HomeMy WebLinkAbout09_Site Plan Project Narrative 07 19 19
l:\bznfac_bip\docs\4_code\4.3_ahj_submittals\working files\sp submittal\site plan project narrative 07 09 19_1.docx
http://www.ctagroup.com E-mail: info@ctagroup.com
Site Plan Submitted July 19th, 2019
Completeness Review Submitted July 9th, 2019
City of Bozeman
Community Development Department
20 E. Olive Street
PO Box 1230
Bozeman, MT 59771-1230
RE: Site Plan Application - Bozeman Light Manufacturing Project
Dear Planning & Development Review Committee,
This application request is for a Site Plan Development Review Application by the City’s
Development Review Committee (DRC).
Site Plan Checklist General Information:
Name of Project: Bozeman Light Manufacturing Project
Project Zoning: B2
Project Location: Catron Crossing Subdivision Phase 1 Lots 8 & 9 (designated lots from
Preliminary Plat approval), west of E. Valley Center Road and north of Catamount Street.
Previous review applications completed for this property include:
- Application 18057 City Commission Staff Report for the Catron Crossing Preliminary Plat
Subdivision 6.4.18
- Application 16452 Staff Report Catron Crossing Master Site Plan approved 12.15.17
- Application 19069 Informal Review
- Application 19186 Concept Review
Project Legal Description: Tract A-1, C.O.S., 1827, SE ¼ of Section 26 Township 1S, Range
5E, PMM, City of Bozeman, Montana.
Project Narrative: Applicant has talked with Director Matsen and he has agreed to review
the submittal prior to final plat being recorded. Applicant understands approval is
conditional upon final plat recording. Also, applicant agrees to pay for re-review fees that
may necessary as a result of out of sequence work.
The project site is currently undeveloped land with an approved preliminary plat - Catron
Crossing Subdivision - from the City of Bozeman, June 4, 2018. The project consists of
site development, ground up construction, for a single story light manufacturing and office
facility. The project proposes a 61,146 gross square foot building footprint with a total lot
size of 5.82 acres. The project is not phased.
Site Development
Catron Crossing Subdivision
Lots 8 & 9
Site Plan Application - July 19th, 2019
Page 2
2
The building will be designed to include three primary uses. The primary areas of use
will be crystal growth, optical fabrication and laser manufacturing. The secondary areas
include the office area, restrooms, exercise area, lockers, break room, storage, as well
as conference and secured public areas.
The facility is projected to include dedicated office space to support operations such as
basic lab space, Class 1,000 clean room lab space and light manufacturing, assembling,
and distribution space.
The project proposes to consolidate three existing operations located within the
Bozeman community. Existing project sites include the crystal growth facility at 310 Ice
Pond Road in an R-S zone, an optical components facility at 900 Technology Blvd in a
BP zone, and a laser manufacturing facility at 31948 Frontage Road in an M-1 zone. The
consolidation of existing uses will be beneficial to the environment by reducing vehicle
miles traveled, reducing energy consumption using new technologies, improving
groundwater impacts by improving storm water treatment options, and by allowing the
city to correct non-compliant, grandfathered land uses, as the vacated sites develop in
the future.
FLIR’s Bozeman operation engineers and manufacturers lasers, grows synthetic crystals
and manufactures small optics from synthetic crystals. The new site would include the
growth of high purity crystals such as sapphire and garnets. Grown crystals are
approximately the size of a wine bottle that are then shaped and polished into several
small precision optical components that are sold world-wide, primarily for use in laser
systems. The laser manufacturing portion of the operation assembles optics, mechanical
parts, and electronics into laser modules. The lasers modules vary in size from a
matchbox to a shoebox. All manufacturing takes place in labs or cleanrooms within the
building. No activities take place outside of the building and no materials are stored
outside of the building. The processes require extreme cleanliness for all stages of
manufacturing and do not generate any fumes, odors, or noise.
