Loading...
HomeMy WebLinkAbout19- Change Order 1 - Langlas & Associates - Bozeman Public Safety Center 2270 Grant Road ® 1019 E.Main St.,Suite 101 Billings,MT 59102LanglasBozeman,MT 59715 Phone:406-656-0629 & Associates Phone:406-585-3420 Fax:406-656-1088 Fax:406-585-4110 GENERAL CONTRACTORS PRIME CHANGE ORDER# 1 PROJECT: Public Safety Center DATE: 10/1/2019 907 N. Rouse Ave. PROJECT# 19426 Bozeman, MT 59715 ORIG. CONTRACT DATE: 08.05.19 PROJECT MANAGER: Loren Cantrell Langlas &Associates, Inc. is directed to make the following changes in this Contract: Item Description Cost CE 1 Pay demolition permit fees. Previously listed as"by Owner". $ 2,009.57 CE 2 Add Hazardous Material Survey and Sample Testing. Previously listed as"by Owner" $ 5,225.24 Total $ 7,234.81 Original Contract Sum: $238,788.00 Net Change by Previously Authorized Change Orders: $0.00 Contract Sum Prior to this Change Order: $238,788.00 Total this Change Order: $7,234.81 New Contract Sum: $246,022.81 Contract Time shall be Modified as Follows: No change to contract time. Authorization for Work Described Above: Owner Contractor City of Bozeman Langlas &Associates, Inc. 121 N. Rouse Ave. 1019 E. Main St., Suite 101 Bozeman, MT 59715 Bozeman, MT 59715 Name Date Name Date r;FNVRnt. CONTRACTORS Change Estimate Report Project: Bozeman Public Safety Center CE No: 1 Project# 19426 Revision# Change Source: 0 Date: 10/1/2019 Description: Provide demolition permit fees by Contractor. Previously listed "by Owner". Category Description Quantity Unit Unit Cost Total ADD $ - 01.0120 Building Dept. Demolition Permit Fee 1 ea $ 1,800.00 $ 1,800.00 01.0120 Planning Dept. Demolition Permit Review Fee 1 sum $ 116.00 $ 116.00 $ _ $ - SUBTOTAL $ 1,916.00 GL Insurance 0.625%1 $ 11.98 CM Fee 3.2% $ 61.70 Bond 1.0% $ 19.90 TOTAL $ 2,009.57 rmvmm G E FR#t- t-f7.NT 3R A C TO 475 Change Estimate Report Project: Bozeman Public Safety Center CE No: 2 Project# 19426 Revision# 0 Change Source: 0 Date: 10/1/2019 Description: Provide Hazardous Material Survey and Sample Testing. Previously listed "by Owner". Category IDescription I Quantity Unit I Unit Cost I Total ADD $ _ 01.0130 RTI Hazardous Material Survey 1 sum $ 4,981.95 $ 4,981.95 SUBTOTAL $ 4,981.95 GL Insurance 0.625% $ 31.14 CM Fee 3.2% $ 160.42 Bond 1.0% $ 51.74 TOTALI $ 6,226.24