Loading...
HomeMy WebLinkAbout55_A300 Site Submittal -ExteriorElevations 09-03-2019BUILDING 1 FIRST FLOOR 93'-0 3/4" BUILDING 1 ROOF 116'-6 3/4" BUILDING 1 SECOND FLOOR LEVEL 105'-0 3/4" BUILDING 2 & 3 FIRST FLOOR 100'-0" BUILDING 1 CONNECTOR FIRST FLOOR 99'-0 1/2" SECOND FLOOR 114'-0" ROOF/PENTHOUSE FLOOR 128'-0" PENTHOUSE/AUDITORIUM ROOF PLAN 142'-0" 50'-1 1/2" 2 1/2" 35'-4 3/4" 257'-10 1/4" 7'-9 1/2" 8'-0" 12'-0" 8'-0" EXISTING N-WING 2 2' - 0 " 2' - 1 0 " BUILDING 1 FIRST FLOOR 93'-0 3/4" BUILDING 1 ROOF 116'-6 3/4" BUILDING 1 SECOND FLOOR LEVEL 105'-0 3/4" BUILDING 2 & 3 FIRST FLOOR 100'-0" BUILDING 1 CONNECTOR FIRST FLOOR 99'-0 1/2" SECOND FLOOR 114'-0" ROOF/PENTHOUSE FLOOR 128'-0" PENTHOUSE/AUDITORIUM ROOF PLAN 142'-0" 8'-0" 12'-0" 8'-0" 18'-2 1/2" 100'-9 1/2" 20'-1" 8'-0" 12'-0" 8'-0" 12'-0" 8'-0" 12'-0" 8'-0" 4'-0" 3'-7" EXISTING N-WING BUILDING 2 & 3 FIRST FLOOR 100'-0" REGION HAWKS NEST FLOOR LEVEL 105'-0 3/4" BUILDING 5A FIRST FLOOR 108'-2" BUILDING 1 CONNECTOR FIRST FLOOR 99'-0 1/2" SECOND FLOOR 114'-0" ROOF/PENTHOUSE FLOOR 128'-0" PENTHOUSE/AUDITORIUM ROOF PLAN 142'-0" 21' - 4 1/4" 12' - 0" 112' - 9" 23' - 3 1/8" 136' - 7 5/8" 31' - 11 3/4" EXISTING DAY CARE EXISTING CORRIDOR REGION HAWKS NEST FLOOR LEVEL 105'-0 3/4" BUILDING 5A FIRST FLOOR 108'-2" ROOF/PENTHOUSE FLOOR 128'-0" PENTHOUSE/AUDITORIUM ROOF PLAN 142'-0" 90' - 2" 53' - 5 3/8" 105' - 1 3/4" 74' - 6 1/2" 48' - 0" 55' - 10 1/8" EXISTING SWIM CENTER EXISTING GYM 74' - 6 1/2" EXITING A-WING 2 2 1. BRICK MATERIALS LEGEND 2. BLACK FLUSH SIDING 4. WHITE HORIZ. SIDING 3. BLACK VERTICAL SIDING 5. GRAPHIC CONCRETE 6. GLAZING ® 8 0 0 . 7 5 7 . 9 5 2 2 w w w . c t a g r o u p . c o m REVISIONS 8/30/2019 2:44:25 PM SITE SUBMITTAL - EXTERIOR ELEVATIONS A300. BO Z E M A N H I G H S C H O O L - A D D I T I O N A N D R E N O V A T I O N BO Z E M A N , M O N T A N A 1.15.2019 CHECKED BY | WELLES © 2019 | ALL RIGHTS RESERVED 20 5 N O R T H 1 1 T H A V E . DRAWN BY | WELLES CITY SITE PLAN SET | CTA # BZN_HIGHRENO | L:\BZN_HIGHRENO\BIMCAD\Revit 1/16" = 1'-0" A300. 3 SITE SUBMITTAL - OVERALL EAST ELEVATION - CENTRAL 1/16" = 1'-0" A300. 4 SITE SUBMITTAL - OVERALL EAST ELEVATION - NORTH 1/16" = 1'-0" A300. 2 SITE SUBMITTAL - OVERALL EAST ELEVATION - SOUTH 1/16" = 1'-0" A300. 1 SITE SUBMITTAL - OVERALL SOUTH ELEVATION GLAZING AREA: EAST FACADE - 4,547 SF SOUTH FACADE - 1,239 SF TOTAL WALL AREA: EAST FACADE - 27,989 SF SOUTH FACADE - 7,639 SF GLAZING TO WALL AREA RATIO: EAST FACADE - 16.2% SOUTH FACADE - 16.2% 2 9/3/2019 COB2 2