HomeMy WebLinkAbout9Ten MURD TIF Request REVISED 12.2019BOZEMAN MIDTOWN TIF ASSISTANCE REQUEST
MAY 2019
Revised December 2019
9TEN mixed use
802-910 North 8th Avenue
Residential Mixed-Use Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
Project Summary
The 9TEN mixed use project site is located west of the North 7th Avenue U -Haul and southwest
of Gallatin Valley Furniture. The project site is vacant and is generally bound by North 8th
Avenue, Aspen and Juniper Streets. This infill project targets a best use scenario for the site by
delivering higher density, smart-growth development with workforce housing near the core of
Midtown. This project will provide much needed housing in a central location and will foster
desirable, walkable urban living, especially as Midtown continues to evolve. Furthermore, this
project will provide tenant amenities not common to most rental apartments in the area. The
project is seeking TIF assistance and consists of two buildings to be constructed in a single
phase. A concept review application for this project was submitted to the City of Bozeman Office
of Community Development on May 7th.
At full build out the site will include two buildings totaling 120,760 sf and off-street parking.
Building 1 is located on the north end of the site and consists entirely of residential units.
Building 2 is located on the south end and consists of a mix of residential units on the upper
floors and ground floor commercial space. The project will also provide open space and tenant
amenities on site. The commercial spaces will front onto North 8th Avenue and Aspen Street,
providing an active and engaging streetscape.
The property abuts existing rights-of-way along Aspen Street, Eighth Avenue and a 20’ wide
alley. However, there are currently no completed streets and limited utility infrastructure at this
location. This project proposes to collaborate with the City of Bozeman to complete the
infrastructure adjacent to this property . Anticipated improvements include new infrastructure at
North 8th Avenue between Aspen and Juniper Streets, and completion/update of infrastructure
along Aspen and Juniper Streets from North 7th to North 8th. . This includes all necessary curb
and gutter, sidewalks, water line extensions and stormwater infrastructure needed at these
locations. Additionally, it is anticipated that the existing sewer line that runs in the alley to the
east will need to be re-routed to some extent. It is anticipated the project would incur the
burden of these costs initially, with eventual reimbursement via TIF Assistance Funds.
With necessary approvals, construction of streets and infrastructure will begin late Winter 2020
with building construction beginning in Summer 2020, and a target completion date in late
Summer 2021.
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
PROPERTY INFORMATION
• • • • • •
APPLICANT INFORMATION
• • • • • •
COMPANY PROFILE
• • • • • •
PROJECT INFO & DETAIL
• • • • • •
CRITERIA FOR TIF ASSISTANCE
• • • • • •
PROJECT NARRATIVE
• • • • • •
MAPS, EXHIBITS, PLANS
PART 1
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
Property Address: 802-910 North 8th Avenue
Legal Description: Lots 13-18 & south 35 feet of Lot 12, Block 12
of Durston’s 2nd Subdivision
Property Owner 816 N 8th, LLC
& Developer: Geoff Anderson
203.376.0746
geoffreympanderson@gmail.com
Project Intrinsik Architecture, Inc
Representative: Attn: Scott Freimuth
406.582.8988
PROPERTY & APPLICANT INFO
Residential Mixed-Use Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
Geoff Anderson
12-20-2019
SAME
9TEN mixed use
Bozeman Midtown TIF Assistance Request
Business Location:
The project site is currently a vacant, undeveloped lot at 802-910 North 8th Avenue
Year Business Established:
2018 (816 N 8th LLC)
Type of Business
816 N 8th LLC is a development company
Outline Business Plan: (Please note these are the best estimates and projections at
this time).
COMPANY PROFILE
GROSS SALES
Gross Condominium Sales
(min. 20% units sold to individuals 80% AMI)
$24,827,813
Gross Commercial Shell Space Sales $700,000
TOTAL Gross Sale Revenue $25,527,813
TAX REVENUE
Annual Tax Generation $216,986
TIF FUNDING
Eligible TIF Funding Requested $1,829,578
PAYBACK PERIOD
Estimated TIF Payback timeline 8.4 Years
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
SOURCES & USES OF FUNDS
The 9TEN project will use and allocate funds and resources as outlined below.