The designation of light manufacturing is requested for this project as identified by BMC
B-2: Manufacturing light* - Special Use
Article 7: Definitions – manufacturing light (38.42.1870). Small scale fabrication of and/or
assembly of goods from previously prepared materials that occurs entirely indoors and
features low levels of trucking access typical of standard retail or general service
establishments.
Fabrication and assembly work is completed entirely indoors and uses small amounts of
raw materials during the manufacturing process. There is no outside storage. The
manufacturing and assembly process does not result in any negative effects to the
environment related to noise pollution, air pollution, light pollution, or water pollution.
There are no emissions during manufacturing or assembly that are related to negative
air quality. All processes are conducted in a highly controlled indoor environment. No
environmental impacts will occur to soil or groundwater. Site lighting will adhere to the
City’s Night Sky Ordinance and development regulations.
Site Development
Catron Crossing Subdivision
Lots 8 & 9
Site Plan Application - July 19th, 2019
Page 3
3
City utilities are available to the project site but will need to be extended as part of the final
plat process. The building will not exceed 50 feet in height. The project has approximately
93 parking stalls which are adequate for the proposed use. The project will be built in one
phase, therefore project phasing does not need to be addressed.
Currently operations employ 68 people. The project will provide high tech, market wage
jobs to the community. Employees arrive at staggered times of the day with 20% of
employees starting at 6:00 a.m. and departing at 3:00 p.m. and the remainder of
employees on site from 8:00 a.m. to 5:00 p.m.
Levels of trucking for this use are low and consist mainly of UPS and Federal Express
truck deliveries of materials. These deliveries can occur on a daily basis. Occasional
deliveries will take place where materials are delivered (typically a pallet of material)
every 3 to 4 months. These deliveries are by a single unit 2-axle truck. When a larger
pallet of material is delivered a pallet jack is typically used to offload the truck. No
forklifts are required. There are also deliveries of liquid oxygen or nitrogen once or twice
a month. All deliveries will occur at the rear of the building through a shipping/receiving
door. Item 77 on Site Plan Checklist regarding traffic study has been addressed in
Morrison Maierele Traffic Impact Study dated August 2017.
1. Project Design
Block Frontage / Access
The project proposes Mixed Use Block Frontage for Street A and Internal Storefront
Block Frontage for Street B as proposed by City staff (alley). Access to the site is
proposed from both Street A and Street B.
Landscape / Civil Narrative
The site improvements for the project will focus on aesthetics, safety and long-term
maintenance. The landscaping is intended to direct focus to the front entry of the
building, direct vehicular traffic in a safe, secure fashion and provide gathering areas of
for employees at the building.
We anticipate the native site soils will be required to be removed and replaced with
structural imported materials at paved and building areas. Approach and building entry
are integral to the building and is intended to be open and inviting. A pedestrian entry
element will extend from the front entry and provide a lit and protected cover for walking
traffic. Plantings will align with the entry element and complement the architecture. At
the entry area there will be a defined entry point and bicycle racks, and benches will be
provided as needed.
Parking islands will terminate each block of parking with a mix of trees, shrubs and
perennials.
Site Development
Catron Crossing Subdivision
Lots 8 & 9
Site Plan Application - July 19th, 2019
Page 4
4
Pedestrian crossings and sidewalks will be appropriately denoted. For the pedestrian
pathway within the parking lot, contrasting materials will denote the pedestrian way. All
crossings within and at the perimeter of the site will be accessible for all users.
Adjacent to an interior employee breakroom, an outdoor patio space is available for use
by employees. Landscaping will provide a natural separation between hardscaped
areas.
The project will be fully irrigated with a mix of efficient spray and drip systems using
water-sensitive controls and sensors. Dryland grass areas along the west and south will
established with temporary only to help reduce the water consumption.
Site requirements will include concrete aprons, sidewalks, curb and gutter along with
asphalt paving over compacted fill. Paved areas should accommodate commuter cars
and light truck traffic. A paved surface is proposed around the building to provide fire
department access.
