access was not provided by
means of a street within the subdivision and how the access complies with section
38.400.090.
Response: Cottonwood Road is a Principal Arterial and none of the proposed lots have direct
access to it. Access to Cottonwood Road will be achieved through the intersections of W.
Garfield Street and Loyal Drive.
c. Modification of existing streets, roads or alleys. Explain any proposed closure or
modification of existing streets, roads or alleys.
Response: The only proposed modification to an existing street is the widening of Cottonwood
Road as previously mentioned. The improvements to Cottonwood Road are a separate project
that has been approved by the MDT and City and will be starting construction in summer 2019.
All other roads constructed within this subdivision will be contained on the subject property
and will not cause road closures for any existing streets.
d. Dust. Describe provisions considered for dust control on alleys.
Response: If alleys are constructed on site they will be paved, which will mitigate any potential
problems associated with dust.
e. Pollution and erosion. Explain how street, road and alley maintenance will be provided
to meet the department of environmental quality guidelines for prevention of water
pollution and erosion.
Response: The roads will be dedicated to the City and will be maintained like the rest of the
roads in the City. The boulevards and other disturbed areas will be seeded and stabilized,
which is a best management practiced outlined by the MDEQ as a means to reduce pollution
and erosion control, and reducing sediment from running into the roads and inlets. Temporary
erosion control will also be provided at the dead ends of streets between phases of construction.
f. Traffic generation. Discuss how much daily traffic will be generated on existing local
and neighborhood streets, roads and alleys, when the subdivision is fully developed, and
provide the following information:
1. The report format must be as follows:
a. Trip generation, using the Institute of Transportation Engineers Trip
Generation Manual;
471
Cottonwood Subdivision
Preliminary Plat Application
b. Trip distribution;
c. Traffic assignment;
d. Capacity analysis;
e. Evaluation; and
f. Recommended access plan, including access points, modifications and any
mitigation techniques.
2. The report must include the following information:
a. Land use and trip generation in the form of a table of each type of land
use, the number of units or square footage, as appropriate, the trip rates
used (daily and peak) and resulting trip generation.
b. Traffic graphics, which show:
i. A.M. peak hour site traffic;
ii. P.M. peak hour site traffic;
iii. A.M. peak hour total traffic;
iv. P.M. peak hour total traffic; and
v. Total daily traffic (with site-generated traffic shown separately).
c. A.M. and P.M. capacity analysis with an A.M. and P.M. peak-hour
capacity analysis provided for:
i. All major drive accesses that intersect collector or arterial streets
or roads; and
ii. All arterial-arterial, collector-collector and arterial-collector
intersections within one-half mile of the site, or as required by the
city engineer during the pre-application review, concept plan review,
or informal project review.
d. For two-way stop controlled intersections, analysis of whether the intersection
would satisfy signalization warrants if the two-way stop control was removed.
Response: Please see Traffic Impact Study performed by Marvin & Associates that includes the
requested information.
472
Cottonwood Subdivision
Preliminary Plat Application
g. Capacity. Indicate the levels of service (before and after development) of existing and
proposed streets and roads, including appropriate intersections, to safely handle any
increased traffic. Describe any anticipated increased maintenance that will be necessary
due to increased traffic and who will pay the cost of maintenance.
Response: Please see Traffic Impact Study performed by Marvin & Associates that includes the
requested information.
h. Bicycle and pedestrian pathways, lanes and routes. Describe bicycle and pedestrian
pathways, lanes or routes to be developed with the development.
Response: Bike lanes are included with the improvements to Cottonwood Road. All the roads
within the subdivision will have sidewalks on both sides for pedestrians. West Garfield Street
is considered a collector so it is likely to include bike lanes. However, it is unclear from the
Bozeman Transportation Master Plan (TMP) and Appendix K: Corridor Striping Plans of said
TMP whether the long-range plan for this section of West Garfield Street will include bikes
lanes or not. At this time, it is assumed that bike lanes will be required on West Garfield Street.
i. Traffic calming. Detailed drawings of any proposed traffic calming installations,
including locations and turning radius templates.
Response: No traffic calming installations are proposed on any of the new roads through the
site.
473
FUTURE TWO-THIRDS STAFFORD AVE. STREET SECTION
(NORTH OF COTTONWOOD SUBDIVISION)
STAFFORD AVE. STREET SECTION
FIGURE A
MADISON ENGINEERING
895 TECHNOLOGY BLVD, SUITE 203
BOZEMAN, MT 59718
PHONE (406) 586-0262
COTTONWOOD SUBD.
STAFFORD ROAD CROSS SECTION
474
ALLIED
WASTE
New Paving Line (curb and gutter)
LOT L,
MINOR SUB 313
TRACT 1,
COS 2229
LOT 2,
MINOR SUB 454B
STAFFORD AVE.
TOWN PUMP
ALPHA DR. (FUTURE)
COTTONWOOD SUBD.
HUFFINE LANE
ALLEY
MADISON ENGINEERING
895 TECHNOLOGY BLVD SUITE 203
BOZEMAN, MT 59718
(406) 586-0262
FIGURE
B
Stafford Ave. R.O.W.
COTTONWOOD SUBDIVISION Cottonwood Subd.
BOZEMAN, MT
40' R.O.W. ALIGNMENT
STAFFORD AVE. NORTH OF SUBD.
1 inch =
0
SCALE
1000'
500 1000 2000
475
476
477
Cottonwood Subdivision
Preliminary Plat Application
Utilities
Northwestern Energy has been notified that electricity and natural gas service will need to be
provided to the subdivision and has confirmed that they can provide service, as seen in the
attached letter. It has been requested from Northwestern to work concurrently and in
cooperation with other utilities and services, including telephone, internet, and cable TV
providers to provide for their respective infrastructure in joint utility trenches. Gas, electricity,
and information utilities will be phased and will be installed after completion of roads but prior
to construction of dwellings. All utilities will be located underground and per the City of
Bozeman Standards. Please see the responses below to the items requested in Section
38.220.060 – Additional Subdivision Preliminary Plat Supplements in the Bozeman Municipal
Code:
a. Affected utilities. Indicate which affected utilities the subdivision plat has been
submitted to for review, and include a copy of responses.
Response: Northwestern Energy has been contacted. Please see the comments included in this
section.
b. Include a description of:
1. The method of furnishing electric, natural gas, cable TV, internet or telephone
service, where provided.
2. Estimated timing of each utility installation.
3. The developer must provide a written statement from the utility companies that
the proposed subdivision can be provided with service.
Response: Northwestern Energy has been contacted. Please see the comments included in this
section. Typically, the other utility companies that supply cable TV, internet, or telephone
services piggyback on the scheduling and installation with Northwestern Energy.
478
479
480
481
482
483
484
485
486
487
Cottonwood Subdivision
Preliminary Plat Application
Neighborhood Center Plan
Neighborhood Center Plan drawings are provided is Section 4 of the Park Master Plan
located in Section 3.P of this preliminary plat application.
Please see the responses below to the items requested in Section 38.410.020 – Community
Design and Elements in the Bozeman Municipal Code:
a. To provide a neighborhood focal point, all residential subdivisions or planned unit
developments that are ten net acres in size or greater, must have a neighborhood
center. Developments may be exempted from this requirement if every lot within the
development is within one-half mile of an existing neighborhood center. Generally,
the center must be no less than one acre in size. The center must be comprised of a
park, square, green, plaza, transit stop, neighborhood commercial center, civic use or
any combination of these. The following requirements apply to all neighborhood
centers:
1. The geographic center point of the neighborhood center must be no further than
600 feet from the geographic center point of the development. This requirement may
be waived in the following circumstances:
a. The development would create parcels that are all non-residential;
b.The center is a neighborhood commercial center or is adjacent to a neighborhood
commercial center;
c.The site is constrained by the presence of critical lands;
d. The site is part of an approved subarea plan that shows the center in a different
location; or
e. The topography of the site presents physical constraints on the property.
Response: The neighborhood center pavilion is located within 600 feet of the geographic
center of the development.
2. With the exception of civic and neighborhood commercial center uses, the
developer must install all center-related improvements as part of the required
development improvements. When a multi-phase project is developed, improvements
must be installed with each phase. Required improvements must be based on the
definition of each feature found in article 7 of this chapter, and/or city standards.
Response: The largest of the parks (2.64 acres) that contains the neighborhood center
pavilion is being constructed with Phase 1 of the road and infrastructure improvements for
Cottonwood Subdivision.
488
Cottonwood Subdivision
Preliminary Plat Application
3. The neighborhood center must have frontage along 100 percent of its perimeter on
public or private streets or roads. The city may consider and approve the installation
of streets along less than 100 percent, but not less than 50 percent, of the perimeter in
accordance with section 38.420.060.
Response: The park that contains the neighborhood center pavilion has public street
frontage along over 80 percent of its borders. This is because the subject 28-acre parcel has
an irregular shape. If the parcel to the east is developed, then the park will have 100
percent public street frontage. See Subdivision Map in Section 2.B. of this application for a
visual reference.
4. With the exception of civic and neighborhood commercial center buildings and
grounds, the center is considered a common area to be owned and maintained by the
property owners' or a property owners' association. The property owners' association
may establish an improvement district to collect assessments to pay for the
maintenance.
Response: The covenants have been updated to add the neighborhood center pavilion as a
designated maintenance property of the property owner’s association. See item 6.6.4 of the
Covenants located in Section 2.D of this application.
5. After receiving a recommendation from the city recreation and parks advisory
board, areas within neighborhood centers used for park, square, or green may count
towards parkland dedication requirements (subject to review and approval by the
review authority) if they meet the following criteria:
a. The area is predominantly open space with enhanced natural features, but may
contain amenities such as sidewalks, seating, drinking and ornamental fountains and
public art; and
b. The area provides active and/or passive recreation opportunities.
Response: The neighborhood center pavilion is located in the large 2.64-acre park located
within Phase 1. The park is predominantly open space and features benches and areas for
passive and active recreation.
6. The neighborhood center may be used for limited stormwater retention/detention
facilities if reviewed and approved by the review authority. However, any part of the
center used for stormwater management does not count towards park dedication
requirements.
Response: It is anticipated that underground stormwater retention/detention may be
developed within the park footprint.
7. New neighborhood commercial centers are subject to the community design
framework master plan provisions of sections 38.210.130 and 38.510.030.L.
Response: No commercial center is proposed.
489
490
491
492
493
494
495
496
497
498
499
500
Page 1 of 1
TO: DEVELOPMENT REVIEW COMMITTEE
FROM: MARTY MATSEN, DIRECTOR OF COMMUNITY DEVELOPMENT
RE: COTTONWOOD MAJOR SUBDIVISION, APPLICATION 19401
DATE: DECEMBER 5, 2019
Recommendation: The subdivision is not subject to affordable housing
requirements of BMC 38.380
These comments are provided on the November 4, 2019 application.
Discussion: The proposal from the subdivider is to not provide affordable housing as
the project does not propose any market rate homes or lots that could accommodate
individual homes.
The Affordable Housing Program concurs with the determination that this
subdivision is not subject to the affordable housing requirements of BMC 38.380.
I recommend that this information be provided to the Community Affordable Housing
Advisory Board (CAHAB) for their information.
Section 2 – RECOMMENDED CONDITIONS OF APPROVAL
Please note that these conditions are in addition to any required code provisions
identified in this report. These conditions are specific to the development.
1. Not applicable.
Section 3 – REQUIRED CODE PROVISIONS. All citations are to the Bozeman
Municipal Code (BMC).
1. Not applicable.
501
502
503
504
505
Cottonwood Subdivision
Preliminary Plat Application
Park and Recreation Facilities
Four public park areas (2.64 acres, 0.70 acres, 0.56 acres and 0.38 acres) are proposed as
part of this project. A Park Master Plan is attached to this section of the application.
The northern most 2.64 acre park (City Park Lot 1, Block 4) will be completed during the
first phase of the work, while the southern three parks along the Farmers Canal will be
completed during phase 2. All maintenance, weed control, garbage collection, snow
removal, leaf removal, and irrigation maintenance will be coordinated and paid for by the
subdivisions Property Owners Association (POA). Detailed maintenance plans will be
developed by the POA at a later date.
