Loading...
HomeMy WebLinkAbout01-13-20 City Commission Packet Materials - C8. Res. 5128, CO 1 to Sunset Hills and Lindley Park Water Conserv. ProjectCommission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Jessica Ahlstrom, Water Conservation Specialist Mitch Reister, Director of Public Works SUBJECT: Resolution 5128 Authorizing Change Order Number 1 to the Sunset Hills Cemetery and Lindley Park Water Conservation Project. MEETING DATE: January 13, 2020 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the Mayor to Sign Resolution 5128 Authorizing Change Order Number 1 to the Sunset Hills Cemetery and Lindley Park Water Conservation Project. BACKGROUND: The Sunset Hills Cemetery and Lindley Park Water Conservation Project included the installation of infrastructure necessary to utilize existing surface water supplies in Bozeman Creek to irrigate Sunset Hills Cemetery and Lindley Park. Benefits of this project include the conservation of treated drinking water supplies, increased instream flows in Bozeman Creek, and year-round fish passage in Bozeman Creek. Attached is Resolution 5128 and Change Order No. 1 for the above referenced project. The change order modifies the construction contract by decreasing the total contract price by $10,988.00 and extending the final completion date to December 31, 2019. The purpose of the price modification is to reconcile the final contract price to the original contract amount based on actual quantities. Lower quantities than originally estimated for a number of bid items were required, resulting in a final contract price of $610,155 as compared to the original contract amount of $621,143. The extension of the final completion date was needed to accommodate unforeseen scheduling issues regarding power connection, to allow for proper project closeout, and to meet grant reporting requirements for the Bureau of Reclamation and Department of Natural Resources and Conservation. The substantial completion date for this project did not change and the contractor met this deadline. FISCAL EFFECTS: The FY20 general fund CIP includes project GF231 – Cemetery Irrigation Project, which is allocated $682,859. Of the $682,859 allocated for this project, Bureau of Reclamation WaterSMART Water Efficiency Grant funding reimbursement represents $300,000, Department of Natural Resources and Conservation Renewable Resource Grant funding reimbursement represents $125,000, and the City of Bozeman general fund represents the remaining $257,859. The final contract price for construction of this project is $610,155, a reduction of $10,988 in total costs. UNRESOLVED ISSUES: None. ALTERNATIVES: As suggested by the Commission ATTACHMENTS: Resolution 5128 Change Order Number 1 Resolution No. 5128, Change Order No. 1 to Sunset Hills Cemetery and Lindley Park Water Conservation Project COMMISSION RESOLUTION NO. 5128 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH CENTRAL EXCAVATION INC., BELGRADE, MONTANA. WHEREAS, The City Commission did, on March 4, 2019, authorize award of the bid for the Sunset Hills Cemetery and Lindley Park Water Conservation Project to Central Excavation Inc., Belgrade, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Central Excavation, Inc., as contained in Change Order No. 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 13th day of January 2020. Resolution No. 5128, Change Order No. 1 to Sunset Hills Cemetery and Lindley Park Water Conservation Project ___________________________________ CHRIS MEHL Mayor ATTEST: ________________________________________ MIKE MAAS Interim City Clerk APPROVED AS TO FORM: ___________________________________ GREG SULLIVAN City Attorney CHANGE ORDER No. 01 DATE OF ISSUANCE December 4.2019 EFFECTP/E DATE OWNER City ofBozeman CONTRACTOR Central Excavation. Inc. Contract: Entire Project Project: Sunset Hills Cemetery and Lindley Park Water Consen'ation Project OWNER'S Contract No. ENGE^EER Morrison