HomeMy WebLinkAbout01-27-20 City Commission Packet Materials - C9. Construction Agreement with Lutey Construction-The Craftsman, Inc. for Stiff Bldg. Renov. EXHIBIT H1OWNER:
CITY OF BOZEMAN
20 E. OLIVE
BOZEMAN, MT 59715
MIKE GRAY, FACILITIES
406-582-3232
ARCHITECT:
ARCHITECTURE 118
115 E. OAK ST
BOZEMAN, MT 59715
MIKE WISEMAN
406-404-1777
MEP ENGINEER:
CONSULTING DESIGN SOLUTIONS, INC.
7540 CHURCHILL ROAD
MANHATTAN, MT 59741
SCOTT ELDERS
406-282-7082
STRUCTURAL ENGINEER:
HYALITE ENGINEERS
2304 N 7TH AVE, STE L
BOZEMAN, MT 59715
MATT ANDERSON
406-587-2781
CIVIL ENGINEER:
HYALITE ENGINEERS
2304 N 7TH AVE, STE L
BOZEMAN, MT 59715
MIKE STENBERG
406-587-2781
REMEDIATION CONSULTANT:
ENVIRONMENTAL SOLUTIONS
PO BOX 7010
BOZEMAN MT 59771
SONIA ROGERS
406-579-1441
FURNITURE:
KR OFFICE INTERIORS
119 N 7TH AVE #3303
BOZEMAN, MT 59715
MEGAN BITTINGER
406-585-5417
1
View Name
1/8" = 1'-0" SCALE
101A
5
A3-8
3
A5-2
A
0
0
Room name
202
BUILDING SECTIONS
SEE DRAWINGS
EX: SHEET A3-8, DETAIL 5
WALL SECTIONS
SEE DRAWINGS
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:41 PM
19-022
MW Checker
C1.0
DEMO SITE PLAN
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
123 DESCRIPTION DATE
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:42 PM
19-022
MW Checker
C1.1
PROPOSED SITE
PLAN
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
123 DESCRIPTION DATE
UP
DN
UP
UP
DN
DN
DN
2 2
1 1
4 4
5 5
A
A
H
H
16' - 2 3/4"
44' - 7 15/16" 2' - 11 7/8" 16' - 8 3/16"
11' - 1 3/4" 9' - 4" 11' - 5" 18' - 0" 13' - 4 3/4"
13' - 6" 2' - 2 1/16"
5' - 5" 3' - 0" 23' - 7" 16' - 0" 6' - 8" 16' - 6"
10' - 6 3/4" 5' - 1 1/16" 8' - 3 15/16" 2' - 4" 11' - 0" 10' - 4 1/16"
6' - 7" 9' - 11" 5' - 5" 11' - 1" 5' - 2" 7' - 6 15/32"
12' - 7 15/16" 2' - 8" 5' - 7" 1' - 4"
64' - 4"
123' - 1 15/32"
7' - 11" 5' - 11" 12' - 9" 12' - 2 11/16" 3' - 9 5/16"
3 3
F
CONSTRUCTION LIMITS
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
10' - 1 1/2"
16' - 2"
16' - 1" 16' - 0" 16' - 0" 16' - 3"
E
48' - 0 3/4"
B D G
16' - 2" 32' - 0 3/4" 16' - 0" 22' - 7" 10' - 8 3/4" 18' - 9"
C
2 2
1 1
4 4
5 5
A
A
H
H
16' - 7 3/4" 16' - 7 1/4" 1' - 9" 8' - 11" 18' - 5 3/4"
17' - 3" 20' - 5 1/4" 6' - 4 3/4" 18' - 5 3/4"
9' - 1" 26' - 8" 4' - 6" 13' - 11 3/4"
3' - 8" 24' - 3"
8' - 1 3/4" 45' - 0" 10' - 9 1/16"
3' - 9" 24' - 3"
UP
DN
UP
DN
BUILDING SYSTEMS
017
COMMON
BUILDING SYSTEMS
019
COMMON
PLANNING FILE STORAGE
020
PLANNING
RR
018
COMMON
RR
016
COMMON
FACILITIES WORK ROOM
014
FACILITIES
SMALL CONFERENCE ROOM
006
COMMON
FACILITIES ROOM
014B
FACILITIES
FACILITIES DIRECTOR
004
FACILITIES
CONFERENCE ROOM
007
COMMON
PLAT ROOM
005
ENGINEERING
IT STORAGE
002
IT
SERVER ROOM
002A
IT
LARGE CONFERENCE
008
COMMON
BREAK ROOM
009
COMMON
SUMP SERVICE
012
COMMON
ENG FILE STORAGE
013
ENGINEERING
STAIR
00
COMMON
STAIR
01
ADA INFORMATION SHOWN IS IN ACCORDANCE WITH
STANDARD ADA MINIMUM REQUIREMENTS. IF
MATERIALS/PRODUCTS SPECIFIED OR JOB CONDITIONS DO
NOT MEET THESE REQUIREMENTS, NOTIFY THE
ARCHITECT.
PULL SIDE
PUSH SIDE
PULL SIDE
X=42" MIN IF Y=54"
PUSH SIDE
Y
PULL SIDE
X
Y
PUSH SIDE
X
Y
FRONT APPROACHES - SWINGING DOORS
A B
NOTE: X=12" MIN IF
DOOR HAS BOTH A
CLOSER & LATCH
HINGE SIDE APPROACHES - SWINGING DOORS
NOTE: X=36" MIN IF Y=60"
NOTE: Y=48" MIN
IF DOOR HAS BOTH
A CLOSER & LATCH
A
B
LATCH SIDE APPROACHES - SWINGING DOORS
A
B
TWO HINGED DOORS IN SERIES
A B
NOTE: Y=54" MIN IF DOOR
HAS CLOSER
NOTE: Y=48" MIN
IF DOOR HAS
CLOSER
48" min
18" min, 24" PREFERRED
Y
X
42" min
42" min
22" min
24" min
48" min
MANEUVERING CLEARANCES
3
5
4
60" min 5
2
4
X 1
4
2
2
4
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:21 PM
19-022
MW Checker
A2.2
ABATEMENT
PLANS
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
123 DESCRIPTION DATE
UP
UP
2 2
1 1
4 4
5 5
A
A
H
H
3 3
F
DUMB WAITER
D1
D2
3' - 0" 9' - 2 1/2"
6' - 0"
D3
D3
CONSTRUCTION LIMITS
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
B C D E G
D4
S007
S006
S001
S005
S002
S003
S004
D2
4 1/2"
12' - 3 3/4"
9' - 3 1/2"
D3
S009
S010
S008
D5
S012
D5
D5
D5
D6
D6
S013
2 2
1 1
4 4
5 5
A
A
DN
UP
2 2
1 1
4 4
5 5
A
A
H
H
3 3
F
D1
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
CONSTRUCTION LIMITS
D2
6' - 4 1/2"
B C D E G
S101
S102
S103
S104
S105
S106
S107
S108
D3
D4
C-3
C-4
C-5
C-7
C-2
C-6
C-1 C-9
C-8
D5
D5
D6
D4
D7
D8
D8
5' - 9 3/4" D9
2 2
1 1
4 4
5 5
A
A
H
H
17' - 0 1/2" 6' - 6"
13' - 1 1/4" 9' - 10" 10' - 0" 9' - 10" 10' - 6" 16' - 9 3/4" 16' - 3 1/4" 1' - 9" 7' - 9" 7' - 9" 11' - 6 1/4"
16' - 4 3/16" 10' - 6 1/4" 26' - 4 1/4" 10' - 6"
OFFICE
116
OFFICE
DN
DN
DN
2 2
1 1
4 4
5 5
A
A
H
H
3 3
F
D2
D2
D1 D2
D2
D1
D1
D2
D2
21' - 8"
D1
9' - 4 3/16"
D3
2' - 4 1/2"
6' - 7" 4' - 0"
D3
4 1/2" 4" 4' - 0"
3' - 3 1/2"
14' - 6 1/2"
CONSTRUCTION LIMITS
ROOM NOT IN SCOPE
B C D E G
S201
S202
S204
S203
S205
S206
S218
S219
S207
S210
S212
S213
S211
S209
S214
S215
S217
D4
S208
3' - 4 3/4" 6' - 4"
D2
11' - 0 5/8"
7' - 9"
1' - 1 1/2"
5' - 2 7/8"
4' - 0" 17' - 5 1/2" 6' - 4"
2 2
1 1
4 4
5 5
A H
3 3
F
SOFFIT
SOFFIT
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
SOFFIT
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
SOFFIT
ROOM NOT IN SCOPE
B C D E G
CONSTRUCTION LIMITS
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
D1
D2
DASHED PATTERN INDICATES
CEILING GRID TO BE REMOVED
2 2
1 1
4 4
5 5
A H
3 3
F
SOFFIT @ 7'-5" AFF
SOFFIT @
7'3" AFF
SOFFIT
7'-6" AFF
SOFFIT @
6'-10" AFF
B C D E G
MOVE LIGHT
C3
C2
C1
C1
CONSTRUCTION LIMITS
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
2 2
1 1
4 4
5 5
A
A
H
H
3 3
F
F
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
CONSTRUCTION LIMITS
E
E
B
B
D
D
G
G
C
C
C1
C1
C1
C1
C2
OFFICE
116
OFFICE
114
OFFICE
112
OFFICE
110
OFFICE
108
STAIR
00
VESTIBULE
101
RR
106
RR
105
OFFICE
104A
IT OPEN OFFICE
104
OFFICE
102B
OFFICE
104B
OFFICE
104C
OFFICE
102A
2 2
1 1
4 4
5 5
A
A
H
H
3 3
F
F
SKYLT
DRYWALL LID
TO REMAIN
SKYLT
DRYWALL
LID TO BE
REMOVED
SKYLT SKYLT
SKYLT
ROOM NOT IN SCOPE
ROOF HATCH
CONSTRUCTION LIMITS
ROOM NOT IN SCOPE
E
E
B
B
D
D
G
G
C
C
D3
D1
D1
D2
DASHED PATTERN INDICATES
CEILING GRID TO BE REMOVED
ROOM NOT IN SCOPE
D3 D3
D4
D3
2 2
1 1
4 4
5 5
A
A
H
H
3 3
F
F
SKYLT
SKYLT SKYLT SKYLT
SKYLT
ROOM NOT IN SCOPE
ROOF HATCH
2
1
F
4 A5.0
A5.0 6
3
2
5
7
9
8
MIN
5' - 0"
MIN
1' - 6"
MIN
1' - 6"
MIN
5' - 0"
MIN
4' - 0"
MIN
4' - 0"
MAX
1' - 0"
1'-6" MIN 1'-6" MIN
MAX
1' - 0"
MIN
5' - 0"
MIN
4' - 8"
MIN
4' - 8"
MIN
5' - 0"
G
RR
106
RR
105
1' - 6"
2' - 6"
2' - 6"
4' - 10"
2
1
F
A5.0
12
14
13
11
A5.0
17
16
18 15
MIN
4' - 0"
MIN
1' - 6" 2' - 6"
MAX
3' - 6"
2' - 6"
1' - 6" 3' - 0"
3-DRAWER BASE, TYP
OPEN ADJ SHELVES
2 SHELVES PER BOX
ROLL-UP SHUTTERS
MONITOR
HOUSING
NOTE:
42" STANDING HEIGHT EXCEPT @ ADA
COUNTER
KNEE SPACE AT BOTH SIDES OF ADA COUNTER
4
A5.2
3
A5.2
2
A5.2
6
A5.2
3' - 0" 1' - 6"
UPPER CAB
WD TRIM
WRAP WALL W/ HPL
PANEL TO MATCH
CAB
NEW BASE
MIN
3' - 6"
NEW GRID CLG
PER SPEC
8' - 0"
NEW BASE, TYP
4
A5.2
3
A5.2
2
A5.2
HPL PANEL TO MATCH CAB
STYLE @ FRONT OF
SERVICE COUNTER
WD TRIM
P-LAM COUNTER W/ WD
NOSING
ST BRACKET
2' - 6"
4
3
F
5 A5.1
1' - 4 1/2"
1' - 11 3/4" 5' - 0" 8" 8' - 6" 8" 5' - 0" 1' - 11 3/4"
1' - 11 3/4"
2' - 6" 2' - 6"
5' - 11 1/2"
3
T econt ci Cop yrgiht 2007
LEVEL 2
10' - 8 5/8"
ADA COUNTER
11" MIN
2' - 6" 5' - 3"
(4) 10" X 10" ST COUNTER
BRACKET - 250LB
CAPACITY MIN
(2) 16" X 16" ST
COUNTER BRACKET -
250LB CAPACITY MIN
P-LAM COUNTER TOP
W/ WD NOSING
OH ROLLING SHUTTER
STUD WALL
P-LAM SURFACE TO
MATCH HPL CABINET
GRID CEILING
SHUTTER HEAD
FRAME
2 1/2"
A5.2
5
3' - 0"
5' - 1" 7"
5' - 0"
3/4" WD TRIM
2X4 STUD
1/2" GWB
8" X 3/4" WD TRIM
W/ 1/4" DADO
1/4" REVEAL
SHUTTER DOOR GUIDE
1/2" PLYWD
2X SPACER
8" X 3/4" WD TRIM
W/ 1/4" DADO
3/4" WD TRIM
2X4 STUD
1/2" GWB
3/4" WD TRIM,
MATCH EXST
PROFILE
SHUTTER
DOOR GUIDE
1/4" REVEAL
1 1/2" X 1 1/2"
WD TRIM
3/4" X 3 1/2"
WD TRIM
2 1/2"
CEILING GRID
3/4" X 2 1/2" WD TRIM
3/4" X 4" WD TRIM
1/4" REVEAL
SHUTTER GUIDE
SHUTTER
SCREEN
SHUTTER HEAD
2
A
3
4
A6.1
3
A6.1
66" X 56" NEW
CONCRETE.
SEE STRUCT
DTL
CUT & PATCH
ASPHALT AS
NEEDED
SUPPORT NEW
STAIR ON (E) CONC
NO HANDRAIL EXTENSION
PER IEBC 403.1 EXC #2
19 RISERS @ 7" MAX
18 TREADS @ 11" MIN
FIELD VERIFY ALL CONDITIONS
3 RISERS @ 7" MAX
2 TREADS @ 11" MIN
3"
CL
CL
ALIGN STRINGER
W/ EXISTING POST
INSIDE STRINGER
3' - 8"
INSIDE STRINGER
3' - 8"
T.O.C. = 20 1/2" LOWER
THAN EXST PLATFORM-
SLOPE AWAY @ MIN
1/8:12
1' - 0" IBC 1009.8
CONTINUE SLOPE OF
RAILING 11" PAST TREAD
PER IBC 1012.6
44" INSIDE STRINGER
CLEAR- TYP.
EDGE OF ALLEY/ ASSUMED
PROPERTY LINE
6' - 3"
11" MIN
2
A
3
3
A6.1
EXISTING PLATFORM
TO REMAIN
EXTEND NEW
HANDRAIL TO WALL
MODIFY EXST WALL/
ALIGN NEW RAIL AS NEEDED
STRINGER W/
EXISTING COL/ TS
LANDING
LEFT HAND RIGHT HAND
DOOR R.O. 4 1/2"
UNLESS NOTED OTHERWISE, DOORS AT WALL INTERSECTIONS TO BE LOCATED
AS SHOWN ABOVE
A
3' - 0"
FLOOR LINE
DOOR
HEAD
ALIGN HEAD W/ DOOR HEAD
7' - 0" +/-
2' - 0" 5' - 0"
TEMPERED 1/4"
GLAZING GL2
B
9' - 0"
FLOOR LINE
DOOR
HEAD
LAMINATED 1/4"
GLAZING GL3
ALIGN HEAD W/ DOOR HEAD
7' - 0" +/-
2' - 0" 5' - 0"
TRIM TO MATCH EXT - CUST. WIDTH
GWB
1/4" REVEAL TYP.