Please see the responses below to the items requested in Section 38.220.060 – Additional
Subdivision Preliminary Plat Supplements in the Bozeman Municipal Code:
a. Park plan. A park plan, including:
(1) Site plan with one-foot contour topographic survey for the entire property; showing
developer installed improvements on the initial park plan and proposed future
improvements on the future park plan, and phasing proposed if any;
(2) Drainage areas;
(3) Utilities within, serving, and adjacent to the property;
(4) The zoning and ownership for adjacent properties;
(5) The location of any critical lands (wetlands, riparian areas, streams, etc.) and location
of watercourse setbacks and any permits from non-city agencies required to execute the
proposed plan;
(6) Park landscaping plan, prepared by a qualified landscape professional in accordance
with section 38.220.100, showing the location and specific types and species of plants,
shrubs, trees as well as grass seed mixes and the irrigation system including but not limited
to identification of water source, points of connection, mains, laterals, valves, zones, and
sprinkler heads;
(7) General description of land, including size, terrain, details of location and history, water
features, and proposed activities;
(8) Trail design and construction showing compliance with adopted city standards and trail
classifications;
(9) The requirement for approval of the final park plan by the review authority with a
recommendation from the city recreation and parks advisory board prior to any site work;
(10) The requirement for a preconstruction meeting prior to any site work;
(11) Appropriate sections from the design guidelines for city parks;
(12) Cost estimate, installation phasing and responsibility, and maintenance plan tasks and
responsibility for all improvements;
506
Cottonwood Subdivision
Preliminary Plat Application
(13) If playground equipment will be provided, information including the manufacturer,
installation data and specifications, installer, type of fall zone surfacing and age group
intended for use;
(14) Soils information and analysis;
(15) A description of how the proposed park plan is consistent with the goals of the city's
long range parks plan;
(16) A description of how the proposed park will meet the recreational needs of the
residents of the development;
(17) The proposed manner of providing irrigation to the park including water source,
amount of water expected to be consumed annually, and proposed manner of transfer of
water facilities and rights to the city; and
(18) A phase I environmental assessment of the area proposed to be transferred to the city
or property owner's association.
Response: Please see Parks Master Plan by Design 5 included in this section.
b. Park maintenance.
(1) Maintenance information, including levels of maintenance, a maintenance schedule, and
responsible parties;
(2) Weed control plan, including responsible parties; and
(3) Plan for garbage collection, snow removal and leaf removal including responsible
parties.
Response: Please see Parks Master Plan by Design 5 included in this section.
c. Irrigation information.
(1) An irrigation system map generally showing the locations and types of lines, including
depth, water source, heads, electric valves, quick couplers, drains and control box; and
(2) If a well will be used for irrigation, a certified well log must be submitted showing depth
of well, gpm, pump type and size, voltage, water rights, etc.
Response: Please see Parks Master Plan by Design 5 included in this section. Also, see well
exempt determination letter from the DNRC.
d. Phasing. If improvements will be phased, a phasing plan must be provided including
proposed financing methods and responsibilities.
Response: Please see Parks Master Plan by Design 5 included in this section.
e. Cash-in-lieu. If the development includes a proposal for cash-in-lieu of park a specific
justification responding to the cash-in-lieu review factors established by resolution of the
city commission. If improvements-in-lieu are proposed specific costs of proposed
improvements and costs to install must be provided.
Response: Please see parkland area calculations spreadsheet by Studio H Design on the
following page.
507
Cottonwood Development - Parkland Area Calculations
12/02/19
Total Site Area (A) 1,223,426 sf 28.09 acres
Total Commercial Land Area (c) 0 sf 0.00 acres
Total Industrial Land Area (i) 0 sf 0.00 acres
Reserved but Undedicated School or Park Sites (s) 0 sf 0.00 acres
Street, Public or Private, Rights of Way & Transportation Easements (a) 252,391 sf 5.79 acres
Common Open Spaces (d) 48,695 sf 1.12 acres
Dedicated Parkland (d) 186,579 sf 4.28 acres
Developable Residential Net Area 735,761 sf 16.89 acres
R-5 Density Cap for Unknown Density 8 du/acre
Residential Net Area 16.89 acres
Number of Dwelling Units Requiring Parkland (Density Cap x Net Area) 135.13 du
Required Parkland Acreage per Dwelling Unit 0.03 acres/du
Parkland Required @ 8 DU/acre (Number of DU x Req'd Acreage/DU) 4.05 acres
Calculations for Subsequent Development @ 12 DU/acre
R-5 Maximum Density Cap 12 du/acre
Number of Dwelling Units Requiring Parkland (Density Cap x Net Area) 202.69 du
Total Parkland Required @ 12 DU/acre 6.08 acres
Additional Parkland Required for Subsequent Development to 12 DU/acre 2.03 acres
Required at time of Platting (8 DU/acre)
City Provided Value of Land $ 1.60 Value/sf (* See Note)
Parkland Required @ 8 DU/acre (Required at time of Platting) 4.05 acres
Parkland Proposed 4.28 acres
Required Parkland Balance (At time of Platting) (0.23) acres
Cash or Improvements in Lieu Required (@ 8 DU/acre) (Req'd at time of Platting) $ - Improvements Req'd
Required at time of Subsequent Development (12 DU/acre)
Additional Parkland Required for Subsequent Development to 12 DU/acre 2.03 acres
City Provided Value of Land $ 1.60 Value/sf
Parkland Required @ 12 DU/acre (Required at time of Subsequent Development) 6.08 acres
Parkland Proposed 4.28 acres
Required Parkland Balance (Required at time of Subsequent Development) 1.80 acres
Cash or Improvements in Lieu Required (@ 12 DU/acre) (Req'd at time of Site Planning) $ 125,272 Improvements Req'd
* See Note
Studio H Design Inc.
81211 Gallatin Rd. Ste E
Bozeman, MT 59718
(406) 587-9968
Area Calculations
Required Parkland Calculations
Cash or Improvements-in-lieu Calculations
* Note: The fair market value of land for cash-in-lieu of parkland purposes is determined at the time of final plat completion. Cash-
in-lieu equivalents provided above are estimates only. Value of land per sf and cash-in-lieu equivalents subject to change.
508
509
510
The Cottonwood Project
Park Master Plan
RV 1 -December 2019
REVISIONS IN RESPONSE TO
ADDI JADIN MEMORANDUM OCT 21,2019
TO ADDI JADIN MEMORANDUM OCT
10,2019
Prepared for:
City of Bozeman
&
The Cottonwood Project, LLC
Prepared by:
With:
Studio H Design
Madison Engineering
511
The Cottonwood Project December 3, 2019
Park Master Plan
1
Parks Master Plan
July 2019
SECTION 1
PROJECT LOCATION AND HISTORY 2
PROJECT SCOPE 2
DEDICATED PARKLAND AND OPEN SPACE 2
TRAIL SYSTEM 2
PARKLAND AND OPEN SPACE AMENITIES 3
COMMUNITY CENTER 3
PROJECT PHASING 3
DEDICATED PARKLAND 3
VEGETATION 3
IRRIGATION 5
SOILS 5
PLAYGROUND 6
TRAILS 6
MAINTENANCE 6-9
SECTION 2
LANDSCAPE DRAWING SHEETS
SECTION 3
SOILS INFORMATION
SECTION 4
PLAYGROUND EQUIPMENT, PICNIC SHELTER, AND SITE AMENITIES
SECTION 5
COST ESTIMATE
SECTION 6
COTTONWOOD CITY CODE CORRECTION IN RSPONSE TO ADDI JADIN MEMORANDUM OCT 21,2019
512
The Cottonwood Project December 3, 2019
Park Master Plan
2
The Cottonwood Project is located of Huffine and Cottonwood Rd. in Bozeman. The land that
makes up the Cottonwood Project Subdivision has been used primarily for agriculture and
livestock production for many years. The site is predominately grass land and agricultural land.
Project Scope
The Cottonwood Project Master Park Plan is comprised of three main components: Dedicated
Park (Mary Long Alderson), Common Open Space areas (with Public Access Easements) and a
Linear Park. The primary purpose of this document is to describe the initial level of
development and maintenance of the parks, trails and common open space. The second
objective is to show a concept for future recreation facilities that could complement those
installed by the developer.
Guiding Ideas:
• Provide connections between residential neighborhoods and park / open space areas.
• Provide variety in recreation experiences and opportunities
• Provide areas for passive and active recreation
• Protect, retain and improve native and natural drainage corridors
• Minimize hard or impervious surface
• Address current parkland needs while also minimizing impacts to wetlands and streams
Dedicated Parkland and Common Open Space
Dedicated Parkland and Common Open Space will make up 5.4 acres of The Cottonwood
Project subdivision. The ML Alderson Park and Linear Park Provide 4.28 acres of total dedicated
parkland.
The following section outlines the installation and maintenance of all dedicated park areas for
Final Plat filings. The plan puts emphasis on open, maintained areas for passive and active
recreation. There will also be a playground with age appropriate equipment, which will be
installed with Intent for construction. Part of the parkland is adjacent to a watercourse
corridor and the natural character of this area will be maintained to the greatest extent
possible
Linear Park and Open Space Trails
In the Linear Park and Open Space areas of the project, the Developer will install and maintain
8' paved multi-use trail (Asphalt) (Class II Trail). It is the intent to create a more park like
experience along the edges of the development. These trails will also serve as important
linkages to existing and planned community amenities. All landscape standards for street
trees, landscape and irrigation will be adhered to.
513
The Cottonwood Project December 3, 2019
Park Master Plan
3
Parkland and Open Space Amenities
The development of Parkland amenities will be installed by the developer as necessary to meet
the Parks Master Plan goals. The current list of planned amenities includes:
1. 6’ wide Class II trail through Central Park – Asphalt
2. 8’ wide Class II trail through Linear Park – Asphalt
3. Benches at intermittent intervals along streams and paths where necessary
4. Playground along with shade pavilion with tables, benches, trash receptacle and bike
racks
Financing: All Parks, Open Space, street boulevards adjacent to the parks and detention storm
water basins for any phase of the subdivision will be bonded with the Final Plat for that phase.
A cost estimate has been provided under Section 5.
Construction: Any and all site work (including trails) must be preceded by a preconstruction
meeting with the City of Bozeman. All plans, improvements, structures and plantings must be
approved by the City prior to installation. Building Permits are required for any structural
improvements. Any deviation from the Park Master Plan must be submitted to the City and
approved before construction.
Vegetation
All vegetation shall be quality nursery stock and construction documents will dictate further
specifications and species selection. A variety of species shall be selected to ensure that a pest
or disease event does not decimate the entire project. Trees, shrubs and herbaceous plants will
be chosen for their size, hardiness and aesthetic nature. Plants used will be regionally native
and/or adapted to the extent possible.
Trees
All trees are subject to approval by the City of Bozeman. Tree selection should be based on the
recommended species list provided by the City of Bozeman. Tree size and selection shall be
varied in order to create visual interest and a varied genetic palette.
Recommended Tree List
Colorado Blue Spruce
Northwoods Red Maple
Quaking Aspen
Cottonwood
Common Honeylocust
Spring Snow Crabapple
American Linden
514
The Cottonwood Project December 3, 2019
Park Master Plan
4
Norway Maple
American Elm
Shrubs
Shrubs used within the watercourse setback will be used to enhance the existing native
vegetation, increase native habitat and provide a varied visual experience. Plants will be
chosen based on hardiness, aesthetic quality and size. The City Forester will approve final plant
selection for all woody plant material.
Recommended Shrub List
Red Osier Dogwood
Geyer Willow
Yellow Willow
Native Chokecherry
Grasses
Herbaceous seed mixes will be dictated by the construction documents. In general, turf areas
will receive a Kentucky bluegrass mix, detention areas will be seeded with a mix tolerant of wet
conditions. All areas disturbed by construction will be properly prepared and seeded with a
narrow spacing drill seeder. Before seeding, the soil shall be loosened to a minimum depth of
six inches in order to improve initial root development and amended if necessary. The soil will
not be compacted in any manner. Sufficient compaction is readily achieved through the grading
process and normal rainfall. Fertilizer should be applied prior to planting to insure healthy plant
development.
Recommended Turf Grass Mix (Dedicated Parkland, Open Space and Boulevards)
Pennfine Perennial Rye 30%
Glade Kentucky Bluegrass 30%
Baron Kentucky Bluegrass 30%
Pennlawn Creeping Red Fescue 10%
Recommended Native Grass Mix (Storm Water Detention Areas)
Common Name Scientific Name Percent %
Westeren Wheatgrass ‘ Rosanna’ Pascopyrum Smithii 40%
Streambank Wheatgrass ‘Sodar’ Elymus Lanceolatus ‘Sodar’ 20%
Thickspike Wheatgrass ‘ Critana’ Elymus Lanceolatus‘ Critana’ 10%
Covar Sheep Fescue Festuca Ovina 10%
Bluebunch Wheatgrass Psuedorogneria Spicata 10%
Sherman Big Blue Grass Poa Secunda ‘Sherman’ 10%
515
The Cottonwood Project December 3, 2019
Park Master Plan
5
Irrigation
All irrigation systems will be designed to meet City of Bozeman requirements.
