Loading...
HomeMy WebLinkAbout19314 Site Plan Details06.29.17 11:09 PM | L:\BZNFAC_BIP\BIMCAD\LandArch\BZNFAC_BIP_City Submittal Cover.dwgCVRCOVER SHEETOSTERGAARD3 11.08.2019 COB 1ROSASite Development for Lots 8 & 9 of Catron Crossing Subdivision07.09.2019SITE PLAN REVIEW SUBMITTALPROJECT LOCATIONADDRESS: TBDBOZEMAN, MT 59718LAND USE MAP (CONST. ACCESS)LocatorPROPERTY OWNERVC Development, LLC1184 North 15th StreetDon CapeBozeman, MT 59715406-624-0382SHEET INDEXFOR VISUALIZATIONPURPOSES ONLYCIVILXC001 NOTESXC002 CONSTRUCTION ROUTE MAPXC003 EXISTING CONDITIONSX XC004 EROSION CONTROL & CONSTRUCTION MANAGEMENT PLANXC005 DEMOLITION PLANX XC100 OVERALL SITE PLANX XC101 DETAILED SITE PLAN - NORTHX XC102 DETAILED SITE PLAN - SOUTHX XC103 APPROACHES PLAN DETAILXC200OVERALL GRADING & DRAINAGE PLANX XC201 DETAILED GRADING PLAN - NORTHX XC202 DETAILED GRADING PLAN - SOUTHX XC203 APPROACHES GRADING DETAILX XC204 STORMWATER MANAGEMENT PLANX XC205 STORMWATER MANAGEMENT PLANX XC206 STORMWATER MANAGEMENT PLANXC207 STORMWATER MANAGEMENT PLANX XC300 OVERALL UTILITY PLANX XC301 OVERALL DRY UTILITY PLANX XC302 WATER MAIN PLAN & PROFILEX XC303FIRE LINE PLAN & PROFILEX XC304 DOMESTIC LINE PLAN & PROFILEX XC305 EXTRACTION WELL DETAILSX XC306 INJECTION GALLERY DETAILSX XC400 CIVIL DETAILSX XC401 CIVIL DETAILSX XC402 CIVIL DETAILSXC403 CIVIL DETAILSXC404 CIVIL DETAILSXC405 CIVIL DETAILSAPPLICATION DATA:PROJECT PARKING STATISTICSOFFICE USES = 27.8 (*125% = 34.7 MAXIMUM ALLOWED)(1) SPACE PER 250 SF OF FLOOR AREA (7500 @ 85% = 6,375 SF) = 27.8MANUFACTURING USES = 65.0 (*125% = 82.0 MAXIMUM ALLOWED)(1) SPACE PER 1000 SF OF FLOOR AREA (52,920 @ 85% = 44,982 SF) = 45.0(1) SPACES PER / EACH MANUF. EMPLOYEES (39 ) = 20 TOTAL REQUIRED PARKING SPACES = 93 (92.8) (*125% = 116.0 MAXIMUM ALLOWED)89 NON-ACCESSIBLE + 4 ACCESSIBLE (3 REGULAR + 1 VAN)TOTAL PROVIDED PARKING SPACES = 93 (*25% = MAXIMUM COMPACT)89 NON-ACCESSIBLE (89 REGULAR + 0 COMPACT) + 4 ACCESSIBLE (3 REGULAR + 1 VAN)BICYCLE PARKINGSPACES REQUIRED (10% OF REQUIRED PARKING) = 10SPACES PROVIDED = 10ZONING B-2 COMMUNITY BUISINESS DISTRICTCURRENT LAND USE VACANTPROPOSED LAND USE LIGHT MANUFACTURING(SPECIAL USE)LAND PARCEL SIZEGROSSNET (MINUS PUBLIC ACCESS EASEMENT)ACRES (SUBJECT SITE) = 5.82 ACRES= 5.62 ACRESSQUARE FOOTAGE (SF) = 253,557 SF= 244,861 SFSITE STATISTICS(USING NET)=100%244,861 SF PERCENTAGE OF BUILDINGS =25.0% 61,146 SFPERCENTAGE OF DRIVES AND PARKING =19.2% 47,123 SF.PERCENTAGE OF SETBACKS, O.S. & LANDSCAPE =55.8% 123,592 SFPERCENTAGE OF PUBLIC RIGHT-OF-WAY=0.0% 0 SF BUILDING INFORMATION EXISTING NET (FAR)PROPOSED NET (FAR)TOTAL (USING NET)FLOOR TO SITE RATIO (FAR) 0 SF (REMAINING)61,146 SF= 61,146 SF/ 244,861BUILDINGS/ STRUCTURES TOTAL0 SF (0.0%) 61,146 SF(25.0%)= 61,146 SF(25.0%)MAIN BUILDING 0 SF (0.0%)61,146 SF (25.0%)= 61,146 SF (25.0%)ACCESSORY BLDGS 0SF (0.0%) 0 SF (0.0%)= 0 SF (0.0%)(FOOTPRINT ONLY)LEGAL DESCRIPTION (TO BE AGGREGATED):CATRON CROSSING SUBDIVISION (PRELIMINARY PLAT COMPLETER, FINAL PLAT 2019)PHASE 1, LOTS 8 & 9.CATRON CROSSING SUBDIVISION: TRACT A-1 OF THE CORRECTED CERTIFICATE OFSURVEY 1827A, SINTUATED IN THE SE14, OF SECTION 26C TOWNSHIP 1 SOUTH, RANGE 5EAST, PRINCIPAL MERIDIAN, CITY OF BOZMEAN, GALLATIN COUNTY, MONTANA.ZONING MAPBLOCK FRONTAGE MAPDAVIS LN I-90FRONTAGE RDNORTHNORTH'MIXED' (PURPLELINES ALONGCATAMOUNT &STREET A)PROJECTPROPERTYDRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |Site Development for Lots 8 & 9 of Catron Crossing CATRON CROSSING LOTS 8 & 9 Bozeman, MTSITE PLAN APPLICATION07.09.20192019STA T E OF MONTANALANDSCAPE ARCH ITECT DEBRALICENSED 264ANN-LESLIEROSALANDSCAPEX XL101 LANDSCAPE SITE PLANX XL301 PLANTING PLANX XL302 NORTH PLANTING PLANX XL303 SOUTH PLANTING PLANXL401 PLANTING DETAILXL501 IRRIGATION DETAILXL502 IRRIGATION DETAILCONSTRUCTION ACCESS1. FROM E VALLEYCOMMONS RD ANDCATAMOUNT STGEOTECHNICAL INFORMATIONAllied EngineeringCraig Madson, P.E.32 Discovery Dr.Bozeman, MT 59718406.582.0221SEE GEOTECH REPORTCOMMUNITY PLAN: COMMUNITY COMMERCIAL MIXED USESNEIGHBORHOOD CONSERVATION: NOWETLAND/WATERCOURSE: MITIGATED W/ SUBDIVISIONHISTORIC DISTRICT: NO FLOOD ZONE: NOUSABLE OPEN SPACE REQUIRED: 4,898 (2% OF PROJECT AREA)PEDESTRIAN-ORIENTED O.S. REQUIRED: 0 SF (0%) **SEATING REQUIRED: 0 LF (2 LF (16" WIDE) PER 60 SF OF PED-ORIENTED O.S. REQ'DUSABLE OPEN SPACE PROVIDED: 6,546 SF (2.6%)PEDESTRIAN-ORIENTED O.S. (2 PLAZAS) PROVIDED 0 SF (0%) **SEATING PROVIDED: 0 LF(** NUMBERS INCLUDED AS A PART OF USABLE O.S.) PROJECTAREAPROJECTAREASTAGINGAREACATAMOUNT STN 19TH AV 11.08.2019 COB 1 07.09.2019 CITY SUBMITTAL GENERALX XCVR COVER SHEETB-2R-OB-2'INTERNALROADWAYSTOREFRONT'(YELLOW LINESALONG STREETB / ALLEY)STREET ACATAMOUNT STE VALLEY COMMONS RDVACANTMULTI-HOUSERESID.COMMERCIALRETAILHOTEL/MOTELALPHA DRSTREET ASTREET B(ALLEY)TRAILCATAMOUNT STARCHITECT/ENGINEER/SURVEYCTA Architects Engineers411 E Main St, Ste 101Bozemans, MT 59715406.556.7100Project Manager: Zack GrahamAPPLICANTE VALLEY CENTER RDM 27TH STN 19TH AVE CATRON STHOTEL/MOTELVACANTVACANTVACANTRESTAURANT/BARCATAMOUNT STE VALLEY COMMONS RD'TRAIL/PARK'(CYAN LINESALONGON-SITE TRAILPROJECTPROPERTYNORTHNORTHE VALLEY COMMONS RDARCHITECTUREX XA101 FLOOR PLANXA101B OVERALL FLOOR PLANX XA102 2ND FLOOR AND ROOF PLANSXA102B2ND FLOOR AND ROOF PLANSxXA200 EXTERIOR MATERIALX XA201 EXTERIOR ELEVATIONSXA201B EXTERIOR ELEVATIONSX XA202GEOTHERMAL DESIGNPERSPECTIVESXA202BCOOLING TOWER DESIGNPERSPECTIVEFLIR31948 E Frontage RoadBozeman, MT 59715406-585-3772TRAILELECTRICALXES1 CITY ELECTRICAL SITE PLANXES2 CITY ELECTRICAL SITE DETAILSSURVEYXV001 TOPOGRAPHY SURVEY3 LOT 8 & 9 CATRONCROSSING SUBDIVISION5.82 ACRES253,557 SFEXISTING HOTEL & PARKING LOTNEW BUILDING(61,146 SF)oh oh oh oh oh oh oh oh oh oh oh oh ohCATAMOUNT STREETgasgasgasgas gas gas gasgas gas gas gas gas gas gas gas STREET ASTREET BN90° 00' 00"E 203.23'N0° 00' 00"E 56.92'N58° 27' 42"E 84.44'S31° 31' 42"E12.16'L=184.89, R=205.00D=51°40'29"N0° 48' 41"E 78.74'L=34.49, R=152.01D=13°00'04"N12° 11' 23"W 1 5 4 . 7 2'N89° 48' 13"E 470.83'S12° 11' 23"E 6.07'L=71.74,R=152.36D=26°58'35"N39° 06' 47"W 98.40'L=37.77, R=147.84D=14°38'15"N89° 50' 26"E 451.85'N0° 00' 00"E 216.78'S89° 50' 21"W 138.61'N0° 48' 34"E 395.18'N0° 48' 34"E 271.49'WV HY DDWVWVWVWVWVWWW DDWVWWWW1C1011C1023C1032C1031C1038' PARKING SETBACK5' BUILDING SETBACKVISION TRIANGLE10' BUILDING SETBACK& UTILITY EASEMENT10' MASTER PLAN BUILDING/PARKING SETBACK 6' PARKING SETBACK0' BUILDING SETBACKUTILITYEASEMENTB-2 ZONINGB-2 ZONINGB-2 ZONINGB-2 ZONINGB-2 ZONING10' UTILITYEASEMENTVISIONTRIANGLESNOWSTORAGESNOW STORAGE SNOW STORAGE TRAFFICFLOW, TYP.LOT 10SNOW STORAGESHARED USE PATHSHARED USE PATHCIRCULATION VEHICLE PATH(INTERNAL ROADWAYSTOREFRONT BLOCK FRONTAGE)(MIXED