PRE MFR DOOR JAMB
SHIM SPACE
2X STUD FRMG = EDGE OF R.O.
GWB
TRIM TO MATCH EXST - CUST WIDTH
SHIM SPACE
3/4" JAMB
3/4" STOP
GLAZING
PER SPEC
CLR SILICONE
HALF WALL BELOW
AL WALL END CAP
STUD WALL, TYP
CAULKING OR GASKET PER MFR
AL. PARTITION TERMINATION
EXST INSULATED GLAZING
CAULKING OR GASKET PER MFR
NOTCH TERMINATION AT EXST FRAME
AS REQ'D. SEAL W/ CLEAR SILICONE
NOTE:
AL PARTITION CLOSER TO BE GORDON "WINDOW MATE (SERIES 30)" OR SIMILAR.
COLOR TO MATCH AL WDW FRAME
3' - 0" 4' - 0"
ALIGN HEAD W/ DOOR HEAD
7' - 0" +/-
C
6' - 0"
1/4" GLAZING GL1
FLOOR LINE
F - FLUSH PANEL FNV - VISION PANEL
GLASS PLACEMENT PER MFR
HG - HALF GLAZE FG - FULL GLAZE
UP
3 3
2 2
1 1
5 5
6 6
7 7
A
A
C
C
4 4
B
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED:
19-022
CV CS
PERMIT SET
STIFF PROFESSIONAL BUILDING
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
SD
DEC. 1, 2019
MD1.0
BASEMENT LEVEL-
DEMO PIPING
BASEMENT LEVEL PLAN - DEMO PIPING
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
DN
UP
UP
DN
3 3
2 2
1 1
5 5
6 6
7 7
A
A
C
C
4 4
B
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED:
19-022
CV CS
PERMIT SET
STIFF PROFESSIONAL BUILDING
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
SD
DEC. 1, 2019
MD1.1
FIRST LEVEL-
DEMO PIPING
FIRST LEVEL FLOOR PLAN - DEMO PIPING
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
UP
3 3
2 2
1 1
5 5
6 6
7 7
A
A
C
C
4 4
B
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED:
19-022
CV CS
PERMIT SET
STIFF PROFESSIONAL BUILDING
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
SD
DEC. 1, 2019
MD2.0
BASEMENT LEVEL-
DEMO HVAC
BASEMENT FLOOR PLAN - DEMO HVAC
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
DN
UP
UP
DN
3 3
2 2
1 1
5 5
6 6
7 7
A
A
C
C
4 4
B
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED:
19-022
CV CS
PERMIT SET
STIFF PROFESSIONAL BUILDING
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
SD
DEC. 1, 2019
MD2.1
FIRST LEVEL-
DEMO HVAC
FIRST LEVEL FLOOR PLAN - DEMO HVAC
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
DN
DN
3
2
1
5
6
7
A
A
C
C
4
B
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED:
19-022
CV CS
PERMIT SET
STIFF PROFESSIONAL BUILDING
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
SD
DEC. 1, 2019
MD2.2
SECOND LEVEL-
DEMO HVAC
SECOND LEVEL FLOOR PLAN - DEMO HVAC
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
3
2
1
5
6
7
A C
4
B
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED:
19-022
CV CS
PERMIT SET
STIFF PROFESSIONAL BUILDING
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
SD
DEC. 1, 2019
MD2.3
ROOF PLAN - DEMO
MECHANICAL
ROOF PLAN - DEMO MECHANICAL
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
2 2
1 1
4 4
5 5
A
A
H
H
3 3
F
F
E
E
B
B
D
D
G
G
C
C
UP
BUILDING SYSTEMS
017
BUILDING SYSTEMS
019
PLANNING FILE STORAGE
020
RR
018
RR
016
FACILITIES WORK ROOM
014
SMALL
CONFERENCE ROOM
006
FACILITIES ROOM
014B
FACILITIES DIRECTOR
004
CONFERENCE ROOM
007
PLAT ROOM
005
IT STORAGE SERVER ROOM
002A
LARGE CONFERENCE
008
BREAK ROOM
SUMP SERVICE 009
ENG FILE STORAGE 012
013
STAIR
00
STAIR
01
STORM WATER STORAGE
001
ELEV SUPPORT
2 2
1 1
4 4
5 5
A
A
H
H
3 3
F
F
E
E
B
B
D
D
G
G
C
C
UP
BUILDING SYSTEMS
017
BUILDING SYSTEMS
019
PLANNING FILE STORAGE
020
RR
018
RR
016
FACILITIES WORK ROOM
014
SMALL CONFERENCE ROOM
006
FACILITIES ROOM
014B
FACILITIES DIRECTOR
004
CONFERENCE
ROOM
007
PLAT ROOM
005
IT STORAGE
SERVER ROOM
002A
LARGE CONFERENCE
008
BREAK ROOM
009
SUMP SERVICE
012
ENG FILE STORAGE
013
STAIR
00
STAIR
01
3
2
1
5
6
7
A C
4
B
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED:
19-022
CV CS
PERMIT SET
STIFF PROFESSIONAL BUILDING
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
SD
DEC. 1, 2019
M2.3
ROOF PLAN - HVAC
ROOF PLAN - HVAC
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
A
M3.1
1
M2.1
FLOOR DRAIN IN WOOD FLOOR DETAIL
NO SCALE
1
M3.1
FLOOR SINK / DRAIN DETAIL
NO SCALE
2
M3.1
PIPE HANGER DETAIL
NO SCALE
3
M3.1
THREE WAY COIL DETAIL
NO SCALE
4
M3.1
TWO WAY COIL DETAIL
NO SCALE
5
M3.1
FINNED TUBE RADIATION PIPING DETAIL
NO SCALE
6
M3.1
FINNED TUBE RADIATION PIPING DETAIL
NO SCALE
7
M3.1
PIPE SLEEVE DETAIL
NO SCALE
8
M3.1
PIPE SLEEVE DETAIL
NO SCALE
9
M3.1
DIFFUSER DETAIL
NO SCALE
10
M3.1
CEILING CABINET FAN DETAIL
NO SCALE
11
M3.1
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
A
M3.1
1
M2.1
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED:
19-022
CV CS
PERMIT SET
STIFF PROFESSIONAL BUILDING
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
SD
DEC. 1, 2019
M4.1
MECHANICAL
SPECS
MECHANICAL LEGEND SCHEDULES AND DETAILS
NO SCALE (24X36 SHEETS)
UP
3 3
2 2
1 1
5 5
6 6
7 7
A
A
C
C
4 4
B
STIFF PROFESSIONAL BUILDING
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
PROJECT LOCATION:
OWNER:
PRINTED:
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
19-022
TW SE
PERMIT SET
SD
DEC. 1, 2019
ED1.0
BASEMENT LEVEL-
DEMO POWER
BASEMENT FLOOR PLAN - DEMO POWER
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
DN
UP
UP
DN
3 3
2 2
1 1
5 5
6 6
7 7
A
A
C
C
4 4
B
STIFF PROFESSIONAL BUILDING
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
PROJECT LOCATION:
OWNER:
PRINTED:
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
19-022
TW SE
PERMIT SET
SD
DEC. 1, 2019
ED1.1
FIRST LEVEL-
DEMO POWER
FIRST LEVEL FLOOR PLAN - DEMO POWER
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
DN
DN
3
2
1
5
6
7
A
A
C
C
4
B
STIFF PROFESSIONAL BUILDING
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
PROJECT LOCATION:
OWNER:
PRINTED:
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
19-022
TW SE
PERMIT SET
SD
DEC. 1, 2019
ED1.2
SECOND LEVEL-
DEMO POWER
SECOND LEVEL FLOOR PLAN - DEMO POWER
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
3
2
1
5
6
7
A B C
STIFF PROFESSIONAL BUILDING
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
PROJECT LOCATION:
OWNER:
PRINTED:
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
19-022
TW SE
PERMIT SET
SD
DEC. 1, 2019
ED1.3
ROOF PLAN - DEMO
POWER
ROOF PLAN - DEMO POWER
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
UP
3 3
2 2
1 1
5 5
6 6
7 7
A
A
C
C
4 4
B
STIFF PROFESSIONAL BUILDING
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
PROJECT LOCATION:
OWNER:
PRINTED:
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
19-022
TW SE
PERMIT SET
SD
DEC. 1, 2019
ED2.0
BASEMENT LEVEL-
DEMO LIGHTING
BASEMENT FLOOR PLAN - DEMO LIGHTING
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
DN
UP
UP
DN
3 3
2 2
1 1
5 5
6 6
7 7
A
A
C
C
4 4
B
STIFF PROFESSIONAL BUILDING
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
PROJECT LOCATION:
OWNER:
PRINTED:
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
19-022
TW SE
PERMIT SET
SD
DEC. 1, 2019
ED2.1
FIRST LEVEL-
DEMO LIGHTING
FIRST LEVEL FLOOR PLAN - DEMO LIGHITNG
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
DN
DN
3
2
1
5
6
7
A
A
C
C
4
B
STIFF PROFESSIONAL BUILDING
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
PROJECT LOCATION:
OWNER:
PRINTED:
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
19-022
TW SE
PERMIT SET
SD
DEC. 1, 2019
ED2.2
SECOND LEVEL-
DEMO LIGHTING
SECOND LEVEL FLOOR PLAN - DEMO LIGHTING
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
2 2
1 1
4 4
5 5
A
A
H
H
3 3
F
F
E
E
B
B
D
D
G
G
C
C
UP
BUILDING SYSTEMS
017
BUILDING SYSTEMS
019
PLANNING FILE STORAGE
020
RR
018
RR
016
FACILITIES WORK ROOM
014
SMALL CONFERENCE ROOM
006
FACILITIES ROOM
014B
FACILITIES DIRECTOR
004
CONFERENCE ROOM
007
PLAT ROOM
005
IT STORAGE
SERVER ROOM
002A
LARGE CONFERENCE
008
BREAK ROOM
SUMP SERVICE 009
012
ENG FILE STORAGE
013
STAIR
00
STAIR
01
STORM WATER STORAGE
001
2 2
1 1
4 4
5 5
A
A
H
H
3 3
F
F
E
E
B
B
D
D
G
G
C
C
UP
BUILDING SYSTEMS
017
BUILDING SYSTEMS
019
PLANNING FILE STORAGE
020
RR
018
RR
016
FACILITIES WORK ROOM
014
SMALL CONFERENCE ROOM
006
FACILITIES ROOM
014B
FACILITIES DIRECTOR
004
CONFERENCE ROOM
007
PLAT ROOM
005
IT STORAGE SERVER ROOM
002A
LARGE CONFERENCE
008
BREAK ROOM
SUMP SERVICE 009
012
ENG FILE STORAGE
013
STAIR
00
STAIR
01
STORM WATER STORAGE
001
ELEV SUPPORT
STIFF PROFESSIONAL BUILDING
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
PROJECT LOCATION:
OWNER:
PRINTED:
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
19-022
TW SE
PERMIT SET
SD
DEC. 1, 2019
E3.1
ELECTRICAL ONE
LINE DIAGRAM
STIFF PROFESSIONAL BUILDING
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
PROJECT LOCATION:
OWNER:
PRINTED:
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
19-022
TW SE
PERMIT SET
SD
DEC. 1, 2019
E3.2
ELECTRICAL
PANEL SCHEDULES
ACCESS CONTROL ROUGH-IN DETAIL
NO SCALE
3
E4.1
LOW-VOLTAGE RACEWAY DETAIL
NO SCALE
2
E4.1
LAY-IN SEISMIC FIXTURE BRACING DETAIL
NO SCALE
4
E4.1
LIGHTING CONTROL INTENT DETAIL
NO SCALE
1
E4.1
WATTSTOPPER 'LMRC-213' 0-10V DIMMING ROOM CONTROLLER
NO SCALE
5
E4.1
STIFF PROFESSIONAL BUILDING
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
PROJECT LOCATION:
OWNER:
PRINTED:
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
19-022
TW SE
PERMIT SET
SD
DEC. 1, 2019
E4.1
ELECTRICAL
SCHEDULES AND
DETAILS
003
BUILDING STORAGE
002B
IT/ELEC
012A IT/ELEC
010
ELEC
015
STOR
011
HALL
000B
HALL
000A
002
STIFF PROFESSIONAL BUILDING
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
PROJECT LOCATION:
OWNER:
PRINTED:
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
19-022
TW SE
PERMIT SET
SD
DEC. 1, 2019
E2.0
BASEMENT LEVEL-
LIGHTING
BASEMENT FLOOR PLAN - LIGHTING
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
ELEV SUPPORT
003
BUILDING STORAGE
002B
IT/ELEC
012A IT/ELEC
010
ELEC
015
STOR
011
HALL
000B
HALL
000A
3
E4.1
3
E4.1
3
E4.1
002
STIFF PROFESSIONAL BUILDING
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
PROJECT LOCATION:
OWNER:
PRINTED:
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
19-022
TW SE
PERMIT SET
SD
DEC. 1, 2019
E1.0
BASEMENT LEVEL-
POWER
BASEMENT FLOOR PLAN - POWER
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED:
19-022
CV CS
PERMIT SET
STIFF PROFESSIONAL BUILDING
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
SD
DEC. 1, 2019
M3.1
MECHANICAL
LEGEND
SCHEDULES AND
MECHANICAL LEGEND SCHEDULES AND DETAILS DETAILS
NO SCALE (24X36 SHEETS)
STORM WATER STORAGE
001
ELEV SUPPORT
003
BUILDING STORAGE
002B
IT/ELEC
012A
IT/ELEC
010
ELEC
015
STOR
011
HALL
000B
HALL
000A
002
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED:
19-022
CV CS
PERMIT SET
STIFF PROFESSIONAL BUILDING
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
SD
DEC. 1, 2019
M2.0
BASEMENT LEVEL-
HVAC
BASEMENT FLOOR PLAN - HVAC
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
003 BUILDING STORAGE
002B
IT/ELEC
012A
IT/ELEC
010
ELEC
015
STOR
HALL 011
000B
HALL
000A
002
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
123 DESCRIPTION DATE
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED:
19-022
CV CS
PERMIT SET
STIFF PROFESSIONAL BUILDING
20E OLIVE ST BOZEMAN MT
59715
20E OLIVE ST BOZEMAN MT 59715
SD
DEC. 1, 2019
M1.0
BASEMENT LEVEL-
PIPING
BASEMENT FLOOR PLAN - PIPING
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
DIMENSIONS TO MATCH ESXT
8 7/8" 4 3/4"
4 3/4" 4 3/4"
4 3/4"
4 3/4" 4 3/4"
PER MFR
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:40 PM
19-022
MW Checker
A7.1
WINDOW AND
DOOR INFO
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
DOOR SALVAGE SCHEDULE
MARK WIDTH HEIGHT GLAZING SWING COMMENTS
BASEMENT
S001 2' - 6" 7' - 0" LH DISPOSE
S002 3' - 0" 7' - 0" RH DISPOSE
S003 2' - 6" 7' - 0" RH DISPOSE
S004 3' - 0" 7' - 0" LH DISPOSE
S005 2' - 8" 7' - 0" FULL WIRE LITE RH DISPOSE
S006 3' - 0" 7' - 0" FULL LITE LH DISPOSE
S007 2' - 8" 7' - 0" LH DISPOSE
S008 2' - 8" 7' - 0" RH DISPOSE
S009 2' - 8" 7' - 0" LH DISPOSE
S010 2' - 8" 7' - 0" LH DISPOSE
S012 3' - 0" 7' - 0" LH SALVAGE DOOR AND HARDWARE, MOVE TO FACILITIES ROOM 014
S013 3' - 0" 7' - 0" LH DISPOSE
LEVEL 1
S101 3' - 0" 7' - 0" LH BATHROOM LOCKSET; SALVAGE DOOR AND HARDWARE
S102 3' - 0" 7' - 0" FULL LITE RH SALVAGE DOOR AND HANDLE SET
S103 3' - 0" 7' - 0" FULL LITE LH SALVAGE DOOR AND HANDLE SET
S104 3' - 0" 7' - 0" FULL LITE LH SALVAGE DOOR AND HANDLE SET
S105 3' - 0" 7' - 0" FULL LITE RH SALVAGE DOOR AND HANDLE SET
S106 3' - 0" 7' - 0" FULL LITE LH SALVAGE DOOR AND HANDLE SET
S107 3' - 0" 7' - 0" LH SALVAGE DOOR, HANDLE SET AND CLOSER
S108 3' - 0" 7' - 0" LH SALVAGE DOOR AND HANDLE SET
LEVEL 2
S201 3' - 0" 7' - 0" RH SALVAGE DOOR, BATHROOM LOCKSET AND DOOR MNT CLOSER
S202 3' - 0" 7' - 0" FULL WIRE LITE RH SALVAGE DOOR, ELECTRONIC KEYPAD; DOOR MNT CLOSER
S203 2' - 6" 7' - 0" RH SALVAGE HANDLE SET AND CLOSER
S204 3' - 0" 7' - 0" FULL LITE LH SALVAGE DOOR AND HANDLE SET
S205 3' - 0" 7' - 0" FULL LITE LH SALVAGE DOOR AND HANDLE SET
S206 3' - 0" 7' - 0" FULL WIRE LITE RH SALVAGE DOOR, ELECTRONIC KEYPAD, DOOR MNT CLOSER. RE-USE
RM 203
S207 2' - 8" 7' - 0" LH DISPOSE
S208 3' - 0" 7' - 0" RH SALVAGE DOOR AND HANDLE SET; RE-USE ROOM 014
S209 3' - 0" 7' - 0" RH DISPOSE
S210 3' - 0" 7' - 0" RH DISPOSE
S211 3' - 0" 7' - 0" FULL WIRE LITE RH SALVAGE DOOR, ELECTRONIC KEYPAD, DOOR MNT CLOSER.