Irrigation systems will be compatible with Maxicom systems or approved alternate. All water
lines shall be schedule 40 PVC or Black Poly pipe. Pipe shall be installed at a minimum depth of
twelve (12) inches, main lines at eighteen inch minimum depth. If this depth is unachievable,
the Parks Division must be consulted. No stacking of irrigation lines shall be permitted. Four (4)
inches of sand shall be placed beneath pipe, and four (4) inches of sand above the pipe, to
prevent compaction and settling. Sprinkler heads will be installed on manufactured swing joints
(schedule 80 w/ o-rings). Heads to be installed must be approved by the Parks Division and shall
be gear driven, with interchangeable nozzle sizes, unless noted otherwise, and shall be capable
of producing the specified gpm and coverage area and shall be set to manufacturers’
specifications. Electrical locate tape shall be installed along all lines. Upon completion of
installation, all warranty and maintenance information, as well as well logs and pump
warranties and information, if applicable, and an “as- built” map shall be supplied to the City of
Bozeman Parks Division and HOA.
Soils
All soils to be used on public park land shall be inspected by and meet the approval of City of
Bozeman Parks Division Staff prior to installation and shall meet the minimum depth
requirement of 6 inches. All rock in excess of 1 inch in diameter shall be removed. Soil tests (a
sieve analysis and soil analysis) shall be performed prior to planting to determine the
classification and texture of the soils, along with any nutrient deficiencies. The classification and
texture will determine what amendments, if any, are needed, while the soil analysis will help
correct any nutrient problems with a pre-plant fertilization.
* Guidelines for soils - The soil will be deemed acceptable if: it is less than 35% clay and less
than 70% sand and 70% silt. Ph must not exceed 8.4. The soil will be screened at 1” minus for
rocks and debris; topsoil depth will be at least 6 inches.
Amendments may vary depending on existing soils but will generally consist of 60% coarse sand
(generally concrete sand), 20% organics (C: N ratio below 30) and 20% approved native soil.
Soils will be mixed, prior to installation, with a screener / mixer machine, or applied in layers on
site and mixed thoroughly with a deep rototiller. Depth of amended soil will be a minimum of
ten (10) inches. There will be no compaction following the grading process. Fertilizer, and the
rate at which it will be applied, should be dictated by the soil test report.
Playgrounds
Playgrounds shall be installed on Parkland managed by the HOA (or by the City of Bozeman at
such time as a Park Maintenance District is created). All playgrounds must be approved by a
Certified Playground Safety Inspector (CPSI) and meet current ASTM, CPSC and ADA guidelines
516
The Cottonwood Project December 3, 2019
Park Master Plan
6
and specifications. Playgrounds shall be age appropriate, for area served, and be signed
accordingly. There shall be an adequate use zone area around equipment, approved material in
use zone, which meets impact attenuation criteria as specified in ASTM 1292, and adequate
drainage. All installation plans, materials list, construction guidelines, maintenance information
and manufacturer’s name shall be supplied to the HOA/City of Bozeman’s Parks Division, upon
completion of playground installation. All work will be overseen and approved by a CPSI.
Kompan is the recommended structure and final selection will be subject to City of Bozeman
approval. Cut sheets for preferred equipment are provided in this submittal under Section 4.
Maintenance
Responsible Party
The Association shall be responsible for liability insurance, local taxes and maintenance of
recreation and other facilities in the common space areas. The assessments levied by the Board
for the maintenance, upkeep, repair and operation of common areas like all other assessments,
become a lien on each lot within The Cottonwood Project Subdivision. The Board may, in its
discretion, adjust the assessments to meet the changing needs of the community and the areas
serving the community.
The Association shall enter into an annual contract with a certified landscape nursery person for
upkeep and maintenance. The Association will be responsible for park maintenance until such
time a City-Wide Park Maintenance District is created. The Association shall also be responsible
for the maintenance of all common properties, paths and trails, facilities, centers, and adjacent
sidewalks and/or landscaping in street boulevards.
The Declarant will be responsible for maintaining pathways, open space and parkland until 50
percent of the lots are sold. At such time, the Association will take over maintenance.
Maintenance will include the following as well as care and replacement of playground
equipment (CPSI approved) and/or site furnishings, replacement of doggie pick-up bags and
emptying of refuse containers. Any and all work and/or park fixtures must meet standards set
by the City Parks Division.
Trees and Shrubs
A contractor will be hired to perform park maintenance. Maintenance duties to be performed
will consist of spring and fall clean up, routine mowing, lawn patching, care and replacement of
dead trees and/or shrubs. All tree trimming and pruning must be performed by a certified
arborist as outlined in City Ordinance 12.30.040 in coordination with Forestry Division. All trees
on public property are subject to City of Bozeman permits and ordinances.
517
The Cottonwood Project December 3, 2019
Park Master Plan
7
Trails
Natural fines trails will not be plowed. These trails will be inspected regularly and receive
routine patching and surface maintenance to prevent erosion or unsafe conditions. Weeds on
the trails well be controlled following City of Bozeman standards, set by the City Parks Division,
and using industry standards or as part of the weed control plan described in this document.
Turf Care
Native grass areas should be mowed 3-4 times per year dependent on rainfall levels. The first
mowing should occur at the end of May, and the second time should take place around mid-
July, with the final mowing in Mid-October.
Kentucky bluegrass areas should be maintained between 2"-4 1/2" and should receive
approximately 12" water between June 1st and late September. This translates to about 1"
water per week for lawn areas. Mowing will not be done during extremely wet periods or when
sub-grade is saturated or with standing water. Established lawns can receive a deep, but less
frequent watering in order to conserve and not over water.
Noxious Weed Control
A weed control program will be developed that conforms to the requirements of the City of
Bozeman, Gallatin County Wed Control Board Supervisor and NRCS. This program will consist
of an annual visit in June to spot spray where necessary, including trails and sidewalks. Weeds
will be sprayed by a licensed contractor, according to industry and local standards, on a regular
basis, using appropriate applications and products. The utmost care will be taken to protect
water sources, park users and adjacent property owners. The City of Bozeman shall be notified
of any and all applications of pesticides and/or herbicide on public lands. Signs shall be posted
prior to application in appropriate and noticeable locations identifying the product applied and
the date applied. Signs will remain in place for a minimum of two days after treatment.
Records shall be maintained in accordance with State of Montana Pesticide Act, Administrative
Rule 4.10.207 and copies submitted to the City of Bozeman Parks Division.
Fertilization
Fertilization should be minimized to prevent unnecessarily high amounts of nutrients running
off into streams and wetlands on and off the site. No fertilizer should be applied within 50ft of
streams or wetlands to further minimize the potential for contamination through run-off. Trees
and shrubs inside the 50ft buffer should be monitored and if fertilization is necessary, capsule
fertilizer should be used.
Lawns should be fertilized once in spring with a 24-4-24 blend after the last frost and with a 21-
3-21 in mid to late summer. It is recommended that slow release fertilizer be used to prevent
excessive shoot growth and to provide turf nutrition over an extended period. Lawns should be
518
The Cottonwood Project December 3, 2019
Park Master Plan
8
fertilized according to manufacturer standards. Annual soil test should be performed to check
nutrient levels and determine whether changes are necessary.
Outside the 50ft buffer, shade trees should be fertilized in April with a 16-10-9 blend plus iron
and zinc. Other trees should be fertilized with food spikes, but no fertilization of woody
vegetation should occur past mid-July. Trees under one year old should not be fertilized.
Evergreens should be pruned as necessary in June and shade tree pruning should be done in
April, except for birches and maples. Birches and maples should be pruned in mid-July to
prevent bleeding. All trees should be continually monitored for pests and diseases throughout
the growing season. Woody vegetation should be deep watered right before the ground
freezes.
Snow and Leaf Removal
Snow removal will be provided within the park by a snow removal service retained by the
Neighborhood Association. Sidewalks must be cleared within 24 hours after the end of a
snowfall event per Bozeman Ordinance 1529. The Home Owner’s Association will be
responsible for clearing snow on sidewalks, on walks adjacent to Parks and Open Spaces and
the South 19th
boulevard; no snow removal will be performed on the natural fines trails. Leaf
removal will be provided most likely by a landscape contractor or handyman service, as
retained by the Neighborhood Association.
Playground Inspection
Playground inspection should be performed on an annual basis by an independent contractor
certified as a National Certified Playground Safety Inspector. The inspector shall submit a
report to the City of Bozeman Parks and Recreation Department. The Neighborhood
Association is responsible for hiring the independent contractor.
Irrigation System
The irrigation system should be charged in May, after the ground thaws and plants start
growing. The manual drain valves should be turned to the closed position and well pump
power switch turned on. The controller should be programmed for the anticipated water
requirements for the current month. All heads should be checked for breakage and proper
coverage and check on a monthly basis for necessary adjustments. Drip emitters should be
periodically checked, and the entire system should be regularly monitored for line breaks, head
breakage and vandalism.
519
The Cottonwood Project December 3, 2019
Park Master Plan
9
Head replacement should be done with the same brand to ensure efficient coverage for the
system working pressure and dispersal at an equal precipitation rate. The height of heads
should be checked to avoid damage from mowers or maintenance equipment.
Winterization should take place during the last week of October. Power to the well pump
should be shut off and all manual drain valves opened. To flush out the lines, a high-power air
pump shall be connected to the quick coupler valves and air should be run through the system.
Each valve zone should be opened and closed until all water is completely flushed out, then the
controller should be turned off and water left off until spring. Any necessary watering during
the winter months should be done with a tank to prevent damage to the irrigation system.
Animal Control
Pets should always be leashed while in the parks and open space in addition residents must
clean up after their pets. If rodents become a problem with regards to damaging plant material
or posing a health risk to residents or pots, rodent control should be utilized. However, no
poison is permitted on within parkland or open space areas.
Refuse
Refuse within the parks and open space will be collected weekly by a service retained by the
Neighborhood Association or the party responsible for maintenance.