An enclosed trash area with paved access is proposed south of the building.
The utility area is tucked to the southwest of the building and will be screened using
architectural panels and additional tree and shrub plantings to soften.
Based on the Comprehensive Drainage Plan, prepared by Morrison Maierle (dated
January 2018), the subdivision provides a regional detention facility, while intending the
development of lots 8 & 9 to incorporate LID practice through the capture and detention
of the first 0.5 inch of rainfall from a 24-hour storm preceded by 48 hours of no
noticeable measurable precipitation. Due to high groundwater, on-site stormwater
detention chambers/tanks with controlled release will be utilized.
To provide water to the new building for domestic and fire supply, a new 8” public water
main will be looped through the property. The new water main will be connected to the
existing 12” water line at the north end of the property and extended south along the
west side of the property where it will be connected to the existing 8” water main in
Catamount Street. A new fire hydrant and a new 6” water supply line for fire protection
will be brought into the building from the newly installed water main. A 4” domestic water
service will also be brought to the building from the new water main. This service will be
reduced to a 3” service line immediately following the OS&Y valve. A 3” water meter will
be provided. Process water for the manufacturing process is limited to a closed cooling
system with vessels open to the atmosphere, such that the only loss is evaporative. A 6”
sanitary sewer service will be installed from the building to the City sewer line. The
manufacturing process does not produce wastewater.
Based on the Traffic Study prepared by Morrison Maierle (dated August 2017) traffic
generation is expected to be in line with the generation values used for that study. The
applicant will verify generation numbers in the conceptual site plan submittal.
Site Development
Catron Crossing Subdivision
Lots 8 & 9
Site Plan Application - July 19th, 2019
Page 5
5
Architectural Building Systems – Preliminary Design
Concrete
Standard conventionally reinforced, cast-in place continuous concrete spread footing
and stem walls will be utilized where required. The structural floor system is a reinforced
slab on grade ranging from 4”-8” thick.
The building structural system will consist of conventional concrete pre-cast exterior
walls. The concrete wall thickness will be appropriate for height, span and loading. The
concrete walls may be reinforced and have an insulated core. A graphic cast into the
pre-cast panels will give the elevation a composed finish.
Masonry
A portion of the north elevation by the office is shown as a natural stone veneer applied
to the exterior wall system.
Metals
A portion of the east elevation by the office is shown as 2 varying profiles of prefinished
22 gauge corrugated metal panels.
Exterior perimeter structural columns and brace frames with metal framed infill walls will
be used at the northeast corner of the building.
There will be a series of column and beam lines to provide a clear span in the primary
building areas. The standard metal roof deck will be supported by open web steel bar
joist and joist girder system.
Metal ladders will be required to access portions of the roof. Interior space will be
identified for roof access.
Fire Suppression
A 6” supply, riser and mains will be provided for the building. Both, a wet and dry system
will be required for this building and will include mains, branch lines, and heads.
Site Lighting
Parking lights will be illuminated with LED pole mounted lights mounted to a 20’-0”
tapered pole. These lights are to be a color temp of 3000k and will have zero up lighting.
Building entrances will be illuminated with wall mounted LED lights attached to the
building surface. Wall mounted lights will have a color temp and will have zero up
lighting. Lighting calculations were performed for all site lighting areas and meet the
requirements that were outlined in the Bozeman Parking lot Lighting Ordinance.
Site Development
Catron Crossing Subdivision
Lots 8 & 9
Site Plan Application - July 19th, 2019
Page 6
6
CONCEPT REVIEW COMMENTS – May 29, 2019
Applicant received comments from the City of Bozeman Planning Department on May 29, 2019
related to the Concept Review submitted to the City on May 7, 2019. Below are the City
comments/responses to the list of applicant questions as well as additional response narrative
addressing City comments:
Recommendation: Concept comments only. All references below to the Bozeman Municipal Code, BMC.