S212 2' - 8" 7' - 0" LH SALVAGE DOOR, DISPOSE HARDWARE
S213 2' - 8" 7' - 0" FULL LITE LH SALVAGE DOOR, DISPOSE HARDWARE
S214 2' - 8" 7' - 0" RH DISPOSE
S215 3' - 0" 7' - 0" LH DISPOSE DOOR, SALVAGE ELECTRONIC KEYPAD, DOOR MNT CLOSER;
MOVE TO DOOR 200-1
S217 3' - 0" 7' - 0" RH SALVAGE DOOR AND HANDLE SET
S218 3' - 0" 7' - 0" FULL LITE LH SALVAGE DOOR AND HANDLE SET
S219 3' - 0" 7' - 0" FULL LITE RH SALVAGE DOOR AND HANDLE SET
S220 3' - 0" 7' - 0" RH SECURE ACCESS (TRILOGY LOCK)
DOOR SCHEDULE - NEW AND MODIFIED DOORS ONLY
MARK RM# RM NAME WIDTH HEIGHT PANEL SWING HARDWARE COMMENTS
BASEMENT
000-1 000B HALL 3' - 0" 7' - 0" HG LH 07 SECURE ACCESS (TRILOGY LOCK)
000-2 000A HALL 3' - 0" 7' - 0" HG RH 07 SECURE ACCESS (TRILOGY LOCK)
002-1 002A SERVER ROOM 3' - 0" 7' - 0" F EX-01 ADD SMOKE SEAL AND THRESHOLD TO EXST
DOOR
004-1 004 FACILITIES DIRECTOR 3' - 0" 7' - 0" FG RH 05
004-2 014B FACILITIES ROOM 3' - 0" 7' - 0" FG LH
005-1 005 PLAT ROOM 3' - 0" 7' - 0" FG RH 02
006-1 006 SMALL CONFERENCE ROOM 3' - 0" 7' - 0" FG LH 02
007-1 007 CONFERENCE ROOM 3' - 0" 7' - 0" FG LH 02
014-2 014B FACILITIES ROOM 3' - 0" 7' - 0" FNV RH 02
LEVEL 1
100-1 100 VESTIBULE 6' - 0" 7' - 0" PER MFR RH 01 NEW STOREFRONT DOOR W/ SIDELITE
101-1 101 VESTIBULE 6' - 0" 7' - 0" PER MFR LH 01 NEW STOREFRONT DOOR W/ SIDELITE
102-1 102 GIS OPEN OFFICE 3' - 0" 7' - 0" FG RH 04
102-2 102A OFFICE 3' - 0" 7' - 0" FG LH 10
102-3 102B OFFICE 3' - 0" 7' - 0" FG LH 10
102-4 102C OFFICE 3' - 0" 7' - 0" FG RH 10
103-1 103 GIS OPEN OFFICE 3' - 0" 7' - 0" FG RH 03
103-2 103A OFFICE 3' - 0" 7' - 0" FG RH 10
104-1 104 IT OPEN OFFICE 3' - 0" 7' - 0" FG LH 03
104-2 104A OFFICE 3' - 0" 7' - 0" FG RH 10
104-3 104B OFFICE 3' - 0" 7' - 0" FG RH 10
104-4 104C OFFICE 3' - 0" 7' - 0" FG LH 10
105-1 105 RR 3' - 0" 7' - 0" F LH 11
106-1 106 RR 3' - 0" 7' - 0" F RH 11
129-1 129 OFFICE 3' - 0" 7' - 0" FG LH 05
LEVEL 2
200-1 200A HALL 3' - 0" 7' - 0" HG LH 08 RE-USE TRILOGY LOCK FROM DOOR S215
200-2 200A HALL 3' - 0" 7' - 0" HG LH 07 SECURE ACCESS (TRILOGY LOCK)
200-3 200A HALL 3' - 0" 7' - 0" HG LH 07 SECURE ACCESS (TRILOGY LOCK)
202-1 202 PROJECT INTAKE 5' - 0" 4' - 3" PER MFR ROLL-UP PER MFR
202-2 202 PROJECT INTAKE 8' - 6" 5' - 3" PER MFR ROLL-UP PER MFR
202-3 202 PROJECT INTAKE 5' - 0" 4' - 3" PER MFR ROLL-UP PER MFR
204-1 204 ADMIN OFFICE 3' - 0" 7' - 0" FG LH 05
205-1 205 OFFICE 3' - 0" 7' - 0" FG LH 10
207-1 207 OFFICE 3' - 0" 7' - 0" FG RH 10
211-1 211 AFFORDABLE HOUSING
MANAGER
3' - 0" 7' - 0" FG RH 07.01 SECURE ACCESS (TRILOGY LOCK)
213-1 213 FISH BOWL CONFERENCE 3' - 0" 7' - 0" FG RH 02
214-1 214 RR 3' - 0" 7' - 0" F RH 11
215-1 215 STORAGE 3' - 0" 7' - 0" F RH 09
217-1 217 DIRECTOR 3' - 0" 7' - 0" FG LH 05
220-1 220 FAM RM 3' - 0" 7' - 0" F RH 02
221-1 221 STORAGE 3' - 0" 7' - 0" F RH 09
222-1 222 LONG RANGE PLANNING 3' - 0" 7' - 0" FG LH 04
222-2 222A OFFICE 3' - 0" 7' - 0" FG LH 06
222-3 222B OFFICE 3' - 0" 7' - 0" FG LH 10
222-4 222C OFFICE 3' - 0" 7' - 0" FG LH 10
222-5 222D AFFORDABLE HOUSING/
PLANNING
3' - 0" 7' - 0" FG RH 10
222-6 222D AFFORDABLE HOUSING/
PLANNING
3' - 0" 7' - 0" FG RH 10
NOTE:
1. ALL GLAZING IN DOORS TO BE TEMPERED
2. SEE SPECS FOR HARDWARE GROUPS
3. ALL DOOR HARDWARE SHALL BE IN
ACCORDANCE W/ 2012 IBC SECTION 1008.1.9
1/2" = 1'-0"
1
WDW A - TEMPERED
1/2" = 1'-0"
2
WDW B
DOOR REPURPOSE SCHEDULE
MARK RM NAME RM NUMBER WIDTH HEIGHT GLAZING SWING COMMENTS
BASEMENT
S012 FACILITIES WORK ROOM 014 3' - 0" 7' - 0" LH RE-USE DOOR W/ EXST HARDWARE
S208 FACILITIES WORK ROOM 014 3' - 0" 7' - 0" RH RE-USE DOOR W/ EXST HARDWARE
LEVEL 2
S206 CURRENT DEVELOPMENT PLANNING 203 3' - 0" 7' - 0" RH RE-USE DOOR W/ TRILOGY LOCK, HARDWARE
1 1/2" = 1'-0"
6
1 1/2" = 1'-0" INTERIOR WDW - JAMB DETAIL
5
WALL/ WINDOW INTERSECTION
123 DESCRIPTION DATE
NOTE:
CONTRACTOR TO VERIFY WITH OWNER WHICH DOORS ARE TO BE SALVAGED AND RE-PURPOSED
1/2" = 1'-0"
3
WDW C
NOTE:
ALL WINDOWS FIXED PANE, CONSTRUCTED ON SITE.
FRAMES, STOPS AND TRIM TO MATCH EXISTING TRIM
STYLE AND MATERIAL
1/2" = 1'-0"
4
DOOR PANELS
TUBE STEEL HANDRAIL
(1 1/4" DIAMETER MIN.
PER IBC 1012.3.1)
NEW GRATING 1/2" DIA MAX
OPEN RAILING
LESS THAN 4" SPHERE
PER IBC 1013.4
FIELD VERIFY ALL CONDITIONS
INSIDE STINGERS
3' - 8"
19 RISERS @ 7" MAX
18 TREADS @ 11" MIN
CONT. GRIPPING
SURFACE
PER IBC 1012.4
1' - 0"
11" MIN 11"
MAX
7"
1' - 8 1/2"
VFY FINAL RISE AFTER
NEW SLAB IS INSTALLED
3' - 6"
1' - 0"
NOSINGS SHALL BE UNIFORM
PER IBC 1009.7.5.2
9/16" BEVEL MAX FOR NOSING
PER IBC 1009.7.5
SOLID RISER MATERIAL
PER IBC 1009.7.3.5
3' - 0"
RAILING EXTENSION MUST
MAINTAIN ACCESS TO
EQUIPMENT. VERIFY ACCESS
IS MAINTAINED, OR SEE
ARCHITECT ABOUT
ALTERNATE DESIGNS PRIOR
TO FABRICATION AND
INSTALLATION
A6.1
6
7
A6.1
2
LEVEL 2
10' - 8 5/8"
3
PAINT NEW STAIR &
HANDRAIL BLACK
HNDRAIL HT
3' - 0"
GDRAIL HT
3' - 6"
7"
11"
NEW GRATE ON
EXST STRUCTURE
EXST GUARD RAIL
3' - 0"
FV
3' - 6" MIN
EXST GRATE
EXST CONC SLAB
11' - 0 3/4" 2" +/-
A6.1
5
A6.1
5
7
A6.1
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:38 PM
19-022
MW Checker
A6.1
EXTERIOR STAIR
DETAILS
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
1/4" = 1'-0"
1
EXT. STAIR - LEVEL 1
1/4" = 1'-0"
2
EXT. STAIR - LEVEL 2
1/2" = 1'-0"
4
EXT. STAIR - LOWER FLIGHT
1/4" = 1'-0"
3
EXT. STAIR - UPPER FLIGHT
1/2" = 1'-0"
5
EXT UPPER STAIR
1/2" = 1'-0"
6
EXT LOWER STAIR
1/2" = 1'-0"
7
EXT STAIR RAILING
123 DESCRIPTION DATE
FRAME AND
ROLLING
MECHANISM
1/2" GWB
2X12 BOX HEADER
LEVEL 2
10' - 8 5/8"
P-LAM COUNTER TOP
W/ WD NOSING
OH ROLLING SHUTTER
STUD WALL
P-LAM SURFACE TO
MATCH HPL CABINET
GRID CEILING
SHUTTER HEAD
FRAME
HPL CABINET
3' - 0"
4 1/2"
3' - 6" 4' - 3"
A5.2
5
1"
SEALANT
3/16" PLATE GLASS
P-L COUNTER
CHAMFERED WD
NOSING, TYP
1"
3/8" 1' - 6" 3/8"
3/4"
OWNER PROVIDED MONITOR-
MOUNT W/ BRACKETS TO
UNDERSIDE OF COUNTER. VFY
MONITOR SIZE W/ OWNER
5 A5.1
3
4
2' - 6"
5' - 11 1/2"
PROJECT INTAKE
202
2X4 WALL
2' - 6"
11 1/2"
HPL CAB BOXES
(4) 10" X 10" ST
COUNTER BRACKET -
250LB CAPACITY MIN
(2) 16" X 16" ST
COUNTER BRACKET -
250LB CAPACITY MIN
EDGE OF
COUNTER ABV
6 1/2"
2' - 5"
1' - 10" 5' - 5 3/4" 9' - 2" 5' - 5 1/2" 2' - 2 3/4"
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:36 PM
19-022
MW Checker
A5.2
INTERIOR DETAILS
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
3/4" = 1'-0"
3
LOW INTAKE COUNTER SECTION
1 1/2" = 1'-0"
4
PROJECT INTAKE COUNTER - SHUTTER
123 DESCRIPTION DATE
1 1/2" = 1'-0"
5
SHUTTER HEAD
3/4" = 1'-0"
2
HIGH INTAKE COUNTER1
3" = 1'-0"
6
MONITOR MOUNTING
1/4" = 1'-0"
1
INTAKE COUNTER FRAMING
7
INTAKE COUNTER
8
INTAKE COUNTER - BACK
4
PROJECT INTAKE
202
2X4 WALL
MONITOR MTD UNDER
GLASS-FLUSH W/
COUNTER
6 A5.1
2X4 WALL BEHIND CAB'S
W/ PANEL FACE WITH
POWER AND DATA
10' - 2"
3' - 0" 8' - 0" 2' - 8"
8 1/2" 2' - 0"
1' - 6"
P-LAM COUNTER W/
WD BACKSPLASH &
NOSING
3' - 6" 1' - 6" 2' - 6"
HPL CABINET, VFY
STYLE W/ OWNER
3' - 6" 1' - 3"
1' - 6" 4' - 0"
3' - 6" 1' - 6" 2' - 6"
1' - 3" 3' - 6"
2' - 0" 2' - 0"
P-LAM COUNTER
W/ WD NOSING
3' - 6"
3' - 0" 4' - 0" 3' - 0"
P-LAM COUNTER W/
WD NOSING
HPL CABINET, VFY FINISH
W/ OWNER. HPL PANEL @
ENDS AND BACK WALL
OPEN ADJ SHELVES
4
C
A5.1
8
A7.1
6
3' - 3" 1' - 10 1/2"
OFFICE
222C
OFFICE
222B
A A
3' - 3" 1' - 10 1/2"
NEW GRID CLG
8' - 0"
A A
TRIM TO MATCH EXST - 2" NOM,
CLR FINISHED, VFY SPECIES
NEW BASE, TYP
4
E
P-LAM COUNTER W/ WD BACKSPLASH,
MNT @ 30" AFF
ATTACH TO P-LAM
CNTR FOR SUPPORT
OPEN UNDERNEATH
SALVAGE COUNTER TOP C-2
MNT @ 30" AFF,
ADD WD BACKSPLASH
WALL LEDGER
3
D
10 A5.1 11
COPIER BY OWNER
10' - 9 1/4"
2' - 2"
UPPERS
1' - 2"
2' - 2"
UPPERS
1' - 2"
4' - 1"
COPY ROOM
216
3' - 5" 2' - 0" 2' - 2"
1" 4' - 0"
ADJ SHELVES
INSIDE
PLAM COUNTER W/
WD BACKSPLASH
ADJ SHELVES IN 14"
DEEP UPPERS
3
3' - 5" 2' - 0" 2' - 2"
1 5/8" 1' - 9" 3' - 6" 3' - 6" 1' - 9" 1 5/8"
1 5/8" 2' - 6" 2' - 9" 2' - 9" 2' - 6" 1 5/8"
HPL CABINETS W.