520
The Cottonwood Project December 3, 2019
Park Master Plan
10
Section 2
PARK PLAN DRAWINGS
521
The Cottonwood Project December 3, 2019
Park Master Plan
11
Section 3
SOILS INFORMATION
522
The Cottonwood Project December 3, 2019
Park Master Plan
12
523
The Cottonwood Project December 3, 2019
Park Master Plan
13
524
The Cottonwood Project December 3, 2019
Park Master Plan
14
525
The Cottonwood Project December 3, 2019
Park Master Plan
15
526
The Cottonwood Project December 3, 2019
Park Master Plan
16
Section 4
COMMUNITY CENTER
&
PARK AMENITIES
527
The Cottonwood Project December 3, 2019
Park Master Plan
17
Playground Equipment KOMPAN
SIX SIDED CLIMBING STRUCTURE
Natural, IG
NRO816-1003
528
The Cottonwood Project December 3, 2019
Park Master Plan
18
Thepark
6-Ft.Wooden U- Frame Park Bench -Pressure Treated- Back Model: 398-1206
Specifications- Surface Mount
Thepark
32 Gallon Verona Series Square Trash Receptacle
Item #: 398-9123
529
The Cottonwood Project December 3, 2019
Park Master Plan
19
Thepark
6-Ft. Heavy Duty Wooden Picnic Table- Pressure Treated – Black Frame
Item #: 398-1250
530
The Cottonwood Project December 3, 2019
Park Master Plan
20
Pilot Rock
Utility Table
Item # Utl- 3
Thepark
U Bike Rack
Item #: 509-2000
531
The Cottonwood Project December 3, 2019
Park Master Plan
21
Section 5
COST ESTIMATE
532
MARY LONG ALDERSON PARK BASE COSTS Quantity Unit Unit Cost
Total Item
Cost Contingency TOTAL
Site Preparation
strip site 2" depth / haul off 115,000 sf $0.15 $17,250 $1,725 $18,975
strip / stockpile 6" depth topsoil 115,000 sf $0.15 $17,250 $1,725 $18,975
rough grade 115,000 sf $0.15 $17,250 $1,725 $18,975
spread topsoil + 1" depth amendments 107,100 sf $0.30 $32,130 $3,213 $35,343
fine grade 107,100 sf $0.20 $21,420 $2,142 $23,562
Subtotal $105,300 $10,530 $115,830
Site Landscape
lawn seed 107,100 sf $0.30 $32,130 $3,213 $35,343
irrigation 107,100 sf $1.25 $133,875 $13,388 $147,263
Subtotal $166,005 $16,601 $182,606
TOTAL (base costs within property only - $271,305 $27,131 $298,436
does not include any boulevard improvements)
contingency shown = 10%
SOUTH LINEAR PARK BASE COSTS Quantity Unit Unit Cost
Total Item
Cost Contingency TOTAL
Site Preparation
strip site 2" depth / haul off 70,000 sf $0.15 $10,500 $1,050 $11,550
strip / stockpile 6" depth topsoil 70,000 sf $0.15 $10,500 $1,050 $11,550
rough grade 70,000 sf $0.15 $10,500 $1,050 $11,550
spread topsoil + 1" depth amendments 58,900 sf $0.30 $17,670 $1,767 $19,437
fine grade 58,900 sf $0.20 $11,780 $1,178 $12,958
Subtotal $60,950 $6,095 $67,045
Site Landscape
native grass seed 58,900 sf $0.30 $17,670 $1,767 $19,437
trees 28 ea $250.00 $7,000 $700 $7,700
irrigation 58,900 sf $1.25 $73,625 $7,363 $80,988
asphalt path (8' wide + base prep) 11,200 sf $3.50 $39,200 $3,920 $43,120
Subtotal $137,495 $13,750 $151,245
TOTAL (base costs only) $198,445 $19,845 $218,290
contingency shown = 10%
GRAND TOTAL
Main Park + South Linear Park $469,750 $516,725
The Parks at The Cottonwood Project
Baseline -Draft Statement of Probable Cost - Dec 02, 2019
533
Quantity Unit Unit Cost Total Item Cost
SITE CONSTRUCTION (excludes baseline costs for site prep, grading, topsoil, seed, irrigation)
Landscape
Deciduous Flowering Trees (2.5" caliper) 13 ea $450.00 $5,850
Subtotal $5,850
Other Site Construction
Plaza (scored concrete) 3,240 sf $5.00 $16,200
Concrete seating around play area (8' wide) 920 sf $5.00 $4,600
Concrete perimeter containment curb - play area 106 lf $60.00 $6,360
Asphalt walk (6' wide x 490' long) 2,940 sf $3.00 $8,820
Concrete access drive 790 sf $5.00 $3,950
Subtotal $39,930
Site Amenities and Programming
Shade structure (20' x 30') 1 ea $35,000.00 $35,000
Benches (6' wood) 9 ea $700.00 $6,300
Picnic tables (6' wood) 4 ea $700.00 $2,800
Bike racks 1 ea $800.00 $800
Trash receptacles 1 ea $500.00 $500
Play area (12" depth bark surfacing) 45 cy $60.00 $2,700
Play area (play equipment) 1 ea $30,000.00 $30,000
BBQ stands (charcoal) 2 ea $750.00 $1,500
Subtotal $79,600
TOTAL $125,380
The Park at The Cottonwood Project
Design Concept Plan -Park Improvements-in-Lieu Draft Statement of Probable Costs - Dec 03, 2019
534
The Cottonwood Project December 3, 2019
Park Master Plan
22
Section 6
COTTONWOOD CODE CORRECTION
COTTONWOOD CITY CODE CORRECTION
IN RESPONSE TO
ADDI JADIN MEMORANDUM OCT,21,2019 TO
ADDI JADIN MEMORANDUM OCT,21,2019
535
MEMORANDUM
---------------------------------------------------------------------------------------------------------------------
FROM: ADDI JADIN, PARKS PLANNER AND DEVELOPMENT MANAGER
TO: SUBDIVISION REVIEW COMMITTEE OF RECREATION AND PARKS
ADVISORY BOARD
RE: COTTONWOOD SUBDIVISION PRELIMINARY PLAT APPLICATION 19401
DATE: OCTOBER 10, 2019
--------------------------------------------------------------------------------------------------------------------
The park plan describes parkland and improvements-in-lieu up to the density cap for future
development which is 12 units per acre. Based on the net residential lot area of 16.89 acres, the
parkland required at the time of subdivision for 8 dwelling units per acre is 4.05 acres. The
applicants propose 4.28 acres of land which creates a surplus of 0.23 acres.
Subsequent development requires the balance as cash- or improvements-in-lieu for 4 dwelling
units per acre which is an additional 2.03 acres. The additional land given at subdivision may
count as a credit, resulting in the need for cash- or improvements-in-lieu equivalent of 1.80 acres
at the time of subsequent development. The additional proposal must be reviewed based on city-
accepted market value of land at the time of site plan completion. A note indicating that CIL
equivalents are estimates must be added to the park plan tracking tables.
Phasing notes indicate that a 2.64-acre neighborhood park would be developed in Phase 1, while
the improvements in the linear parks along Farmers Canal would be completed in Phase 2. Staff
does not agree that base park improvements in the linear parks can be deferred beyond the final
plat approval without an improvements agreement. See suggested code correction #5 below.
A recommended motion for Subdivision Review Committee follows the code corrections and
conditions of approval. Any additional comments for applicants/DRC committee will be added to
the memo and provided to applicants following meeting.
The following code corrections are required prior to preliminary plat approval:
1. BMC 38.220.060.A.16. The following elements of the Park Plan must be corrected:
• Please provide park plan drawings as separate, individual electronic sheets so that
resolution of the drawings is legible on a large screen.
• The fair market value of land for cash-in-lieu of parkland purposes is determined at
the time of final plat completion (see comment 2). Please note that valuations are
estimates within the tracking table.
536
2. BMC 38.420.080.B. The park boundary bordering all private lots must be delineated at the
common private/public corner pins in accordance with this section. Delineation is required
between linear parks and private lots.
3. PROST Plan Appendix G: The Developer shall prepare a signage plan for parks and/or trails in
new developments. The signage plan will include: A map(s) showing sign locations. A list of
signs, sign posts and sign totems to be installed, indicating content, materials and location of
each sign.
4. A park name is required prior to park plan adoption. There is guidance in the PROST Plan
(page 11-6) which states that the proposed name must be appropriate to the area or facility
being named; be easy and concise to pronounce; have some historic significance, be a
memorial, etc.; and not be similar to an existing name.
5. BMC 38.420.080.A.1. and 2. At a minimum, all parks must be improved to the standards of
this section (minimum improvements to land dedications and irrigation) prior to final plat.
The additional requirements of 38.420.080 and the PROST Plan may be financially guaranteed
prior to final plat. Phasing comments in the park plan must be updated.
6. BMC 38.420.030.C. The currently adopted fair market value of land is $1.60 per square foot.
The park plan must be updated to reflect the fair market value at the time of final plat
completion. The next appraisal is scheduled for March 2020.
The following code corrections are required prior to final plat approval:
7. BMC 38.220.060.A.16. The following elements of the Park Plan must be corrected:
• Remove open space, boulevard, and detention pond landscaping sheets and notes
from the park plan submittal.
• Irrigation and water supply must be designed so that the system for parks is separate
from that for open space, boulevards, or other private lots.
8. BMC 38.420.030.D. Where a cash donation has been accepted in-lieu of land dedication, the
amount of cash donation must be stated on the final plat or plan as appropriate.
9. After the proposal is approved or conditionally approved by the City Commission, the
applicant must submit 2 copies of the new or amended park master plan to the Planning
Department.
Conditions of Approval:
10. Condition of Approval: When a park master plan is being prepared for a newly dedicated park,
as part of the subdivision review process, the Planning Department will prepare a resolution
and schedule it for City Commission consideration.
537
11. Condition of Approval: Condition #8 on preliminary plat sheet 3 of 3 states that open space
maintenance will be the responsibility of parks upon adoption of a parks and trails district.
The condition must be removed.
12. Condition of Approval: Park improvements from 38.420.080 and the PROST Plan must be
completed prior to final plat approval or an improvements agreement is required. Applicants
may not financially guarantee the requirements from 38.420.080.A.1 and 2.
13. Condition of Approval: Perimeter fencing of the park at boundary with land outside the
subdivision is required.
14. Condition of Approval: The drive access serving the pavilion must be signed as a loading zone
and requires approval by engineering for separation from the intersection.
• Advisory comment: Moving the access to the north of the pavillion may allow for back-
in loading which may be preferred for pedestrian safety.
15. Condition of Approval: Any significant changes to the park plan must be reviewed by the
Subdivision Review Committee prior to final plat approval.
Recommended Motion:
Having reviewed and considered the application materials, staff memo, public comment, and
all information presented, I hereby adopt the findings presented in the staff memo for
application 19401 and move to recommend approval to the City Commission of the Park
Master Plan for Cottonwood Subdivision subject to conditions and all applicable code
provisions.
538
COTTONWOOD CODE CORRECTION IN RESPONSE TO ADDI JADIN
MEMORANDUM OCT,21,2019
Date: December 3, 2019
RE: Cottonwood Subdivision Preliminary Plat Application 19401
Code corrections required prior to preliminary plat approval:
1. Design 5 drawings have been individualized into 3 separate sheet sets:
• Mary Long Alderson Park
• Linear Park
• Open Space and Boulevards
2. The park boundary bordering all private lots is delineated by park boundary pins, see Mary
Alderson Park sheet set, L201: Park Boundary
3. Park signage:
• Mary Long Alderson Park: See sheet L200: Hardscape Plan
• Linear Park: See sheet L000, Keynote 14
4. Mary Long Alderson is the adopted central park name.
5. Acknowledged
6. Park fair market value of land has been updated to $1.60 per foot
7. Acknowledged
• Open space, boulevard, and detention pond landscaping sheets have been removed from
park plan submittal
• Irrigation and water supply well for Mary Long Alderson and Linear Park located on Linear
Park parcel. See Linear Park sheet set, L100: Keynote 4
8. See Civil
9. Acknowledged
10. Acknowledged
11. See Civil
12. Acknowledged
13. Existing fences line the perimeters of the subdivision.
14. See Civil
• Westside access road has been realigned for better vehicle access.
15. Acknowledged
539
5
5
10
9
8 7
3
L701 NTS
Drip for Trees and Large Shrubs
GALVANIZED TIE
DOWN STAKE:
PRESSURE
COMPENSATING
EMITTER MODULE
1
4" VINYL
DISTRIBUTION TUBING
DIFFUSER BUG CAP
TREE
XERI-TUBE 700
COMPRESSION
ADAPTER
PVC FITTING AND RISER
PVC LATERAL PIPE
COMPRESSION FLUSH
TREE PLAN
DIFFUSER BUG CAP:
1
4" TUBING STAKE:
MULCH AS SPECIFIED
WEED CONTROL FABRIC
1
4" VINYL DISTRIBUTION
TUBING
XERI-TUBE 700
SINGLE-OUTLET EMITTER
TREE SECTION
NOTE:
1. DIRECT TWO (2) 1GPH EMITTERS PER SHRUB AND FOUR (4)
1GPH EMITTERS PER TREE
2. EMITTERS SHOULD BE PLACED INSIDE TREE WELL, HALFWAY
BETWEEN THE BASE OF THE TREE AND EDGE OF ITS
CANOPY.
3. RUN XERI-TUBE 700 DISTRIBUTION TUBING NO MORE THAN
250' LENGTH
4. RUN 1
4" VINYL DISTRIBUTION TUBING NO MORE THAN 5'
LENGTH
Irrigation
Details
L 701
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l700_the cottonwood project_irrdetails.dwg
The Cottonwood Project
Bozeman, Montana
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
396
HEIGHT 6' ABOVE GRADE
RUN LEAD WIRES
TO CONTROLLER
3
L700 NTS
Mini Weather Station - Hunter or Equivalent 4
L700 NTS
Quick Coupler
NOTE:
FINISH GRADES AT VALVE BOXES MUST BE AT A LEVEL SUCH THAT
THE ESTABLISHED TURF OR MULCH SURFACE WILL FLUSH WITH THE
TOP OF THE BOX.
QUICK COUPLING VALVE:
RAINBIRD HQ44-RC OR EQUIVALENT
6" ROUND VALVE BOX WITH
LOCKING LID
3 INCH MINIMUM DEPTH OF
3
4" WASHED GRAVEL
BRICK (1 OF 2)
PVC SCH. 80 NIPPLE
PVC 1X1 TXT COUPLING LASCO
G132212 SWING JOINT
PVC OR POLY MAINLINE PIPE
PER PLAN
36" #4 REBAR WITH STAINLESS
STEEL GEAR CLAMPS
FINISH GRADE.
T CHRISTY ID. TAG
REMOTE CONTROL VALVE
SCH 80 PVC SOLVENT WELDED UNIONS
SCH 40 PVC OR POLY PIPE LATERAL LINE
9
L700 NTS
Irrigation Control Valve - TURF
STANDARD VALVE BOX WITH LOCKING LID
FINISH GRADE - SEE NOTE
WATERPROOF DBR/DBY CONNECTIONS (2)
18-24" COILED WIRE
SCH. 80 TOE NIPPLE
SCH. 40 FITTINGS
BRICK SUPPORTS (4)
3
4" MINUS WASHED GRAVEL
NOTE:
FINISH GRADES AT VALVE BOXES MUST BE AT A LEVEL SUCH THAT
THE ESTABLISHED TURF OR MULCH SURFACE WILL FLUSH WITH THE
TOP OF THE BOX.
18"
18" 12" 18" 12"
18"
5
L700 NTS
Trenching Details
FINISH GRADE
LATERAL
LATERAL
MAIN LINE
BEDDING
LOW VOLTAGE WIRE
LOW VOLTAGE WIRE
SECTIONS
PLANS
SNAKE ALL
LATERAL PIPE
IN TRENCH
TAPE AND BUNDLE ALL WIRING AT 10'
INTERVALS. USE 6" WIDE MARKING TAPE 6"
ABOVE ALL DIRECT BURIAL WIRING. ALL
SPLICES SHALL BE MADE IN VALVE BOXES
AND LOCATED ON AS-BUILT PLANS.
