Loading...
HomeMy WebLinkAbout01-06-20 City Commission Packet Materials - C12. Res. 5135, Change Order G-2 with Western Municipal for Pear StreertCommission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Shawn Kohtz, City Engineer SUBJECT: Resolution 5135 authorizing Change Order No. 2 to the Pear Street Booster Station Rehabilitation Project. MEETING DATE: January 6, 2020 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution 5135 authorizing Change Order No. 2 to the Pear Street Booster Station Rehabilitation Project. BACKGROUND: Attached is a copy of resolution 5135 and change order number 2 for the above referenced project. The existing walls within the booster station building were known to be in poor condition, but removal and replacement was not included in the bid due to budget constraints. When the contractor completed the demo on the project, it was discovered that the walls were in much worse shape than previously thought. There were large holes discovered behind some of the electrical panels, and mold was found in several locations. It was decided that it would be best to replace the walls now while all of the electrical boxes, conduits and piping were down. The new walls are Fiber Reinforce Plastic instead of the traditional drywall so there should not be any additional moisture problems. The change also includes a credit for a fitting that needed to be changed out and an addition of 23 days to the contract time for the wall replacement and some discrepancies in the piping layout shown on the plans. The final recommended change in cost and time for these items is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: This change order increases the contract amount by $25,038.88 from $532,697.52 to $557,736.40. Attachments: Resolution No 5135, Change Order No 2 Report compiled on: 12/23/19 160 RESOLUTION NO. 5135 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH WESTERN MUNICIPAL CONSTRUCTION, INC., BILLINGS, MONTANA. WHEREAS, the City Commission did, on the 11th day of April 2019, authorize award of the bid for the Bozeman Pear Street Booster Station Rehabilitation project, to Western Municipal Construction Inc., Billings, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Western Municipal Construction Inc., as contained in Change Order No. 2, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 161 PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 6th day of January, 2020. ______________________________________ CHRIS MEHL Mayor ATTEST: ___________________________________ MIKE MAAS Interim City Clerk APPROVED AS TO FORM: ______________________________________ GREG SULLIVAN City Attorney 162 HE? www.ae2s.com December 17,2019 Bob Murray- Engineering Division City of Bozeman 20 East Olive St #202 Bozeman, MT 59715 bmurrav@bozeman.net RE: Bozeman Pear Street Booster Station Rehabilitation Recommendation to Approve Change Order G-2 Dear Mr. Murray: AE2S recommends the approval of the enclosed Change Order G-2 on to the General Construction Contract for Pear Street Booster Station Rehabilitation project. The following information is included in this recommendation letter for your and the Commission's review: Summary of Scope Changes, and the General Construction Contract Summary. Summary of Scope Change: • Change Order Request No. 2 - FRP Wall Panel Improvements Cost Increase: $25.620.00 Contract Time: +14 Days During the early construction phase, Western Municipal suggested and provided a quote for removing the existing drywall finish and replacing with insulated FRP paneling. The poor condition of the existing walls was noted during the design but