BLOCKFRONTAGE)(MIXED BLOCK FRONTAGE)(TRAIL/PARK BLOCK FRONTAGE)(TRAIL/PARK BLOCK FRONTAGE)SHARED USE PATH(TRAIL/PARK BLOCK FRONTAGE)30' UTILITY EASEMENT30' UTILITYEASEMENT36.00R.O.WVISION TRIANGLELOT 430' UTILITYEASEMENTLOT 5LOT 610' MASTERPLANSETBACK15' QWEST EASEMENT30' WATER & SEWEREASEMENT12' X 70' DELIVERYTRUCK SPACEREFUSE CONTAINERLOCATIONVISION TRIANGLEEXISTING ASPHALT SINGLE POLE SIGNPROPOSED CONCRETEPROPOSED ASPHALTPROPERTY BOUNDARY - APPROXIMATE - SUBJECTPROPERTY BOUNDARY - APPROXIMATE - ADJACENTEXISTING CONCRETEPROPOSED LANDSCAPINGSITE LEGENDEXISTING STORM CATCH BASINDEXISTING SEWER MANHOLESEXISTING WATER VALVEEXISTING FIRE HYDRANTHYDFIRE HYDRANT / CONTROL POINTWATER VALVEHYDPROPOSED STORM MANHOLE/OUTLET STRUCTUREPROPOSED AREA INLETPROPOSED CURB INLETDEXISTING UTILITY POLECATCH CURB AND GUTTERSPILL CURB AND GUTTERLAYDOWN CURB AND GUTTERPROPOSED REINFORCED CONCRETESITE PLAN NOTES1.THE CONTRACTOR SHALL REFER TO BUILDING PLANS FOR LOCATION AND DIMENSIONS OF SLOPED PAVING,EXIT PORCHES, TRUCK DOCKS, BUILDING DIMENSIONS, BUILDING ENTRANCE LOCATIONS, TOTAL NUMBER,LOCATIONS AND SIZES OF ROOF DOWNSPOUTS.2.ALL TRAFFIC CONTROL SIGNS SHALL BE FABRICATED AS SHOWN IN THE NATIONAL MANUAL ON UNIFORMCONTROL DEVICES FOR STREETS AND HIGHWAYS EXCEPT AS NOTED ON THE PLANS.3.ALL CURB RADII DIMENSIONS SHOWN ARE TO BACK OF CURB.4.ALL PAVING DIMENSIONS ARE TO FACE OF CURB, FACE OF BUILDING, PROPERTY LINES, UNLESS OTHERWISENOTED.5.ALL COORDINATES SHOWN ARE TO FACE OF CURB OR OUTSIDE OF WALL.6.THE CONTRACTOR SHALL MATCH EXISTING PAVEMENT IN GRADE AND ALIGNMENT AND VERIFY AGAINST THEPLANS. NOTIFY ENGINEER IMMEDIATELY OF ANY DISCREPANCIES.7.THE CONTRACTOR SHALL MATCH EXISTING CURB AND GUTTER IN GRADE, SIZE, TYPE AND ALIGNMENT ATADJACENT ROADWAYS AND VERIFY AGAINST THE PLAN. NOTIFY ENGINEER IMMEDIATELY OF ANYDISCREPANCIES.8.THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OF DAMAGE TO ANY EXISTING IMPROVEMENTS DURINGCONSTRUCTION, SUCH AS, BUT NOT LIMITED TO, DRAINAGE, UTILITIES, PAVEMENT, STRIPING, CURB, ETC.REPAIRS SHALL BE EQUAL TO OR BETTER THAN EXISTING CONDITIONS.9.ALL WORK ON THIS PLAN SHALL BE DONE IN STRICT ACCORDANCE WITH THE PROJECT SPECIFICATIONS.PAVING NOTES1.PAVEMENT SHALL BE PLACED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS.2.PAVEMENT SECTION RECOMMENDATIONS WERE TAKEN FROM THE PROJECT GEOTECHNICAL REPORT.5327.9Max 68.5° HorizMax 10° Vert43.542.523.5417.44.2WB-67 - Interstate Semi-TrailerOverall Length73.501ftOverall Width8.500ftOverall Body Height13.500ftMin Body Ground Clearance1.334ftMax Track Width8.500ftLock-to-lock time6.00sMax Steering Angle (Virtual)28.40°1C100OVERALL SITE PLAN0204080SCALE: 1" = 40'NORTHDRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |Site Development for Lots 8 & 9 of Catron Crossing CATRON CROSSING LOTS 8 & 9 Bozeman, MTSITE PLAN APPLICATION07.09.2019201911.6.2019 12:56 PM | L:\BZNFAC_BIP\BIMCAD\Civil\BZNFAC_BIP_C100.dwgC100OVERALLSITE PLANSCHLEGEL3 11.08.2019 COB1GRAHAMPROJECT PARKING STATISTICSOFFICE USES = 27.8 (*125% = 34.7 MAXIMUM ALLOWED)(1) SPACE PER 250 SF OF FLOOR AREA (7500 @ 85% = 6,375 SF) = 27.8MANUFACTURING USES = 65.0 (*125% = 82.0 MAXIMUM ALLOWED)(1) SPACE PER 1000 SF OF FLOOR AREA (52,920 @ 85% = 44,982 SF) = 45.0(1) SPACES PER / EACH MANUF. EMPLOYEES (39 ) = 20 TOTAL REQUIRED PARKING SPACES = 93 (92.8) (*125% = 116.0 MAXIMUM