Maierle. Inc. _ ENGBSTEER's Contract No. 0417.076 You are directed to make the following changes in the Contract Documents: Description: Increase time to final completion due to extended timefi-ame for the utility company to provide power to the facilities and to reconcile final contract price. Reason for Change Order: To allow for complete close out of the project. Attachments: Reconciliation Summary CHANGE IN CONTRACT PRICE: Original Contract Price $621,143.00 Net Increase (Decrease) from previous Change Orders No. 0 to 0 : $0.00 Contract Price prior to tliis Change Order: $621.143.00 Net increase (decrease) of this Change Order: $(10.988.00) Contract Price with all approved Change Orders: $610,155.00 CHANGE IN CONTRACT TIMES: Original Contract Times: Substantial Completion: October 15, 2019 Ready for final payment: November 1,2019 (days or dates) Net change from previous Change Orders No. _Q_ No. 0 : Substantial Completion: Q_ Ready for final payinent: 0_ to (days) Contract Times prior to this Change Order: Substantial Completion: October 15, 2019 Ready for final payment: November 1,2019 (days or dates) Net increase (decrease) this Change Order: Substantial Completion: 0_ Ready for final payment: 60 (days) Contract Times with all approved Change Orders: Substantial Completion: October 15, 2019 Ready for final payment: December 31,2019 (days or dates) Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set forth herein and unless expressly stated otherwise in the Change Order. And further, that the price agreed-upon herein represents the full cost and value for the subject work performed and the materials supplied under the tenns of the contract aqd that the work quantities and value were properly deteniiined and are correct. ]^^/ci 'RACTOR (Authorized Signature) Date RECOMMENDED BY: l^^/l APPROVED (BY: '11 ^ENGINEER - Signature). -Date— '/. -0-WNER-(Auth^zed Signature) 1>1^-1^ 1-^ Eij 22 _0_TO s v s Q. s" 1 s 3 fc V u I UJ Q. IIIU (0 0 0 0; I IU I ^. ^ Q z 3 Ia (0 -J ^ I Eu V) z => OT ^ s. 6 Iu c I s I § § Iu ll 'g 8 I0 § u ^ z 3 §|8|S|g|S[8|g|8|g|§|§|8|S|8|8|8|S|g|8|8|8|S r^CD j o| t CD t-j (| D CO | co | CO ] (D 110 j CD | ^t\ ] ^C\1 [h-| 10 ~| '^] f ^in ] r^I <j T-o"| ^co J <I o_co ] I ^co^j 00} i T-in] I •<oq| tf ^ co | in ] 10] 04 ] 0) y»|w|v»|w|y>|«»|«»|y»|w|ei»|«»|6<»|ei>|w|<^|w|w|«»[w|y>|6»|w|y>|y>|(fl.|wl<» oil of co r^li-l-T §1§|S|§ SI§JII^. Ollc^lrolo s S tO CM •t 00 p0: 004 co 0 II- 0 §|r^cn | I oj s|co't <§l§l§l§l§l§l§l§l§l§l§!-co | <I o_co'1 | n| u"<> D| I "(t) 0| ^t-'n| \ ^io[\ •^-\ ^10 | N[ I CO •^| |<oo[ o | CD §|•^|n| I s|<io| D| §|T-co s||'<| ti m §|•^i | it0"§|w\ 01 l to| §|cn| N| §|o I •^ T-§|| I co a:?) I ![co co §|I | t0'| §|o | P^ §|o>[9i '-.| IT-I lo4ir^|i-|io| IV-ICN; y>|y»|c&iw[«»|e>»lTOl»»l<A|wlwl«»l<A|y»|fc»|u»|y>|«>[«>|<A|6»|y»lw|y»[u»]y»: 0>1 CD'I CO | CO I CM U">1^-1^ §|l^lol^8|-8|ltDltOltOlCDl §|8|8|8|?ItOl'q'ltNlT-]|^§||io-§||<8|o|8|^|ICOl'^m|8|m| §|£|l'lT-8|ll^§|lT- § w\w^\w>\w>\wlw\w\v>\w>\w>\w>\w\<A\w\m\w\wtwlm\w}\w\wt<»lw\w\o^ CO 8|8|§|8|§|§|§|§ §j8|8|S|S|§|§|8! l0| 10 J CM] | |tD|0|0^ lol t l^rlLolco li-l I I Ir^l I ^ Q; ui Q I II So Q >. I I 3 Ill Ill llll. 11111 Ill II §c 115 lll(sl§ llllili IIs! st I c a 5 |u <S| I "I a LU §1°1 ill 1^1 ill elsj 111 ILIU i (0 IIc ^J!ISII I-c L I c|5|c5 Ill s\m\s ll.Ul| * ill S\'^\K w|s|s lsi" |(£| \s\ IWI B.ll &\s\ llll §1 u h- Q 11 Jl (0 81 Ill ^li ^1.1 &\w I s. I ill i5| w s M sl'EI llll.sj M\s} uj|£|illli a|^ 51^4\11111 illllll llll.&1 sl1" \S\ il^ CNJ i g|1 I ! !|^|. S| <!ltii llll£l ilD^ slil-ihll Sl II in I ill II. il^TO l: •l.jll ?ill illl: S18S &l'il'1 c Ill LU II' II II T co § I .11 !llll il! ill! s|5 y3|t3 t3 (3 3C3S.IuiC3y3<3^^t3 U3 ^$^s<3 <3 u] S5 3 •T 5|gIs's'§1sls 0£ II s <D N •q- 00 ^g §m^0 Islsl 'rot-^-1 in l CD (^-loo I •T-1 IN co CN CN UJ C3 iBli fl§! Ill I 81 134 DatS^ EJCDC 1910-8-B (1996 Edition Page 1 of 2 N:\0417\076\Construction\Change OrdertCOB Change Order Form.doc 133