Applicant Questions:
1. Will the building façade transparency for the east elevation be required to conform to the mixed
block frontage standards or internal roadway storefront standards? Provide specification section in
the UDC that states this. Per Section 38.510.030.F, the drive aisle on the eastern portion of the
property would have to adhere to these standards. It is the most prominent façade along the street
and should be reinforced to enhance the storefront environment. The BMC is currently having minor
adjustments adopted by the City Commission to better clarify the hierarchical standing of block
frontage standards. Within the adoption of Ordinance No. 2019, Section 4, the BMC will have an
order of precedence for building placement in multiple street frontage situations and building
entrances. The proposed site plan must adhere to the street block frontage standard first, the
trail/park block frontage standard second, and the internal roadway block frontage standard third.
However, dependent on the location and front orientation of the building, it must be compatible with
the character of the area and enhance the character of the street. As the building is proposed, the
east and west façade facing the trail and the internal roadway are the most prominent, therefore,
are held to the standards and criteria of site design and building design. The updates to the BMC can
be referenced here. Along this internal roadway, transparency requirements, landscaping, and
sidewalk width must meet standards as outlined in Table 38.510.030.F.
a. Applicant Response: Understood.
2. Per Section 38.530.040.B, building massing and articulation, with an alley to the east, rear yard to
the south, and side yard to the west, would this exception include all elevations of this project,
except the north elevation? Each elevation must meet these standards.
a. Applicant Response: Understood.
3. Per Section 38.530.070, blank wall standards, would the approach of balance between graphic
concrete panels and smooth concrete panels be an acceptable approach to blank wall treatment?
Staff would be in support of this along with more landscaping efforts along the wall.
a. Applicant Response: Understood.
4. Per Section 38.510.030.F, is a deviation required for a 5’ wide sidewalk per the internal roadway
storefront block frontage standard? A 12’ wide sidewalk is required. Alternative designs may be
considered to minimize the width of the sidewalk, but we would require it to meet pathway design
per section 38.520.040.D.3.
a. Applicant Response: A 10’ wide sidewalk between the east building wall and the parking
lot is provided as an alternate design departure.
5. Per Section 38.510.030.I, since there is no street, does parking limitation of 50% apply since it falls
along the rear and side yards? If it does apply, would a deviation request be allowed? This standard
does not apply.
a. Applicant Response: Understood
Site Development
Catron Crossing Subdivision
Lots 8 & 9
Site Plan Application - July 19th, 2019
Page 7
7
6. Where in the code is the standard that 1 tree per 50 linear feet is required along the public access
trails? Per Section 38.550.070, open spaces and trail corridors must be landscaped to meet
boulevard/ROW standards. The east/west public access trail is considered a midblock crossing and
must adhere to 1 tree per 50 linear feet. The south/west public trail is considered a public ROW that
also must adhere to these standards based on Section 38.550.050.D. It is also shown on the Master
Site Plan.
a. Applicant Response: Trees are provided at the prescribed 1 tree per 50 linear feet along
the east/west trail and the south/north trail.
7. Are the roof drain leaders allowed a direct connection to the storm drain system that leaves the site
without treatment or detention? Storm service connections may be permitted but will require a
hydraulic analysis/review and approval from the Engineering and Sewer Department. We will likely
not allow a straight connection to the storm sewer. Roof drains must connect to single structure and
then tie in.
Planning Division; Sarah Rosenberg srosenberg@bozeman.net 406-582-2260
1. Section 38.510.030.C. Building entrances must be visible and directly accessible from the street. A
departure is allowed and staff would be in support of the location of the entrance since there is
appropriate articulation and weather protection. However, along with this design feature, before
granting this departure, the internal roadway storefront block frontage standards should be
incorporated further. This includes tree pits, landscaping between the sidewalk and building, and a
wider sidewalk. Staff would be in support of a 10’ sidewalk, instead of the 12’ requirement, along
the entrance with landscaping and trees incorporated into it. This should be consistent along the
whole east elevation.
a. Applicant Response: It was determined with a follow-up clarification to city staff that
the internal roadway storefront block frontage applies to the sidewalk east of the
building and the parking lot. A 10’ sidewalk is provided with tree wells along this
sidewalk. To keep visibility from Street A to the main building entrance, the tree wells
have been located south of the main entrance at the prescribed 1 tree per 50 linear
feet of the adjacent building façade. See landscape sheets for plantings.