value-engineered out of the Bidding Documents to save on project budget. The Contractor noted this work is best to complete while the process piping and existing electrical is "gutted" from the facility and wanted to give the City this option while the opportunity was present. AE2S and the City agreed with the contractor's approach and decided to move forward with the proposed improvements. The change order covers the following work: removal of the existing drywall panels, insulation, and framework; and installation of new wall framing, support header, rigid foam insulation, dry-wall, and FRP panels per construction the detail sketch provided in WCD No. 2. The improvement provides the following benefits: cleaner finished work environment, easier cleaning and maintenance with water resistant finishes, and sturdier support headers for hanging electrical panels. The estimated labor included in the PCO price was generally in line with the labor and time AE2S observed and recorded on-site, and the Contractor has provided the invoice for the materials estimated. Advanced Engineering and Environmental Services, Inc. 1288 North 14th Avenue, Unit 103 . Bozeman, MT 59715 . 406-219-2633 163 t» Extension of Contract Time Cost Change: $0.00 Contract Time: +9 Days A total of 9 calendar days are added as a result of the following change of conditions: i. Discrepancy between the record drawing, project drawings, and the field condition of the existing supply line located in the northwest corner of the building. ii. Alignment issues depicted on the existing pump discharge lines. iii. Orientation difficulties on the surge anticipation line due to existing bolt patterns. The change of conditions listed above are legitimate changes AE2S observed on site. AE2S will reflect the changes in the record drawings as best as reasonably possible. Modification in Process Pipincc Cost Decrease: f$581.12) As mentioned in the extension of contract time section, WMC had to utilize an additional reducer in liue of a new 12" valve. As a result of this field modification the new 12" valve was not installed. WMC offered a cost deduct for the difference in cost between the fitting and the valve. • Stop Work Order: No Cost Change WMC will shut down construction activities for the Christmas Holiday and requested a Stop Work Order to suspend contract days between December 23, 2019 and January 5, 2020. During this time, no work will be performed in the field by either WMC or AE2S and the contract days will be suspended to allow Substantial Completion to be achieved after the holiday break. General Construction Contract Summary: 0 0 0 0 0 Change in Contract Price: Original Contract Price:.......................................... Cost Increase from Change Order G-1: Cost Increase from Change Order G-2: fthis CO) .$521,060.00 +$11,637.52 + $25.038.88 Current Contract Price:............................................................ NET Percent Increase / (Decrease) by Change Order:. . $557,736.40 .....7.04% https^/ae2s^liarefiomtcom/sltes/PearSI-BoosterStatlail/Shared DoaimenG/Genual/Phase 060 - Consouctmn/Task 03 - ConKruction Phase/P] Change OnleK/COJSlJRP Wall PaaeWear St_G2 cawr fettcr.doof 164 ^ 0 0 0 Change in Contract Times: Time adjustments: 23 Days added to Time for Substantial Completion 23 Days added to Time for Final Completion Time for Substantial Completion: ...............................................January 9. 