HomeMy WebLinkAbout00 Table of Contents 12-26-19ARMORY HOTEL PROJECT
24 WEST MENDENHALL
TABLE OF CONTENTS
Dec 26, 2019
ITEMS LISTED BELOW HAVE NOT CHANGED UNLESS SHOWN IN RED
01 Application
02 19410 Armory Modification Review ltr to Applicant w/ Applicant Responses 11-21-19 NEW
02.1 FSP MOD UDC Analysis & Narrative REV
MODIFICATION PHASE 1
04 AC1.1 Architectural Site Plan
06 L2.0 Landscape Drawings (11x17)
07 A1.0-5 Plans REV
09 Site Calculations
10 Parking Calculations REV, serving area diagrams on plans, traffic generation analysis
11 Bridger Park Bozeman Agreement for Parking
12 Loading Zone Document (8x11) & Drawing (11x17)
13 Encroachment Permit Document (8x11) & Drawing (11x17)
14 Construction Management Plan
MODIFICATION PHASE 2
08 A2.1-4 Elevations
17 Preliminary Signage
18 Screen Wall Details
19 Window Details & Types
20 Lighting Cutsheets (8x11) REV & Photometric Drawings REV (11x17) Additional drawings requested and
not yet provided. These drawings will be provided in January 2020 for Phase 2 review to proceed.
Additional material samples provided for material board per adequacy letter 12-26-19