USE of FUNDS
LAND (fair market value) $ 1,147,600
SOFT COSTS (Planning, Arch, Engineering, Entitlements) 796,422
CONSTRCUTION COSTS $20,143,245
HARD COST CONTINGENCY $1,991,055
IMPACT FESS $ 702,900
PERMIT FEES $ 30,000
MISC (Title, Recording, Insurance) $100,000
FINANCE COSTS (Origination, Lender Legal, Appraisal) $ 225,384
LOAN INTEREST $1,425,973
NMTC (New Market Tax Credits) COSTS $2,000,000
DEVELOPER FEE $2,832,988
TOTAL $31,395,567
SOURCE of FUNDS
GROSS NMTC Equity $6,630,000
SOURCE LENDER PROVIDING NMTC $13,370,000
DIRECT LOAN $11,395,567
TOTAL $31,395,567
9TEN mixed use
Bozeman Midtown TIF Assistance Request
Project Information:
9TEN is a mixed-use development consisting of two buildings: one an exclusively
residential building with 52 units (Bldg 1) and a second mixed-use with commercial
& 45 multi-household residential units on the upper levels (Bldg 2).
Property Manager: North Coast Companies
General Contractor: TBD
Project Intrinsik Architecture, Inc
Manager: Attn: Scott Freimuth
406.582.8988
sfreimuth@intrinsikarchitecture.com
Property Status
The property is currently vacant, undeveloped land.
Type of TIF Assistance Sought
Assistance with Public Infrastructure Costs, Impact Fees
Value of TIF Assistance Sought
$1,829,578
PROJECT INFO & DETAILS
Project Name: 9TEN mixed use
The subject site (1.62 acres) is vacant land on the SW portion of the block between
N Seventh & N Eighth Avenues and Juniper & Aspen Streets. The site is adjacent to
the current U-Haul store and Gallatin Valley Furniture. The site is currently vacant
and lacks adjacent infrastructure. This project seeks to complete the block with
streets and infrastructure in addition to new development.
Site:
Estimated Occupancy:
Spring 2022
Residential Mixed-Use Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
$31,162,872
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
CRITERIA FOR TIF ASSISTANCE
OVERALL DISTRICT RELEVANCE
1. This project touches on the major goals and objectives identified in
the Midtown Urban Renewal Plan: Specifically, 9TEN will promote
economic development; improve opportunities for multimodal
transportation; promote unified, human scale urban design and
support compatible urban density mixed land uses.
PROMOTE ECONOMIC DEVELOPMENT
2. Tax Generation: The two buildings (120,760 SF) and site
improvements, at full build out, will significantly increase the tax
base for the site. Further, the addition of this development will add
commercial space and increase the property values for adjacent
sites, thus increasing the overall tax generation for the area.
3. Elimination of Blight: Currently the site is vacant, undeveloped land
and the adjacent rights-of-way (ROW) are incomplete. Adjacent lots
and ROW (U-Haul, Cat’s Paw) contain infrastructure that is not up to
current City standards (lack sidewalks, curb and gutter, standard
access points, etc.). The development of this site will complete the
City block generally encompassed by Juniper & Aspen Streets and 7th
& 8th Avenues. Standard sidewalks and boulevard tree plantings will
be installed as required. Drive access points to the adjacent
businesses are anticipated to be improved and brought into
compliance, creating more complete and pedestrian friendly
streetscapes.
4. Employment Generation: The project development itself will create
jobs in the form of design and construction opportunities for local
businesses. Upon final build out, the commercial space, totaling
5/5
4/4
4/4
3/3
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
CRITERIA FOR TIF ASSISTANCE
3,500 sf, will generate office or retail based jobs. Additionally, property
management and maintenance positions will be required for the post-
occupancy operations and upkeep.