ALLOWED)89 NON-ACCESSIBLE + 4 ACCESSIBLE (3 REGULAR + 1 VAN)TOTAL PROVIDED PARKING SPACES = 93 (*25% = MAXIMUM COMPACT)89 NON-ACCESSIBLE (89 REGULAR + 0 COMPACT) + 4 ACCESSIBLE (3 REGULAR + 1 VAN)EMPLOYEE PARKING SPACES = 93 SPACESBICYCLE PARKINGSPACES REQUIRED (10% OF REQUIRED PARKING) = 10SPACES PROVIDED = 102C100CIRCULATION VEHICLENTSTHIS PROJECT HASBEEN DESIGNED TOBE ADA COMPLIANTWETLAND/STREAMS/PONDS/FLOOD PLAIN·EXISTING ONSITE WETLANDS HAVE BEEN MITIGATED BY THE SUBDIVISION. PERMIT NONWO-2012-01707-MTH·NO STREAMS OR IRRIGATION DITCHES WITHIN OR ADJACENT TO THE PROPERTY. THENEAREST CREEK IS CATRON CREEK WHICH IS APPROXIMATELY 200 FT TO THE EAST OF THEPROPERTY ALONG VALLEY CENTER ROAD·PROPERTY CONTAINS AN ABANDONED TEMPORARY STORMWATER POND WHICH HAS BEENREPLACED WITH STORMDRAIN BY THE SUBDIVISION.·THE PROPERTY IS LOCATED IN ZONE X (OUTSIDE OF FLOOD PLAIN) PER FIRM PANEL30031C0804D.33 HY DDWVWVWVWVWV DWVWWWWLOT 8 & 9 CATRONCROSSING SUBDIVISIONNEW BUILDING(61,146 SF)oh oh oh oh oh oh oh oh oh oh oh oh STREET ASTREET B2223322445511678TYP.91011TYP.121212121212131314TYP.3181819191.0014.0'TYP9.0'TYP18.0 'TYP13.9632.8690.009.001.6710.8168.1943.4747.665.00173.3796.001.00 24.0'TYP 9.0'TYP94.51 5.00 16.63 113.3410.0014.00R244.5023.0526.00TBC TO TBC25.00TBC TO TBC5.0013.005.0035.1724.002022122TYP.23TYP.2426SHARED USE PATH 45.199.009.008.009.009.165.00634.005.605.3642.0614.43 5.00TYP.29.7713.25R184.50R4.00R15.00 R10.00 R80.00R51.00EXISTINGCONCRETE STREETAPPROACH10.001.50' CENTER OF BOLLARD TOOUTSIDE FDN WALL, TYP.2722107772303031R 3 . 5 0 R19.50R44.50R3.50 TYP.R3.50R2.50 R7.00R39.50R39.50R90.50R64.50R129.50R154.00KEY NOTES1.NEW ASPHALT PAVING. SEE 1/C400.2.NEW 4" CONCRETE SIDEWALK. SEE 2/C400.3.NEW REINFORCED CONCRETE. SEE 3/C400.4.NEW PEDESTRIAN RAMP, SEE 4/C400.5.NEW PEDESTRIAN RAMP AT DRIVE APPROACH. SEE 5/C400.6.NEW PROTECTIVE BOLLARD. SEE 6/C400.7.NEW VERTICAL CURB. SEE 7/C400.8.NEW ACCESSIBLE PARKING STRIPING. SEE 8/C400.9.NEW VALLEY GUTTER. SEE 9/C400.10.NEW "FIRE LANE. NO PARKING" SIGN. SEE 10/C400.11.NEW ADA PARKING SIGNAGE. SEE 13/C400.12.NEW CATCH CURB & GUTTER. SEE 4/C401.13.NEW SPILL CURB & GUTTER. SEE 4/C401.14. NEW 4" YELLOW STRIPING.15. NEW COMMERCIAL DRIVEWAY.16.NEW SITE LIGHTING. SEE ELECTRICAL.17.PROTECT EXISTING DECORATIVE PEDESTRIAN CROSSWALK.18.NEW 10' WIDE ASPHALT TRAIL. SEE 5/C40119.STORMWATER DETENTION AREA. SEE C20020.CURB CUT. SEE DETAIL 15/C40021. SNOW STORAGE AREA22.PARKING LOT/STREET LIGHT. SEE ELECTRICAL PLAN23.TREE GRATE. SEE LANDSCAPE PLAN24.FIRE DEPARTMENT CONNECTION (FDC) LOCATION25.GEOTHERMAL WELL. SEE SHEET C30526.BICYCLE PARKING. SEE 2/L10127.FLAG POLE LOCATION. SEE L10128. NOT USED29. COORDINATE WITH NWE FOR PAVING AROUND EXISTINGPOWER POLE30. 6' X 6' CONCRETE APRON AROUND STORM STRUCTUREFRAME PER MANUFACTURER'S RECOMMENDATION31.NEW DROP CURB FOR DRIVEWAY. SEE 4/C401#1C101DETAILED SITE PLAN - NORTH010 2040SCALE: 1" = 20'NORTHDRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |Site Development for Lots 8 & 9 of Catron Crossing CATRON CROSSING LOTS 8 & 9 Bozeman, MTSITE PLAN APPLICATION07.09.2019201911.6.2019 12:56 PM | L:\BZNFAC_BIP\BIMCAD\Civil\BZNFAC_BIP_C101.dwgC101DETAILEDSITE PLAN - NORTHSCHLEGEL3 11.08.2019 COB1GRAHAMTHIS PROJECT HASBEEN DESIGNED TOBE ADA COMPLIANT33333COOLING SYSTEM ALTERNATIVE:LOCATION OF COOLING TOWERS INTHE EVENT THAT WATER RIGHTSARE NOT OBTAINED FORGEOTHERMAL WELL SYSTEM WV WWWDWEXISTING HOTEL & PARKING LOToh oh oh oh oh oh oh oh oh oh oh oh oh ohCATAMOUNT STREET2222233344444444551169991012131313131313131214TYP.153331718181924.00 R120.00 R102.00 4. 