REPORT TO: Honorable Mayor and City Commission
FROM: Jessica Ahlstrom, Water Conservation Specialist
Mitch Reister, Director of Public Works
SUBJECT: Resolution 5128 Authorizing Change Order Number 1 to the
Sunset Hills Cemetery and Lindley Park Water Conservation
Project.
MEETING DATE: January 13, 2020
AGENDA ITEM TYPE: Consent
RECOMMENDATION: Authorize the Mayor to Sign Resolution 5128 Authorizing Change
Order Number 1 to the Sunset Hills Cemetery and Lindley Park
Water Conservation Project.
BACKGROUND: The Sunset Hills Cemetery and Lindley Park Water Conservation Project
included the installation of infrastructure necessary to utilize existing surface water supplies in
Bozeman Creek to irrigate Sunset Hills Cemetery and Lindley Park. Benefits of this project
include the conservation of treated drinking water supplies, increased instream flows in Bozeman
Creek, and year-round fish passage in Bozeman Creek.
Attached is Resolution 5128 and Change Order No. 1 for the above referenced project. The
change order modifies the construction contract by decreasing the total contract price by
$10,988.00 and extending the final completion date to December 31, 2019.
The purpose of the price modification is to reconcile the final contract price to the original
contract amount based on actual quantities. Lower quantities than originally estimated for a
number of bid items were required, resulting in a final contract price of $610,155 as compared to
the original contract amount of $621,143. The extension of the final completion date was needed
to accommodate unforeseen scheduling issues regarding power connection, to allow for proper
project closeout, and to meet grant reporting requirements for the Bureau of Reclamation and
Department of Natural Resources and Conservation. The substantial completion date for this
project did not change and the contractor met this deadline.
FISCAL EFFECTS: The FY20 general fund CIP includes project GF231 – Cemetery Irrigation
Project, which is allocated $682,859. Of the $682,859 allocated for this project, Bureau of
Reclamation WaterSMART Water Efficiency Grant funding reimbursement represents $300,000,
Department of Natural Resources and Conservation Renewable Resource Grant funding
reimbursement represents $125,000, and the City of Bozeman general fund represents the
remaining $257,859. The final contract price for construction of this project is $610,155, a
reduction of $10,988 in total costs.
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the Commission
ATTACHMENTS: Resolution 5128
Change Order Number 1
Resolution No. 5128, Change Order No. 1 to Sunset Hills Cemetery and Lindley Park Water Conservation
Project
COMMISSION RESOLUTION NO. 5128
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH
CENTRAL EXCAVATION INC., BELGRADE, MONTANA.
WHEREAS, The City Commission did, on March 4, 2019, authorize award of the bid for
the Sunset Hills Cemetery and Lindley Park Water Conservation Project to Central Excavation
Inc., Belgrade, Montana; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such
alterations or modifications of the specifications and/or plans of the contract be made by
resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make alterations
or modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of
Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the
City of Bozeman, a municipal corporation, and Central Excavation, Inc., as contained in Change
Order No. 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby
authorized and directed to execute the contract change order for and on behalf of the City; and the
City Clerk is authorized and directed to attest such signature.
PASSED, ADOPTED, AND APPROVED by the City Commission of the City of
Bozeman, Montana, at a regular session thereof held on the 13th day of January 2020.
Resolution No. 5128, Change Order No. 1 to Sunset Hills Cemetery and Lindley Park Water Conservation
Project
___________________________________
CHRIS MEHL
Mayor
ATTEST:
________________________________________
MIKE MAAS
Interim City Clerk
APPROVED AS TO FORM:
___________________________________
GREG SULLIVAN
City Attorney
CHANGE ORDER
No. 01
DATE OF ISSUANCE December 4.2019 EFFECTP/E DATE
OWNER City ofBozeman CONTRACTOR Central Excavation. Inc.
Contract: Entire Project
Project: Sunset Hills Cemetery and Lindley Park Water Consen'ation Project OWNER'S Contract No.
ENGE^EER Morrison Maierle. Inc. _ ENGBSTEER's Contract No. 0417.076
You are directed to make the following changes in the Contract Documents:
Description: Increase time to final completion due to extended timefi-ame for the utility company to provide power
to the facilities and to reconcile final contract price.
Reason for Change Order: To allow for complete close out of the project.
Attachments: Reconciliation Summary
CHANGE IN CONTRACT PRICE:
Original Contract Price
$621,143.00
Net Increase (Decrease) from previous Change
Orders No. 0 to 0 :
$0.00
Contract Price prior to tliis Change Order:
$621.143.00
Net increase (decrease) of this Change Order:
$(10.988.00)
Contract Price with all approved Change Orders:
$610,155.00
CHANGE IN CONTRACT TIMES:
Original Contract Times:
Substantial Completion: October 15, 2019
Ready for final payment: November 1,2019
(days or dates)
Net change from previous Change Orders No. _Q_
No. 0 :
Substantial Completion: Q_
Ready for final payinent: 0_
to
(days)
Contract Times prior to this Change Order:
Substantial Completion: October 15, 2019
Ready for final payment: November 1,2019
(days or dates)
Net increase (decrease) this Change Order:
Substantial Completion: 0_
Ready for final payment: 60
(days)
Contract Times with all approved Change Orders:
Substantial Completion: October 15, 2019
Ready for final payment: December 31,2019
(days or dates)
Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or
omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set
forth herein and unless expressly stated otherwise in the Change Order. And further, that the price agreed-upon herein
represents the full cost and value for the subject work performed and the materials supplied under the tenns of the
contract aqd that the work quantities and value were properly deteniiined and are correct.
