HomeMy WebLinkAbout9TEN MURD TIF Request Infrastructure Diagram REVISED 12.2019_ReducedNorth 8th Avenue
Road (Aspen to Juniper)
- Subgrade
- pavement
- Curb & Gutter (East & West sides)
Sidewalk & Boulevard (East)
- 5’ sidewalk
- ADA ramps
- (3) street lights
- Street signage
-- Landscaping and trees
Alley
- Demolition of existing alley
- Subgrade
- Pavement
- Valley Gutter/ stormwater line
Re-route swer line around existing
Gallatin Valley furniture structure
(trench Juniper as neccesarry)
New stormwater facilities
(Aspen to Juniper)
Temporary stormwater pond
(Shown Approximately)
Replace existing clay sewer line
from Aspen to 8th
West Aspen Street
Road (7th to 8th)
-Demolition of Existing Street
-Subgrade
-pavement
-Curb & Gutter (North side only)
-Valley Gutter
Sidewalk & Boulevard (North)
- 5’ sidewalk
- Street trees
- ADA ramps
- (1) street light
- Street signage
- Landscaping and trees
West Juniper Street
-no improvements anticipated
Sidewalk (West Side) *ALT.*
- 5’ sidewalk
- Landscape & Trees
*Not requested by MURD Board
Sidewalk (South Side) *ALT.*
- 5’ sidewalk
- Landscape & Trees
*Not requested by MURD Board
Proposed
9Ten
Delopment North 7th AvenueWest Aspen StreetAlley (20’ R.O.W.)North
Building
Gallatin Valley
furniture (exist.)
U-Haul
(exist.)
Cat’s Paw
(exist.)
South
Building
North 8th Avenue Improvements
Preliminary Construction Diagram
Decemeber 2019
NOT TO SCALE
Alley (15’ R.O.W.)
Vacant
Land
North 8th AvenueWest Juniper Street