ALL 120V. WIRING SHALL BE IN CONDUIT WITH
MARKER TAPE AS ABOVE. ALL WIRING UNDER
PAVEMENT AND THROUGH SLEEVES SHALL BE
IN CONDUIT.
TIE A LOOSE 20" LOOP IN WIRING AT ALL
CHANGES IN DIRECTION GREATER THAN 30
DEGREES. UNTIE ALL LOOPS AFTER MAKING
CONNECTIONS
FINISH GRADE
MARKING TAPE
TIES
LOOP
DIRECT BURY
SECTION
CONDUIT
SECTION
DIRECT BURY PLAN CONDUIT PLAN
FINISH GRADE
SCH. 40 PVC SLEEVE - 4" MIN. OR 2X THE O.D.
OF THE IRRIGATION PIPING
WRAP 12 GAUGE WIRE AROUND EACH END
OF THE SLEEVE AND EXTEND TO THE
SURFACE
WASHED AND GRADED MORTAR
SAND BACKFILL IN ROCKY SOIL.
PAVEMENT EDGE
6
L700 NTS
Irrigation Sleeve
NOTE:
1. CAP SLEEVES UNTIL USE.
2. 4" MIN. HORIZONTAL SEPARATION REQUIRED BETWEEN SLEEVES
IN THE SAME TRENCH.
3. IRRIGATION PIPE AND CONTROL WIRES SHALL BE SLEEVED
SEPARATELY.
4. SOIL AROUND SLEEVE BACKFILLED AND COMPACTED TO THE
SAME DENSITY AS THE SURROUNDING SOIL.
DEPTH PER TRENCHING DETAIL
EQ. EQ.
7
L700 NTS
Valve Box Layout
IRRIGATION CONTROL
VALVE BOX
PROVIDE EQUAL SPACING
BETWEEN BOXES
EDGE OF PAVEMENT
ALIGN BOXES PARALLEL
TO THE EDGE OF
PAVEMENT
PLACE BOXES A MINIMUM
OF ONE (1) FOOT FROM
EDGE OF PAVEMENT
NOTE:
GROUP SIMILAR BOX TYPES AND SIZES TOGETHER, I.E. PLACE
RECTANGULAR OR ROUND BOXES TOGETHER.
1' MIN.
NIBCO T-113 BRONZE GATE VALVE
OR EQUIVALENT
SCH 40 MALE ADAPTOR
FINISH GRADE
10" VALVE BOX W/LOCKING LID
SCH 40 PVC MAIN LINE
8
L700 NTS
Isolation Valve
NOTE:
FINISH GRADES AT VALVE BOXES MUST BE AT A LEVEL SUCH THAT
THE ESTABLISHED TURF OR MULCH SURFACE WILL FLUSH WITH THE
TOP OF THE BOX.
10
L700 NTS
Irrigation Valve Bank Layout, typ.
NOTES:
- STANDARD BOX TO ACCOMMODATE 4 VALVES
- VALVE BANKS TO BE CONSTRUCTED TO LOCAL CODES AND
STANDARDS.
- LATERALS MAY BE PE PIPE WITH SCH. 80 FITTINGS FIRMLY SECURED
WITH OETIKER CLAMPS
- IF PE PIPE IS USED FOR LATERAL LINES 2 OETIKER CLAMPS TO BE USED
AT EACH VALVE OUTLET CLAMPED AT MIRRORED ANGLES TO INSURE
SECURE GRIP, SEE OETIKER CONNECTION DETAIL
S X S X T SCH. 40 TEE
TO MAINLINE BELOW
STANDARD VALVE BOX
SCH 80 THREADED NIPPLE
WITH TEFLON TAPE
S X T COUPLER WITH TEFLON
TAPE AND PVC SOLVENT
LATERAL LINE
11
L700 NTS
Polyethylene Lateral Line at Valve Connection (Oetiker connections)
SCH. 80 THREAD TO BARB ADAPTER
THREADED END TO BE TEFLON WRAPPED
OETIKERS (2) CLAMPED ON OPPOSING SIDES
POLY PIPE LATERAL IRRIGATION LINE
(1" TYP.)
OETIKERS (2) CLAMPED ON OPPOSING SIDES
MODEL PROS-04 OR EQUIVALENT
LATERAL PIPE
FINISH GRADE
LATERAL TEE OR ELL
SWING JOINT:
RAINBIRD SA125050 OR EQUIVALENT
1
L701 NTS
Hunter Pro Spray or Equivalent
NOTE:
FINISH GRADES AT VALVE BOXES MUST BE AT A
LEVEL SUCH THAT THE ESTABLISHED TURF OR
MULCH SURFACE WILL FLUSH WITH THE TOP OF THE
BOX.
Irrigation
Details
L 700
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l700_the cottonwood project_irrdetails.dwg
The Cottonwood Project
Bozeman, Montana
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
395
BAI
AMU
AMU
SPR
BAI
BAI
BAI
SPR
SPR
SPR
SPR
SPR
SPR SPR
SPR
SPR
SPR
SPR
8'
AMU
AMU
BAI
BAI
BAI
SPR
SPR
BAI
BAI
BAI
AMU
SPR
SPR
BAI
BAI
BAI
BAI
SPR
SPR
BAI
BAI
BAI
BAI
BAI
BAI
SPR
AMU
AMU
BAI
BAI
WES
HIG
SNO
PRA
PRA
PRA
PRA
PRA
PRA
PRA
PRA
SPR
W
W
BF
C
CP
BF
C
CP
WELL 1
WELL 2
1345'-11"
1345'-11"
IRRIGATION
TYPE
IRRIGATION SCHEDULE
TOTAL
AREA / QTY
ANNUAL
ET RATE
TOTAL
ANNUAL H2O
38,240 SF 29 IN / SF 690,882 GAL
H.E. BLVD
SPRAY IRRIGATION
165,933 SF 29 IN / SF 2,997,912
H.E. ROTARY
PARKS
SPRAY IRRIGATION
H.E. TREE
BUBBLER
146 TREES 2,409 GAL /
WEEK
43,362 GAL
H.E. SHRUB
DRIP IRRIG.
40 SHRUBS 300 GAL /
WEEK
5,400 GAL
TOTAL ANNUAL H2O REQUIRED: 4,402,764 GAL
TOTAL ACRE FEET PER YEAR: 13.51 ACRE
FEET
36,819 SF 29 IN / SF 665,209 GAL
H.E. ROTARY
OPEN SPACE
IRRIGATION
SYMBOL DESCRIPTION SIZE DETAIL
IRRIGATION LEGEND
BF BACKFLOW PREVENTER 1" 2, L701
C IRRIGATION CONTROLLER* 1,3, L701
WEATHER STATION, LOCATION TBD IN
FIELD
1,3, L701
CONNECTION POINT
WELL SEE
PLAN
W
CP
IRRIGATION SLEEVE, 4" MIN. SCH 40 PVC 6, L701
***NOTES:
- LAYOUT TO BE DETERMINED IN FIELD BY IRRIGATION CONTRACTOR.
- WELL TO BE 100' FROM SANITARY SEWER LINES.
*ALL IRRIGATION CONTROLLERS NEED TO BE “WEATHERMATIC" SL
SERIES UNLESS OTHERWISE APPROVED BY THE CITY'S PARK OPS SUPT.
VERIFY MODEL AND TYPE WITH BOZEMAN PARKS AND REC.
CONTACT DAVE DELANGE AT HD FOWLER FOR MODEL NUMBERS AND
MORE DETAILS: DAVEDE@HDFOWLER.COM
W
SEE
PLAN
IRRIGATION NOTES AND SPECIFICATIONS
1. ALL VALVE BOXES TO BE STANDARD SIZE OR LARGER
2. IRRIGATION MAIN LINE TO BE 2" SCH 40 PVC PIPE OR 150 PSI POLY PIPE
3. ALL TREES TO BE IRRIGATED THROUGH DEDICATED BUBBLERS EVENLY DISTRIBUTED AROUND BASE OF
TREE WITH FOUR (4) EVENLY SPACED 1 GPH BUBBLER EMITTERS.
4. **BUBBLERS TO TREES MUST BE INSTALLED PER INDIVIDUAL PLANT REQUIREMENTS.
5. LAWN AND SEED AREAS TO BE IRRIGATED WITH SPRAY OR ROTOR OVERHEAD IRRIGATION AS
INDICATED PER PLAN.
6. ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE.
7. SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR.
8. BACKFLOW ASSEMBLY AND BLOWOUT ASSEMBLY SHALL BE LOCATED IN EXTERNAL GRADEBOX, AND IS
THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO COORDINATE INSTALLATION PER LOCAL
CODES AND ORDINANCES, WITH ARCHITECTURE AND WITH ALL OTHER TRADES.
9. POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICAL ENGINEERING
AND ELECTRICAL CONTRACTOR BY LANDSCAPE CONTRACTOR.
10. DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADE CHANGES ARE
PRESENT.
11. ALL INFORMATION TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION.
12. THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT 'AS-BUILT' IRRIGATION PLAN ON SITE AT
ALL TIMES. CONTRACTOR TO PROVIDE CITY WITH "AS BUILT" PLAN UPON INSTALLATION COMPLETION.
13. ALL SPRAY AND ROTOR HEADS WITHIN SOD LAWN AREAS TO PROVIDE A PRECIPITATION RATE OF
0.4-0.8"/sqft.
0 50 100 200
N
1
L600 1"=100'-0"
Irrigation Plan
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l600 cottonwood project_irrigationbase.dwg
The Cottonwood Project
Bozeman, Montana
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
Irrigation Methods
& Calculations
L 600
COTTONWOOD ROAD
W. GARFIELD ST.
LOYAL DRIVE
STAFFORD AVE.
ALPHA DRIVE
RESORT DRIVE
PHASE 2
PHASE 2
PHASE 2
PHASE LINE
PHASE LINE
PHASE 2
PHASE 1
PHASE 1
394
2X DIAMETER OF ROOT BALL
Ball and Burlap Deciduous Tree Planting Detail
L500 3/8"=1'
2
*NOTE: ALL DECIDUOUS SHRUBS AND TREES
TO BE FENCED FOR UNGULATE AND OTHER
HERBIVORE PROTECTION.
EXCAVATE HOLE
2X DIAMETER OF ROOT BALL
PRUNE TREE TO REMOVE
DEAD OR DAMAGED LIMBS AND
BRANCHES
TREE STAKES AND TIES
AS SHOWN. STAKES SHALL
BE DRIVEN INTO EXISTING,
UNDISTURBED SOIL AND
SHALL NOT PENETRATE THE
ROOT BALL. STAKES TO BE
REMOVED AFTER TWO YEARS.
FINISHED ELEVATION OF TREE
CROWN TO BE MIN 3" AND
MAX 6" ABOVE FINISHED GRADE
CIRCULAR SWALE TO RING TREE,
3' DIAMETER WITH 3" HIGH
MOUNDED RING OF SOIL
BURLAP TO BE REMOVED
FROM TOP 1
3 OF ROOT BALL.
REMOVE WIRE CAGE
FOLLOWING PLANTING.
1
3 NATIVE SOIL WITH
1
3 SANDY
LOAM AND 1
3 DEBRIS FREE
TOPSOIL.
AMENDED SOIL,
MOUND TO
ELEVATION OF
CROWN
ORIGINAL
GRADE
Coniferous Ball and Burlap Planting - On Slope
L500 3/8"=1'
3
EXCAVATE HOLE
2X DIAMETER OF ROOT BALL
PRUNE TREE TO REMOVE
DEAD OR DAMAGED LIMBS AND
BRANCHES
TREE STAKES AND TIES
AS SHOWN. STAKES SHALL
BE DRIVEN INTO EXISTING,
UNDISTURBED SOIL AND
SHALL NOT PENETRATE THE
ROOT BALL. STAKES TO BE
REMOVED AFTER TWO YEARS.
FINISHED ELEVATION OF TREE
CROWN TO BE MIN 3" AND
MAX 6" ABOVE FINISHED GRADE
CIRCULAR SWALE TO RING TREE,
3' DIAMETER WITH 3" HIGH
MOUNDED RING OF SOIL
BURLAP TO BE REMOVED
FROM TOP 1
3 OF ROOT BALL.
REMOVE WIRE CAGE FOLLOWING
PLANTING.
1
3 NATIVE SOIL WITH
1
3 SANDY LOAM
AND 1
3 DEBRIS FREE TOPSOIL.
AMENDED SOIL,
MOUND TO
ELEVATION OF
CROWN
ORIGINAL
GRADE
Ball and Burlap Deciduous Tree Planting Detail - On Slope
L500 3/8"=1'
4
*NOTE: ALL DECIDUOUS SHRUBS AND TREES
TO BE FENCED FOR UNGULATE AND OTHER
HERBIVORE PROTECTION.
