Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
56_A301 Exterior Materials And UDC Compliance Table 09-03-2019
EAST FACADE OF AUDITORIUM IS ONLY WALL THAT MEETS DEFINITION. METHODS TO TREAT BLANK WALLS: 4. INSTALLING A MURAL AS APPROVED BY THE REVIEW AUTHORITY. 5. SPECIAL BUILDING DETAILING THAT ADDS VISUAL INTEREST AT A PEDESTRIAN SCALE. PROPOSED GRAPHIC CONCRETE MEETS THE TREATMENT INTENT. BLANK WALL TREATMENTS 070 BUILDING MATERIALS WILL PRIMARILY BE METAL SIDING, BRICK BASE IN SOME LOCATIONS, GRAPHIC CONCRETE PANELS, AND GLAZING. BUILDING MATERIALS 060 FAÇADE ARTICULATION MET THROUGH OTHER FEATURES. ROOF MODULATION IF NEEDED FOR FAÇADE ARTICULATION 040.F MAXIMUM WIDTH FOR LARGEST SINGLE WALL IS 146'. EACH ELEVATION HAS MULTIPLE VERTICAL AND HORIZONTAL STEPS ALL LESS THAN 150' WIDTH. MAXIMUM FAÇADE WITH 150' 040.E 3 FEATURES FOR AUDITORIUM: 7. ARTICULATION OF A SINGLE BUILDING MATERIAL THROUGH VARYING COLORS, TEXTURES, OR INCORPORATING JOINT OR/AND TRIM PATTERN. 8. OTHER DESIGN TECHNIQUES THAT EFFECTIVELY REINFORCE A HUMAN-SCALED PATTERN COMPATIBLE WITH THE BUILDINGS SURROUNDING CONTEXT. 9. PROVIDING VERTICAL ELEMENT SUCH AS A TRELLIS WITH PLANTS, GREEN WALL, ART ELEMENT. FAÇADE ARTICULATION - MIN. OF 3 ARTICULATION FEATURES EVERY 60' MAX 040.B ALL NEW MECHANICAL EQUIPMENT TO BE LOCATED IN ROOFTOP PENTHOUSES. LOCATION AND DESIGN OF SERVICE AREAS AND MECHANICAL EQUIPMENT 070 COVERED ENTRANCE PROVIDED AT SOUTH ENTRANCE. 3' DEEP WEATHER PROTECTION AT PRIMARY ENTRANCE EAST ELEVATION = 16% GLAZING SOUTH ELEVATION = 19% GLAZING FAÇADE TRANSPARENCY, AT LEAST 10% REQUIRED PRIMARY BUILDING ENTRANCE IS ON THE WEST. SECONDARY ENTRANCE IS ON THE SOUTH. BUILDING ENTRANCE FACING THE STREET 030.G LANDSCAPE BLOCK FRONTAGE SELECTED. BLOCK FRONTAGE STANDARDS 030.A PROVIDED DESCRIPTION UDC 38.510 BLOCK FRONTAGE STANDARDS UDC DESCRIPTION PROVIDED 38.520 SITE PLANNING AND DESIGN ELEMENTS UDC DESCRIPTION PROVIDED 38.530 BUILDING DESIGN 16% ® 8 0 0 . 7 5 7 . 9 5 2 2 w w w . c t a g r o u p . c o m REVISIONS 8/30/2019 2:44:25 PM EXTERIOR MATERIALS AND UDC COMPLIANCE TABLE A301. BO Z E M A N H I G H S C H O O L - A D D I T I O N A N D R E N O V A T I O N BO Z E M A N , M O N T A N A 1.15.2019 CHECKED BY | WELLES © 2019 | ALL RIGHTS RESERVED 20 5 N O R T H 1 1 T H A V E . DRAWN BY | WELLES CITY SITE PLAN SET | CTA # BZN_HIGHRENO | L:\BZN_HIGHRENO\BIMCAD\Revit Product Cut Sheets 2 9/3/2019 COB2 2 2