IMPROVE MULTI-MODAL TRANSPORTATION
5. Facilitate Public Health & Mobility: Given its location near the Midtown
core, proximity to transit and downtown, this site offer multiple options for
walkability and cyclists alike. The improvements the project will bring to
the block will provide ADA standard accessibility and extend the
streetscape along the east side of 7th avenue and allow visitors and
residents of the site to easily access the North 7th corridor.
6. Reduces Resource Demand: The Blue Line bus stop is only a few blocks
away (less than .15 miles) and allows riders to access the transfer station
downtown in under 10 minutes and then connect to the Orange and Red
lines headed for other destinations in the city. Expanded future bus service
is contemplated in the pending Downtown Bozeman Improvement Plan
that would connect several central hubs and parking facilities. With these
planned densities, ride sharing opportunities are probable.
7. Promotes Active Transportation: It’s close proximity to downtown and area
amenities make it a walkable and bikeable destination. This project site
development will includes ample bicycle parking.
IMPROVE, MAINTAIN and SUPPORT INNOVATION IN INFRASTRUCTURE
8. Infrastructure Improvements: The project proposes to improve sidewalks,
completing the block and installing boulevard trees where required.
1/1
1/1
2/2
1/2
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
CRITERIA FOR TIF ASSISTANCE
PROMOTE UNIFIED HUMAN SCALE URBAN DESIGN
9. Street Frontage: Building 2 will adhere to Storefront Block standards
along 8th and Aspen, promoting pedestrian activity with 12’ wide
sidewalks, weather protection, and expansive storefront glazing. The
overall site configuration highlights the pedestrian oriented street
façade and prioritizes pedestrian access.
10. Reduced Vehicular Access: There are only two main vehicular access
points via the alley at the rear of the site and a central drive to be
created between the two buildings. This moves vehicular access to the
rear of the buildings and away from the Pedestrian circulation on Aspen
Street and Eighth Avenue.
11. Enhances 7th Ave Entry Corridor: The proposed project does not front
directly onto North 7th Avenue. However, the associated improvements
will improve pedestrian access along Aspen Street, improve the
vehicular access points to properties on Aspen Street and provide an
infill project on a highly visible block on North 7th Avenue. Existing and
future businesses along North 7th will benefit from the residents and
commercial spaces created.
12. Enhances Pedestrian Experience: This project will adhere to Storefront
and landscape Block standards along 8th and Aspen, promoting
pedestrian activity with 12’ wide sidewalks, weather protection, and
expansive storefront glazing, and street trees. Furthermore, landscaped
and urban plazas are placed directly adjacent to the sidewalks.
13. Quality of Development: The design intent is to meet or exceed the
Bozeman UDC requirements.
2/2
2/2
2/3
3/3
2/2
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
SUPPORT COMPATIBLE URBAN DESNITY MIXED LAND USES
14. Increases Housing Units: This project proposes 52 units in Building One
and 45 units Building two, for a total of 97 dwelling units of workforce
housing. This will include a mix of Studio, 1, 2 & 3 bedroom units.
15. Mixed Use: Building two includes 3,500 sf of commercial on the ground
floor along with 45 multi-household dwelling units on the subsequent
three floors. The project as a hole places multiple households in the
heart of the Midtown district, walkable to multiple commercial and
retail destinations, and encouraging future development.
16. Shared Parking: The project currently does not have a shared parking
component. It will be providing, at a minimum, the required parking B-
2M zoning requirements; as opposed to providing no or limited parking
as currently allowed in the Midtown District. The applicant may explore
a shared parking agreement with adjacent properties in the future.