0 ' T Y P 9.0'TYP18.0' TYP R 1 5 . 5 0 R525.00R4.0010.008.0043.00 TBC TO TBC 34.00TBC TO TBC20.00 5.00 42.66 14.0010.19R454.508.01R15.5014.0' TYP 1.0'TYP45.209.0090.009.0090.009.0090.0021212125SHARED USE PATHSHARED USE PATH8.007714.50R78.00 R144.00 R45.00R45.00R35.00 30.65 221.45212.44R15.00R25.00R5.00R5.00R5.00R5.00R5.0010.002162.002.002.00R35.00R15.0010.00295.002525KEY NOTES1.NEW ASPHALT PAVING. SEE 1/C400.2.NEW 4" CONCRETE SIDEWALK. SEE 2/C400.3.NEW REINFORCED CONCRETE. SEE 3/C400.4.NEW PEDESTRIAN RAMP, SEE 4/C400.5.NEW PEDESTRIAN RAMP AT DRIVE APPROACH. SEE 5/C400.6.NEW PROTECTIVE BOLLARD. SEE 6/C400.7.NEW VERTICAL CURB. SEE 7/C400.8.NEW ACCESSIBLE PARKING STRIPING. SEE 8/C400.9.NEW VALLEY GUTTER. SEE 9/C400.10.NEW "FIRE LANE. NO PARKING" SIGN. SEE 10/C400.11.NEW ADA PARKING SIGNAGE. SEE 13/C400.12.NEW CATCH CURB & GUTTER. SEE 4/C401.13.NEW SPILL CURB & GUTTER. SEE 4/C401.14.NEW 4" YELLOW STRIPING.15.NEW COMMERCIAL DRIVEWAY.16.NEW SITE LIGHTING. SEE ELECTRICAL.17.PROTECT EXISTING DECORATIVE PEDESTRIAN CROSSWALK.18.NEW 10' WIDE ASPHALT TRAIL. SEE 5/C40119.STORMWATER DETENTION AREA. SEE C20020.CURB CUT. SEE DETAIL 15/C40021.SNOW STORAGE AREA22.PARKING LOT/STREET LIGHT. SEE ELECTRICAL PLAN23.TREE GRATE. SEE LANDSCAPE PLAN24.FIRE DEPARTMENT CONNECTION (FDC) LOCATION25.GEOTHERMAL WELL. SEE SHEET C30526.BICYCLE PARKING. SEE 2/L10127.FLAG POLE LOCATION. SEE L10128. NOT USED29.COORDINATE WITH NWE FOR PAVING AROUND EXISTINGPOWER POLE30. 6' X 6' CONCRETE APRON AROUND STORM STRUCTUREFRAME PER MANUFACTURER'S RECOMMENDATION31.NEW DROP CURB FOR DRIVEWAY. SEE 4/C401#1C102DETAILED SITE PLAN - SOUTH010 2040SCALE: 1" = 20'NORTHDRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |Site Development for Lots 8 & 9 of Catron Crossing CATRON CROSSING LOTS 8 & 9 Bozeman, MTSITE PLAN APPLICATION07.09.2019201911.6.2019 12:56 PM | L:\BZNFAC_BIP\BIMCAD\Civil\BZNFAC_BIP_C101.dwgC102DETAILEDSITE PLAN - SOUTHSCHLEGEL3 11.08.2019 COB1GRAHAMTHIS PROJECT HASBEEN DESIGNED TOBE ADA COMPLIANT3333COOLING SYSTEM ALTERNATIVE:LOCATION OF COOLING TOWERS INTHE EVENT THAT WATER RIGHTSARE NOT OBTAINED FORGEOTHERMAL WELL SYSTEM3 25.00EXISTING DRIVE APPROACH.CONTRACTOR TO VERIFYLOCATION AND WIDTHTAPER CURB OVER 2LFCONTRACTOR TOCOORDINATE CONSTRUCTIONOF NEW ACCESS WITHADJACENT PROPERTY OWNER(LOT 10)DD24.007.005.005.0011.7111.73GUTTERFLOWLINECAST-IN-PLACE DETECTIBLEWARNING PANELS, TYPR19.50R44.506.006.00 24.00 9.641 4 . 2 6 R3. 0 0 2.50 1 3 . 0 4 6" CONCRETESECTIONPROTECTEXISTINGPEDESTRIANCROSSWALK26.635.00ADD PROTECTIVEBOLLARDS TOEXISTING HYDRANTGUTTERFLOWLINECAST-IN-PLACE DETECTIBLEWARNING PANELS, TYPR144.50R119.50 7.941C103APPROACH PLAN DETAIL - NORTH051020SCALE: 1" = 10'NORTHDRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®w w w . c t a g r o u p . c o m8 0 0 . 7 5 7 . 