Loading...
HomeMy WebLinkAboutBogart Pavilion Proposal, R&R Taylor, 2006 Proposal Proposal CONSTRUCTION INC. July 20, 2006 James Gochmng City of Bozeman Bozeman, Mt 59715 Dear James Goehrung: Please find attached our proposal spreadshect to repair the Bogart Pavihon as per discussions with you and John Schlegelmilch and dctails drawn by John Schlegelmilch. Scope 0 f Work: Remove and haul off damaged trusses, plywood, and roofing matenal (Approx. 15,000 sf) Replace with specified trusses, hardware, 5/8 plywood roof sheathing Replace the damaged arched beams Replace Membrane roof New Electrical Sand blast and Paint Clean up Exclusions: Rewire existing Sound system Pem1its We Propose hereby to furmsh matenal and labor, complete m accordance wlth abovc spcclficatlOn for the sum of $ Three hundred forty eight thousand eight hundred thirty dollars{.$___.__ 348,830.00 ). Payment to be made as follows: MonthJy)nstallments All matenallS guaranteed to be as speeitied_ All work to be Completed in a workmanlike manner according to standard Practices. Any alteration or deviation li'om ahove spec1fi<:alHlllS mvolvmg extra costs will he executed only upon vv'ntten ordcrs, And will become an extra charge over and ahove the esl.1male. All agreemcnts contingent upon strikes, aCCidents or delay beyond our controL Owncr to carry tire, tornado and other necessary msurance. Our Workcrs arc fully cuvered by Wurk- man's Compensal.1on Insurancc. Authonzed Slgnature____..___ ___Date ThiS Proposal may be withdrawn by us If not Accepted wlthm 30 Days. ACCEPTANCE OF PROPOSAL the abovc prices, Specifications and condItIOns are satlsfaelory and are Hereby accepted. You are authorized to do the work As specificd. Payment will be made as outlined abuve. Upon acceptance this proposal bccomes a bmding contract betwccn R & R Taylor Construction, loe. and: (In n-J (\ 1'\ 0 ~ Signatur~J)atc ?~_?j_ -06 Signature Datc