4/4
3/4
1/2
TOTAL POINTS: 40/44
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
PROJECT NARRATIVE
Intro
This project consists of a 1.62 acre site zoned B-2M located along North 8th Avenue
between Aspen and Juniper Streets. The 816 North 8th Avenue project consists of two
4-story buildings and related site improvements. Building 1 is exclusively residential
and Building 2 provides ground floor commercial and parking, and multi-household
residential. Building 1 totals 58,880 gross sf and includes 52 dwelling units and 2,350 sf
of tenant amenity space. Building 2 totals 61,880 gross sf and includes 45 dwelling
units, 3,500 sf of ground floor commercial, and ground level indoor parking. This
application seeks TIF assistance for Impact fees for both buildings, as well as costs to
build out non-existent street and utility infrastructure adjacent to the property. A
concept review application for this project was submitted to the City of Bozeman
Office of Community Development on May 7, 2019.
Building Design
Upon full build out, the site will include off-street parking, a residential building, and a
building with a mix of residential units and ground floor commercial space, as well as
open space and tenant amenities. The commercial space(s) will front onto North 8th
Avenue, providing an active and engaging storefront for pedestrians. The commercial
space will be built as shell space with the flexibility to accommodate a single large or
several smaller commercial tenants. The upper floors will house the dwelling units,
which at this time are anticipated to be a mix of Studio, 1, 2 & 3 bedroom units.
Preliminarily, this project will include 45 units on the upper 3 levels of Building 2 and
52 units in Building 1. Open space for tenants will be provided by a mix of private
balconies and in-building amenity space. Building 1 will include the fourth floor roof-
top amenity space for tenants. Additionally, Building 1 will house ground level lobbies
with workstations and lounge space, and additional tenant amenity areas. In addition
to the recreational & amenity areas, indoor vehicle parking, bike parking, and storage
for residents will be located on the ground level of Building 2.
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
PROJECT NARRATIVE
Anticipated Infrastructure improvements
The public right-of-way abuts the property on all sides, but the streets are not
complete and the utility infrastructure at these locations is minimal. This project
proposes to collaborate with the City of Bozeman to complete the infrastructure
adjacent to this property. Anticipated improvements include paving, curbs, gutter and
public sidewalks of North 8th Avenue between Aspen and Juniper Streets. Additional
improvements along Aspen and Juniper Streets from North 7th to North 8th are
anticipated. This includes the water, sewer, and stormwater infrastructure needed at
these locations. Additionally, it is anticipated that the existing sewer line that runs in
the alley to the east will need to be re-routed to some extent. It is anticipated the
project will incur the burden of these costs with some sort of payback program with
the city and through the TIF assistance program.
Access and Parking
Both Building 1 and 2 will front on North 8th Avenue, where the primary residential
entrance and commercial storefront will be located. A central drive access in between
the two buildings. Surface parking will flank the entire length of the east side of the
property, accessible via the Alley, as well as along the central drive. The Alley will be
accessed by the Aspen street to the south as well as a west entrance to the north of
the property. Additionally, indoor garage parking will be provided on the ground level
of the Building 2.
Schedule
With necessary approvals, construction of streets and infrastructure will begin late
spring 2020 with building construction beginning in fall 2020, and a target completion
date in spring 2022.
