Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
19036 Civil Plans
(W BEALL ROW)W VILLARDW DURSTONW LAMMEW MENDENHALLMAIN STN 11 AVEN 15 AVERUTH THIBEAULT WAYBEALL STN-WINGPOOLGYMHFAGYMMGENERALX X X XCVR COVER SHEETXG001SITE UTILIZATION PLANXG002SITE UTILIZATION PLANXG003SITE UTILIZATION PLAN06.29.17 11:09 PM | L:\BZN_HIGHRENO\BIMCAD\LandArch\BZN_HIGHRENO_City Submittal Cover.dwgCVRCOVER SHEETOSTERGAARD01.24.2019 COB 109.03.2019 COB 210.25.2019 COB 3ROSABOZEMAN PUBLIC SCHOOLSEXISTING BOZEMAN HIGH SCHOOL CAMPUS01.15.2019CITY SITE PLAN SUBMITTALPROJECT LOCATIONBOZEMAN HIGH SCHOOL205 N 11TH AVEBOZEMAN, MT 59715VICINITY MAPLocatorOWNERBozeman High School District 7404 West Main StreetBozeman, MT 59715406.522.6000ARCHITECT/ENGINEERCTA Architects Engineers411 E Main St, Ste 101Bozemans, MT 59715406.556.7100Project Manager: Bob FranzenSHEET INDEXFOR VISUALIZATION PURPOSES ONLYARCHITECTURALx x A100 SITE SUBMITTAL - FLOOR PLANSx A200 REFERENCE PLAN FOR EXTERIOR PHOTOSxA201 EXTERIOR PHOTOSx x A300 SITE SUBMITTAL - EXTERIOR ELEVATIONSx xA301EXTERIOR MATERIALS AND UDCCOMPLIANCE TABLEx x A302 PERSPECTIVESCIVILx C101NOTES, LEGEND, AND ABBREVIATIONSx x x C102SURVEY DATA AND EXISTINGCONDITIONS MAPx x xC103SITE PLAN OVERVIEW ANDSHEET INDEX MAPx x x C104 CIVIL PLANNING MAPxC105CONSTRUCTION OVERVIEWxC106N. 11TH AVENUE SIGNAGE PLANx x xC201 DEMOLITION PLAN - SOUTHx x C202 UTILITY PLAN OVERVIEWx xC301SITE PLAN - SOUTHWESTx x C302 SITE PLAN - SOUTHx x C303 SITE PLAN - SOUTHEASTx xC304 SITE PLAN - EASTx x x C305 SITE PLAN - NORTHx xC306 SITE PLAN - ENTRY DETAILSxC307SITE PLAN - WEST PARKING LOT & ACCESSDETAILSx x C401 SEWER PLANXxC501WATER PLANXx C601 STORM DRAINAGE PLAN - SOUTHXxC602 STORM DRAINAGE PLAN - SOUTHEASTx x C603 STORM DRAINAGE PLAN - NORTHx xC604 STORM DRAINAGE PLAN - IRRIGATION DITCHx x C701 GRADING PLAN - SOUTHWESTx XC702 GRADING PLAN - SOUTHx xC703 GRADING PLAN - SOUTH EASTx x C704 GRADING PLAN - EASTx xC705 GRADING PLAN - NORTHx x C706 GRADING PLAN - ENTRYxC707 GRADING PLAN - S PARKING LOT ACCESSx x CD101 SITE DETAILSx xCD102 SITE DETAILSx XCD103 SITE DETAILSAPPLICATION DATA:PROJECT PARKING STATISTICSSENIOR HIGH USE1.5 SPACES PER 103 CLASSROOM OR LECTURE HALL = 155+ 1 SPACE / 5 STUDENTS = 1685 STUDENTS = 337 + 1 SPACE / EACH NON-TEACHING EMPLOYEE @ 50 STAFF = 50+ 1 SPACE / EACH 3 FIXED SEATS IN THE AREA OF PUB. ASSEMBLY.COMPETITION GYM @ 1801 SEATS = 601 (HIGHEST DEMAND)AUXILIARY GYMS @ 307 SEATS = 103AUDITORIUM @ 750 SEATS = 250* NOTE: PUBLIC ASSEMBLY USES DO NOT OCCUR SIMULTANEOUSLY NOR DURING SCHOOL HOURSTOTAL REQUIRED PARKING SPACES = 704 (FOR HIGHEST DEMAND: COMPETITION + AUXILIARY GYMS)TOTAL PROVIDED PARKING SPACES = 956 SERVING PROJECT AREA (NOT INCLUDING 29 FOR SWIM CENTER)925 NON-ACCESSIBLE + 31 ACCESSIBLEBICYCLE PARKINGSPACES REQUIRED (10% OF REQUIRED PARKING FOR NORMAL SCHOOL DAY) = 55SPACES REQUIRED (10% OF REQUIRED PARKING FOR HIGHEST DEMAND) = 71SPACES PROVIDED = 210ZONING PLI, PUBLIC LANDS & INSTITUTIONCURRENT LAND USE SCHOOL / EDUCATION FACILITYPROPOSED LAND USE SCHOOL / EDUCATION FACILITYLAND PARCEL