ADJ SHELVES
INSIDE
PLAM COUNTER W/
WD BACKSPLASH &
NOSING
ADJ SHELVES IN 14"
DEEP UPPERS
4
A
B
A5.1
13
16' - 3 7/8"
OFFICE
222A
P-LAM COUNTER W/
WD BACKSPLASH &
NOSING
FALSE PANEL
HPL CAB W/ ADJ
SHELVING, TYP
2" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 2' - 6"
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:35 PM
19-022
MW Checker
A5.1
ENLARGED PLANS
& ELEVATIONS
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
1/4" = 1'-0"
5
INTAKE COUNTER - WEST (BACK)
1/4" = 1'-0"
2
INTAKE COUNTER - EAST (FRONT)
1/4" = 1'-0"
1
PROJECT INTAKE 202
1/4" = 1'-0"
3
INTAKE COUNTER - NORTH
1/4" = 1'-0"
4
INTAKE COUNTER - SOUTH
1/4" = 1'-0"
6
INTAKE BACK COUNTER EAST
1/4" = 1'-0"
7
PLANNING 222
1/4" = 1'-0"
8
PLANNING 222 - NORTH
1/2" = 1'-0"
14
HALL 200A ADA COUNTER
1/4" = 1'-0"
9
COPY RM 216
1/4" = 1'-0"
11
COPY RM 216 - EAST
1/4" = 1'-0"
10
COPY RM 216 - WEST
1/4" = 1'-0"
12
OFFICE 222A
1/4" = 1'-0"
13
OFFICE 222A - NORTH
123 DESCRIPTION DATE
2' - 0"
RR
214
RR
210
2' - 6"
2' - 6"
JAN
212
5' - 9"
8 3/8"
WP PANEL
4' - 0"
3' - 6"
NEW BASE, TYP
FRP PANEL
8' - 0"
WP PANEL
4' - 0"
FRP PANEL PER SPEC
MIN
1' - 3"
WP PANEL
4' - 0"
INSULATE EXP
PIPES, TYP
MIN
1' - 3"
8' - 0"
WP PANEL
4' - 0"
NEW BASE, TYP
FRP PANEL PER SPEC
WP PANEL
4' - 0"
INSULATE EXP
PIPES, TYP
FRP PANEL PER SPEC
3' - 6"
WP PANEL
4' - 0"
EXST VANITY
NEW VERT
GRAB BARS
8' - 0"
NEW CLG
TILES, TYP
EXST FRP
4' - 0"
NEW BASE, TYP
4' - 0"
REMOVE AND RE-USE EXST
FRP TO ACCOMMODATE
NEW WALL NEW VERT
GRAB BAR
EXST ACCESSORIES
TO REMAIN, TYP
THIS BATHROOM
4' - 2 1/2"
MATCH EXST FRP
NEW VERT
GRAB BAR
8' - 0"
NEW CLG
TILES, TYP
EXST FRP
NEW BASE, TYP
NEW DISPENSER
BELOW GRAB BARS
4' - 0"
REPLACE FRP @
URINAL, MATCH
EXST, TYP
EXST
VANITY
EXST ACCESSORIES
TO REMAIN, TYP
THIS BATHROOM
5' - 0"
2' - 0"
F.V.
3' - 7 3/8"
28" X 25"
RECYCLE
CONTAINER BY
OWNER
NEW P LAM
COUNTER W/
OPEN SHELVES
BELOW
FLIPPER
CABINET
3 DRAWER
PEDESTAL
BY OWNER
C
BINDING
123
A5.0
21
20
3
E
A5.0 23
7" 9' - 0" 7" 1' - 10" 2' - 2"
1' - 0" 9' - 0" 1' - 1 3/4"
FISH BOWL CONFERENCE
213
24
B
B
TRIM TO MATCH EXST - 2"
NOM, CLR FINISHED, VFY
SPECIES
HD HT
7' - 0"
B
9' - 0"
2' - 0" 5' - 0"
NEW BASE, TYP
8' - 0"
2' - 0" 5' - 0"
TRIM TO MATCH EXST - 2" NOM,
CLR FINISHED, VFY SPECIES
9' - 0"
B
FV
1' - 7 3/8" 2' - 0" 2' - 0"
VFY OPENING
ACCOMMODATES
OWNER CABINET
HPL CABINET, VFY
STYLE W/ OWNER
3' - 0"
5' - 0"
P-LAM CNTR W/
WD BACKSPLASH
& NOSING
CONTAINER BY
OWNER
3' - 0"
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:32 PM
19-022
MW Checker
A5.0
ENLARGED PLANS
& ELEVATIONS
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
1/2" = 1'-0"
1
RR103 RR105
1/4" = 1'-0"
10
RR221 RR223
1/4" = 1'-0"
2
RR106 - EAST
1/4" = 1'-0"
3
RR106 - NORTH
1/4" = 1'-0"
4
RR106 - WEST
1/4" = 1'-0"
5
RR106- SOUTH
1/4" = 1'-0"
6
RR105 - EAST
1/4" = 1'-0"
7
RR105 - NORTH
1/4" = 1'-0"
8
RR105 - SOUTH
1/4" = 1'-0"
9
RR105 - WEST
1/4" = 1'-0"
11
RR214 - EAST
1/4" = 1'-0"
12
RR214 - NORTH
1/4" = 1'-0"
13
RR214 - SOUTH
1/4" = 1'-0"
14
RR214 - WEST
1/4" = 1'-0"
15
RR210 - EAST
1/4" = 1'-0"
16
RR210 - NORTH
1/4" = 1'-0"
17
RR210 - SOUTH
1/4" = 1'-0"
18
RR210 - WEST
1/2" = 1'-0"
19
BINDING AREA
1/4" = 1'-0"
22
FISHBOWL CONFERENCE 205
1/4" = 1'-0"
23
FISHBOWL CONFERENCE EAST
1/4" = 1'-0"
24
FISHBOWL CONFERENCE NORTH
NOTE:
SEE A2.1 FOR FIXTURE
MOUNTING HTS & CLEARANCE
1/4" = 1'-0"
20
BINDING WEST
1/4" = 1'-0"
21
BINDING NORTH
123 DESCRIPTION DATE
CONSTRUCTION LIMITS
ROOM NOT IN SCOPE
E
E
B
B
D
D
G
G
C
C
EXST CLG
EXST CLG
C1
C1
C2
C1
C1
C1
C2
C1
BUILDING OFFICIAL
219
DIRECTOR
217
STAIR
00
STORAGE
215
FISH BOWL CONFERENCE
213
COPY ROOM
216
PLAN REVIEWERS
218A
BUILDING INSPECTIONS
218
OFFICE
222B
OFFICE
222C
STORAGE
221
FAM RM
220
OFFICE
222A
LONG RANGE PLANNING
222
AFFORDABLE HOUSING/ PLANNING
222D
AFFORDABLE HOUSING MANAGER
211
STAIR
01
PROJECT INTAKE
202
CURRENT DEVELOPMENT
PLANNING
203
OFFICE
205
OFFICE
207
ADMIN OFFICE
209
CODE COMPLIANCE
208
ADMIN OFFICE
204
CODE COMPLIANCE
206
RR
214
RR
210
JAN
212
ROOF
00A
HALL
200A
HALL
200C
C1
C3
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
10' - 6 1/2"
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ EQ EQ
EQ EQ
ROOM NOT IN SCOPE
C1
10"
HOLD CLG BACK
AT ROLLING DR
HEAD
7' - 11" TYP
7' - 11" TYP
7' - 11" TYP
7' - 11" TYP
7' - 11" TYP
7' - 11" TYP
7' - 11" TYP
NOTE:
PREFERRED CLG HEIGHT AT 2ND FLOOR = 7'-11" AFF.
MECHANICAL, STRUCTURAL AND OTHER IMPEDIMENTS
MAY REQUIRE LOWER CEILINGS. APPROVE ANY CEILING
LOWER THAN 7'-9" AFF WITH ARCHITECT
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:27 PM
19-022
MW Checker
A4.2
SECOND FLOOR
RCP
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
1/8" = 1'-0"
1
DEMO LEVEL 2 RCP
1/8" = 1'-0"
2
LEVEL 2 RCP
RCP DEMO NOTES - LEVEL 2
NUMBER COMMENTS
D1 REMOVE LIGHTS ONLY
D2 EXST DRYWALL CLG AND LIGHT TO REMAIN
D3 EXST LIGHTS AND CLG TILES TO REMAIN
D4 RE-USE EXST LIGHT
RCP NOTES - LEVEL 2
NUMBER COMMENTS
C1 EXST LIGHTS AND CLG TILES TO REMAIN
C2 NEW LIGHTS IN EXST CLG TILES
C3 RE-USE EXST LIGHT
NOTE:
MECHANICAL VENTS AND LOUVERS AND LIGHTING ARE SHOWN FOR LOCATION REFERENCE
ONLY. SEE MECHANICAL AND ELECTRICAL PLANS FOR FULL SCOPE OF DEMOLITION AND
SPECIFIC VENT/ LOUVER/ LIGHTING TYPE AND PLACEMENT.
123 DESCRIPTION DATE
OFFICE
102C
GIS OPEN OFFICE
102
GIS OPEN OFFICE
103
OFFICE
107
OFFICE
109
OFFICE
121
OFFICE
129
STAIR
01
OFFICE
132
OFFICE
130
OFFICE
128
OFFICE
126
OFFICE
124
OFFICE
119
OFFICE
127
STORAGE
125
MEN'S RR
117
WOMEN'S RR
120
OFFICE
118
OFFICE
111
OFFICE
122
VESTIBULE
100
OFFICE
113
OFFICE
103A
SHARED
102D
HALL
100B
BINDING
123
HALL
100B
HALL
100A
EQ EQ
EQ EQ EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
7' - 6"
8' - 0" TYP
8' - 0" TYP
8' - 0" TYP
8' - 0" TYP
NOTE:
PREFERRED CLG HEIGHT AT 1ST FLOOR = 8'-0" AFF.
MECHANICAL, STRUCTURAL AND OTHER IMPEDIMENTS
MAY REQUIRE LOWER CEILINGS. APPROVE ANY CEILING
LOWER THAN 7'-9" AFF WITH ARCHITECT
2 2
1 1
4 4
5 5
A
A
H
H
3 3
F
F
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
CLG SLOPES TO
TOP OF WINDOW
ROOM NOT IN SCOPE
CONSTRUCTION LIMITS
E
E
B
B
D
D
G
G
C
C
D2
D1
DASHED PATTERN INDICATES
CEILING GRID TO BE REMOVED
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:25 PM
19-022
MW Checker
A4.1
FIRST FLOOR RCP
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
1/8" = 1'-0"
1
LEVEL 1 RCP
1/8" = 1'-0"
2
DEMO LEVEL 1 RCP
RCP DEMO NOTES - LEVEL 1
NUMBER COMMENTS
D1 EXST LIGHTS AND CLG TILES TO REMAIN
D2 EXST DRYWALL CLG AND LIGHT TO REMAIN
RCP NOTES - LEVEL 1
NUMBER COMMENTS
C1 EXST LIGHTS AND CLG TILES TO REMAIN
C2 PATCH CLG GRID AND TILES AS REQ'D AROUND DEMO AREA
NOTE:
MECHANICAL VENTS AND LOUVERS AND LIGHTING ARE SHOWN FOR LOCATION REFERENCE
ONLY. SEE MECHANICAL AND ELECTRICAL PLANS FOR FULL SCOPE OF DEMOLITION AND
SPECIFIC VENT/ LOUVER/ LIGHTING TYPE AND PLACEMENT.
123 DESCRIPTION DATE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
C1
C1
C4
C4
C5
BUILDING SYSTEMS
017
BUILDING SYSTEMS
019
PLANNING FILE STORAGE
020
RR
018
RR
016
FACILITIES WORK ROOM
014
SMALL CONFERENCE ROOM
006
FACILITIES ROOM
014B
FACILITIES DIRECTOR
004
CONFERENCE ROOM
007
PLAT ROOM
005
IT STORAGE
002
SERVER ROOM
002A
LARGE CONFERENCE
008
BREAK ROOM
009
SUMP SERVICE
012
ENG FILE STORAGE
013
STAIR
00
STAIR
01
STORM WATER STORAGE
001
ELEV SUPPORT
003
BUILDING STORAGE
002B
IT/ELEC
012A
IT/ELEC
010
ELEC
015
STOR
011
FACILITIES WORK ROOM
014A
HALL
000B
HALL
000A
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ
EQ EQ EQ EQ
EQ EQ
EQ EQ
EQ EQ
NOTE:
PREFERRED CLG HEIGHT AT BASEMENT = 8'-0" AFF.
MECHANICAL, STRUCTURAL AND OTHER IMPEDIMENTS
MAY REQUIRE LOWER CEILINGS. APPROVE ANY CEILING
LOWER THAN 7'-9" AFF WITH ARCHITECT
8' - 0" TYP
8' - 0" TYP
8' - 0" TYP
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:24 PM
19-022
MW Checker
A4.0
BASEMENT RCP
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
1/8" = 1'-0"
1
DEMO BASEMENT RCP
1/8" = 1'-0"
2
BASEMENT RCP
RCP NOTES - BASEMENT
NUMBER COMMENTS
C1 EXST LIGHTS AND CLG TILES TO REMAIN
C2 NEW LIGHTS IN EXST CLG TILES
C3 PATCH CLG GRID AND TILES AS REQ'D AROUND DEMO AREA
C4 CUT AND PATCH CLG GRID/ TILES AROUND NEW WALL
C5 LEAV CLG OPEN TO STRUCTURE ABV. SEAL ALL PENETRATIONS
RCP DEMO NOTES - BASEMENT
NUMBER COMMENTS
D1 REMOVE LIGHTS ONLY
D2 DEMO SOFFIT IF POSSIBLE, OTHERWISE EXTEND ACROSS NEW OPENING
NOTE:
MECHANICAL VENTS AND LOUVERS AND LIGHTING ARE SHOWN FOR LOCATION REFERENCE
ONLY. SEE MECHANICAL AND ELECTRICAL PLANS FOR FULL SCOPE OF DEMOLITION AND
SPECIFIC VENT/ LOUVER/ LIGHTING TYPE AND PLACEMENT.