2. Per Section 38.520.070.C, the equipment must be screened fully from public view.
a. Applicant Response: Any equipment proposed on the exterior of the building, either
on the roof or within the mechanical side yard will be screened fully from public view
using a material of similar finish and quality as the corrugated metal siding. Staff will
notice dashed linework on the west elevation indicating larger equipment which is
shown above the current screen wall. However, we anticipate this equipment will not
be needed as we proceed with finalizing the design. If the larger equipment is needed,
the screen wall will be raised to screen this equipment as well.
Engineering Division, Griffin Nielsen, gnielsen@bozeman.net, 582-2280
1. The applicant should include stormwater mitigation in the design to infiltrate,
evapotranspire, or capture for reuse the runoff generated from the first 0.5 inches of rainfall
from a 24-hour storm to the greatest extent feasible for the site. A stormwater
drainage/treatment grading plan and maintenance plan for a system designed to remove
solids, silt, oils, grease, and other pollutants must be provided to and approved with the
Site Development
Catron Crossing Subdivision
Lots 8 & 9
Site Plan Application - July 19th, 2019
Page 8
8
site plan application. The plan must demonstrate adequate site drainage (including
sufficient spot elevations), storm water detention/retention basin details (including basin
sizing and discharge calculations, and discharge structure details), storm water discharge
destination, and a storm water maintenance plan. The approved stormwater maintenance
plan must be incorporated into the Owners Association Documents and submit a copy
prior to site plan approval. The seasonal high groundwater elevation must be identified
within the stormwater report to ensure all City requirements can be met during the season
high.
a. Applicant Response: Please see the included detailed grading and stormwater
management plan sheets (C200 – C206), engineering report, and stormwater
operation and maintenance manual.
2. A City standard 30 foot easement is required for the proposed main extension,
encroachment into the easement must be approved by the public works department. No
major structure including the proposed fencing and mechanical equipment at the rear of
the building will be permitted within the easement.
a. Applicant Response: Please see civil plan sheet C100 where a 30’ wide utility
easement is proposed for the newly installed stormdrain line and proposed water
main extension.
3. The water service must be a minimum of 10 feet from the proposed mechanical equipment.
a. Applicant Response: Please see civil plan sheet C303 where it is shown that the
proposed mechanical yard wall is a minimum of 10’ away from the proposed water
service lines.
4. Access on to Street B must be 25 feet from the southern property boundary.
a. Applicant Response: Please see civil plan sheet detail 3/C103 where a dimension from
the south east property corner to the south edge of the south access onto Street B has
been provided.
5. The applicant must present a summary of all possible chemicals which may be introduced
to the facilities wastewater stream, additional pre-treatment may be required.
a. Applicant Response: Only typical domestic waste will be discharged through the
sanitary line. Other potential chemicals such as battery acid will be collected and
neutralized within the building and disposed separately from sanitary waste.
6. A City standard street light must be installed at the proposed mid-block crossing. The
Street light must be adopted into an SILD prior to occupancy of the building. The
Applicant should consult the City of Bozeman Design Standards and Specification Policy
Manual for the City’s Street light specifications.
a. Applicant Response: A new street light is proposed in the southeast corner of the site
which will illuminate the mid-block crossing. See the site electrical plan sheets for
details.
7. The applicant must contact the City of Bozeman Engineering Department (Brian
Heaston) for an analysis of cash-in-lieu of water rights. The transfer of water rights
or the payment of cash-in-lieu of water rights shall be provided in accordance to
Bozeman Municipal Code (BMC) section 38.410.130, prior to an application
approval.