9 5 2 2CHECKED BY |Site Development for Lots 8 & 9 of Catron Crossing CATRON CROSSING LOTS 8 & 9 Bozeman, MTSITE PLAN APPLICATION07.09.2019201911.6.2019 12:57 PM | L:\BZNFAC_BIP\BIMCAD\Civil\BZNFAC_BIP_C103.dwgC103APPROACHES PLANDETAILSCHLEGEL3 11.08.2019 COB1GRAHAM2C103APPROACH PLAN DETAIL - EAST051020SCALE: 1" = 10'NORTH3C103APPROACH PLAN DETAIL - SOUTH051020SCALE: 1" = 10'NORTHTHIS PROJECT HASBEEN DESIGNED TOBE ADA COMPLIANT33 1 43 53.92 THERMAL LAB 157 MONOBLOCK LAB 158 LRF SUBS 161 LRF ALIGNMENT 162 SUPERVISOR OFFICE 160 ELECTRICAL ENGINEERING LAB 206 SHIP/RECEIVE/STORAGE 153 QC INSPECTION LAB 130 QC LASER LAB 188 LASER CHEM 192 LASER INVENTORY 181 FITNESS 185 VIBRATION STATIONS 156 CLASS 4 LAB 168 CLASS 4 LAB 169 CLASS 4 LAB 170 CLASS 4 LAB 171 CLASS 4 LAB 172 CLASS 4 LAB 173 CLASS 4 LAB 174 CLASS 4 LAB 175 SUB-ASSEMBLY CLEAN ROOM 167 CLASS 4 LAB 210 CLASS 4 LAB 209 CLASS 4 LAB 208 CLASS 4 LAB 207 WOMEN'S 202 MEN'S 201 RECORDS 217 BOARD ROOM 106 UNSECURE CONF 103 BREAK ROOM 107LOCKERS 107A GROWTH STORAGE 180 CHEM LOADING 128 GLASS MELT & ANNEALING 184 ALEX/FAB POLISH 122 ACID LAB 152 FAB LAYOUT/CRYSTAL PROCESSING 129 CHEM LAB 115 FAB SHOP 127 ROUGH POLISHING 116 BELL JAR 137 UPS 139 MECH / PLUMB 140 MEP STORAGE 138 MACHINE SHOP 196 GROWTH 136 FINISH POLISHING 118 PRE-GROWTH 135 LOBBY 102 VESTIBULE 101 ? ? OFFICE 218 OFFICE 220 OFFICE 221 OFFICE 222 OFFICE 223 OFFICE 219 OFFICE 216 OFFICE 215 OFFICE 214 OFFICE 213 ELEC 155 MDF ELEC 183 MTNG RM 224 VISIT OFFICE 225 STAIR 204 CONF 142 DOC STOR 148 MFG MGR OFFICE 110 TOILET 104 RECEPTION 105 CONF 182 OPEN OFFICE 109 OFFICE 147 OFFICE 146 ALEX. VEST 124 OPEN OFFICE 145 TOILET 149A JAN 126 CRUCIBLE STORAGE 151 OPEN OFFICE 200 BOILER WATER HEATER RM 143 CR ENTRY 165 CR VEST. 166 STORAGE 205 MONOBLOCK SUBS 159 VIBRATION CONTROL RM 156A NEC STORAGE 181A ADA SHOWER 185A TOILET 186 MEN'S 190 WOMEN'S 191 CRUCIBLE PROCESSING 193 WELDING ROOM 194 Zr ROOM 195 FAB SHOP CNC 119 STOR 108 UPS RECEIVING 154 ALEX/FAB POLISH 121 ALEX/FAB POLISH 120 FINISH POLISHING 117 ANTEROOM 123 ALEX LOADING 125 MECHANICAL YARD 131 GeneratorElectrical GeneratorH A E B C D F G SHOWER 185B Transformer OFFICE 211 COPY 200A ELEC 200B GAS STOR. 141 HALL 005 HALL 001 HALL 002 ANTEROOM 190A HALL 006 HALL 003 HALL 004 ANTEROOM 201A HALL 007 IDF 138A GeneratorGenerator® 8 0 0 . 7 5 7 . 9 5 2 2 w w w . c t a g r o u p . c o m REVISIONS 11/5/2019 4:16:23 PM OVERALL FLOOR PLAN A101BOZEMAN FACILITYFLIR10.11.2019 CHECKED BY | COOK © 2019 | ALL RIGHTS RESERVED DRAWN BY | MARKUSON BID SET | CTA # BZNFAC_BIP | L:\BZNFAC_BIP\BIMCAD\Revit 1/16" = 1'-0"A101 1 FIRST FLOOR Site Development for Lots 8 & 9 of Catron CrossingCATRON CROSSING LOTS 8 & 9Bozeman, MTSITE PLAN APPLICATION 11.08.2019 SKYANN COOK ARC-ARC-LIC-5549L TICEN S E D ARCHI T ECB NOZEMA M AONTANS ATA TE OF MO N T AN3 3 3 11.08.2019 COB1 1 43 53.92 THERMAL LAB 157 MONOBLOCK LAB 158 LRF SUBS 161 LRF ALIGNMENT 162 SUPERVISOR OFFICE 160 ELECTRICAL ENGINEERING LAB 206 SHIP/RECEIVE/STORAGE 153 QC INSPECTION LAB 130 QC LASER LAB 188 LASER CHEM 192 LASER INVENTORY 181 FITNESS 185 VIBRATION STATIONS 156 CLASS 4 LAB 168 CLASS 4 LAB 169 CLASS 4 LAB 170 CLASS 4 LAB 171 CLASS 4 LAB 172 CLASS 4 LAB 173 CLASS 4 LAB 174 CLASS 4 LAB 175 SUB-ASSEMBLY CLEAN ROOM 167 CLASS 4 LAB 210 CLASS 4 LAB 209 CLASS 4 LAB 208 CLASS 4 LAB 207 WOMEN'S 202 MEN'S 201 RECORDS 217 BOARD ROOM 106 UNSECURE CONF 103 BREAK ROOM 107LOCKERS 107A GROWTH STORAGE 180 CHEM LOADING 128 GLASS MELT & ANNEALING 184 ALEX/FAB POLISH 122 ACID LAB 152 FAB LAYOUT/CRYSTAL PROCESSING 129 CHEM LAB 115 FAB SHOP 127 ROUGH POLISHING 116 BELL JAR 137 UPS 139 MECH / PLUMB 140 MEP STORAGE 138 MACHINE SHOP 196 GROWTH 136 FINISH POLISHING 