Residential Mixed-Use Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
MAPS, EXHIBITS, PLANS
9TEN mixed use
Bozeman Midtown TIF Assistance Request
SITE SURVEY
9TEN mixed use
Bozeman Midtown TIF Assistance Request
SITE DIAGRAM & VICINITY
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
Aerial Perspective looking East
Aerial Perspective Looking West
PERSPECTIVE IMAGES
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
PERSPECTIVE IMAGES
Perspective looking Northeast
Perspective Looking Northwest
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
PERSPECTIVE IMAGES
Perspective looking Southwest
Perspective Looking Northwest
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
SITE PLAN CONCEPT
N
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
FLOOR PLANS
BUILDING 1 LEVELS 2,3 FLOOR PLAN
BUILDING 1 LEVEL 1 FLOOR PLAN
N
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
FLOOR PLANS
BUILDING 1 LEVEL 4 FLOOR PLAN
N
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
FLOOR PLANS
BUILDING 1 LEVEL 1 FLOOR PLAN
BUILDING 2 LEVELS 2-4 FLOOR PLAN
N
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
PART 2
PROJECT TIMELINE
• • • • • •
PUBLIC BENEFITS
• • • • • •
PROJECT FINANCIAL INFORMATION
Residential Mixed-Use Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
Residential Mixed-Use Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
Project Milestones
Development Concept Review Submittal May 7, 2019
Preliminary TIF request approval (MURD Board) Oct. 3, 2019
Final TIF request approval (MURD Board) Jan. 9, 2020
Final TIF request approval (City Commission) Feb. 24, 2020
Infrastructure entitlements submittal May 1, 2020
Development entitlements submittal (Site Plan) June 1, 2020
Start of Infrastructure Construction July 1, 2020
Development Building Permit Submittal Oct. 1, 2020
Start of Development construction Dec. 1, 2020
Est. completion of infrastructure construction Nov. 15,2020
Est. completion of development construction (occupancy) June 1, 2022
• • • • • •
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
PUBLIC BENEFIT
Re-occupancy of Vacant Land
This lot has historically been vacant, so this isn’t re-occupancy in the true sense.
However, the addition of this project will complete the block making the area more
vibrant, desirable and walkable. Project infrastructure will contribute to “completing”
Aspen and Juniper Streets. Additionally, Aspen Street is a designated “Storefront”
block frontage, and the streetscape will be reflective of that with wider sidewalks and
an activated streetscape.
Elimination of Blight
Currently the parking lots, sidewalks and curbs in and around the site are not up to
city standards and are unsafe. As part of this project and site development,
infrastructure will contribute to complete and improve conditions on Aspen & Juniper
Streets. Rather than unsightly, vanishing streets to nowhere, the block will be
completed and built to City Engineering Standards. This means pedestrian friendly
routes, sidewalks and boulevard tree plantings. Clearly defined ground level spaces
will surround the new buildings providing office and retails spaces along with a
mixture of multi-household workforce living units.
Creation of New Office/Retail Spaces
Building 2 includes 3,500 sf of ground level commercial space. The use(s) is TBD, but it
will be well suited for office or retail space with a highly visible location in the
Midtown corridor.
Urban Living Options
This project proposes a variety of dwelling types including Studio, 1, 2 & 3-bedroom
units. The design of the building and layout of dwelling units will maximize natural
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
light coupled with surrounding views of the mountains encompassing the valley. This
site is located in the heart of Midtown and residents will enjoy many options to
access local eateries, music venues, services, bus lines, schools and Downtown.
Health and Mobility
Site development will modernize this block and area of the Midtown Corridor. It is
close to the Blue Line and easily accessible for pedestrians, cyclists, bus riders and
drivers alike. The site will include accessible facilities and a green space for passive
recreation and enjoyment. Its proximity to other Midtown Amenities and the urban
sidewalk network make it an easy destination to access. Site improvements will also
create a clean, safe and inviting location within the district.
Increased Tax Revenue
This project development will translate into new property tax revenues that
contribute to future Midtown projects. A breakdown of the anticipated tax
projections are as follows:
Projected Taxes: $ 216,986
Payback to TIF (8.4 years): $1,829,578
New Jobs and Local Sales
The project development itself will create jobs in the form of design and construction
opportunities for local businesses. Upon final build out, the commercial space,
totaling 3,500 sf, will generate office or retail based jobs. Additionally, property
management and maintenance positions will be required for the post-occupancy
operations and upkeep.
PUBLIC BENEFIT
Residential Mixed-Use Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
9TEN mixed use
Bozeman Midtown TIF Assistance Request
Concept Review: 816 North 8th
Residential Urban Infill
9TEN mixed use
Bozeman Midtown TIF Assistance Request
TIF ELIGIBLE EXPENSES
Description Amount
CITY of BOZEMAN: Impact Fees $702,900
Public R.O.W. Infrastructure Upgrades
( Juniper, Aspen & 8th )
$1,126,679.87
TOTAL $1,829,578