123 DESCRIPTION DATE
4' - 2 15/16"
D5
S220
ROOM NOT IN SCOPE
2' - 11 1/4"
2 2
1 1
4 4
5 5
A
A
H
H
3' - 8"
BUILDING OFFICIAL
219
DIRECTOR
217
STAIR
00
STORAGE
215
FISH BOWL CONFERENCE
213
COPY ROOM
216
PLAN REVIEWERS
218A
BUILDING INSPECTIONS
218
OFFICE
222B
OFFICE
222C
STORAGE
221
FAM RM
220
OFFICE
222A
LONG RANGE PLANNING
222
AFFORDABLE HOUSING/ PLANNING
222D
AFFORDABLE HOUSING MANAGER
211
STAIR
01
PROJECT INTAKE
202
CURRENT DEVELOPMENT
PLANNING
203
OFFICE
205
OFFICE
207
ADMIN OFFICE
209
CODE COMPLIANCE
208
ADMIN OFFICE
204
CODE COMPLIANCE
206
RR
214
RR
210
JAN
212
ROOF
00A
BUILDING SYSTEMS
201
CONSTRUCTION LIMITS
PUBLIC COUNTER
3 3
CHAIRS
24' - 4 1/4" 16' - 0" 13' - 5" 12' - 8" 4' - 6" 4' - 0" 12' - 1" 13' - 5" 15' - 10 1/4"
116' - 3 1/2"
16' - 0 5/8" 2' - 5" 8' - 4 1/2" 5' - 2 7/8" 12' - 8 5/8" 3' - 3 3/8" 16' - 3"
16' - 8 3/8" 27' - 7 7/8" 9' - 4 1/2" 17' - 2" 20' - 3 5/8" 6' - 5 7/8" 18' - 7 1/4"
64' - 4"
28' - 8" 9' - 4 3/8" 8' - 0" 8' - 0 1/2" 2' - 0 5/8" 8' - 2 1/2"
9' - 10" 10' - 2" 4' - 0"
5' - 3 1/4" 15' - 11 7/8" 11' - 1 3/4" 5' - 0"
9' - 9 3/4" 11' - 5 3/4"
8' - 2 3/8"
12' - 0 1/2"
4' - 0" 11' - 3"
F
F
27' - 5 3/4"
14' - 5 1/8"
17' - 1"
10' - 0 7/8"
18' - 7"
12' - 2 1/2"
27' - 3 3/8"
5' - 0 1/2" 6' - 9 3/4"
3' - 8" 9' - 10 1/2"
P1
P2
P2 5' - 6"
9' - 6"
11' - 1 1/2" 5' - 3" 24' - 0" 2' - 8 3/4" 4' - 0" 2' - 8 3/4" 14' - 4 1/4"
10' - 7 1/4" 6' - 11 1/4"
P2
P1
P5
P4
P7
ROOM NOT IN SCOPE
5' - 7 3/8"
5' - 9"
8 1/2"
8' - 9 1/2" 3' - 3"
7' - 8 1/2"
A5.0
10
A5.1
1
40' - 5"
P6
E
E
B
B
D
D
G
G
C
C
A6.1
2
217-1
215-1
213-1
200-1
214-1
207-1
205-1
211-1
200-3
222-4
222-6
222-5
222-3
222-1
221-1
222-2
220-1
204-1
HALL
200A
HALL
200C
A5.1
7
200-2
P5
C-2
P6
P6
P5
A5.0
22
A
B
B
A A
I.2
I.1s
I.1s
I.1s
3' - 2"
A5.1
14
A5.1
9
A5.1
12
S206
P2
P2
MIN
1' - 6"
MIN
1' - 6"
P4
ROOM NOT IN SCOPE
P5
P5 A5.2
1
202-1 202-2 202-3
P8
P9
21' - 3 1/2"
INT FINISH LEGEND: SEE SPECS FOR DETAILS
CONC = CONCRETE CPT = CARPET CPT TILE= CARPET TILE FRP = FIBER REINFORCED PANEL LAY-IN = GRID CEILING W/ LAY-IN TILES
LVT = LUXURY VINYL TILE NC = NO CHANGE PTD = PAINTED RB = RUBBER BASE RES = RESILIENT FLOORING
VINYL = VINYL TREAD, LOW GRIT
(1) LAYER 5/8" GYPSUM BOARD
2X WOOD STUD FRAMING @ 16" O.C.
(1) LAYER 5/8" GYPSUM BOARD
FINISH CEILING - REFER TO REFLECTED
CEILING PLAN AND FINISH SCHEDULE
(E) FLOOR
2X TOP PLATE
EXTEND WALL TO STRUCTURE
ABOVE WHERE POSSIBLE
PARTITION I.1s / I.2s
SOUND ATTENUATED WALL
SOUND-ATTENUATION BLANKETS
WHERE SHOWN - REFER TO PLAN
2X4 PLATE
(E) FLOOR
2X4 TOP PLATE
FINISH FLOORING - REFER TO FINISH PLANS
8'-6" ABOVE FLOOR U.N.O.
PARTITION I.1
2X4 STUD WALL
2X PLATE
FINISH FLOORING - REFER TO FINISH PLANS
ACOUSTICAL SEALANT ON TOP & BOTTOM
FINISHES MAY VARY - REFER TO
FINISH PLANS AND SCHEDULE
(1) LAYER 5/8" GYPSUM BOARD
2X4 WOOD STUD FRAMING @ 16" O.C.
(1) LAYER 5/8" GYPSUM BOARD
FINISHES MAY VARY - REFER TO
FINISH PLANS AND SCHEDULE
FINISH CEILING - REFER TO
REFLECTED CEILING PLAN AND
FINISH SCHEDULE
NOTE:
ALL WALLS 2X4 WOOD STUD, PARTITION TYPE I.1,
UNLESS OTHERWISE CALLED OUT ON FLOOR PLANS
GASKET @ OUTLETS +
SWITCHES, TYP.
2X6 PLATE
(E) FLOOR
2X6 TOP PLATE
FINISH FLOORING - REFER TO FINISH PLANS
8'-6" ABOVE FLOOR U.N.O.
PARTITION I.2
2X6 STUD WALL
(1) LAYER 5/8" GYPSUM BOARD
2X6 WOOD STUD FRAMING @ 16" O.C.
(1) LAYER 5/8" GYPSUM BOARD
FINISHES MAY VARY - REFER TO
FINISH PLANS AND SCHEDULE
FINISH CEILING - REFER TO
REFLECTED CEILING PLAN AND
FINISH SCHEDULE
I.2
WALL TAG
NOTE:
METAL STUD FRAMING MAY BE ENCOUNTERED IN VARIOUS AREAS OF THE BUILDING. CONTRACTOR MAY, AT THEIR
DISCRETION, SUBSTITUTE METAL STUDS OF COMPARABLE SIZE FOR THE WALL TYPE.
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:22 PM
19-022
MW Checker
A3.2
SECOND FLOOR
PLANS
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
1/8" = 1'-0"
1
DEMO LEVEL 2
1/8" = 1'-0"
2
LEVEL 2
PLAN NOTES - LEVEL 2
NUMBER COMMENTS
P1 NEW TREADS ONLY IN STAIRWELL
P2 WIRELESS KEY ENTRY
P4 FURNITURE SYSTEMS PROVIDED AND INSTALLED BY OWNER
P5 NEW BUILT IN COUNTER
P6 ADA PROHIBITS DOOR CLOSER THIS LOCATION
P7 RE-USE SALVAGED COUNTER
P8 REPLACE EXISTING FIRE EXTINGUISHER CABINET
P9 NEW FIRE EXTINGUISHER CABINET
DEMO NOTES - LEVEL 2
NUMBER COMMENTS
D1 REMOVE DOOR AND SEAL OPENING
D2 DEMO NEW DOOR OPENING
D3 DEMO NEW WALKWAY OPENING
D4 REMOVE URINAL
D5 REMOVE DOOR AND JAMB, SALVAGE TRIM, PREP FOR NEW DOOR
LEVEL 2 FINISH SCHEDULE
NUMBER ROOM NAME CEILING FINISH WALL FINISH BASE FLOORING COMMENTS
00 STAIR NC NC NC VINYL NEW FLOORING AT STAIR TREADS ONLY
00A ROOF ROOM NOT IN SCOPE
01 STAIR NC NC NC VINYL NEW FLOORING AT STAIR TREADS ONLY
200A HALL LAY-IN PTD RB LVT
200B HALL LAY-IN PTD RB CPT TILE
200C HALL LAY-IN PTD RB CPT TILE
201 BUILDING SYSTEMS NC NC NC NC NO CHANGE TO FINISHES
202 PROJECT INTAKE LAY-IN PTD RB CPT TILE
203 CURRENT DEVELOPMENT PLANNING LAY-IN PTD RB CPT TILE
204 ADMIN OFFICE LAY-IN PTD RB CPT TILE
205 OFFICE LAY-IN PTD RB CPT TILE
206 CODE COMPLIANCE NC NC NC CPT TILE NEW FLOORING ONLY, WORK AROUND EXISTING BASE
207 OFFICE LAY-IN PTD RB CPT TILE
208 CODE COMPLIANCE NC NC NC CPT TILE NEW FLOORING ONLY, WORK AROUND EXISTING BASE
209 ADMIN OFFICE LAY-IN PTD RB CPT TILE
210 RR NC PTD/ FRP RB RES
211 AFFORDABLE HOUSING MANAGER LAY-IN PTD RB CPT TILE
212 JAN NC NC NC NC NO CHANGE TO FINISHES
213 FISH BOWL CONFERENCE LAY-IN PTD RB CPT TILE
214 RR LAY-IN PTD/ FRP RB RES FINISHES MATCH EXST; PAINT ENTIRE ROOM; PATCH
BASE/ CLG AS POSSIBLE.
215 STORAGE LAY-IN PTD RB CPT TILE
216 COPY ROOM LAY-IN PTD RB CPT TILE
217 DIRECTOR LAY-IN PTD RB CPT TILE
218 BUILDING INSPECTIONS LAY-IN PTD RB CPT TILE
218A PLAN REVIEWERS NC NC NC NC ROOM NOT IN SCOPE
219 BUILDING OFFICIAL NC NC NC NC ROOM NOT IN SCOPE
220 FAM RM LAY-IN PTD RB CPT TILE
221 STORAGE LAY-IN PTD RB CPT TILE
222 LONG RANGE PLANNING LAY-IN PTD RB CPT TILE
222A OFFICE LAY-IN PTD RB CPT TILE
222B OFFICE LAY-IN PTD RB CPT TILE
222C OFFICE LAY-IN PTD RB CPT TILE
222D AFFORDABLE HOUSING/ PLANNING LAY-IN PTD RB CPT TILE
NOTE: ADA SIGNAGE @ STAIRS,
RESTROOMS (IF NOT CURRENTLY
PROVIDED) TYP.
1" = 1'-0"
WALL TYPES
123 DESCRIPTION DATE
114
OFFICE
112
OFFICE
110
OFFICE
108
STAIR
00
VESTIBULE
101
RR
106
RR
105 OFFICE
104A
IT OPEN OFFICE
104
OFFICE
102B
OFFICE
104B
OFFICE
104C
OFFICE
102A
OFFICE
102C
GIS OPEN OFFICE
102
GIS OPEN OFFICE
103
OFFICE
107
OFFICE
109
OFFICE
121
OFFICE
129
STAIR
01
OFFICE
132
OFFICE
130
OFFICE
128
OFFICE
126
OFFICE
124
OFFICE
119
OFFICE
127
STORAGE
125
MEN'S RR
117
WOMEN'S RR
120
OFFICE
118
OFFICE
111
OFFICE
122
VESTIBULE
100
TV/ AV
OFFICE
113
3 3
116' - 3 1/2"
64' - 4"
15' - 9 3/4" 2' - 4" 7' - 7" 8' - 6" 10' - 3" 3' - 2 1/16" 5' - 6 3/16" 10' - 1 1/2"
17' - 5" 20' - 1 1/4" 6' - 6 3/4" 18' - 5 31/32"
8' - 8 3/4" 7' - 7" 5' - 10" 9' - 10" 4' - 0 1/4" 6' - 4"
22' - 6" 9' - 6 1/4"
12' - 0" 9' - 6"
11' - 0 3/4" 9' - 11" 11' - 3 15/32"
21' - 6"
F
F
9' - 6" 21' - 11 3/4"
10' - 11" 11' - 2 1/2"
4' - 0"
P1
P1
P8
P6
P5
P2 P3
P5
A5.0
19
P6
21' - 10 1/2"
P9
P8
P9
P4
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
CONSTRUCTION LIMITS
4' - 10"
A5.0
1
OFFICE
103A
SHARED
102D
HALL
100B
BINDING
123
E
E
B
B
D
D
G
G
C
C
A6.1
1
103-2
129-1
103-1
101-1
104-3
104-4
104-1
105-1
106-1
104-2
102-2
102-3
102-4
102-1
100-1
C-7 C-5
P10
P6
HALL
100B
HALL
100A
P11
A
A5.1
8 SIM
A7.1
5
I.2
I.2
I.2
I.2
I.2 s I.1 s
8' - 0"
STORAGE
115
P12
P12
P7
EQ EQ
EQ EQ
EQ EQ
C
C
C
EQ EQ
C
INT FINISH LEGEND: SEE SPECS FOR DETAILS
CONC = CONCRETE CPT = CARPET CPT TILE= CARPET TILE FRP = FIBER REINFORCED PANEL LAY-IN = GRID CEILING W/ LAY-IN TILES
LVT = LUXURY VINYL TILE NC = NO CHANGE PTD = PAINTED RB = RUBBER BASE RES = RESILIENT FLOORING
VINYL = VINYL TREAD, LOW GRIT
(1) LAYER 5/8" GYPSUM BOARD
2X WOOD STUD FRAMING @ 16" O.C.
(1) LAYER 5/8" GYPSUM BOARD
FINISH CEILING - REFER TO REFLECTED
CEILING PLAN AND FINISH SCHEDULE
(E) FLOOR
2X TOP PLATE
EXTEND WALL TO STRUCTURE
ABOVE WHERE POSSIBLE
PARTITION I.1s / I.2s
SOUND ATTENUATED WALL
SOUND-ATTENUATION BLANKETS
WHERE SHOWN - REFER TO PLAN
2X4 PLATE
(E) FLOOR
2X4 TOP PLATE
FINISH FLOORING - REFER TO FINISH PLANS
8'-6" ABOVE FLOOR U.N.O.
PARTITION I.1
2X4 STUD WALL
2X PLATE
FINISH FLOORING - REFER TO FINISH PLANS
ACOUSTICAL SEALANT ON TOP & BOTTOM
FINISHES MAY VARY - REFER TO
FINISH PLANS AND SCHEDULE
(1) LAYER 5/8" GYPSUM BOARD
2X4 WOOD STUD FRAMING @ 16" O.C.
