HomeMy WebLinkAbout01-06-20 City Commission Packet Materials - C3. Sundance Minor Subdivision Final PlatCommission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Tim Cooper, Assistant City Attorney
Tom Rogers, Senior Planner
SUBJECT: Approve the Final Plat for the Sundance Minor Subdivision Final
Plat; authorize the Director of Public Works to execute the same
on behalf of the City of Bozeman, and the Director of Community
Development to execute the improvements agreements on behalf
of the City of Bozeman, Application 19307.
MEETING DATE: January 6, 2020
AGENDA ITEM TYPE: Consent
RECOMMENDATION: That the City Commission approve the Final Plat for the Sundance
Minor Subdivision Final Plat; and authorize the Director of Public Works to execute the same on
behalf of the City of Bozeman, and the Director of Community Development to execute the
improvements agreements on behalf of the City of Bozeman.
STRATEGIC PLAN: Vision Statement: 4. A Well-Planned City. We consistently improve our
community’s quality of life as it grows and changes, honoring our sense of place and the
‘Bozeman feel’ as we plan for a livable, affordable, more connected city. 4.2 High Quality Urban
Approach. Continue to support high quality planning, ranging from building design to
neighborhood layouts, while pursuing urban approaches to issues such as multimodal
transportation, infill, density, connected trails and parks, and walkable neighborhoods. 4.4
Vibrant Downtown, Districts & Centers. Promote a healthy, vibrant Downtown, Midtown, and
other commercial districts and neighborhood centers – including higher densities and
intensification of use in these key areas.
BACKGROUND: On March 23, 2015, the City Commission approved the findings of fact
completing the preliminary plat approval to subdivide 27.855 acres together with the required
supplementary plans and information to create three commercial lots and a park, and rights-of-
way. The developer has applied for final plat review and approval. The preliminary plat was
unanimously approved (5:0) by the City Commission on March 2, 2015.
Staff has concluded that all terms and conditions of the preliminary plat approval have been met.
An improvements agreement has been completed for the future installation of landscaping, Davis
Lane improvements, pedestrian corridor, and boulevard landscaping improvements. The
appropriate financial guarantees have been received.
9
§76-3-611(1), MCA, provides that the City Commission shall approve the plat only if:
(a) it conforms to the conditions of approval set forth on the preliminary plat and to the terms of
this chapter and regulations adopted pursuant to this chapter; and
(b) the county treasurer has certified that all real property taxes and special assessments assessed
and levied on the land to be subdivided have been paid.
The County Treasurer has certified that all real property taxes and special assessments assessed
and levied on the land to subdivide have been paid. Attached is a memorandum from Tom
Rogers, Senior Planner, stating the staff has concluded that all terms and conditions of the
preliminary plat approval have been met.
An Improvements Agreement is required for final plat approval of this subdivision. The
improvements agreement guarantees the installation of public street lighting, park improvements,
lot frontage sidewalks, and subdivision pathways. All other necessary infrastructure
improvements are constructed.
UNRESOLVED ISSUES: None.
ALTERNATIVES: As proposed by the City Commission.
FISCAL EFFECTS: Fiscal impacts are undetermined at this time, but will include increased
property tax revenues from new development, along with increased costs to deliver municipal
services to the property.
Report compiled on December 26, 2019
Attachments: Staff Memo
Final Plat
10
MEMORANDUM
----------------------------------------------------------------------------------------------------------
TO: GREG SULLIVAN, CITY ATTORNEY
ROBIN CROUGH, CITY CLERK
FROM: TOM ROGERS, SENIOR PLANNER
RE: FINAL PLAT REVIEW FOR THE SUNDANCE MINOR SUBDIVISION, PHASE
A & C, PLANNING FILE NO. 19307
DATE: December 11, 2019
----------------------------------------------------------------------------------------------------------
Baxter Meadows Land Partners, LLC (Applicant), made application to the City of Bozeman
Department of Community Development for Final Plat review and approval for the
Sundance Minor Subdivision, Phase A and C to create three (3) lots, dedicate a park,
dedicate street rights-of-way, and provide public access easements. Attached is a copy of
the Findings of Fact and Order. The Commission unanimously approved the Findings of
Fact on March 23, 2015. Minor subdivision approvals are valid for one year. However, due
to a clerical error the Sundance Minor subdivision was granted a three year approval. In
addition, four extensions were granted extending the preliminary plat approval to January
22, 2020.