118 PRE-GROWTH 135 LOBBY 102 VESTIBULE 101 ? ? OFFICE 218 OFFICE 220 OFFICE 221 OFFICE 222 OFFICE 223 OFFICE 219 OFFICE 216 OFFICE 215 OFFICE 214 OFFICE 213 ELEC 155 MDF ELEC 183 MTNG RM 224 VISIT OFFICE 225 STAIR 204 CONF 142 DOC STOR 148 MFG MGR OFFICE 110 TOILET 104 RECEPTION 105 CONF 182 OPEN OFFICE 109 OFFICE 147 OFFICE 146 ALEX. VEST 124 OPEN OFFICE 145 TOILET 149A JAN 126 CRUCIBLE STORAGE 151 OPEN OFFICE 200 BOILER WATER HEATER RM 143 CR ENTRY 165 CR VEST. 166 STORAGE 205 MONOBLOCK SUBS 159 VIBRATION CONTROL RM 156A NEC STORAGE 181A ADA SHOWER 185A TOILET 186 MEN'S 190 WOMEN'S 191 CRUCIBLE PROCESSING 193 WELDING ROOM 194 Zr ROOM 195 FAB SHOP CNC 119 STOR 108 UPS RECEIVING 154 ALEX/FAB POLISH 121 ALEX/FAB POLISH 120 FINISH POLISHING 117 ANTEROOM 123 ALEX LOADING 125 MECHANICAL YARD 131 GeneratorElectrical GeneratorH A E B C D F G SHOWER 185B Transformer OFFICE 211 COPY 200A ELEC 200B GAS STOR. 141 HALL 005 HALL 001 HALL 002 ANTEROOM 190A HALL 006 HALL 003 HALL 004 ANTEROOM 201A HALL 007 IDF 138A GeneratorGeneratorCooling Tower Cooling Tower ® 8 0 0 . 7 5 7 . 9 5 2 2 w w w . c t a g r o u p . c o m REVISIONS 11/5/2019 4:04:55 PM OVERALL FLOOR PLAN A101BBOZEMAN FACILITYFLIR10.11.2019 CHECKED BY | COOK © 2019 | ALL RIGHTS RESERVED DRAWN BY | MARKUSON BID SET | CTA # BZNFAC_BIP | L:\BZNFAC_BIP\BIMCAD\Revit 1/16" = 1'-0"A101B 1 FIRST FLOOR Site Development for Lots 8 & 9 of Catron CrossingCATRON CROSSING LOTS 8 & 9Bozeman, MTSITE PLAN APPLICATION 11.08.2019 SKYANN COOK ARC-ARC-LIC-5549L TICEN S E D ARCHI T ECB NOZEMA M AONTANS ATA TE OF MO N T AN3 3 3 11.08.2019 COB1 DN UP 32 E C D F 2ND FLOOR EQUIPMENT PLATFORM 1 M201 2ND FLOOR EQUIPMENT PLATFORM 2 M202 111'-9" 111'-9"DN A80325 24 1 43 53.92 H A E B C D F G 1/4":12" TYP SLOPE 1/4":12" TYP SLOPE 1/4":12" TYPSLOPE1/4":12" TYPSLOPE1/4":12" TYP SLOPE 1/4":12" TYP SLOPE 1/4":12" TYPSLOPE1/4":12" TYPSLOPEROOF ACCESS PLATFORM UPPER ROOF LOWER ROOF 63'-10"66'-6"61'-1 1/2"8 1/2"21'-9" R1 25'-0" 25'-0" 21'-0" 25'-0" 25'-0" 18'-5" 213'-11" 7" / 12" 1/4":12" TYP SLOPE 1/4":12" TYP SLOPE 1/4":12" TYP SLOPE 1/4":12" TYP SLOPE R1 MECHANICAL EQUIPMENT SCREEN 25'-0" 21'-0" 24'-0" 21'-0" 23'-0" 21'-0" 4x4 T.S. FRAME, SEE STRUCT. METAL GATE HINGE, FEMALE SIDE WELDED TO T.S. GATE. 3EQ. SPACED, SEE STRUCT. METAL PLATE "STOP & LOCK", WELD TO T.S. 36" A.F.F.3"4"36" A.F.F.-TOP VIEW- -FRONT VIEW- 1x1 ANGLE, SEE STRUCT. NOTE: POWDER COAT (BLACK) ALL METAL GATE COMPONENTS GRADE, SEE ELEVATIONS FOR GRADING. 3" 2"4 1/2"2" CORRUGATED METAL PANEL CANE BOLT CANE BOLT ® 8 0 0 . 7 5 7 . 9 5 2 2 w w w . c t a g r o u p . c o m REVISIONS 11/5/2019 4:16:27 PM 2ND FLOOR AND ROOF PLANS A102BOZEMAN FACILITYFLIR10.11.2019 CHECKED BY | COOK © 2019 | ALL RIGHTS RESERVED DRAWN BY | MARKUSON BID SET | CTA # BZNFAC_BIP | L:\BZNFAC_BIP\BIMCAD\Revit 1/16" = 1'-0"A102 2 MECHANICAL LEVEL - 2ND FLOOR PLAN 1/16" = 1'-0"A102 1 OVERALL ROOF PLAN 1" = 1'-0"A102 3 METAL PANEL AND T.S. WALL AT DUMPSTER - SIM AT MECH YARD Site Development for Lots 8 & 9 of Catron CrossingCATRON CROSSING LOTS 8 & 9Bozeman, MTSITE PLAN APPLICATION 11.08.2019 SKYANN COOK ARC-ARC-LIC-5549L TICEN S E D ARCHI T ECB NOZEMA M AONTANS ATA TE OF MO N T AN3 3 3 11.08.2019 COB1 DN UP 32 E C D F 2ND FLOOR EQUIPMENT PLATFORM 1 M201 2ND FLOOR EQUIPMENT PLATFORM 2 M202 111'-9" 111'-9"DN A80325 24 1 43 53.92 H A E B C D F G 