Sprinkler Technology Design, Inc.
2011 N. 22nd Avenue, Suite 4 phone 406-582-1936
Bozeman, MT 59718-2781 fax 406-585-8332
i nfo@sprinklertechno1ollvdesign.com
August 22,2006
City of Bozeman
P.O. Box 1230
Bozeman, MT 59771
Attn: James Goehrung
Ref: Bogart Pavilion
Fire Sprinkler Design
Bozeman, Montana
Fee Proposal
Dear James,
Per your request we are pleased to proVide the following proposal for engineering of the
fire spnnkler system for the above referenced project. Our work will Include:
1. Layout drawings of the fire sprinkler system including pipe routing; sprinkler head
location; and appropriate device and equipment locations. Preparation of main
level plans for a 25,875 sq. ft. pavilion building. Also included will be one sheet
which will have appropriate legends, notes, sections, details, fire service line, etc.
2. Specifications.
3. Hydraulic calculations based upon anticipated water supply to this location.
4. Engineering of fire service line in accordance with City of Bozeman requirements.
5. Electrical engineering to incorporate fire alarm/reporting requirements from
appropriate sprinkler flow and tamper switches and power requirements for valve
house heat, light and power.
6. The cost of attending meetings at your office for the purpose of coordinating
design.
7. Pre-bid coordination with Contractors.
8. Material and shop drawing submittal.
9. Drawings for bid, submittal and installation.
10. Ongoing office support and advice during installation of fire sprinklers.
"FIRE SPRINKLERS SAVE LIVES'.
11. Final on site observation and preparation of "punch list."
12. Verification of punch list completion.
13. Close-out documentation.
We will provide final shop drawings ready for fire sprinkler contractor fabrication, and
installation, including approvals from building officials for the fixed fee of $5,260.00.
We anticipate probable sprinkler construction costs of $45,000.00. We anticipate
probable electrical construction costs of $5,000.00.
We will provide final drawings for a new fire service line including approvals from
building officials and water officials for the fixed fee of $2,250.00.
We anticipate probable fire service line construction costs of $45,000.00.
Attached please find a design proposal in the amount of ($2,500.00) for design of the
new valve house. We will coordinate this design in the bid package for $250.00.
We anticipate probable valve house construction of $10,000.00
10%
$ 10,260.00
$105,000.00 (est)
$115,260.00
$ 11.526.00 (continqencv)
$126,786.00
Total design
Construction
This proposal does not include the cost of permits.
This proposal does not include the cost of CADD files obtained from others.
Contractor shall provide or)e complete "hard" (printed) copy of project plans and
specifications including all alternates and addendums.
This proposal does not include on-site construction administration or observation other
than included above. This work will be provided based upon Sprinkler Technology
Design's standard hourly rates and expenses at cost plus 10% if requested.
If Sprinkler Technology Design, Inc. does not provide on-site observation verifying the
installation is in accordance with plans provided; the contractor shall hold Sprinkler
Technology Design, Inc. harmless from any and all claims resulting due to contractor
deviation from plans provided.
"FIRE SPRINKLERS SAVE LIVES"
Should you find this proposal acceptable, please sign one copy and return it to us.
We look forward to working with your team on this project.
Very Truly Yours,
'J>~~. '\L\j-r
SPRINKLER TECHNOLOGY DESIGN, INC.
David R. Hughes, Jr., P.E.
-\-
Accepted th~S 5 ~V ,2006.
By. C~A--I
$/0,260, ~
Amount:
"FIRE SPRINKLERS SAVE LIVES"