(1) LAYER 5/8" GYPSUM BOARD
FINISHES MAY VARY - REFER TO
FINISH PLANS AND SCHEDULE
FINISH CEILING - REFER TO
REFLECTED CEILING PLAN AND
FINISH SCHEDULE
NOTE:
ALL WALLS 2X4 WOOD STUD, PARTITION TYPE I.1,
UNLESS OTHERWISE CALLED OUT ON FLOOR PLANS
GASKET @ OUTLETS +
SWITCHES, TYP.
2X6 PLATE
(E) FLOOR
2X6 TOP PLATE
FINISH FLOORING - REFER TO FINISH PLANS
8'-6" ABOVE FLOOR U.N.O.
PARTITION I.2
2X6 STUD WALL
(1) LAYER 5/8" GYPSUM BOARD
2X6 WOOD STUD FRAMING @ 16" O.C.
(1) LAYER 5/8" GYPSUM BOARD
FINISHES MAY VARY - REFER TO
FINISH PLANS AND SCHEDULE
FINISH CEILING - REFER TO
REFLECTED CEILING PLAN AND
FINISH SCHEDULE
I.2
WALL TAG
NOTE:
METAL STUD FRAMING MAY BE ENCOUNTERED IN VARIOUS AREAS OF THE BUILDING. CONTRACTOR MAY, AT THEIR
DISCRETION, SUBSTITUTE METAL STUDS OF COMPARABLE SIZE FOR THE WALL TYPE.
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:22 PM
19-022
MW Checker
A3.1
FIRST FLOOR
PLANS
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
1/8" = 1'-0"
1
DEMO LEVEL 1
1/8" = 1'-0"
2
LEVEL 1
PLAN NOTES - LEVEL 1
NUMBER COMMENTS
P1 NEW TREADS ONLY IN STAIRWELL
P2 EXISTING FIRE EXTINGUISHER CABINET TO REMAIN
P3 REMOVE ADA ACTUATOR
P4 ADA DRINKING FOUNTAIN AND BOTTLE FILL
P5 EXTEND DRYWALL TO HARD LID TO MITIGATE BATHROOM NOISE, TAPE ONLY ABOVE LAY-IN CEILING
P6 FURNITURE SYSTEMS PROVIDED AND INSTALLED BY OWNER
P7 NEW FIRE EXTINGUISHER CABINET
P8 FROST GLASS FOR PRIVACY
P9 RE-USE EXST SIGNAGE
P10 RE-USE SALVAGED COUNTER. VFY MOUNTING W/ OWNER
P11 PATCH CARPET & BASE AS REQ'D IN DEMO AREA
P12 OWNER PROVIDED EQUIPMENT, SHOWN FOR REFERENCE
DEMO NOTES - LEVEL 1
NUMBER COMMENTS
D1 REMOVE STEEL STAIR
D2 REMOVE HALF WALL AND FIN TUBE
D3 SALVAGE COUNTER TOP, RELOCATE TO INTAKE AREA 200A
D4 SALVAGE COUNTER FOR OWNER
D5 SALVAGE COUNTER TOP, RELOCATE TO IT 104
D6 SALVAGE COUNTER TOP, RELOCATE TO PLANNING 203 (VFY LOC W/ OWNER)
D7 SAVE TOILET, GRAB BARS & ALL ACCESSORIES FOR RE-USE
D8 REMOVE DOOR PANELS AND HARDWARE. PREP FRAME FOR NEW DOOR W/ SIDELITE PER MFR/
SUPPLIER
D9 DEMO NEW DOOR OPENING
LEVEL 1 FINISH SCHEDULE
NUMBER ROOM NAME CEILING FINISH WALL FINISH BASE FLOORING COMMENTS
00 STAIR NC NC NC VINYL NEW FLOORING AT STAIR TREADS ONLY
01 STAIR NC NC NC VINYL NEW FLOORING AT STAIR TREADS ONLY
100 VESTIBULE NC PTD NC NC PAINT ONLY
100A HALL LAY-IN PTD RB CPT TILE
100B HALL NC NC NC NC PATCH WALL AND PAINT ONLY AS REQ'D FOR
LOCAL MATCH
101 VESTIBULE NC PTD NC NC PAINT ONLY
102 GIS OPEN OFFICE LAY-IN PTD RB CPT TILE
102A OFFICE LAY-IN PTD RB CPT TILE
102B OFFICE LAY-IN PTD RB CPT TILE
102C OFFICE LAY-IN PTD RB CPT TILE
102D SHARED LAY-IN PTD RB CPT TILE
103 GIS OPEN OFFICE LAY-IN PTD RB CPT TILE
103A OFFICE LAY-IN PTD RB CPT TILE
104 IT OPEN OFFICE LAY-IN PTD RB CPT TILE
104A OFFICE LAY-IN PTD RB CPT TILE
104B OFFICE LAY-IN PTD RB CPT TILE
104C OFFICE LAY-IN PTD RB CPT TILE
105 RR LAY-IN PTD/ FRP RB RES
106 RR LAY-IN PTD/ FRP RB RES
107 OFFICE LAY-IN PTD RB CPT TILE
108 OFFICE ROOM NOT IN SCOPE
109 OFFICE ROOM NOT IN SCOPE
110 OFFICE ROOM NOT IN SCOPE
111 OFFICE ROOM NOT IN SCOPE
112 OFFICE ROOM NOT IN SCOPE
113 OFFICE ROOM NOT IN SCOPE
114 OFFICE ROOM NOT IN SCOPE
115 STORAGE ROOM NOT IN SCOPE
116 OFFICE ROOM NOT IN SCOPE
117 MEN'S RR ROOM NOT IN SCOPE
118 OFFICE ROOM NOT IN SCOPE
119 OFFICE ROOM NOT IN SCOPE
120 WOMEN'S RR ROOM NOT IN SCOPE
121 OFFICE ROOM NOT IN SCOPE
122 OFFICE ROOM NOT IN SCOPE
123 BINDING NC PTD NC NC PATCH WALL AND PAINT ONLY AS REQ'D FOR
LOCAL MATCH
124 OFFICE ROOM NOT IN SCOPE
125 STORAGE ROOM NOT IN SCOPE
126 OFFICE ROOM NOT IN SCOPE
127 OFFICE ROOM NOT IN SCOPE
128 OFFICE ROOM NOT IN SCOPE
129 OFFICE LAY-IN PTD RB CPT TILE
130 OFFICE ROOM NOT IN SCOPE
132 OFFICE ROOM NOT IN SCOPE
1" = 1'-0"
WALL TYPES
NOTE: ADA SIGNAGE @ STAIRS,
RESTROOMS (IF NOT CURRENTLY
PROVIDED) TYP.
123 DESCRIPTION DATE
H
H
6' - 1 1/4" 10' - 0 1/2" 15' - 8 1/2"
9' - 9" 19' - 0 31/32"
116' - 3 1/2"
15' - 11 1/32" 37' - 3" 16' - 8 1/2" 13' - 1 1/2" 7' - 10 1/4" 6' - 6 3/4" 7' - 4" 11' - 6 15/32"
BUILDING SYSTEMS
017
BUILDING SYSTEMS
019
PLANNING FILE STORAGE
020
RR
018
RR
016
FACILITIES WORK ROOM
014
SMALL CONFERENCE ROOM
006
FACILITIES ROOM
014B
FACILITIES DIRECTOR
004
CONFERENCE ROOM
007
PLAT ROOM
005
IT STORAGE
002
SERVER ROOM
002A
LARGE CONFERENCE
008
BREAK ROOM
009
SUMP SERVICE
012
ENG FILE STORAGE
013
STAIR
00
STAIR
01
STORM WATER STORAGE
001
ELEV SUPPORT
003
BUILDING STORAGE
002B
42' - 2 3/4"
9' - 8 1/2"
IT/ELEC
012A
IT/ELEC
010
ELEC
015
STOR
011
3 3
16' - 4 3/4"
20' - 10 15/16" 11' - 5" 18' - 0" 14' - 0 1/16"
9' - 7" 11' - 9 1/16"
4' - 0"
4' - 0"
F
F
26' - 2 1/2" 16' - 0"
5' - 5" 16' - 0" 15' - 6 1/2" 5' - 8"
12' - 2 1/2"
P1
P2
P1
P2
P4
P4
FACILITIES WORK ROOM
014A
FLRNG TRANSITION
P5
P5
P6
P6
CONSTRUCTION LIMITS
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
MIN
1' - 6"
MIN
1' - 6"
P7
E
E
B
B
D
D
G
G
C
C
000-1
014-2
000-2
005-1
HALL
000B
HALL
000A
002-1
I.1s
I.1s
P3 P3
S208
004-2
004-1
006-1
007-1
P5
P8
P8
S012
INT FINISH LEGEND: SEE SPECS FOR DETAILS
CONC = CONCRETE CPT = CARPET CPT TILE= CARPET TILE FRP = FIBER REINFORCED PANEL LAY-IN = GRID CEILING W/ LAY-IN TILES
LVT = LUXURY VINYL TILE NC = NO CHANGE PTD = PAINTED RB = RUBBER BASE RES = RESILIENT FLOORING
VINYL = VINYL TREAD, LOW GRIT
(1) LAYER 5/8" GYPSUM BOARD
2X WOOD STUD FRAMING @ 16" O.C.
(1) LAYER 5/8" GYPSUM BOARD
FINISH CEILING - REFER TO REFLECTED
CEILING PLAN AND FINISH SCHEDULE
(E) FLOOR
2X TOP PLATE
EXTEND WALL TO STRUCTURE
ABOVE WHERE POSSIBLE
PARTITION I.1s / I.2s
SOUND ATTENUATED WALL
SOUND-ATTENUATION BLANKETS
WHERE SHOWN - REFER TO PLAN
2X4 PLATE
(E) FLOOR
2X4 TOP PLATE
FINISH FLOORING - REFER TO FINISH PLANS
8'-6" ABOVE FLOOR U.N.O.
PARTITION I.1
2X4 STUD WALL
2X PLATE
FINISH FLOORING - REFER TO FINISH PLANS
ACOUSTICAL SEALANT ON TOP & BOTTOM
FINISHES MAY VARY - REFER TO
FINISH PLANS AND SCHEDULE
(1) LAYER 5/8" GYPSUM BOARD
2X4 WOOD STUD FRAMING @ 16" O.C.
(1) LAYER 5/8" GYPSUM BOARD
FINISHES MAY VARY - REFER TO
FINISH PLANS AND SCHEDULE
FINISH CEILING - REFER TO
REFLECTED CEILING PLAN AND
FINISH SCHEDULE
NOTE:
ALL WALLS 2X4 WOOD STUD, PARTITION TYPE I.1,
UNLESS OTHERWISE CALLED OUT ON FLOOR PLANS
GASKET @ OUTLETS +
SWITCHES, TYP.
2X6 PLATE
(E) FLOOR
2X6 TOP PLATE
FINISH FLOORING - REFER TO FINISH PLANS
8'-6" ABOVE FLOOR U.N.O.
PARTITION I.2
2X6 STUD WALL
(1) LAYER 5/8" GYPSUM BOARD
2X6 WOOD STUD FRAMING @ 16" O.C.
(1) LAYER 5/8" GYPSUM BOARD
FINISHES MAY VARY - REFER TO
FINISH PLANS AND SCHEDULE
FINISH CEILING - REFER TO
REFLECTED CEILING PLAN AND
FINISH SCHEDULE
I.2
WALL TAG
NOTE:
METAL STUD FRAMING MAY BE ENCOUNTERED IN VARIOUS AREAS OF THE BUILDING. CONTRACTOR MAY, AT THEIR
DISCRETION, SUBSTITUTE METAL STUDS OF COMPARABLE SIZE FOR THE WALL TYPE.
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:21 PM
19-022
MW Checker
A3.0
BASEMENT FLOOR
PLANS
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
1/8" = 1'-0"
1
DEMO BASEMENT
1/8" = 1'-0"
2
BASEMENT
PLAN NOTES - BASEMENT
NUMBER COMMENT
P1 NEW TREADS ONLY IN STAIRWELL
P2 SECURE ENTRY POINT. NO CLOSER AT THIS DOOR
P3 REMOVE DRYWALL ONE SIDE, EXTEND FRAMING TO STRUCTURE, FILL CAVITY
WITH SOUND BATT, RE-APPLY DRYWALL ON ONE SIDE
P4 PAINTING HALLWAY WALLS TO BE PRICED SEPARATELY
P5 FREE STANDING SHELVING, INSTALLED BY OWNER
P6 OWNER SUPPLIED WORK BENCH, INSTALLED BY CONTRACTOR
P7 ALL WALLS AND PENETRATIONS TO BE SEALED
P8 EXISTING FIRE EXTINGUISHER TO REMAIN
DEMO NOTES - BASEMENT
NUMBER COMMENTS
D1 REMOVE IN-WALL CABINET AND PATCH OPENING
D2 DEMO NEW DOOR OPENING
D3 REMOVE DOOR AND SEAL OPENING
D4 REMOVE DUMB WAITER ENCLOSURE AND PATCH WALL BEHIND
D5 REMOVE DOOR AND JAMB, SALVAGE TRIM, PREP FOR NEW DOOR
D6 MECH AND PIPING WORK ABOVE CLG WILL REQUIRE DUST & STRUCTURE
PROTECTION AND REMOVAL/ RE-INSTALLATION OF CEILING TILES
BASEMENT FINISH SCHEDULE
NUMBER ROOM NAME CEILING FINISH WALL FINISH BASE FLOORING COMMENTS
00 STAIR NC NC NC VINYL NEW FLOORING AT STAIR TREADS ONLY
000A HALL NC NC NC NC PATCH WALL AND CARPET, PAINT ONLY AS
REQ'D FOR LOCAL MATCH
000B HALL NC NC NC NC PATCH WALL AND CARPET, PAINT ONLY AS
REQ'D FOR LOCAL MATCH
01 STAIR NC NC NC VINYL NEW FLOORING AT STAIR TREADS ONLY
001 STORM WATER STORAGE ROOM NOT IN SCOPE
002 IT STORAGE LAY-IN PTD RB CPT TILE
002A SERVER ROOM EXPOSED PTD NC NC SEAL ROOM AND PENETRATIONS COMPLETELY.
PAINT AT PATCHING/ NEW WALLS ONLY.
002B BUILDING STORAGE LAY-IN PTD RB CPT TILE
003 ELEV SUPPORT ROOM NOT IN SCOPE
004 FACILITIES DIRECTOR LAY-IN PTD RB CPT TILE
005 PLAT ROOM LAY-IN PTD RB EXST CPT CUT BACK AND PROTECT CARPET
006 SMALL CONFERENCE ROOM LAY-IN PTD RB CPT TILE
007 CONFERENCE ROOM LAY-IN PTD RB EXST CPT CUT BACK AND PROTECT CARPET
008 LARGE CONFERENCE ROOM NOT IN SCOPE
009 BREAK ROOM ROOM NOT IN SCOPE
010 IT/ELEC ROOM NOT IN SCOPE
011 STOR ROOM NOT IN SCOPE
012 SUMP SERVICE ROOM NOT IN SCOPE
012A IT/ELEC ROOM NOT IN SCOPE
013 ENG FILE STORAGE ROOM NOT IN SCOPE
014 FACILITIES WORK ROOM LAY-IN FRP/ PTD RB CONCRETE FRP TO 4' HT ABV FLOOR; CLEAN & PREP SLAB
FOR OWNER APPLIED SEALANT
014A FACILITIES WORK ROOM LAY-IN PTD RB EXISTING CPT
014B FACILITIES ROOM LAY-IN PTD RB CPT TILE
015 ELEC ROOM NOT IN SCOPE
016 RR ROOM NOT IN SCOPE
017 BUILDING SYSTEMS ROOM NOT IN SCOPE
018 RR ROOM NOT IN SCOPE
019 BUILDING SYSTEMS ROOM NOT IN SCOPE
020 PLANNING FILE STORAGE ROOM NOT IN SCOPE
1" = 1'-0"
WALL TYPES
NOTE: ADA SIGNAGE @ STAIRS,
RESTROOMS (IF NOT CURRENTLY
PROVIDED) TYP.