2019 * Time for Final Completion: .....................................................February 12,2020 ** We greatly appreciate the opportunity to provide professional engineering services to the City of Bozeman and look forward to a successful start-up and close-out of the Pear Street Booster Station Rehabilitation project. Should you have any questions or concerns, please do not hesitate to contact me at your convenience. Sincerely, ^^ Brian Viall, E Project Manag'er End: Change Order G-2 for the General Construction Contract. Work Change Directive No. 2. PCO 5 Letter dated December 11, 2019. * Substantial Completion Date including Stop Work Order between December 23,2019 and January 5, 2020 **Final Completion Date including Stop Work Order between December 23, 2019 and January 5, 2020 https'y/aePs.sharepomt.cam/sites/PearSt.BoosterStatlon/Shored Documents/Generaf/Phose 060 • Construction/Task 03 - Construction Phase/[2J Change Orvfers/CO_62_FRP Wall Panels/Pear St_G2 cover lettendooc 165 Change Order No. G-2 Date of Issuance: December 16, 2019 Effective Date: Project: pear Street Booster Station Rehabilitation ^ Owner: City of Bozeman, MT Contract: General Construction Date of Contract: June 7, 2019 Contractor; Western Municipal Construction, Inc. Engineer's Project No.: P05097-2017-016 The Contract Documents are modified as follows upon execution of this Change Order: DescriDtion ofChanae: Item Description Provide submittals, equipment, and materials for the following: Cost Adjustment 1 FRP Wall Panel Improvement 2 Extension of Contract Time 3 Modification in Process Piping 4 Stop Work OrderDecember 23, 2019 through January 5, 2020. Total Net Change - CO G-2 $25,620.00 $0.00 ($581.12) $0.00 $25,038.88 Attachments: Proposed Change Order No. 2 from WMC, Inc dated October 11,2019 Work Change Directive No. 2 dated October 31, 2019 • PCO 5 letter dated December 11, 2019 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES; Original Contract Price: $ $521,060.00 [Increase] [Dooroaoc] from previously approved Change Orders No. N/A to No. N/A: Original Contract Times: C3 Working days (days or date): [Ready for final payment (days or date): [VJ Calendar days November 26, 2019 December 30, 2019 $ $11,637.52 Contract with [Increase] [Dccrcaco] from previously approved Change Orders $ $532,697.52 Flncreasel [Dccrcaso] of this Change Order [[Increase] [Docroooo] from previously approved Change Orders : No. N/A to No. N/A : [Substantial completion (days): j Ready for final payment (days): [Contract Times prior to this Change Order: jSubstantial completion (days or date): ! Ready for final payment (days or date): icrease] [Docrcaso] Time of this Change Order: {Substantial completion (days or date): _z_ 7 December 3, 2019 January 6,2020 23 $ Contract Price incorporating this Change Order: E.ICDCg ?fiG^;Cef»S-Ki"N"I"CO';TTPA^T OOC(Jt,1£!)IS COMMirTEt Work Change Directive No. 2 iDate of Issuance; 10/31/2019 Effective Date: 10/31/2019 Owner: City of Bozeman, Montana Owner's Contract No.: :ontractor: Western Municipal Construction, Inc Contractor's Project No.: Engineer: AE2S, Inc. Engineer's Project No.: P05097-2017-016 Project: Pear Street Booster Station Rehabilitation Contract Name: General Construction Contractor is directed to proceed promptly with the following change(s): Description: Remove the old interior dry-watl and any existing furring and replace them with insulated FRP panels. The hand sketch attached summarizes the engineer's understanding of the contractor's proposed construction. Final detail to be included in Record Drawings. Attachments: [List documents supporting change] Proposed Change Order PCO No 2: See WMC, Inc. PCO Dated October 11,2019. Purpose for Work Change Directive: Directive to proceed promptly with the Work described herein, prior to agreeing to changes on