SIZEGROSSNET (MINUS PUBLIC ACCESS EASEMENT)ACRES (SUBJECT SITE) = 64.59 ACRES= 62.67 ACRESSQUARE FOOTAGE (SF) = 2,813,411 SF= 2,729,883 SFSITE STATISTICS(USING NET)=100%2,729,883 SF PERCENTAGE OF BUILDINGS =11.1% 302,634 SFPERCENTAGE OF DRIVES AND PARKING =19.2% 525,501 SF.PERCENTAGE OF SETBACKS, O.S. & LANDSCAPE =70.0% 1,901,748 SFPERCENTAGE OF PUBLIC RIGHT-OF-WAY=0% 0 SF BUILDING INFORMATION EXISTING NET (FAR)PROPOSED NET (FAR)TOTAL (USING NET)FLOOR TO SITE RATIO (FAR) = 302,634 SF/ 2,729,883BUILDINGS/ STRUCTURES TOTAL346,971 SF (12.7%) -44,337 SF(-1.6%)= 302,634 SF(11.1%)MAIN SCHOOL 311,380 SF (11.4%) -44,337 SF (-1.6%)= 267,043 SF (9.8%)SUPPORT BLDGS 35,591 SF ( 1.3%) 0 SF (0.0%)= 35,591 SF (1.3%)BUILDING MODIFICATIONSEXISTING DEMOLISH NEW ADDITIONSDIFFERENCETOTALMAIN SCHOOL 311,380 SF -84,265 SF +39,928 SF-44,337 SF 267,043 SF(FOOTPRINT ONLY)LEGAL DESCRIPTIONPROPERTY CONSISTS OF MULTIPLE PARCELS:S12, T02 S, R05 E, ACRES 27.08, HIGH SCHOOL SITE TRACT IN NW4S12, T02 S, R05 E, ACRES 11.23, TRACT IN NW4 PLAT 144-29S12, T02 S, R05 E, ACRES 1.907, TRACT IN NW4 PLAT 153-452S12, T02 S, R05 E, ACRES 3.02, TRACT IN NW4S12, T02 S, R05 E, ACRES 3.98, TRACT IN NW4S12, T02 S, R05 E, C.O.S. 1660, PARCEL 2, ACRES 7.853S12, T02 S, R05 E, C.O.S. 1660, PARCEL 1, ACRES 1.425S12, T02 S, R05 E, ACRES 1.91, TRACT 4 E2NW4 LESS RWS12, T02 S, R05 E, ACRES 2.01, TRACT 3 E2NW4 LESS RWS12, T02 S, R05 E, ACRES 4.907, TRACT 2 NE4NW4 LESS RWZONING MAPBLOCK FRONTAGE MAPN 7TH AV I-90MAIN STNORTHNORTHNORTHNORTH'OTHER' BLOCKFRONTAGES (GREYLINES ALONG MAIN ST,11TH AVE, AND RUTHTHIBEAULT WAY )PROJECTPROPERTYDRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |BOZEMAN HIGH SCHOOL BOZEMAN, MONTANA 205 NORTH 1TH AVE.CITY SITE PLAN SET1.15.20192019LANDSCAPEXx xL001 CODE COMPLIANCE SITE PLANx x x L100 LANDSCAPE NOTES AND LEGENDx x xL101 OVERALL LANDSCAPE PLANx x L102 SOUTHWEST SITE PLANx xL103 SOUTH SITE PLANx x x L104SOUTHEAST SITE PLANx x x L105EAST SITE PLANx xL106 NORTH SITE PLANx x L107 SOUTH ENTRY AND TRASH SITE PLANx xL108 PLAZA AND COURTYARD PLANx x L109 SOUTH ENTRY PLANTING PLANx x L110NORTH ENTRY AND COURTYARDPLANTING PLANx xL201 SITE DETAILSx xL202 SITE DETAILSx L401 PLANTING AND IRRIGATION DETAILSxL402 PLANTING AND IRRIGATION DETAILSGEOTECHNICAL INFORMATIONA geotechnical investigation for the proposed BozemanHigh School Improvements was conducted andpublished for the site in September of 2018. Thefindings and recommendations presented in theresultant report will be consulted for building pad &foundation preparation requirements and pavementdesign.Subsurface soil conditions generally consisted of up toseven feet of surficial lean clay overlaying nativegravels that extend to a depth of at least 15.9 feet (thelimits of investigation). Groundwater was notencountered in any of the soil borings. While seasonalhigher groundwater may exist at different times of theyear, the absence of observed ground water andabundance of gravels support an infiltration strategy forstormwater management, where advantageous andappropriate. The report also identifies