An Improvements Agreement is required for this subdivision for the following
improvements: lot frontage sidewalks, subdivision street improvements, street frontage
landscaping, park improvements, and recreation pathway improvements.
Based on the summary review provided below, the City Engineering Department and
Department of Community Development have reviewed the application against the
conditions of preliminary plat approval; and as a result, find that the Final Plat application
may be approved by the City Commission.
Three (3) original mylars of the Final Plat, original Platting Certificate, property owner
association documents, improvements agreement, and a copy of the Findings of Fact and
Order are attached for your review.
The Community Development staff respectfully requests that you prepare City Attorney's
Certificates using the attached original Platting Certificates as updated; approve the
Certificates of Director of Public Works and Certificate of Completion "as to form".
The final City signatures will be obtained once the City Commission has approved the final
plats.
A completed application was submitted to the Community Development Department on
December 3, 2019, upon receipt of an acceptable letter of credit for financially guarantee
uninstalled subdivision improvements.
11
Page 2 of 2
Provisional completeness is granted subject to a revised Platting Certificate and a financial
guarantee for landscape improvements. The 20-day (working days) review period for
this final plat will initiate once the aforementioned items are received.
The conditions of preliminary plat approval, which are pertinent to this minor subdivision
and how they have been met, are described in the submittal materials.
Note: The Community Development Department and Engineering Department have
also reviewed the final plat application against the preliminary plat cited code
provisions and found compliance with these code requirements. The Engineering
Department has also reviewed and approved the “closure” of the final plat.
The project is scheduled for consideration by the City Commission on December 23, 2019.
Please let me know if this will not work.
Attachments:
Three (3) Mylar Final Plats and One (1) Blackline Copy
Applicant’s Written Narrative and Complete Submittal
Original Platting Certificate
Copy of Findings of Fact and Order
Property Owner Association Documents
(2) Improvements Agreement
Warranty Deed and Realty Transfer Certificate for park
cc: File
12
N89°44'02"E 765.80'
N00°16'28"W 666.60'
N89°43'32"E 406.00'
S00°16'16"W 1045.71'
S89°43'38"W 615.34'
S00°15'44"E 599.91'
S89°43'23"W 385.05'
N00°16'34"W 1039.07'
S89°43'38"W 161.30'
S00°16'22"E
60.00'
SURVEYED BY:
QUALITY CHECK:
JOB NO. FIELDBOOK
DRAWN BY: DATE:
Engineering
tdhengineering.com
MONTANA
WASHINGTON
IDAHO
GREAT FALLS-BOZEMAN-KALISPELL-SHELBY
LEWISTON
SPOKANE
WATFORD CITY NORTH DAKOTA
B13-016
13
N89°44'02"E 765.80'
N00°16'28"W 666.60'
N89°43'32"E 406.00'
S00°16'16"W 1045.71'
S89°43'38"W 615.34'
S00°15'44"E 599.91'
S89°43'23"W 385.05'
N00°16'34"W 1039.07'
S89°43'38"W 161.30'
S00°16'22"E
60.00'
SURVEYED BY:
QUALITY CHECK:
JOB NO. FIELDBOOK
DRAWN BY: DATE:
Engineering
tdhengineering.com
MONTANA
WASHINGTON
IDAHO
GREAT FALLS-BOZEMAN-KALISPELL-SHELBY
LEWISTON
SPOKANE
WATFORD CITY NORTH DAKOTA
B13-016
14