123 DESCRIPTION DATE
48" min. 4 48" min. 4
X
2 24" min
SINK
DASHED LINE
REPRESENTS EXTENT OF
CLEAR FLOOR SPACE
2' - 6"
min
1' - 6"
min
1' - 0"
4' - 0" min max
3' - 0" min
5' - 0" min
6"
max
2' - 8" min
4" max
3' - 6" min
4' - 11" min W/ FLOOR
4'-8" min W/ 5 WALL
MOUNTED WC
MOUNTED WC
NOTE:
PROVIDE 9" TOE CLEARANCE AT TOILET PARTITIONS
TOILET STALL
3' - 6" min
IF DEPTH >24", 6"
EXTRA CLEAR WIDTH IS
REQ'D
URINAL
4' - 0"
2' - 6"
MIN
MIN
DRINKING FOUNTAIN
3' - 0" min
5' - 0" min
6"
max
4' - 11" min W/ FLOOR
4'-8" min W/ 5 WALL
MOUNTED WC
MOUNTED WC
3' - 6" min
TOILET
CLEAR FLOOR
SPACE
SIDE ELEVATION FRONT ELEVATION
ADA LAVATORY
INSULATE EXPOSED PIPES TO
AVOID ACCIDENTAL CONTACT
9"
6" 1' - 0"
2' - 6" max
2' - 5" min
min
min KNEE CLEARANCE
8" min
KNEE CLEARANCE
T.O. RIM
2' - 10" min
6' - 2"
B.O. REFLECTIVE SURFACE
T.O. REFLECTIVE SURFACE
REFLECTIVE
SURFACE
RESTROOM ACCESSORIES
4' - 0" MAX TO HIGHEST
POINT OF OPERATION
HAND DRYER
TOWEL
FLUSH MNT TOWEL
SOAP
NAP. DISPENSER TOILET COVER
FLUSH MNT TOWEL/
WASTE
ADA TOILET AND URINAL
1' - 5"
2' - 9" T.O. BAR
1' - 0" 3' - 4"
max 40" - 42"
3' - 1 3/4"
7"
CLR
3' - 0" max
1' - 7" min
CL
1' - 6"
CL
1' - 7" min
CL
max
3' - 0" min 6"
1' - 0"
min
CL
2' - 6"
CLR WIDTH
4' - 0"
CLR WIDTH
3' - 3" 1' - 6"
39" - 41"
3' - 3"
39" - 41"
1
3' - 6" max
T.O. RIM
17" max
9"
6" max
2
3' - 0" max
2' - 3" min
8"
max
17"-19"
max
ADA DRINKING FOUNTAIN
1 1/2" 1 1/2" 1 1/2" 1 1/2"
HANDRAIL GRAB BAR
HANDRAILS & GRAB BARS
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:18 PM
19-022
MW Checker
A2.1
ADA INFORMATION
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
1/4" = 1'-0"
4
MANEUVERING CLEARANCES
3/8" = 1'-0"
2
SINK CLEARANCE
1/2" = 1'-0"
1
ADA-MOUNTING HEIGHTS
3" = 1'-0"
3
HANDRAIL & GRAB BARS
123 DESCRIPTION DATE
COMMON
STORM WATER STORAGE
001
STORM WATER
ELEV SUPPORT
003
COMMON
BUILDING STORAGE
002B
BUILDING
IT/ELEC
012A
COMMON
IT/ELEC
010
COMMON
CONSTRUCTION LIMITS
ELEC
015
COMMON
STOR
011
COMMON
OPTION TO PAINT
WALL
OPTION TO PAINT
WALL
130'
43'
MOST REMOTE
POINT - 120'
EXIT ACCESS TRAVEL DISTANCE
OFFICE
116
ENGINEERING
OFFICE
114
ENGINEERING
OFFICE
112
ENGINEERING
OFFICE
110
ENGINEERING
OFFICE
108
ENGINEERING
STAIR
00
COMMON
VESTIBULE
101
COMMON
RR
106
COMMON
RR
105
COMMON
OFFICE
104A
IT
IT OPEN OFFICE
104
IT
OFFICE
102B
SUSTAINABILITY
OFFICE
104B
IT
OFFICE
104C
IT
OFFICE
102A
GIS
OFFICE
102C
GIS
GIS OPEN OFFICE
102
GIS
GIS OPEN OFFICE
103
GIS
OFFICE
107
ENGINEERING
OFFICE
109
ENGINEERING
OFFICE
121
ENGINEERING
OFFICE
129
PUBLIC WORKS
STAIR
01
COMMON
OFFICE
132
WATER CONSERVATION
OFFICE
130
STORM WATER
OFFICE
128
ENGINEERING
OFFICE
126
ENGINEERING
OFFICE
124
ENGINEERING
OFFICE
119
STORM WATER
OFFICE
127
STORM WATER
STORAGE
125
IT
MEN'S RR
117
COMMON
WOMEN'S RR
120
COMMON
OFFICE
118
ENGINEERING
OFFICE
111
STORM WATER
OFFICE
122
WATER CONSERVATION
VESTIBULE
100
COMMON
OFFICE
113
WATER CONSERVATION
130'
64'
COMMON PATH OF TRAVEL
BUILDING OFFICIAL
219
BUILDING
DIRECTOR
217
PLANNING
STAIR
00
COMMON
STORAGE
215
BUILDING
FISH BOWL CONFERENCE
213
B/P SHARED
COPY ROOM
216
BUILDING
PLAN REVIEWERS
218A
BUILDING
BUILDING INSPECTIONS
218
BUILDING
OFFICE
222B
PLANNING
OFFICE
222C
PLANNING
STORAGE
221
PLANNING
FAM RM
220
COMMON
OFFICE
222A
PLANNING
LONG RANGE PLANNING
222
PLANNING
AFFORDABLE HOUSING/ PLANNING
222D
PLANNING
AFFORDABLE HOUSING MANAGER
211
PLANNING
STAIR
01
COMMON
PROJECT INTAKE
202
B/P/E SHARED
CURRENT DEVELOPMENT
PLANNING
203
PLANNING
OFFICE
205
PLANNING
OFFICE
207
PLANNING
ADMIN OFFICE
209
PLANNING
CODE COMPLIANCE
208
CODE COMPL.
ADMIN OFFICE
204
PLANNING
CODE COMPLIANCE
206
CODE COMPL.
RR
214
COMMON
RR
210
COMMON
JAN
212
COMMON
ROOF
00A
COMMON
BUILDING SYSTEMS
201
COMMON
130'
74'
COMMON PATH OF TRAVEL
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:17 PM
19-022
MW MW
A2.0
CODE REVIEW
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
3/32" = 1'-0"
1
BASEMENT- CODE
3/32" = 1'-0"
2
LEVEL 1- CODE
3/32" = 1'-0"
3
LEVEL 2- CODE
2012 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
LEVEL 3 ALTERATION
2012 IBC SECTION
303.1.2
• ASSEMBLY AREAS: ALL LESS THAN 50 OCCUPANTS OR 750 SF - B OCCUPANCY
• LARGE CONFERENCE = 540 SF
503
• TYPE II B - 9000 SF / STORY ALLOWED
• 7600 SF ACTUAL - B OCCUPANCY
508.4
• FILE STORAGE = S1 (ACCESSORY USE)
• NO SEPARATION REQUIRED
1004.1.2
• OCCUPANCY LOAD: BUSINESS 100 GROSS = 76 MAX
• LESS DUE TO STORAGE, CORRIDORS, RESTROOMS, ETC.
1005.3.1 + 1005.3.2
• EXIT WIDTHS: STAIRWAY MIN WIDTH REQ'D= 44" (>50 OCCUPANTS)
• STAIRWAYS - 76 x 0.3 = 22.8" REQUIRED - 36" MIN PROV.
• OTHER - 76 x 0.2 = 15.2" REQUIRED - 36" MIN PROV.
1007.3 + 1007.6
• AREA OF REFUGE:
• NEW FINISHES ONLY = NOT APPLICABLE
1008.1.2
• DOOR SWING: IN DIRECTION OF TRAVEL IF GREATER THAN 50 OCCUPANTS SERVED - EXIT DOORS AND STAIRWAYS
1014.2
• INTERVENING SPACES:
• NOT APPLICABLE (ALL SIMILAR FUNCTIONS)
1014.3
• COMMON PATH OF TRAVEL: 100' (SPRINKLED)
• ACTUAL: BASEMENT = 66', FIRST FLOOR=59', SECOND FLOOR = 66'
1015.2.1
• EXIT SEPARATION:
• APPROXIMATE DIAGONAL = 135' - 1/3 DISTANCE (SPRINKLED) = 45 FT MIN
• BASEMENT SEPARATION = 43', SECOND FLOOR = 74'
1016.2
• EXIT ACCESS TRAVEL DISTANCE: B= 200'
• BASEMENT = 120', SECOND FLOOR = 130'
1018
• CORRIDORS:
• NOT APPLICABLE - TRAVEL DISTANCE IS OKAY (1016.2)
24.301.351
• PLUMBING FIXTURES: TOILETS (1 PER 25) = 3 PER FLOOR REQUIRED
• 9 TOTAL, 11 PROVIDED
• BASEMENT = 2, FIRST FLOOR = 6, SECOND FLOOR = 3
• DRINKING FOUNTAINS: 0 REQUIRED
• BASEMENT = 0, FIRST FLOOR = 1 PLUS 2 BOTTLE FILLS, SECOND FLOOR = 0
123 DESCRIPTION DATE
12' - 9 3/4" 12' - 6" 12' - 7" 12' - 10" 12' - 6 3/4"
116' - 3 1/2"
64' - 4"
10"
2' - 6" 11' - 2 15/32"
3 3
F
F
EDGE OF ALLEY
6' - 3"
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
ROOM NOT IN SCOPE
CONSTRUCTION LIMITS
6' - 3 3/8"
10' - 2 1/4" 5' - 2 1/4" 22' - 8" 9' - 4 1/4" 5' - 4 3/4" 10' - 6"
29' - 5 3/4"
16' - 0"
E
E
B
B
D
D
G
G
C
C
2 2
1 1
4 4
5 5
A
A
H
H
23' - 11 3/4" 16' - 0" 13' - 5" 12' - 8" 4' - 6" 16' - 1" 1' - 7" 11' - 10" 16' - 2 3/4"
17' - 2"
16' - 0 5/8" 2' - 5" 8' - 4 1/2" 5' - 4 1/2" 12' - 7" 3' - 6 3/4" 15' - 11 5/8"
3 3
F
F
2' - 9"
CONSTRUCTION LIMITS
ROOM NOT IN SCOPE
16' - 3 7/8" 15' - 8 3/8" 11' - 11 1/2" 9' - 4 1/2" 17' - 2" 20' - 3 5/8" 6' - 10 3/8" 18' - 7 1/4"
6' - 0" 3' - 10" 17' - 0 1/8"
23' - 3 3/4" 12' - 10 1/2" 19' - 10 1/4" 14' - 5 3/4" 5' - 4 1/4" 21' - 5 1/2" 9' - 7" 9' - 4 1/2"
16' - 4 3/4" 10' - 5 3/8"
11' - 3 1/4" 4' - 6" 16' - 4 1/8"
2"
8' - 7 1/4" 3' - 8 1/4" 7' - 10" 8' - 2"
28' - 3 1/2" 11' - 10 1/4" 15' - 7 1/4" 8' - 7"
SKYLIGHT, TYP
5' - 4 3/4" 13' - 2"
3' - 8 1/4" 24' - 2" 4' - 0 9/32" 10' - 0 1/8" 9' - 9 11/32"
29' - 5 3/4"
E
E
22' - 7" 29' - 5 3/4"
B
B
48' - 0 3/4"
D
D
G
G
C
C
16' - 0"
ROOM NOT IN SCOPE
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:13 PM
19-022
MW Checker
A1.0
EXISTING FLOOR
PLANS
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
1" = 10'-0"
1
EXISTING BASEMENT
1" = 10'-0"
2
EXISTING LEVEL 1
1" = 10'-0"
3
EXISTING LEVEL 2
NOTE: ALL CONDITIONS TO BE VERIFIED IN FIELD PRIOR
TO ORDERING MATERIALS + COMMENCEMENT OF
WORK
KNOWN DISCREPANCIES TO BE BROUGHT TO
ARCHITECT'S ATTENTION PRIOR TO BID.
FIELD VERIFY ALL EXISTING DIMENSIONS
123 DESCRIPTION DATE
EX: SHEET A5-2, DETAIL 3
EXTERIOR ELEVATION
SEE DRAWINGS
EX: SHEET A7-1, DETAIL 4
CONSTRUCTION DETAIL
SEE DRAWINGS
EX: SHEET A6-3, DETAIL 2
INTERIOR ELEVATION
SEE DRAWINGS
EX: SHEET A7-1, DETAIL 4 & 5
DOOR SYMBOL
SEE DOOR SCHEDULE
WINDOW SYMBOL
SEE WINDOW TYPES
ROOM SYMBOL
EX: 202 - SECOND FLOOR
GRID LINES:
LETTERS LEFT TO RIGHT
NUMBERS BOTTOM TO TOP
WALL/PARTITION TYPE SYMBOL
SEE WALL/PARTITION TYPES
BENCHMARK
REFERENCE SYMBOLS
E2 s
5
A3-8
1
A101
SIM
4 A7-1
4 A7-1
5
A
AERIAL SITE VIEW 1
E. OLIVE
S. BLACK
VICINITY MAP
PROJECT SITE
APPLICABLE CODES:
ALL CONSTRUCTION AND CONSTRUCTION METHODS TO BE IN ACCORDANCE WITH APPLICABLE CODES, GOVERNMENTAL
AGENCIES, AND LOCAL DESIGN CRITERIA, INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
• INTERNATIONAL BUILDING CODE (IBC) 2012 EDITION
• INTERNATIONAL RESIDENTIAL CODE (IRC) 2012 EDITION
• INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2012 EDITION
• ICC A117.1 – ACCESSIBILITY 2009 EDITION
• UNIFORM PLUMBING CODE (UPC) 2012 EDITION
• INTERNATIONAL MECHANICAL CODE (IMC) 2012 EDITION
• INTERNATIONAL FUEL GAS CODE (IFGC) 2012 EDITION
• NATIONAL ELECTRICAL CODE (NEC) 2014 EDITION
• INTERNATIONAL ENERGY CONSERVATION CODE (IECC)2012 EDITION
1. ANY AMBIGUITIES OR DISCREPANCIES DISCOVERED BY THE USE OF THESE DRAWINGS SHALL BE REPORTED TO THE
ARCHITECT IMMEDIATELY.