PAVEMENT EDGE - SEE PLANS
AND PAVING DETAILS FOR
ADDITIONAL INFORMATION. SEE
ALSO EDGING DETAILS AS
APPLICABLE.
3
4" MINUS WASHED AGGREGATE
BASE MATERIAL UNLESS
OTHERWISE NOTED. SEE
PAVING DETAILS FOR BASE
MATERIAL DEPTH
PREPARED SUBGRADE. REMOVE
ALL STONES OR OTHER DEBRIS
GREATER THAN 1" DIA. AND TILL
EXISTING SOIL MIN. 4" BEFORE
ADDING TOPSOIL OR
AMENDMENTS.
1"REVEAL - SEE NOTE 2
NOTE:
1. SLOPE PLANTED AREAS AWAY FROM PAVED AREAS
2. FINISH GRADES AT PAVEMENT EDGES MUST BE AT A LEVEL SUCH THAT
THE ESTABLISHED TURF SURFACE WILL BE ONE (1) INCH BELOW TOP OF
PAVEMENT FOR A MINIMUM DISTANCE OF SIX (6) FEET FROM THE EDGE.
3. CONTRACTOR SHALL PROVIDE A 6" MINIMUM DEPTH OF TOPSOIL WITH
1" COMPOST TILLED IN ON ALL LAWN AREAS. TOPSOIL SHALL BE DRUM
ROLLED OR TRACK-PACKED AND GRADED SMOOTHLY AND EVENLY.
6" MIN. TOPSOIL. SEE NOTE 3
SLOPE
SEED/SOD PER PLAN
Sod/Seed Planting at Pavement Edge
L500 3/4"=1'
6
BOULDER PER PLAN
FINISHED GRADE
COMPACT AGGREGATE
BASE, 3" DEPTH
NATIVE SOIL
1/2 TO 1/3 OF BOULDER TO BE
BURIED BELOW FINISH GRADE.
Boulder Detail
L500 1"=1'
9
NOTE: ALL SIDEWALK JOINTS TO BE TOOLED, SEE CIVIL ALSO.
4" CONCRETE SLAB
#4 REBAR 24" OC
1
4" W X
1
2" D HAND TOOLED
CONTROL JOINT WITH ROUND
EDGES AND RECESSED SEALANT
IF NECESSARY
BUTT TYPE CONSTRUCTION JOINT
WITH 1
8" RADIUS
BROOM FINISH
1
2" DIAMETER X 12" L TIE BARS.
2' OC. PREVENT BONDING
3
4" MINUS WASHED AGGREGATE
BASE MATERIAL UNLESS OTHERWISE
NOTED
COMPACTED SUBGRADE
Concrete Slab Detail
L500 3/4"=1'
7
NATIVE GRASS SEEDING PER PLAN
TREES AND SHRUBS TO BE PLANTED IN NATURALIZED
GROUPING PER PLAN. ALL TREES AND SHRUBS TO BE
PLANTED ABOVE ANY PERMANENT WATER LINE.
SEE CIVIL FOR DETENTION POND DEPTH AND GRADING
BOULDERS TO BE PLACED IN NATURALIZED
GROUPINGS PER PLAN ALONG DETENTION
POND BANK
Detention Pond Cross Section Typ.
L500 3/16"=1'
11
MAX 4:1 SLOPE
6' AND 8'
1'
3" ASPHALT
4"-6"
3
4" CRUSHED ROCK
COMPACTION TO 95%
TOPSOIL
NOTES: NATIVE SOIL
1. CENTRAL PARK TRAIL - 6'
2. LINEAR TRAIL - 8'
3. PROST GUIDELINES FOR
ASPHALT INSTALLATION
Asphalt Trails Detail
L500 1/2"=1'
8
PRUNE SHRUB TO REMOVE
DEAD OR DAMAGED LEAVES
AND BRANCHES
ELEVATION OF SHRUB
CROWN TO BE 3" ABOVE
FINISHED GRADE ELEVATION
CIRCULAR SWALE TO RING
SHRUB, 2' DIAMETER WITH 3"
HIGH MOUNDED RING OF SOIL
ALL CONTAINMENT MATERIALS
AROUND ROOTS TO BE REMOVED
PRIOR TO INSTALLATION
1
3 NATIVE SOIL WITH
1
3 SANDY
LOAM AND 1
3 DEBRIS FREE
TOPSOIL.
EXCAVATE HOLE
Shrub Planting Detail 2X DIAMETER OF ROOT BALL
L501 3/4"=1'
5
*NOTE: ALL DECIDUOUS SHRUBS AND TREES
TO BE FENCED FOR UNGULATE AND OTHER
HERBIVORE PROTECTION.
5'-0"
8'-0"
6" CURB
SCORE LINE
SCORE LINE
6'-0"
CONC
SIDEWALK
1'-0"
LAWN
PARKWAY
STRIP
PROPERTY LINE
ASPHALT
TRAIL
CONCRETE
EXTENSION
Concrete Extension to Asphalt Detail
L500 1"=1'
10
Landscape Details
L 500
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l500 linear park_details.dwg
Linear Park
The Cottonwood Project
Bozeman, Montana
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
392
PLAN
3 6'-12' 6'-8'
SALIX GEYERIANA
GEYER WILLOW
PER
PLAN
1 15' 8'
PRUNUS VIRGINIANA
NATIVE CHOKECHERRY
SHRUBS
5 GAL
5 GAL
POT
POT
CORNUS SERICEA
RED OSIER DOGWOOD 5 GAL POT 3 6'-9' 6'-10'
SPR
PER
PLAN
TREES
SYMBOL SIZE TYPE SPACING # MATURE
HEIGHT
MATURE
SPREAD
BOTANICAL NAME
COMMON NAME
PLANTING SCHEDULE - WEST DETENTION POND
2" CAL B&B 1 40'-50' 20'-30'
MALUS 'SPRING SNOW' PER PLAN
SPRING SNOW CRABAPPLE
89° 53' 58" E - 412.49'
HIG
HIG
8'
Linear Park
Planting Plan
L 300
1
L301 1"=10'-0"
East Detention Pond Planting Plan
N
0 5 10 20
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l000_linear park_landscape.dwg
Linear Park
The Cottonwood Project
Bozeman, Montana
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
391
BLUEBUNCH WHEATGRASS (PSUEDOROGNERIA SPICATA)
"SHERMAN" BIG BLUE (PAO SECUNDA)
140 SF
SEED SCHEDULE
LINEAR PARK
LINEAR PARK SEED MIX
PERENNIAL RYEGRASS
GLADE KENTUCKY BLUEGRASS
BARON KENTUCKY BLUEGRASS
PENN CREEPING RED FESCUE
30%
30%
30%
10%
***NOTE:CURRENT SF #'S ARE APPROXIMATIONS AND MAY CHANGE
SLIGHTLY. ANY AREAS OF DISTURBANCE DURING CONSTRUCTION
ARE TO BE RESEEDED.
40%
20%
10%
10%
10%
10%
*** SEED RATE=.75#/sq/ft
48,300 SF
LANDSCAPE INSTALL NOTES
1. PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT.
2. PLACE ALL BOULDERS WITH LANDSCAPE ARCHITECT PRESENT.
3. ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERY STOCK.
4. VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.
5. NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT.
ALL REQUESTS SHOULD BE SUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE. 406-587-4873 OR
TROY@DESIGN5LA.COM.
6. LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINED
INTERVALS TO DISCUSS PROGRESS, QUESTIONS, AND PRODUCT PLACEMENT.
7. TURF GRASS SEED AREAS TO HAVE 6" MINIMUM TOPSOIL.
8. NATIVE SEED AREAS SHALL HAVE A MINIMUM OF 3" TOPSOIL.
9. ALL NATIVE SOIL IN PLANTING BEDS SHALL BE TILLED TO A DEPTH OF AT LEAST 12" AND GRADED
SMOOTHLY.
10. ALL TREES SHALL BE STAKED FOR A MINIMUM OF 2 YEARS. REMOVE STAKES AFTER 2 YEARS.
11. ALL TREES AND OTHER SIGNIFICANT LANDSCAPING FEATURES MUST BE PLANTED A MINIMUM OF 10' OF
SEPARATION FROM WATER AND SEWER SERVICES. VERIFY IN FIELD.
12. ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLAN ARE
TO BE RECLAIMED AND RE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, VERIFY DISTURBANCE AREA IN
FIELD.
13. PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPE
INSTALLATION VIA WATER EFFICIENT HEADS. IRRIGATION TO BE INSTALLED IN ACCORDANCE WITH ALL
STATE AND LOCAL CODES AND ORDINANCES. ALL TREES AND SHRUBS TO RECEIVE DIRECT IRRIGATION VIA
DRIP OR BUBBLERS.
14. EACH TREE IS TO BE MULCHED IN A 3' DIAMETER RING WITH SHREDDED CEDAR MULCH AS PER CITY
STANDARDS.
15. ALL DECIDUOUS SHRUBS TO BE FENCED
Linear Park
Planting Plan
0 10 20 40 L 300
N
3
L300 1"=20'-0"
Linear Park Planting Plan
MATCHLINE L300:2
MATCHLINE L300:1
MATCHLINE L300:3
0 10 20 40
N
2
L300 1"=20'-0"
Linear Park Planting Plan
0 10 20 40
N
1
L300 1"=20'-0"
Linear Park Planting Plan
MATCHLINE L300:2
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l000_linear park_landscape.dwg
Linear Park
The Cottonwood Project
Bozeman, Montana
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
390
DETAIL 8
PROPERTY LINE
CONCRETE SIDEWALK
PARK BENCH,
SEE SHEET L501,
DETAIL 1
CONCRETE
EXTENSION, SEE
SHEET L500,
DETAIL 10
VISION TRIANGLE
8' ASPHALT TRAIL,
SEE SHEET L500,
DETAIL 8
CONCRETE
EXTENSION,
SEE SHEET
CROSSWALK L500, DETAIL 10
DETENTION
POND, SEE
SHEET L301 &
L500, DETAIL 11
EAST WELL TO SERVICE
SERVICE LINEAR AND M.L.
ALDERSON PARK
8' ASPHALT TRAIL,
SEE SHEET L500,
DETAIL 8
CONCRETE
EXTENSION,
SEE SHEET
L500, DETAIL 10
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l000_linear park_landscape.dwg
Linear Park
The Cottonwood Project
Bozeman, Montana
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
389
L300- Linear Park Planting Plan
L301- Detention Pond Planting Plan
L500- Landscape Details
L501- Landscape Details
PARK BENCH #398-1206 ON CONCRETE PAD, SEE SHEET 501, DETAIL 1
KEYNOTES
PROPOSED OVERHEAD LIGHTING, SEE CIVIL
8' ASPHALT TRAIL, SEE SHEET L500, DETAIL 8
EAST WELL TO SERVICE LINEAR PARK, DEDICATED WELL LOCATED
ON LINEAR PARK PARCEL
STAFFORD AVE. CROSSING
RESORT DR. CROSSING
CONCRETE EXTENSIONS, SEE SHEET L500, DETAIL 10
1
2
3
4
5
6
7
DETENTION POND, SEE SHEET 301 & 500, DETAIL 11
CONCEPT FUTURE ROAD
IRRIGATION DITCH
PROPERTY LINE
8
9
10
11
LINEAR PARK TREE PLANTING: 1 TREE/ 50'
CLUSTER FOR VISUAL INTEREST AND SHADE
13
12 PHASE LINE: PHASE 1 - NORTH OF PHASE LINE
PHASE LINE: PHASE 2 - SOUTH OF PHASE LINE
14 FUTURE TRAIL HEAD SIGN LOCATION. TO BE COORDINATED W/ GVLT
15 EXISTING FENCE ALONG PERIMETER
ALL LAWN AREAS TO RECEIVE PERMANENT IRRIGATION VIA WATER
EFFICIENT HEADS. ALL TREES AND SHRUBS TO RECEIVE DIRECT
IRRIGATION VIA DRIP OR BUBBLERS.
16
SYMB. PRODUCT QTY. DESCRIPTION CONTACT
SITE AMENITY SCHEDULE
LINEAR PARK
PARK BENCH 4 THEPARK - MODEL 398-1206, 6' WOODEN
U-FRAME PARK BENCH . PRESSURE TREATED
WOOD . FRAME - POWDERCOAT COLOR TO BE
BLACK. SURFACE MOUNT
NOTE:
1. ALL AMENITIES TO BE AS SPECIFIED OR APPROVED EQUAL.
2. ALL AMENITIES TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
W IRRIGATION
WELL
IRRGATION WELL TO BE SELECTED BY
OWNER AND IRRIGATION CONTRACTOR, MUST
COMPLY WITH STATE AND LOCAL
REGULATIONS.