Site Development
Catron Crossing Subdivision
Lots 8 & 9
Site Plan Application - July 19th, 2019
Page 9
9
a. Applicant Response: Cash in lieu of water rights will be paid after City Engineering
review.
8. Plans and Specifications for water and sewer main extensions, streets, and storm
water improvements, prepared and signed by a professional engineer (PE) registered
in the State of Montana shall be provided to and approved by the City Engineer.
Water and sewer plans shall also be approved by the Montana Department of
Environmental Quality. The applicant shall also provide professional engineering
services for construction inspection, post-construction certification, and preparation
of mylar record drawings. Construction shall not be initiated on the public
infrastructure improvements until the plans and specifications have been approved
and a preconstruction conference has been conducted. Building permits will not be
issued prior to City acceptance of the infrastructure improvements unless all provisions
set forth in Section 38.270.030.C of the Bozeman Municipal Code are met to allow for
concurrent construction. Offsite infrastructure improvements do not qualify for
concurrent construction.
a. Applicant Response: Please see the attached Municipal Facilities Exclusion for DEQ.
The site plan including water main extension and engineering report will be
submitted to MDEQ for review after initial comments from City of Bozeman are
provided and the MFE is signed. DEQ requires that the MFE is signed by the reviewing
municipality acknowledging that the city will be reviewing.
9. Plans and specifications for any fire service line must be prepared in accordance with the
City’s Fire Service Line Policy by a Professional Engineer and be provided to and
approved by the City Engineer prior to initiation of construction of the fire service or fire
protection system. The applicant shall also provide Professional Engineering services for
construction inspection, post-construction certification and preparation of mylar record
drawings. Fire service plans, and domestic services 4” or larger, shall be a standalone
submittal, separate from the site plan submittals. City of Bozeman applications for service
shall be completed by the applicant.
a. Applicant Response: Two additional copies of the fire line and domestic line plan and
profile (C303 & C304) have been included as a separate submittal for review.
10. The Montana Department of Fish, Wildlife & Parks, SCS, Montana Department of
Environmental Quality and Army Corps of Engineer's shall be contacted regarding the
proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall
be obtained prior to final approval.
a. Applicant Response: Appendix D of the included engineering report contains
correspondence from the Army Corps of Engineers regarding the wetland mitigation.
As previously stated, a separate submittal will be made to MDEQ for review of the
water main extension.
1. Parks and Recreation; Addi Jadin, ajadin@bozeman.net, 406-582-2908
2. Building Division; Bob Risk brisk@bozeman.net 406-582-2377
3. Sustainability Division; Natalie Meyer nmeyer@bozeman.net 406-582-2317
Site Development
Catron Crossing Subdivision
Lots 8 & 9
Site Plan Application - July 19th, 2019
Page 10
10
4. Solid Waste Division; Russ Ward, rward@bozeman.net, 406-582-3238
· Need detailed plan for refuse enclosure
a. Applicant Response: Details for the refuse enclosure can be found on sheet A201.
· Refuse enclosure will need to be covered
a. Applicant Response: Refuse enclosure is shown as covered on sheet A201.
5. Water Conservation; Jessica Ahlstrom jahlstrom@bozeman.net 406-582-2265
6. Stormwater Division; Kyle Mehrens jkmehrens@bozeman.net 406-582-2270
7. Fire Department; Scott Mueller smueller@bozeman.net 406-582-2353
· No parallel parking allowed along drive aisles. No parking signs and fire lane parking signs
are required.
a. Applicant Response: After additional clarification from the fire department
regarding this comment, the drive aisle behind the building was widened to satisfy
the 20’ minimum fire lane width.
8. Water and Sewer Division; John Alston jalston@bozeman.net 406-582-3200
· There is concern about being able to access the water meters near the equipment. Please
contact Water & Sewer to discuss this further.
a. Applicant Response: The mechanical yard area behind the building has been
modified to allow 10’ separation from the mechanical equipment and screen wall.