2. THE SPECIFICATIONS INCLUDED ARE AN INTEGRAL PART OF THE CONSTRUCTION DOCUMENTS. IT IS THE RESPONSIBILITY
OF THE CONTRACTOR TO REVIEW ALL INFORMATION. IF DISCREPANCIES EXIST, NOTIFY THE ARCHITECT IMMEDIATELY
FOR CLARIFICATION.
3. CHANGES OR DEVIATIONS FROM THE CONTRACT DOCUMENTS MADE WITHOUT THE KNOWLEDGE OR WRITTEN CONSENT
OF THE ARCHITECT ARE UNAUTHORIZED. COORDINATE NECESSARY MODIFICATIONS WITH ARCHITECT PRIOR TO
BEGINNING THE WORK.
4. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR SAFETY AND SHALL TAKE NECESSARY MEASURES TO ENSURE
THE HEALTH AND SAFETY OF THEIR EMPLOYEES, SUBCONTRACTORS, BUILDING OCCUPANTS, PEDESTRIANS NEAR THE
CONSTRUCTION SITE AND ACCESS ROUTES, AND ALL OTHER PERSONS IN AREAS AFFECTED BY THE CONTRACTOR’S
CONSTRUCTION ACTIVITIES. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
5. MAINTAIN A CLEAN AND SAFE WORK SITE AT ALL TIMES.
6. THE CONTRACTOR SHALL PAY PARTICULAR ATTENTION TO SAFETY WHILE WORKING ABOVE AND/OR ADJACENT TO THE
LOCATIONS OF THE BUILDING’S ENTRY DOORS. UNLESS DIRECTED OTHERWISE, ALL BUILDING ENTRANCES ARE TO
REMAIN OPEN AND ACCESSIBLE TO BUILDING OCCUPANTS DURING THE COURSE OF THE PROJECT AND OVERHEAD
PROTECTION WILL BE REQUIRED.
7. SHOULD THE CONTRACTOR ENCOUNTER ANY EXISTING BUILDING MATERIALS SUSPECTED OF BEING HAZARDOUS, THEY
SHALL CEASE WORK IN THE AREA AND NOTIFY THE OWNER AND ARCHITECT IMMEDIATELY.
8. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION AND SCHEDULING OF ALL REQUIRED INSPECTIONS DURING
THE COURSE OF THE CONSTRUCTION PROJECT. PARTIES REQUIRED TO ATTEND SHOULD BE GIVEN A MINIMUM OF TWO
WORKING DAYS NOTICE.
9. NOTIFY OWNER OF ANY EXPECTED DISRUPTIONS IN SERVICE OR CHANGES IN CONSTRUCTION SCHEDULE AT LEAST 72
HOURS IN ADVANCE.
10. DO NOT SCALE THE DRAWINGS. IF CRITICAL DIMENSIONS DO NOT APPEAR ON THE DRAWINGS, NOTIFY THE ARCHITECT.
11. THE DIMENSIONS GIVEN ON THESE PLANS FOR NEW CONSTRUCTION ARE TO THE FACE OF CONCRETE, FACE OF
MASONRY, FACE OF STUD FRAMING, CENTERLINE OF COLUMNS, AND TOP OF SUB-FLOOR; UNLESS NOTED OTHERWISE.
THE DIMENSIONS GIVEN ON THESE PLANS FOR NEW DOOR AND WINDOW UNITS ARE TO THE CENTERLINE OR EDGE OF
NOMINAL OPENING, UNLESS NOTED OTHERWISE. DIMENSIONS TAKEN FROM EXISTING CONSTRUCTION ARE FROM THE
FACE OF THE EXISTING CONSTRUCTION, UNLESS NOTED OTHERWISE. THE CONTRACTOR SHALL VERIFY THE EXISTING
CONDITIONS AND PLAN DIMENSIONS PRIOR TO CONSTRUCTION AND SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES.
12. PROTECT WALLS, CEILINGS, FLOORS, AND OTHER EXISTING FINISH WORK THAT ARE TO REMAIN. COVER AND PROTECT,
FURNITURE, FURNISHINGS, AND EQUIPMENT NOT TO BE REMOVED.
13. PROVIDE NEW MATERIALS, COMPONENTS, AND ACCESSORIES NEEDED FOR A COMPLETE AND FINISHED INSTALLATION
UNLESS NOTED OTHERWISE. COORDINATE ALL WORK WITH SUBCONTRACTORS PRIOR TO BEGINNING WORK.
14. PROVIDE BLOCKING FOR ALL WALL-MOUNTED CASEWORK, MILLWORK, GRAB BARS, HARDWARE, EQUIPMENT, ETC.
15. PENETRATIONS OCCURRING IN FIRE-RATED CONSTRUCTION ASSEMBLIES ARE TO BE SEALED APPROPRIATELY TO
MAINTAIN FIRE-RATING INTEGRITY.
16. ALL WORK SHALL BE PERFORMED BY SKILLED AND QUALIFIED PERSONNEL IN ACCORDANCE WITH BEST PRACTICES AND
COMPLIANT WITH APPLICABLE BUILDING REGULATIONS AND CODES.
17. THE CONTRACTOR SHALL INSPECT EXISTING CONDITIONS PRIOR TO PROCEEDING WITH EACH INSTALLATION OR PART OF
THE WORK. DISCREPANCIES MUST BE REPORTED TO THE ARCHITECT PRIOR TO PROCEEDING. START OF WORK
INDICATES ACCEPTANCE OF EXISTING CONDITIONS.
18. ALL WORK, MATERIAL STORAGE, AND STAGING SHALL OCCUR WITHIN CONSTRUCTION LIMITS SHOWN (EXCEPT NECESSARY
INCIDENTAL WORK).
19. CLEAN CONSTRUCTION AREA(S) AT CONCLUSION OF WORK. RETURN CONSTRUCTION AREA TO CLEANLINESS EXISTING
BEFORE WORK BEGAN.
20. REMOVE ALL DEMOLITION WASTE FROM PROJECT SITE.
21. REFER TO STRUCTURAL, MECHANICAL & ELECTRICAL DRAWINGS FOR COORDINATION OF WORK.
22. ANY 3-DIMENSIONAL VIEWS INCLUDED ARE FOR GENERAL REFERENCE ONLY. REFER TO OTHER DRAWINGS AND DETAILS
AS NEEDED.
GENERAL NOTES
1. THE CONTRACTOR SHALL MINIMIZE INTERFERENCE WITH ADJOINING STREETS, SIDEWALKS, PARKING
AREAS, AND OTHER ADJACENT OCCUPIED OR USED FACILITIES DURING CONSTRUCTION
OPERATIONS. THE CONTRACTOR SHALL NOT BLOCK STREETS, SIDEWALKS, OR ACCESS TO
DUMPSTER LOCATIONS AT ANY TIME.
2. THE CONTRACTOR SHALL PROTECT EXISTING SITE IMPROVEMENTS AND LANDSCAPING FROM
DAMAGE CAUSED BY CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL RESTORE EXISTING
SITE IMPROVEMENTS AND LANDSCAPING DAMAGED BY CONSTRUCTION OPERATIONS AS DIRECTED
BY THE ARCHITECT PRIOR TO SUBSTANTIAL COMPLETION.
3. THE CONTRACTOR SHALL PROTECT EXISTING BUILDINGS FROM DAMAGE, CONTAMINATION, AND
SOILING CAUSED BY CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL KEEP BUILDING
ENTRANCES, CORRIDORS, AND STAIRWELLS CLEAR OF CONSTRUCTION MATERIALS, TOOLS, AND
EQUIPMENT AT ALL TIMES, EXCEPT AS TEMPORARILY REQUIRED WHILE THOSE SPACES ARE BEING
WORKED ON. THE CONTRACTOR SHALL RESTORE EXISTING BUILDINGS DAMAGED BY CONSTRUCTION
OPERATIONS AS DIRECTED BY THE ARCHITECT PRIOR TO SUBSTANTIAL COMPLETION.
4. THE CONTRACTOR SHALL ACCESS THE SITE FROM THE OLIVE STREET ENTRANCE AND MAY UTILIZE
THE PARKING AREA ALONG OLIVE FOR PARKING AND LIMITED STAGING. THE OLIVE (NORTH)
ENTRANCE WILL BE DEDICATED TO THE GENERAL CONTRACTOR FOR WORK ACTIVITY, WHILE THE
SOUTH ENTRANCE AND ELEVATOR WILL REMAIN ACCESSIBLE TO BUILDING OCCUPANTS AND THE
PUBLIC. THE TWO EMERGENCY EXITS ON THE WEST SIDE OF THE BUILDING, THE EXTERIOR AREA
IMMEDIATELY ADJACENT AND THE INTERIOR HALLWAYS MUST BE KEPT CLEAR AND OPERABLE FOR
THOSE FLOORS WHERE CONSTRUCTION IS NOT ACTIVELY TAKING PLACE.
5. CONSTRUCTION STAGING AREA: ON-SITE CONSTRUCTION STAGING FOR THIS PROJECT WILL BE
EXTREMELY LIMITED. SHOULD THE CONTRACTOR REQUIRE ON-SITE CONSTRUCTION STAGING, AN
AREA FOR THIS PURPOSE MAY BE PROVIDED. THE STAGING AREA IS INTENDED FOR THE STORAGE
OF MATERIALS AND EQUIPMENT ONLY. UNLESS DIRECTED OTHERWISE, THE CONTRACTOR WILL BE
REQUIRED TO FENCE THE STAGING AREA TO PREVENT ACCESS FROM UNAUTHORIZED PERSONNEL.
THE CONTRACTOR SHALL RESTORE AREAS USED FOR CONSTRUCTION STAGING THAT ARE DAMAGED
DURING THE COURSE OF CONSTRUCTION OPERATIONS AS DIRECTED BY THE ARCHITECT PRIOR TO
SUBSTANTIAL COMPLETION.
GENERAL SITE/ STAGING NOTES
1. THE INTENT OF THIS PROJECT IS TO RENOVATE INTERIOR SPACES AND LAYOUT IN ACCORDANCE WITH
CHANGING USE PATTERNS BY THE OWNER. THIS PROJECT INCLUDES MULTIPLE DEPARTMENTS SPREAD
OVER THE BUILDING AND MULTIPLE OCCUPANTS THAT MUST REMAIN IN PLACE AND IN SERVICE DURING
THE PROJECT.
2. THE OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO THE WORK AREA.
WHILE IT IS UNDERSTOOD THERE WILL BE INTERRUPTIONS AND DISRUPTIONS ASSOCIATED WITH
CONSTRUCTION WORK, GENERAL CONTRACTOR SHALL CONDUCT AND COORDINATE WORK ACTIVITIES
TO MINIMIZE THOSE DISRUPTIONS AS MUCH AS PRACTICAL.
3. ITEMS INDICATED TO BE REMOVED AND SALVAGED REMAIN OWNER’S PROPERTY. CAREFULLY DETACH
FROM EXISTING CONSTRUCTION, IN A MANNER TO PREVENT DAMAGE, AND DELIVER TO OWNER. IF
DRAWINGS INDICATE ITEM IS TO BE REUSED, CAREFULLY INSTALL IN NEW LOCATION.
4. NEATLY CUT OPENINGS AND HOLES TO BE PLUMB, SQUARE, AND TRUE TO DIMENSIONS REQUIRED.
USE CUTTING, PATCHING AND OTHER CONSTRUCTION METHODS LEAST LIKELY TO DAMAGE
CONSTRUCTION TO REMAIN OR ADJOINING CONSTRUCTION.
PROJECT SUMMARY:
PHASE:
DRAWN BY:
SHEET NUMBER:
SHEET TITLE:
architecture one eighteen
115 east oak street bozeman mt 59715
CHECKED BY:
REVISIONS:
COPYRIGHT NOTICE: This document
and the ideas and designs incorporated
herein are given in confidence and shall
be used only pursuant to the agreement
with Architecture118. No other use,
dissemination, or duplication may be
made without prior written consent of
Architecture118. All common law rights
of copyright are hereby specifically
reserved.
DESIGN TEAM:
0" 1" 2"
PROJECT LOCATION:
OWNER:
PRINTED: 11/27/2019 1:50:12 PM
19-022
MW MW
A0.1
COVER SHEET
STIFF PROFESSIONAL BUILDING
20 E OLIVE ST BOZEMAN MT
59715
20 E OLIVE ST BOZEMAN MT 59715
CITY OF BOZEMAN
DEC 1, 2019
CITY OF BOZEMAN STIFF PROFESSIONAL BUILDING REMODEL, BOZEMAN, MONTANA
20 E. OLIVE, BOZEMAN, MT
SHEET LIST
NUMBER SHEET NAME
A0.1 COVER SHEET
C1.0 DEMO SITE PLAN
C1.1 PROPOSED SITE PLAN
A1.0 EXISTING FLOOR PLANS
A2.0 CODE REVIEW
A2.1 ADA INFORMATION
A2.2 ABATEMENT PLANS
A3.0 BASEMENT FLOOR PLANS
A3.1 FIRST FLOOR PLANS
A3.2 SECOND FLOOR PLANS
A4.0 BASEMENT RCP
A4.1 FIRST FLOOR RCP
A4.2 SECOND FLOOR RCP
A5.0 ENLARGED PLANS & ELEVATIONS
A5.1 ENLARGED PLANS & ELEVATIONS
A5.2 INTERIOR DETAILS
A6.1 EXTERIOR STAIR DETAILS
A7.1 WINDOW AND DOOR INFO
MD1.0 BASEMENT LEVEL DEMO PIPING
MD1.1 FIRST LEVEL DEMO PIPING
MD1.2 SECOND LEVEL DEMO PIPING
MD2.0 BASEMENT LEVEL DEMO HVAC
MD2.1 FIRST LEVEL DEMO HVAC
MD2.2 SECOND LEVEL DEMO HVAC
MD2.3 ROOF PLAN DEMO MECHANICAL
M1.0 BASEMENT LEVEL PIPING
M1.1 FIRST LEVEL PIPING
M1.2 SECOND LEVEL PIPING
M2.0 BASEMENT LEVEL HVAC
M2.1 FIRST LEVEL HVAC
M2.2 SECOND LEVEL HVAC
M2.3 ROOF PLAN HVAC
M3.1 MECHANICAL LEGEND SCHEDULES & DETAILS
M4.1 MECHANICAL SPECS
ED1.0 BASEMENT LEVEL DEMO POWER
ED1.1 FIRST LEVEL DEMO POWER
ED1.2 SECOND LEVEL DEMO POWER
ED1.3 ROOF PLAN DEMO POWER
ED2.0 BASEMENT LEVEL DEMO LIGHTING
ED2.1 FIRST LEVEL DEMO LIGHTING
ED2.2 SECOND LEVEL DEMO LIGHTING
E1.0 BASEMENT LEVEL POWER
E1.1 FIRST LEVEL POWER
E1.2 SECOND LEVEL POWER
E2.0 BASEMENT LEVEL LIGHTING
E2.1 FIRST LEVEL LIGHTING
E2.2 SECOND LEVEL LIGHTING
E3.1 ELECTRICAL ONE LINE DIAGRAM
E3.2 ELECTRICAL PANEL SCHEDULES
E4.1 ELECTRICAL SCHELULES AND DETAILS
123 DESCRIPTION DATE