Loading...
HomeMy WebLinkAbout19- Task Order 10 - Advanced Engineering and Environmental Services, Inc. (AE2S) - Water Treatment Plan Sourdough Influent Metering Improvements EXHIBIT B to Professional Services Agreement Dated April 24, 2017 TASK ORDER NUMBER 10 Issued under the authority of Professional Services Agreement between the City of Bozeman and Advanced Engineering and Environmental Services,Inc.for:A range of professional and technical services related to operations and maintenance of the City of Bozeman Water Treatment Plant and support facilities, including but not necessarily lirnited to engineering design, preparation of construction documents, proiect bidding, and construction administration services for various improvement projects. This Task Order is dated ! ,2019 between City of Bozeman (City)and Advanced Engineering and Environmental Services.Inc. (Contractor). The following representatives have been designated for the work performed under this Task Order: City: Brian Heaston,PE,Project Engineer Contractor: Advanced Engineering and Environmental Services,Inc.(AE2S) Brian Viall,PE,Project Manager SCOPE OF WORK: (attach additional sheet(s)as required) This Task Order is for a feasibility study and technical report with recommendations in association with improvements generally described as: Bozeman WTP—Sourdough Raw Water Influent Metering Improvements 2019 Contractor's Project Number:P05097-2019-014 The scope for which is generally described as follows: Engineering 1. Review record drawings of the influent pipelines from Bozeman Creek in Sourdough Canyon and Hyalite Creek as they enter the"Hyalite Connection Building/Sourdough Flow Control Building." 2. Conduct field investigations at Bozeman Water Treatment Plant(WTP) of surface conditions to identify critical valves,potential tie-in locations, existing utilities and other appurtenances. Does not include field-verification of subsurface conditions by exploratory excavation. 3. Draft record drawings of raw water process.Two drawings will be produced: 1)A process flow diagram(PFD) and 2)conceptual site layout with raw water pipeline ali ents. Existing drawings will be utilized to the maximum extent possible,augmented with ld it 4estigation. 4. Review alternatives for installation of flow metering on the raw,water,influent pipeli ne from the Sourdough Creels Intake. The following alternatives vclill bd euati�ated: ' ^ e ' a. Multi-point insertion ultrasonic system on the Sourdough taw water pipeltir el ow in the Raw Water Control Building. Evaluate the accuracy of this aproacl . ' b. Magnetic Flow Metering in an expansion of the existing Raw Water Control Building. c. Hydraulic Flow Control Valve(Cla-Val)with upstream screening(see flow control valve alternatives,below. 5. Evaluate flow control valve installation alternatives for Sourdough raw water. a. Automatic Backwashing Strainer(ABS)ahead of modulating butterfly valve or hydraulic flow control valve(Cla-Val) 6. Evaluate the impact(if any)of metering and flow control alternatives on Hyalite flow control and flow measurement. 7. Draft conceptual drawings of piping modifications to accommodate proposed improvements. 8. Meetings a. Kickoff Meeting b. Technical Memorandum Review Meeting. Documentation 1. Technical memorandum of recommendations,including the following: a. Existing raw water system evaluation. b. Summary review of flow metering alternatives with Engineer's recommendation of best alternative. c. Summary review of control valve alternatives with Engineer's recommendation of best alternative. d. 30% drawings of process and site-work modifications to accommodate recommended improvements. e. Engineer's Opinion of Probable Construction Cost(EOPCC) to complete work. f. Estimate 15 to 20 pages total document length. Includes drawings,tables, opinions of cost, etc. 2. Revised record drawings of raw water process to show the following: a. Process flow diagram(PFD) of raw water process. b. Site piping alignments on site background. COMPENSATION: The total cost for the engineering, documentation,and materials associated with this Task Order is $39,150.00. Contractor shall be reimbursed on a Time&Materials basis,as detailed in Attachment A— Hour and Fee Estimate by Phase and Task. Contractor shall invoice no more often than monthly for services provided in the prior month. The provisions of the Professional Services Master Task Order Agreement and any Special Terms and Conditions and/or Exhibits or Attachments to this Task Order shall govern the Work. IN WITNESS WHEREOF, the parties authorized to commit resources of the companies have executed this Task Order: Citv PUozeman Contractor By: �''�• By: Title: ��` W ��� Title: dS Date: �Z ( � + 1 Date: //�LZ�Zo79 Fed. ID.No. Attachment A—Hour and Fee Estimate by Phase&Task: 1 Exhibit B I Attachment A-Hour and Fee Estimate by Phase&Task AE2S Labor 2020 Rates City of Bozeman WTP Operations and Maintenance: Task Order 10 -Sourdough Raw Water Metering Improvements Buecker Viall Hintz Hohn AE2S Expenses Total 2019 AE2S Contract No.: ENG VI ENG IV ENG IV TECH IV Labor $221 $187 $187 $173 010-Project Development $884 $1,870 $0 $0 $ 2,754 1.00-Project Management 4 10 020-Study&Report $0 $8,228 $16,830 $11,072 $ 36,130 2.10-Record Drawing Review 6 4 2.11 -Field Investigations 4 2.12-New Record Drawings PFD&Site Piping Alignments) 12 24 2.20-Technology Review-Meters 3 Alternatives 2 16 2.21 -Technology Review-Control Valves 2 Alternatives) 2 16 2.30-30%Design Drafting 2 12 40 2.40-Report&Recommendation 12 40 2.41 -Meetings 4 2 030-Preliminary Engineering NO SCOPE 040-Final Design NO SCOPE 050-Bidding/Negotiations NO SCOPE 060-Construction NO SCOPE 070-Post-Construction[Warranty NO SCOPE 080-I&C System Services NO SCOPE 090-Additional/Continuing Services NO SCOPE Reimbursable Expenses 1. Auto Travel $.65/mile $120 2. Plotter/Printing $146 Subtotal Hours 4 54 90 64 Subtotal Fees $884 1 $10,098 1 $16,830 $11,072 $38,884 $266 $39,150 Total $39,150