9. Forestry Division; Alex Nordquest; anordquest@bozeman.net 406-582-3205
· Provide tree species from the City of Bozeman Street Tree Guide
Applicant Response: See landscape plan sheet L301 for list and location of
proposed tree species.
10. NorthWestern Energy; Cammie Dooley; cammie.dooley@northwestern.com
· There is concern about being able to access the utility meters near the equipment. Please
contact Water & Sewer to discuss this further.
a. Applicant Response: Coordination with NWE has been ongoing to ensure
requirements are satisfied.
Future Impact Fees - Please note that future building permit applications will require payment of the
required transportation, water, sewer and fire impact fees according to the City of Bozeman adopted
impact fee schedule in place at the time of building permit issuance. If you desire an estimate of the
required impact fees according to current rates please contact the Department of Community
Development and/or visit.
Site Development
Catron Crossing Subdivision
Lots 8 & 9
Site Plan Application - July 19th, 2019
Page 11
11
COMPLETENESS REVIEW / Site Plan Checklist Comments and Responses, July 16, 2019
General Information
8d. Location, percentage of parcel(s) and total site, and square footage of the following: Private open
space, provide boundary/ies and dimensions of each space provided (if residential requirement) on plans
or separate exhibit. Provide a summary total types of dwelling units and total open space required and
provided. (Comment: Required for acre commercial. Could be on front cover)
Response: Open space has been outlined in red and area added to show extent of total area. Please refer
to plan sheet L301.
Site Plan Details
20. Block Frontages (Comment: Label on plans)
Response: Block frontages for Street A, Street B and the shared use path are shown on plan sheet C100
and L301
28b. Surface Water including: Watercourses, water bodies and wetlands (include classifications based
upon a determination of the Gallatin Conservation District, Army Corps of Engineers, or Wetland Delineation
Report; note classification of each feature on plans). (Comment: Label on plans)
Response: Please see note on sheets C100 and C200 regarding surface water.
Landscape Plan
61. Approximate centerlines of existing watercourses, required watercourse setbacks, and the location of
any 100-year floodplain;the approximate location of significant drainage features; and the location and size
of existing and proposed streets and alleys,utility easements, utility lines, driveways and sidewalks on the
lot and/or adjacent to the lot.
Response: Note added to show and state where the closest water way is located this is shown on plan
sheet L301.
Water and Water Rights
78. Water rights information. If cash in lieu is proposed a cash in lieu of water rights calculation and payment
amount certified by the Engineering Division. (Comment: Need email correspondence from Brian Heaston)
Response: Cash in Lieu Correspondence from Brian Heaston dated 7.18.19 is included in Appendices.
Departures
83. Departures, a departure narrative must be provided stating which Section(s) of the Bozeman Municipal
Code are proposed for departure, the scope and extent of the plan proposed for departure and a response
to the required departure criteria. If more than one departure, a summary and response to the criteria must
be provided for each departure. (Comment: Departure fee per sidewalk width, $234)
Response: We are requesting a departure to 38.510.030.F to reduce the sidewalk width from 12’
to 10’ as the owner does not want to promote pedestrians to enter the interior of the site. This
departure has previously been reviewed and supported by City planning and meets the intent of
planning’s comment in the CONR response by providing separation from structures and
additional landscaping. 6.11.2019: City Planning Response: A 12’ wide sidewalk is
required. Alternative designs may be considered to minimize the width of the sidewalk,
but we would require it to meet pathway design per section 38.520.040.D.3.
Site Development
Catron Crossing Subdivision
Lots 8 & 9
Site Plan Application - July 19th, 2019
Page 12
12
Sincerely,
CTA ARCHITECTS ENGINEERS
Stephanie Ray, AICP
stephanieray@ctagroup.com
(w) 406.333.7976
cc: CTA File -