]^^/ci
'RACTOR (Authorized Signature) Date
RECOMMENDED BY: l^^/l APPROVED (BY:
'11
^ENGINEER - Signature). -Date—
'/.
-0-WNER-(Auth^zed Signature)
1>1^-1^
1-^
Eij 22 _0_TO
s
v
s
Q.
s"
1
s
3
fc
V
u
I UJ
Q.
IIIU
(0
0
0
0;
I IU
I ^.
^
Q
z
3
Ia
(0
-J
^
I
Eu
V)
z
=>
OT
^
s.
6
Iu
c
I
s
I
§
§
Iu
ll 'g
8
I0
§
u
^
z
3
§|8|S|g|S[8|g|8|g|§|§|8|S|8|8|8|S|g|8|8|8|S
r^CD j o| t CD t-j (| D CO | co | CO ] (D 110 j CD | ^t\ ] ^C\1 [h-| 10 ~| '^] f ^in ] r^I <j T-o"| ^co J <I o_co ] I ^co^j 00} i T-in] I •<oq| tf ^ co | in ] 10] 04 ] 0)
y»|w|v»|w|y>|«»|«»|y»|w|ei»|«»|6<»|ei>|w|<^|w|w|«»[w|y>|6»|w|y>|y>|(fl.|wl<»
oil of co
r^li-l-T
§1§|S|§
SI§JII^.
Ollc^lrolo
s S
tO
CM
•t 00
p0: 004
co
0
II-
0
§|r^cn | I oj s|co't <§l§l§l§l§l§l§l§l§l§l§!-co | <I o_co'1 | n| u"<> D| I "(t) 0| ^t-'n| \ ^io[\ •^-\ ^10 | N[ I CO •^| |<oo[ o | CD §|•^|n| I s|<io| D| §|T-co s||'<| ti m §|•^i | it0"§|w\
01 l to| §|cn| N| §|o I •^ T-§|| I co a:?) I ![co co §|I | t0'| §|o | P^ §|o>[9i '-.|
IT-I lo4ir^|i-|io| IV-ICN;
y>|y»|c&iw[«»|e>»lTOl»»l<A|wlwl«»l<A|y»|fc»|u»|y>|«>[«>|<A|6»|y»lw|y»[u»]y»:
0>1 CD'I CO | CO
I CM
U">1^-1^
§|l^lol^8|-8|ltDltOltOlCDl §|8|8|8|?ItOl'q'ltNlT-]|^§||io-§||<8|o|8|^|ICOl'^m|8|m| §|£|l'lT-8|ll^§|lT- §
w\w^\w>\w>\wlw\w\v>\w>\w>\w>\w\<A\w\m\w\wtwlm\w}\w\wt<»lw\w\o^
CO
8|8|§|8|§|§|§|§
§j8|8|S|S|§|§|8!
l0| 10 J CM] | |tD|0|0^
lol t l^rlLolco
li-l I I Ir^l
I
^ Q;
ui
Q
I
II So Q >.
I
I
3
Ill
Ill
llll.
11111
Ill
II §c
115
lll(sl§
llllili
IIs! st
I
c
a
5
|u
<S|
I "I
a
LU
§1°1 ill
1^1
ill elsj
111
ILIU
i
(0
IIc
^J!ISII I-c L I
c|5|c5
Ill
s\m\s
ll.Ul| * ill
S\'^\K
w|s|s
lsi"
|(£|
\s\
IWI
B.ll
&\s\
llll §1
u
h-
Q
11
Jl (0
81
Ill
^li
^1.1
&\w
I s.
I
ill
i5|
w
s
M
sl'EI
llll.sj
M\s}
uj|£|illli a|^
51^4\11111 illllll llll.&1 sl1" \S\
il^
CNJ
i
g|1
I
! !|^|. S|
<!ltii
llll£l
ilD^
slil-ihll Sl
II
in I
ill
II.
il^TO l:
•l.jll
?ill
illl:
S18S &l'il'1 c
Ill LU
II'
II
II
T
co
§
I
.11
!llll il!
ill!
s|5
y3|t3 t3 (3 3C3S.IuiC3y3<3^^t3 U3 ^$^s<3 <3 u] S5 3
•T
5|gIs's'§1sls
0£
II
s
<D
N
•q- 00 ^g
§m^0 Islsl
'rot-^-1 in l CD (^-loo I •T-1
IN
co
CN
CN
UJ
C3
iBli
fl§! Ill
I 81
134
DatS^
EJCDC 1910-8-B (1996 Edition
Page 1 of 2
N:\0417\076\Construction\Change OrdertCOB Change Order Form.doc
133