opportunities forreusing existing pavement surface and base materialswhere parking lots are being re-constructed. COMMUNITY PLAN: REGIONAL COMMERCIAL & SERVICESNEIGHBORHOOD CONSERVATION: NOWETLAND/WATERCOURSE: YES,JURISDICTIONAL WETLAND: YESHISTORIC DISTRICT: NO FLOOD ZONE: NOPROJECT AREA STATISTICS(USING NET)=100%556,453 SF PERCENTAGE OF BUILDINGS =7.1% 39,928 SFPERCENTAGE OF DRIVES AND PARKING =23.9% 132,997 SFPERCENTAGE OF SETBACKS, O.S. & LANDSCAPE =69.0% 383,528 SFPERCENTAGE OF PUBLIC RIGHT-OF-WAY=0% 0 SFUSABLE OPEN SPACE REQUIRED: 10,864 SF (2% OF PROJECT AREA)PEDESTRIAN-ORIENTED O.S. REQUIRED: 0 SF (0%) **SEATING REQUIRED: 0 LF (2 LF (16" WIDE) PER 60 SF OF PED-ORIENTED O.S. REQ'D)USABLE OPEN SPACE PROVIDED: 271,365 SF (48.7%)PEDESTRIAN-ORIENTED O.S. (3 PLAZAS) PROVIDED 0 SF (0.0%) **SEATING PROVIDED: 0LF(** NUMBERS INCLUDED AS A PART OF USABLE O.S.) OTHEROTHER OTHERLANDSCAPEL.S.OTHEROTHER DURSTONN 19TH AVN 15TH AVN 11TH AV 10.25.2019 CITY REV'S 09.03.2019 CITY REV'S 1.24.2019 SITE REV.S 1.15.2019 SITE PLAN ELECTRICALx xE004 OVERALL ELECTRICAL SITE PLANx x E005 SOUTHWEST ELECTRICAL SITE PLANx x E006 SOUTH ELECTRICAL SITE PLANx x E007 NORTH ELECTRICAL SITE PALN 10.25.2019 CITY REV'S 09.03.2019 CITY REV'S 1.24.2019 SITE REV.S 1.15.2019 SITE PLAN CIVIL ENGINEERTD&H Engineering234 E Babcock St, Ste 3Bozemans, MT 59715406.586.02773 N01°55'28"E 641.45'N89°12'45"W 140.23'S01°28'52"W 1306.14'S88°30'44"E 596.50'N01°28'50"E28.95'S88°25'49"E 593.97'N02°28'14"E 652.73'S88°34'36"E 115.07'N01°51'33"E 1004.30'N89°59'09"W 1189.05'S01°27'14"W 988.14'N89°12'45"W 1181.65'DRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |BOZEMAN HIGH SCHOOL BOZEMAN, MONTANA205 NORTH 11TH AVE.CITY SITE PLAN SET1.15.20192019406.586.0277 • tdhengineering.com Engineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715ANLEFNESSIONGITONMANEERAOPR2 COB 2 - 09/03/19C102SURVEY DATA &EXISTING CONDITIONSMAPCJCCONTROL POINTS: PLIR-3 R-O R-2 R-1R-3PLIB-2PLIR-O R - 4 R - 2 R - 4 B - 3 R - 4 R - 5 R - 3 P L I P L I R - 1 B-1 B-1 COUNTYR-OR-3 R-1R-4R-OR-3 R-OB-2 R - 5 P L I R - 4 R - 4 B - 2MR-O R - 4 R - 5 B - 2M R - 5 R - 3 R-4R-OR-2R-O R-3 DRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |BOZEMAN HIGH SCHOOL BOZEMAN, MONTANA205 NORTH 11TH AVE.CITY SITE PLAN SET1.15.20192019406.586.0277 • tdhengineering.com Engineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715ANLEFNESSIONGITONMANEERAOPR2 COB 2 - 09/03/19C105CONSTRUCTIONOVERVIEWCJCVAN WINKLE STADIUMPHASE I(2018-2019)MAIN STREETN. 11TH AVE.MENDENHALLW. LAMMEVICINITY MAP & CONSTRUCTION ROUTESBOZEMANHIGH SCHOOLVAN WINKLE STADIUM PHASE II(2019)BOZEMAN HIGH SCHOOL RENOVATIONS(2020-2022)DURSTON RD.N. 15TH AVE.BEALLSITE CONSTRUCTION PROJECT OVERVIEWW. VILLARD DRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |BOZEMAN HIGH SCHOOL BOZEMAN, MONTANA205 NORTH 11TH AVE.CITY SITE PLAN SET1.15.20192019406.586.0277 • tdhengineering.com Engineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715ANLEFNESSIONGITONMANEERAOPR2 COB 2 - 09/03/19C201DEMOLITION PLANSOUTHCJCDEMOLITION PLAN - SOUTH SSDRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |BOZEMAN HIGH SCHOOL BOZEMAN, MONTANA205 NORTH 11TH AVE.CITY SITE PLAN SET1.15.20192019406.586.0277 • tdhengineering.com Engineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715ANLEFNESSIONGITONMANEERAOPR2 COB 2 - 09/03/19C202DEMOLITION PLANNORTHCJCDEMOLITION PLAN - NORTH SWIM CENTERMAIN STREETDRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |BOZEMAN HIGH SCHOOL BOZEMAN, MONTANA205 NORTH 11TH AVE.CITY SITE PLAN SET1.15.20192019406.586.0277 • tdhengineering.com Engineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715ANLEFNESSIONGITONMANEERAOPR2 COB 2 - 09/03/19C301SITE PLANSOUTHWESTCJCSOUTH PARKING LOT (PLAN) SWIM CENTERG-WINGA-WINGMAIN STREETDRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |BOZEMAN HIGH SCHOOL BOZEMAN, MONTANA205 NORTH 11TH AVE.CITY SITE PLAN SET1.15.20192019406.586.0277 • tdhengineering.com Engineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715ANLEFNESSIONGITONMANEERAOPR2 COB 2 - 09/03/19C302SITE PLANSOUTHCJCSOUTH ACCESS LOOP (PLAN) A-WINGMAIN STREETN. 11TH AVE.DRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |BOZEMAN HIGH SCHOOL BOZEMAN, MONTANA205 NORTH 11TH AVE.CITY SITE PLAN SET1.15.20192019406.586.0277 • tdhengineering.com Engineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715ANLEFNESSIONGITONMANEERAOPR2 COB 2 - 09/03/19C303SITE PLANSOUTHEASTCJCSOUTHEAST SITE (PLAN) A-WINGN. 11TH AVE.HAWKS NESTDAYCAREF-WINGH-WINGW. MENDENHALLDRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |BOZEMAN HIGH SCHOOL BOZEMAN, MONTANA205 NORTH 11TH AVE.CITY SITE PLAN SET1.15.20192019406.586.0277 • tdhengineering.com Engineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715ANLEFNESSIONGITONMANEERAOPR2 COB 2 - 09/03/19C304SITE PLANEASTCJCEAST SITE (PLAN) H-WINGN. 11TH AVE.W. LAMMEM-WINGNEW CLASSROOMBUILDINGNEW COMMONSNEW AUDITORIUMDRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |BOZEMAN HIGH SCHOOL BOZEMAN, MONTANA205 NORTH 11TH AVE.CITY SITE PLAN SET1.15.20192019406.586.0277 • tdhengineering.com Engineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715ANLEFNESSIONGITONMANEERAOPR2 COB 2 - 09/03/193 COB 3 - 10/25/19C305SITE PLANNORTHCJCNORTH SITE (PLAN) M-WINGWESTENTRANCEN-WINGG-WINGA-WINGSOUTHENTRYDRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |BOZEMAN HIGH SCHOOL BOZEMAN, MONTANA205 NORTH 11TH AVE.CITY SITE PLAN SET1.15.20192019406.586.0277 • tdhengineering.com Engineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715ANLEFNESSIONGITONMANEERAOPR2 COB 2 - 09/03/19C306SITE PLANENTRY DETAILSCJCSOUTH ENTRY DETAILWEST ENTRY DETAIL M-WINGH-WINGSWIM CENTERCONCESSIONS BLDG.DRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |BOZEMAN HIGH SCHOOL BOZEMAN, MONTANA205 NORTH 11TH AVE.CITY SITE PLAN SET1.15.20192019406.586.0277 • tdhengineering.com Engineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715ANLEFNESSIONGITONMANEERAOPR2 COB 2 - 09/03/19C307SITE PLANWEST PARKING LOT &ACCESS DETAILSCJCWEST PARKING LOT (PLAN)SOUTH PARKING LOTWEST DRIVEWAY APPROACH DETAILSWIM CENTER FIRE LANE (PLAN)