1/4":12" TYP SLOPE 1/4":12" TYP SLOPE 1/4":12" TYPSLOPE1/4":12" TYPSLOPE1/4":12" TYP SLOPE 1/4":12" TYP SLOPE 1/4":12" TYPSLOPE1/4":12" TYPSLOPEROOF ACCESS PLATFORM UPPER ROOF LOWER ROOF 63'-10"66'-6"61'-1 1/2"8 1/2"21'-9" R1 25'-0" 25'-0" 21'-0" 25'-0" 25'-0" 18'-5" 213'-11" 7" / 12" 1/4":12" TYP SLOPE 1/4":12" TYP SLOPE 1/4":12" TYP SLOPE 1/4":12" TYP SLOPE R1 MECHANICAL EQUIPMENT SCREEN 25'-0" 21'-0" 24'-0" 21'-0" 23'-0" 21'-0" 4x4 T.S. FRAME, SEE STRUCT. METAL GATE HINGE, FEMALE SIDE WELDED TO T.S. GATE. 3EQ. SPACED, SEE STRUCT. METAL PLATE "STOP & LOCK", WELD TO T.S. 36" A.F.F.3"4"36" A.F.F.-TOP VIEW- -FRONT VIEW- 1x1 ANGLE, SEE STRUCT. NOTE: POWDER COAT (BLACK) ALL METAL GATE COMPONENTS GRADE, SEE ELEVATIONS FOR GRADING. 3" 2"4 1/2"2" CORRUGATED METAL PANEL CANE BOLT CANE BOLT ® 8 0 0 . 7 5 7 . 9 5 2 2 w w w . c t a g r o u p . c o m REVISIONS 11/5/2019 4:05:00 PM 2ND FLOOR AND ROOF PLANS A102BBOZEMAN FACILITYFLIR10.11.2019 CHECKED BY | COOK © 2019 | ALL RIGHTS RESERVED DRAWN BY | MARKUSON BID SET | CTA # BZNFAC_BIP | L:\BZNFAC_BIP\BIMCAD\Revit 1/16" = 1'-0"A102B 2 MECHANICAL LEVEL - 2ND FLOOR PLAN 1/16" = 1'-0"A102B 1 OVERALL ROOF PLAN 1" = 1'-0"A102B 3 METAL PANEL AND T.S. WALL AT DUMPSTER - SIM AT MECH YARD Site Development for Lots 8 & 9 of Catron CrossingCATRON CROSSING LOTS 8 & 9Bozeman, MTSITE PLAN APPLICATION 11.08.2019 SKYANN COOK ARC-ARC-LIC-5549L TICEN S E D ARCHI T ECB NOZEMA M AONTANS ATA TE OF MO N T AN3 3 3 11.08.2019 COB1 ® 8 0 0 . 7 5 7 . 9 5 2 2 w w w . c t a g r o u p . c o m REVISIONS 11/5/2019 4:16:27 PM EXTERIOR MATERIALS A200BOZEMAN FACILITYFLIR10.11.2019 CHECKED BY | COOK © 2019 | ALL RIGHTS RESERVED DRAWN BY | MARKUSON BID SET | CTA # BZNFAC_BIP | L:\BZNFAC_BIP\BIMCAD\Revit 1 2 3 5 4 6 Site Development for Lots 8 & 9 of Catron CrossingCATRON CROSSING LOTS 8 & 9Bozeman, MTSITE PLAN APPLICATION 11.08.2019 SKYANN COOK ARC-ARC-LIC-5549L TICEN S E D ARCHI T ECB NOZEMA M AONTANS ATA TE OF MO N T AN 3 3 3 11.08.2019 COB1 3 3 3 11.08.2019 COB1 ® 8 0 0 . 7 5 7 . 9 5 2 2 w w w . c t a g r o u p . c o m REVISIONS 11/7/2019 11:49:32 AM GEOTHERMAL DESIGN PERSPECTIVES A202BOZEMAN FACILITYFLIR10.11.2019 CHECKED BY | COOK © 2019 | ALL RIGHTS RESERVED DRAWN BY | TALARICO BID SET | CTA # BZNFAC_BIP | L:\BZNFAC_BIP\BIMCAD\Revit NORTH EAST BUILDING PERSPECTIVE SOUTH EAST BUILDING PERSPECTIVE NORTH WEST BUILDING PERSPECTIVE SOUTH WEST BUILDING PERSPECTIVE 4 2 13 56 45226 1 6532 2 5 62 2 5 Site Development for Lots 8 & 9 of Catron CrossingCATRON CROSSING LOTS 8 & 9Bozeman, MTSITE PLAN APPLICATION 11.08.2019 SKYANN COOK ARC-ARC-LIC-5549L TICEN S E D ARCHI T ECB NOZEMA M AONTANS ATA TE OF MO N T AN2 3 3 3 11.08.2019 COB1 ® 8 0 0 . 7 5 7 . 9 5 2 2 w w w . c t a g r o u p . c o m REVISIONS 11/7/2019 11:49:32 AM COOLING TOWER DESIGN PERSPECTIVES A202BBOZEMAN FACILITYFLIR10.11.2019 CHECKED BY | Checker © 2019 | ALL RIGHTS RESERVED DRAWN BY | Author BID SET | CTA # BZNFAC_BIP | L:\BZNFAC_BIP\BIMCAD\Revit NORTH EAST BUILDING PERSPECTIVE SOUTH EAST BUILDING PERSPECTIVE NORTH WEST BUILDING PERSPECTIVE SOUTH WEST BUILDING PERSPECTIVE 4 2 13 56 45226 1 6532 2 5 62 2 5 Site Development for Lots 8 & 9 of Catron CrossingCATRON CROSSING LOTS 8 & 9Bozeman, MTSITE PLAN APPLICATION 11.08.2019 SKYANN COOK ARC-ARC-LIC-5549L TICEN S E D ARCHI T ECB NOZEMA M AONTANS ATA TE OF MO N T AN2 3 3 3 11.08.2019 COB1