Please find attached our proposal spreadshect to repair the Bogart Pavihon as per discussions
with you and John Schlegelmilch and dctails drawn by John Schlegelmilch.
Scope 0 f Work:
Remove and haul off damaged trusses, plywood, and roofing matenal
(Approx. 15,000 sf)
Replace with specified trusses, hardware, 5/8 plywood roof sheathing
Replace the damaged arched beams
Replace Membrane roof
New Electrical
Sand blast and Paint
Clean up
Exclusions:
Rewire existing Sound system
Pem1its
We Propose hereby to furmsh matenal and labor, complete m accordance wlth abovc spcclficatlOn for the sum of
$ Three hundred forty eight thousand eight hundred thirty dollars{.$___.__ 348,830.00 ).
Payment to be made as follows: MonthJy)nstallments
All matenallS guaranteed to be as speeitied_ All work to be
Completed in a workmanlike manner according to standard
Practices. Any alteration or deviation li'om ahove spec1fi<:alHlllS
mvolvmg extra costs will he executed only upon vv'ntten ordcrs,
And will become an extra charge over and ahove the esl.1male.
All agreemcnts contingent upon strikes, aCCidents or delay
beyond our controL Owncr to carry tire, tornado and other
necessary msurance. Our Workcrs arc fully cuvered by Wurk-
man's Compensal.1on Insurancc.
Authonzed
Slgnature____..___ ___Date
ThiS Proposal may be withdrawn by us If not
Accepted wlthm 30 Days.
ACCEPTANCE OF PROPOSAL the abovc prices,
Specifications and condItIOns are satlsfaelory and are
Hereby accepted. You are authorized to do the work
As specificd. Payment will be made as outlined
abuve. Upon acceptance this proposal bccomes a
bmding contract betwccn R & R Taylor Construction,
loe. and:
(In n-J (\ 1'\ 0 ~
Signatur~J)atc
?~_?j_ -06
Signature
Datc