Loading...
HomeMy WebLinkAbout9TEN MURD TIF Request Infrastructure Diagram REVISED 12.2019_ReducedNorth 8th Avenue Road (Aspen to Juniper) - Subgrade - pavement - Curb & Gutter (East & West sides) Sidewalk & Boulevard (East) - 5’ sidewalk - ADA ramps - (3) street lights - Street signage -- Landscaping and trees Alley - Demolition of existing alley - Subgrade - Pavement - Valley Gutter/ stormwater line Re-route swer line around existing Gallatin Valley furniture structure (trench Juniper as neccesarry) New stormwater facilities (Aspen to Juniper) Temporary stormwater pond (Shown Approximately) Replace existing clay sewer line from Aspen to 8th West Aspen Street Road (7th to 8th) -Demolition of Existing Street -Subgrade -pavement -Curb & Gutter (North side only) -Valley Gutter Sidewalk & Boulevard (North) - 5’ sidewalk - Street trees - ADA ramps - (1) street light - Street signage - Landscaping and trees West Juniper Street -no improvements anticipated Sidewalk (West Side) *ALT.* - 5’ sidewalk - Landscape & Trees *Not requested by MURD Board Sidewalk (South Side) *ALT.* - 5’ sidewalk - Landscape & Trees *Not requested by MURD Board Proposed 9Ten Delopment North 7th AvenueWest Aspen StreetAlley (20’ R.O.W.)North Building Gallatin Valley furniture (exist.) U-Haul (exist.) Cat’s Paw (exist.) South Building North 8th Avenue Improvements Preliminary Construction Diagram Decemeber 2019 NOT TO SCALE Alley (15’ R.O.W.) Vacant Land North 8th AvenueWest Juniper Street