1 BY OWNER
THEPARK
1-866-293-8528
www.theparkcatalog.com
PRODUCT DESCRIPTION
BLUEGRASS
SEED MIX
QTY.
AVAILABLE AT CIRCLE S SEED,
RECOMMENDED DRILL SEEDING RATE OF 10
LBS/1000 SQFT. FOR BEST RESULTS DRILL
SEED IN 4 DIRECTIONS.
48,300 SF
STORMWATER
SEED MIX
SEE PLANTING PLAN FOR ADDITIONAL
140 SF INFORMATION
MOSS ROCK
BOULDERS
6 ROUND IN CHARACTER, LICHEN COVERED
BOULDERS TO BE 36" IN DIAMETER.
PLACEMENT PER PLAN. AVAILABLE AT SELECT
STONE; SELECTSTONE.COM
TRAFFIC AND
PEDESTRIAN
SIGNS
TBD SEE CIVIL PLANS FOR ADDITIONAL
INFORMATION
SITE MATERIALS SCHEDULE
LINEAR PARK
SYMBOL
8' ASPHALT
MULTI-USE
PATH
1,200 LF
GAS GAS
SS SS SS SS
W W W W
UE UE UE UE
LINE TYPE LEGEND
GAS LINE
SEWER LINE
WATER LINE
UNDERGROUND POWER
PROPERTY LINE
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
W
B B
PARK BLVD.
1729.38'
PARK BLVD.
1729.38'
PARK BLVD.
1729.38'
PARK BLVD.
1729.38'
WES
HIG
SNO
WES
WES
HIG
WES
WES
WES
HIG
WES
WES
HIG
HIG
HIG
SNO
SPR
SPR
SPR
8'
WES
HIG
SNO
PRA
PRA
PRA
PRA
PRA
PRA
PRA
PRA
SPR
1
1
1
1
3
4
7
8
11 9
12
12
10
3
13
6
7
10
3
13
11
11
5
2
14
14
15
2
16
16
13
TYPE SF
PARK AREA CALCS
LINEAR PARK
ACRES
PARK 30,397 SF .70 ACRES
DETENTION POND 140 SF .0032 ACRES
Overall
Linear Park Site
Plan
0 25 50 100 L 100
N
1
L100 1" = 50'-0"
Overall Linear Park Site Plan
STAFFORD AVE.
RESORT DR.
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l000_linear park_landscape.dwg
Linear Park
The Cottonwood Project
Bozeman, Montana
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
388
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
387
2X DIAMETER OF ROOT BALL
Ball and Burlap Deciduous Tree Planting Detail
L500 3/8"=1'
2
*NOTE: ALL DECIDUOUS SHRUBS AND TREES
TO BE FENCED FOR UNGULATE AND OTHER
HERBIVORE PROTECTION.
EXCAVATE HOLE
2X DIAMETER OF ROOT BALL
PRUNE TREE TO REMOVE
DEAD OR DAMAGED LIMBS AND
BRANCHES
TREE STAKES AND TIES
AS SHOWN. STAKES SHALL
BE DRIVEN INTO EXISTING,
UNDISTURBED SOIL AND
SHALL NOT PENETRATE THE
ROOT BALL. STAKES TO BE
REMOVED AFTER TWO YEARS.
FINISHED ELEVATION OF TREE
CROWN TO BE MIN 3" AND
MAX 6" ABOVE FINISHED GRADE
CIRCULAR SWALE TO RING TREE,
3' DIAMETER WITH 3" HIGH
MOUNDED RING OF SOIL
BURLAP TO BE REMOVED
FROM TOP 1
3 OF ROOT BALL.
REMOVE WIRE CAGE
FOLLOWING PLANTING.
1
3 NATIVE SOIL WITH
1
3 SANDY
LOAM AND 1
3 DEBRIS FREE
TOPSOIL.
AMENDED SOIL,
MOUND TO
ELEVATION OF
CROWN
ORIGINAL
GRADE
Coniferous Ball and Burlap Planting - On Slope
L500 3/8"=1'
3
EXCAVATE HOLE
2X DIAMETER OF ROOT BALL
PRUNE TREE TO REMOVE
DEAD OR DAMAGED LIMBS AND
BRANCHES
TREE STAKES AND TIES
AS SHOWN. STAKES SHALL
BE DRIVEN INTO EXISTING,
UNDISTURBED SOIL AND
SHALL NOT PENETRATE THE
ROOT BALL. STAKES TO BE
REMOVED AFTER TWO YEARS.
FINISHED ELEVATION OF TREE
CROWN TO BE MIN 3" AND
MAX 6" ABOVE FINISHED GRADE
CIRCULAR SWALE TO RING TREE,
3' DIAMETER WITH 3" HIGH
MOUNDED RING OF SOIL
BURLAP TO BE REMOVED
FROM TOP 1
3 OF ROOT BALL.
REMOVE WIRE CAGE FOLLOWING
PLANTING.
1
3 NATIVE SOIL WITH
1
3 SANDY LOAM
AND 1
3 DEBRIS FREE TOPSOIL.
AMENDED SOIL,
MOUND TO
ELEVATION OF
CROWN
ORIGINAL
GRADE
Ball and Burlap Deciduous Tree Planting Detail - On Slope
L500 3/8"=1'
4
*NOTE: ALL DECIDUOUS SHRUBS AND TREES
TO BE FENCED FOR UNGULATE AND OTHER
HERBIVORE PROTECTION.
PAVEMENT EDGE - SEE PLANS
AND PAVING DETAILS FOR
ADDITIONAL INFORMATION. SEE
ALSO EDGING DETAILS AS
APPLICABLE.
3
4" MINUS WASHED AGGREGATE
BASE MATERIAL UNLESS
OTHERWISE NOTED. SEE
PAVING DETAILS FOR BASE
MATERIAL DEPTH
PREPARED SUBGRADE. REMOVE
ALL STONES OR OTHER DEBRIS
GREATER THAN 1" DIA. AND TILL
EXISTING SOIL MIN. 4" BEFORE
ADDING TOPSOIL OR
AMENDMENTS.
1"REVEAL - SEE NOTE 2
NOTE:
1. SLOPE PLANTED AREAS AWAY FROM PAVED AREAS
2. FINISH GRADES AT PAVEMENT EDGES MUST BE AT A LEVEL SUCH THAT
THE ESTABLISHED TURF SURFACE WILL BE ONE (1) INCH BELOW TOP OF
PAVEMENT FOR A MINIMUM DISTANCE OF SIX (6) FEET FROM THE EDGE.
3. CONTRACTOR SHALL PROVIDE A 6" MINIMUM DEPTH OF TOPSOIL WITH
1" COMPOST TILLED IN ON ALL LAWN AREAS. TOPSOIL SHALL BE DRUM
ROLLED OR TRACK-PACKED AND GRADED SMOOTHLY AND EVENLY.
6" MIN. TOPSOIL. SEE NOTE 3
SLOPE
SEED/SOD PER PLAN
Sod/Seed Planting at Pavement Edge
L500 3/4"=1'
6
BOULDER PER PLAN
FINISHED GRADE
COMPACT AGGREGATE
BASE, 3" DEPTH
NATIVE SOIL
1/2 TO 1/3 OF BOULDER TO BE
BURIED BELOW FINISH GRADE.
Boulder Detail
L500 1"=1'
9
NOTE: ALL SIDEWALK JOINTS TO BE TOOLED, SEE CIVIL ALSO.
4" CONCRETE SLAB
#4 REBAR 24" OC
1
4" W X
1
2" D HAND TOOLED
CONTROL JOINT WITH ROUND
EDGES AND RECESSED SEALANT
IF NECESSARY
BUTT TYPE CONSTRUCTION JOINT
WITH 1
8" RADIUS
BROOM FINISH
1
2" DIAMETER X 12" L TIE BARS.
2' OC. PREVENT BONDING
3
4" MINUS WASHED AGGREGATE
BASE MATERIAL UNLESS OTHERWISE
NOTED
COMPACTED SUBGRADE
Concrete Slab Detail
L500 3/4"=1'
7
NATIVE GRASS SEEDING PER PLAN
TREES AND SHRUBS TO BE PLANTED IN NATURALIZED
GROUPING PER PLAN. ALL TREES AND SHRUBS TO BE
PLANTED ABOVE ANY PERMANENT WATER LINE.
SEE CIVIL FOR DETENTION POND DEPTH AND GRADING
BOULDERS TO BE PLACED IN NATURALIZED
GROUPINGS PER PLAN ALONG DETENTION
POND BANK
Detention Pond Cross Section Typ.
L500 3/16"=1'
11
MAX 4:1 SLOPE
6' AND 8'
1'
3" ASPHALT
4"-6"
3
4" CRUSHED ROCK
COMPACTION TO 95%
TOPSOIL
NOTES: NATIVE SOIL
1. CENTRAL PARK TRAIL - 6'
2. LINEAR TRAIL - 8'
3. PROST GUIDELINES FOR
ASPHALT INSTALLATION
Asphalt Trails Detail
L500 1/2"=1'
8
PRUNE SHRUB TO REMOVE
DEAD OR DAMAGED LEAVES
AND BRANCHES
ELEVATION OF SHRUB
CROWN TO BE 3" ABOVE
FINISHED GRADE ELEVATION
CIRCULAR SWALE TO RING
SHRUB, 2' DIAMETER WITH 3"
HIGH MOUNDED RING OF SOIL
ALL CONTAINMENT MATERIALS
AROUND ROOTS TO BE REMOVED
PRIOR TO INSTALLATION
1
3 NATIVE SOIL WITH
1
3 SANDY
LOAM AND 1
3 DEBRIS FREE
TOPSOIL.
EXCAVATE HOLE
Shrub Planting Detail 2X DIAMETER OF ROOT BALL
L501 3/4"=1'
5
*NOTE: ALL DECIDUOUS SHRUBS AND TREES
TO BE FENCED FOR UNGULATE AND OTHER
HERBIVORE PROTECTION.
5'-0"
8'-0"
6" CURB
SCORE LINE
SCORE LINE
6'-0"
CONC
SIDEWALK
1'-0"
LAWN
PARKWAY
STRIP
PROPERTY LINE
ASPHALT
TRAIL
CONCRETE
EXTENSION
Concrete Extension to Asphalt Detail
L500 1"=1'
10
Landscape Details
L 500
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l500 m.l. alderson park_details.dwg
Mary Long Alderson Park
The Cottonwood Project
Bozeman, Montana
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
386
SALIX GEYERIANA
GEYER WILLOW
PER
PLAN
1 15' 8'
PRUNUS VIRGINIANA
NATIVE CHOKECHERRY
SHRUBS
5 GAL
5 GAL
POT
POT
CORNUS SERICEA
RED OSIER DOGWOOD 5 GAL POT 3 6'-9' 6'-10'
SPR
PER
PLAN
TREES
SYMBOL SIZE TYPE SPACING # MATURE
HEIGHT
MATURE
SPREAD
BOTANICAL NAME
COMMON NAME
PLANTING SCHEDULE - WEST DETENTION POND
2" CAL B&B 1 40'-50' 20'-30'
MALUS 'SPRING SNOW' PER PLAN
PP2 SPRING SNOW CRABAPPLE
B B
PP2
SPR
Detention Pond
Planting Plan
L 301
1
L301 1"=10'-0"
East Detention Pond Planting Plan
N
0 5 10 20
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l000_mary long alderson park_landscape.dwg
Mary Long Alderson Park
The Cottonwood Project
Bozeman, Montana
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
385
ALL REQUESTS SHOULD BE SUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE. 406-587-4873 OR
TROY@DESIGN5LA.COM.
6. LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINED
INTERVALS TO DISCUSS PROGRESS, QUESTIONS, AND PRODUCT PLACEMENT.
7. TURF GRASS SEED AREAS TO HAVE 6" MINIMUM TOPSOIL.
8. NATIVE SEED AREAS SHALL HAVE A MINIMUM OF 3" TOPSOIL.
9. ALL NATIVE SOIL IN PLANTING BEDS SHALL BE TILLED TO A DEPTH OF AT LEAST 12" AND GRADED
SMOOTHLY.
10. ALL TREES SHALL BE STAKED FOR A MINIMUM OF 2 YEARS. REMOVE STAKES AFTER 2 YEARS.
11. ALL TREES AND OTHER SIGNIFICANT LANDSCAPING FEATURES MUST BE PLANTED A MINIMUM OF 10' OF
SEPARATION FROM WATER AND SEWER SERVICES. VERIFY IN FIELD.
12. ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLAN ARE
TO BE RECLAIMED AND RE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, VERIFY DISTURBANCE AREA IN
FIELD.
13. PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPE
INSTALLATION VIA WATER EFFICIENT HEADS. IRRIGATION TO BE INSTALLED IN ACCORDANCE WITH ALL
STATE AND LOCAL CODES AND ORDINANCES. ALL TREES AND SHRUBS TO RECEIVE DIRECT IRRIGATION VIA
DRIP OR BUBBLERS.
14. EACH TREE IS TO BE MULCHED IN A 3' DIAMETER RING WITH SHREDDED CEDAR MULCH AS PER CITY
STANDARDS.
15. ALL DECIDUOUS SHRUBS TO BE FENCED
M.L. Alderson
Park
Planting Plan
0 10 20 40 L 300
N
1
L300 1" = 20'-0"
M.L. Alderson Planting Plan
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l000_mary long alderson park_landscape.dwg
Mary Long Alderson Park
The Cottonwood Project
Bozeman, Montana
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
384
2. ALL AMENITIES TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL
BUILDING PERMITS RELATED TO THE CONSTRUCTION OF THE PAVILIONS AND CONFIRMATION OF STRUCTURAL FOOTING
REQUIREMENTS
3. PLAYGROUND EQUIPMENT TO BE INSTALLED OVER ENGINEERED SAFETY SURFACING. DEPTH OF SURFACING MATERIAL TO BE
DETERMINED BY A CERTIFIED PLAYGROUND SAFETY INSPECTOR BASED ON THE REQUIREMENTS OF THE PLAY EQUIPMENT
THAT IS SELECTED.
THEPARK
1-866-293-8528
www.theparkcatalog.com
2
PLAY
STRUCTURE
1
W IRRIGATION
WELL
IRRGATION WELL TO BE SELECTED BY
OWNER AND IRRIGATION CONTRACTOR, MUST
COMPLY WITH STATE AND LOCAL
REGULATIONS.
1 BY OWNER
KOMPAN INC., SIX-SIDED CLIMBING
STRUCTURE - NATURAL ,IG
MODEL # NRO816-1003
KOMPAN INC.
1 (800) 426-9788
www.kompan.us
TR
THEPARK - MODEL 398-1250, HEAVY DUTY 6'
WOODEN PRESSURE TREATED WOOD . FRAME
- POWDERCOAT COLOR TO BE BLACK.
THEPARK - MODEL 398-9123, 32 GAL VERONA
SERIES SQUARE
COLOR - BLACK
THEPARK - MODEL 509-2000, - POWDERCOAT
COLOR TO BE BLACK. SURFACE MOUNT
THEPARK
1-866-293-8528
www.theparkcatalog.com
THEPARK
1-866-293-8528
www.theparkcatalog.com
THEPARK
1-866-293-8528
www.theparkcatalog.com
PARK SIGNAGE 1 SEE SHEET L 201 DETAIL 3 TBD
PRODUCT DESCRIPTION
BLUEGRASS
SEED MIX
QTY.
AVAILABLE AT CIRCLE S SEED,
RECOMMENDED DRILL SEEDING RATE OF 10
LBS/1000 SQFT. FOR BEST RESULTS DRILL
SEED IN 4 DIRECTIONS.
114,400 SF
STORMWATER
SEED MIX
SEE PLANTING PLAN FOR ADDITIONAL
INFORMATION
M.L. ALDERSON
PARK
CONCRETE
NATURAL GRAY CONCRETE. LIGHT BROOM
5'X10' SCORING PATTERN PER DESIGN.
***SCORING PATTERN MAY VARY DEPENDING
ON SITE LAYOUT
PLAY
SURFACING
ASTM F2075-15 ENGINEERED WOOD FIBER
SAFETY SURFACING. SUBMIT SAMPLE FOR
OWNER APPROVAL. DEPTH TO BE
DETERMINED BY THE FALL HEIGHT OF THE
PLAY EQUIPMENT.
140 SF
3,796 SF
1,140 SF
MOSS ROCK
BOULDERS
5 ROUND IN CHARACTER, LICHEN COVERED
BOULDERS TO BE 36" IN DIAMETER.
PLACEMENT PER PLAN. AVAILABLE AT SELECT
STONE; SELECTSTONE.COM
TRAFFIC AND
PEDESTRIAN
SIGNS
TBD SEE CIVIL PLANS FOR ADDITIONAL
INFORMATION
6' ASPHALT
MULTI-USE
PATH
475 LF
SITE MATERIALS SCHEDULE
MARY LONG ALDERSON PARK
SYMBOL
M.L. Alderson
Park
Hardscape Plan
0 5 10 20 L 200
N
1
L200 1" = 10'-0"
M.L. Alderson Hardscape Plan
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l000_mary long alderson park_landscape.dwg
Mary Long Alderson Park
The Cottonwood Project
Bozeman, Montana
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
382
IRRGATION WELL TO BE SELECTED BY
OWNER AND IRRIGATION CONTRACTOR, MUST
COMPLY WITH STATE AND LOCAL
REGULATIONS.
1 BY OWNER
KOMPAN INC., SIX-SIDED CLIMBING
STRUCTURE - NATURAL ,IG
MODEL # NRO816-1003
KOMPAN INC.
1 (800) 426-9788
www.kompan.us
TR
THEPARK - MODEL 398-1250, HEAVY DUTY 6'
WOODEN PRESSURE TREATED WOOD . FRAME
- POWDERCOAT COLOR TO BE BLACK.
THEPARK - MODEL 398-9123, 32 GAL VERONA
SERIES SQUARE
COLOR - BLACK
THEPARK - MODEL 509-2000, - POWDERCOAT
COLOR TO BE BLACK. SURFACE MOUNT
THEPARK
1-866-293-8528
www.theparkcatalog.com
THEPARK
1-866-293-8528
www.theparkcatalog.com
THEPARK
1-866-293-8528
www.theparkcatalog.com
PARK SIGNAGE 1 SEE SHEET L 201 DETAIL 3 TBD
T
R
W
B
B
B
SPR 8'
1
3
4
5
6
7
9
8
12
13
22
11
15
20
20
19
11
18
2
16
21
17
14
23
23
17
17
PROJECT DATA
THE COTTONWOOD PROJECT
MARY LONG ALDERSON PARK
PROJECT OWNER
Local Construct
Patrick Boel
3112 Los Feliz Blvd.
Los Angeles, CA 90039
(310) 997 - 2373
ENGINEER
Madison Engineering, LLC
Chris Budeski
895 Technology Blvd. Suite 203
Bozeman, MT 59718
(406) 586-0262
ARCHITECT
Studio H Design Inc.
Dean Burgess
81211 Gallatin Road, Suite E
Bozeman, MT 59718
(406) 587-9968
LANDSCAPE ARCHITECT
Design 5, LLC
Troy Scherer
37 East Main Street, Suite 10
Bozeman, MT 59715
(406) 587 - 4873
SHEET INDEX
L100- Landscape Site Plan
L200- Hardscape Plan & Dimensions
L201- Park Boundry
L300- M.L. Alderson Park Planting Plan
L301- Detention Pond Planting Plan
L500- Landscape Details
L501- Landscape Details
PARK BENCH #398-1206 ON CONCRETE PAD
KEYNOTES
PICNIC TABLES # 398-1250 (QTY. 4)
6' ASPHALT TRAIL, SEE SHEET L500, DETAIL 8
EAST WELL TO SERVICE M.L. ALDERSON PARK, DEDICATED WELL LOCATED ON
LINEAR PARK PARCEL
BIKE RACK # 509-2000 (QTY. 2), SEE SHEET L501, DETAIL 1
BENCHES # 398-1206 (QTY. 4), SEE SHEET L501, DETAIL 2
UTILITY TABLE,MODEL ULT-3 BY PILOT ROCK BASE PLATE (QTY. 2)
1
2
3
4
5
6
7
SIX-SIDED CLIMBING STRUCTURE, NATURAL, IG # NR0816-1003
TRASH CANS # 398-9123
STAFFORED AVE. ROAD ACCESS
PROPERTY LINE
8
9
10
11
13 UNDERGROUND DRAINAGE SYSTEM
12 PLAY STRUCTURE FALL ZONE
14 PROPOSED OVERHEAD LIGHTS, SEE CIVIL
15 PLAYSCAPE CURB, SEE SHEET L501, DETAIL 3
16 DETENTION POND, SEE SHEET L301 & 500, DETAIL 11
17 PARK BOUNDRY PINS, SEE SHEET L200
18 PHASE LINE: PHASE 1 - NORTH OF PHASE LINE
PHASE LINE: PHASE 2 - SOUTH OF PHASE LINE
19 LANDSCAPING BOULDER, SEE SHEET L500, DETAIL 9
20 CONCRETE EXTENSION, SEE SHEET L500, DETAIL 10
21 LINEAR PARK, SEE INDIVIDUAL SHEET SET
22 EXISTING FENCE ALONG PERIMETER
ALL LAWN AREAS TO RECEIVE PERMANENT IRRIGATION VIA WATER
EFFICIENT HEADS. ALL TREES AND SHRUBS TO RECEIVE DIRECT IRRIGATION
VIA DRIP OR BUBBLERS.
23
GAS GAS
SS SS SS SS
W W W W
UE UE UE UE
LINE TYPE LEGEND
GAS LINE
SEWER LINE
WATER LINE
UNDERGROUND POWER
PROPERTY LINE
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PRODUCT DESCRIPTION
BLUEGRASS
SEED MIX
QTY.
AVAILABLE AT CIRCLE S SEED,
RECOMMENDED DRILL SEEDING RATE OF 10
LBS/1000 SQFT. FOR BEST RESULTS DRILL
SEED IN 4 DIRECTIONS.
114,400 SF
STORMWATER
SEED MIX
SEE PLANTING PLAN FOR ADDITIONAL
INFORMATION
M.L. ALDERSON
PARK
CONCRETE
NATURAL GRAY CONCRETE. LIGHT BROOM
5'X10' SCORING PATTERN PER DESIGN.
***SCORING PATTERN MAY VARY DEPENDING
ON SITE LAYOUT
PLAY
SURFACING
ASTM F2075-15 ENGINEERED WOOD FIBER
SAFETY SURFACING. SUBMIT SAMPLE FOR
OWNER APPROVAL. DEPTH TO BE
DETERMINED BY THE FALL HEIGHT OF THE
PLAY EQUIPMENT.
140 SF
3,796 SF
1,140 SF
MOSS ROCK
BOULDERS
5 ROUND IN CHARACTER, LICHEN COVERED
BOULDERS TO BE 36" IN DIAMETER.
PLACEMENT PER PLAN. AVAILABLE AT SELECT
STONE; SELECTSTONE.COM
TRAFFIC AND
PEDESTRIAN
SIGNS
TBD SEE CIVIL PLANS FOR ADDITIONAL
INFORMATION
6' ASPHALT
MULTI-USE
PATH
475 LF
SITE MATERIALS SCHEDULE
MARY LONG ALDERSON PARK
SYMBOL
PER
PLAN
3 6'-12' 6'-8'
SALIX GEYERIANA
GEYER WILLOW
PER
PLAN
1 15' 8'
PRUNUS VIRGINIANA
NATIVE CHOKECHERRY
SHRUBS
5 GAL
5 GAL
POT
POT
CORNUS SERICEA
RED OSIER DOGWOOD 5 GAL POT 3 6'-9' 6'-10'
SPR
PER
PLAN
TREES
SYMBOL SIZE TYPE SPACING # MATURE
HEIGHT
MATURE
SPREAD
BOTANICAL NAME
COMMON NAME
PLANTING SCHEDULE - WEST DETENTION POND
2" CAL B&B 1 40'-50' 20'-30'
MALUS 'SPRING SNOW' PER PLAN
SPRING SNOW CRABAPPLE
TYPE SF
PARK AREA CALCS
MARY LONG ALDERSON PARK
ACRES
PARK 115,163 SF 2.64 ACRES
DETENTION POND 140 SF .0032 ACRES
Overall
M.L. Alderson
Park Site Plan
L 100
0 20 40 80
N
1
L100 1" = 40'-0"
Overall M.L. Alderson Site Plan
PARK BLVD.
STAFFORD AVE.
W. GARFIELD ST.
RESORT DR.
design5la.com
406.587.4873
date issue
drawn by: checked by: filename: z:\the cottonwood project\autocad\01_sheets\l000_mary long alderson park_landscape.dwg
Mary Long Alderson Park
The Cottonwood Project
Bozeman, Montana
KHM/HU TMS
07/12/19 Pre Plat
11/15/19 Revisions
12/03/19 Revisions V2
381
NCOA
Alfred M. Stif Professional Building
20 East Olive Street 59715 (FED EX and UPS Only)
PO Box 1230
Bozeman, MT 59771
phone 406.582.2260
fax 406.582.2263
planning@bozeman.net
www.bozeman.net
Development Review Application A1 Page 3 of 3 Revision Date: 5.16.18
REQUIRED FORMS: Varies by project type, PLS 377