Contract Price and Contract Time, is issued due to; [check one or both of the following] QNon-agreement on pricing of proposed change. ^ Necessity to proceed for schedule or other Project reasons. Estimated Change in Contract Price and Contract Times (non-binding, preliminary): Contract Price $ 25,620.00 Increase Contract Time 14 days Increase Basis of estimated change in Contract Price: d Lump Sum 13 Cost of the Work D Unit Price D Other ECOMMENDED: By: AUTHORIZED BY: Engineer((^|uthoriz^d Signature) Title: project Manager Title: Date: 10/31/2019 _ Date: By: "/W^^^7^ _ // By: Owner<Authorized Signature) <-t.f- ^MAfM^ Title JP Contractor ~" {/^ r (Authorized Signature) t^f3ll^ Title: /^f, Date: /Z/(,/^ Approved by Funding Agency (if applicable) By: Title: Date: Pear Street Booster Station Bozeman, Montana 00 63 49 - 1 February 2019 Work Change Directive Form 167 ^H^SAdvanced Engineering and Environmental Services, Inc. Maine ^tf^'W.'% »t \ it>?C^ ^A. &i^(lt Cluss A^n,,m_ \^^,^ CJt\hNG>l; bX()LCTl\)l ^. ^ L-: i^}^__^^ Date ^Injt^ ...„_. Pago . ^-, .of ...,,-^-, gt^c.v Sl^i.Av klcj^ F/nist U^f^- -r-1- suPRo^T fc" I^A^E^ VWi^ ^cY\^^i-\^wvLv^b r^CKu WALL. SPACE-' EVrNl^ Alf^'Gi OFWE^-LiME, ^' o/e. <- 5PACE-F^FA^-'/ 0^'C^t^T^^ To ^^)WE STM^^-Q WCUT^ VW Of ^I- At b L'/F&A^/<D''^ tJ\T| F0?r-^^e/ ^?A/^ / |T- .-- - -- •- - --:.j -L- ' I- _ -•_ .— ^ --.^-I't !,!- - - .r- I 1-1 I i ^^vr'bE ^" ^/::U'e Bo^-b TG &uoPo^r ^iC-c-i^A^ P/\i\)EL^ C&^I^^'^E BAlMlT^ | ^( ELEO^TCAL Cf^-fWA^ {(^^c^ ^" tUvrt d. Z'^" T^EATFO LUMfiS? V) ALL FV'^FNG, Z" ^^Tb ^0^ T^^L^TTOia WCHO(2- 2"^" | (AJ/^LL FlA&^I:^^ j (^ji-H^ ANJCJWL I &OLJS T>/?IU£^ ! X/JTT) CM t4 1^^ ^CE ANlCW^S | /8" ofc. I ^ar^ &/\^ m^t—\ I 1;J |L M Ki L^l yX"*(p" TRE/s?^t» LU.K^<^ ^/ALL ^E^E1$, -'K&aj - •»-;%•€• \ m EN^^\ CW VJa\\ r^iKit) FOAM ihjs^^o^ V^" STAt^PQ 'DGv^ALL www.ae2s.com W- LlMt-e ^t^EL ;5$J "t m Western Municipal Construction, Inc. KH-1904-1C02 Pear Booster Station - C02 FRP 10/16/2019 17:10 Page; I Standard Markup Instructions Cost Basis Labor: Burden: Penn Matl: Const Matl: Sub: Eq. Op.Exp: Co. Equip: Rented Eq.: Indirect/0; Misc2; Misc3; Oven'ides: Total: 9,426 5,978 4,267 983 0 268 268 0 600 0 0 0 21,790 Bid Summary Totals Report Markup % Markup Selected Bond Table; A 15.00 15.00 15.00 15.00 5.00 15.00 15,00 15.00 15.00 15.00 15.00 15.00 1,414 897 640 147 0 40 40 0 90 0 0 0 3,268 i I SlMKINSHALLIN 326 N. Broadway ~ PO Box 938 ~ Bozeman, Montana 59771-0938 Phone 406-586-5495 ~ Fax 406-586-2653 ~ 1-800-823-8733 Invoice Address Hogan, Kirk 664 Terrance Loop Bozeman, Montana, 59718 Delivery Address JOB: 1222 South 6th 1222 South 6th Bozeman, Montana, 59715 Quote No Quote Date Customer Job Ret Contact Quotation 10/11/2019 COD-Hoga4040 1222 South 6th Your Ref Taken By Brendan Dore Delivery By 10/11/2019-FRIDAY Page 1 of 1 w s 8:S:ffi S«® 1 2 3 4 5 6 7 9 10 11 12 13 6967 6968 3436 002 003 005 010 3165 1023lit8 2744168 zz_SP-SGEA_2413 zz_SP-SGEA_2414 6764 2x4-12 CA-C Brown Treated 6/12 2x4-16 CA-C Brown Treated 2/16 Sill Sealer Foam 1/4" x 5-1/2" x 50' 2x4-10 #2 S Btr Whltewood 92/10 2x4-12 #2 & Btr Whitewood Western Municipal Construction, Inc. KH-1904-1 C02 Pear Booster Station - C02 FRP RESOURCE DESCRIPTION LABOR USE REPORT QUAN _RATE 12/12/2019 13:38 BASE BURDEN TOTAL LA02 Labor Group2 134.00 MH 23.47 3,459.48 2,261.81 5,721.29 OPFORM Operator Foreman 67.00 MH 30.95 2,281.02 1,415.29 3,696.31 SUPER Superintendent 67.00 MH 50.00 3,685.00 2,300.49 5,985.49 Grand Total 268,00 9,425.50 5,977.59 15,403.09 1 171 Western Municipal Construction, Inc. KH-1904-1CO Pear Booster Station - C02 FRP Report Printed On: 12/12/2019 13:35 Page: 1 Bond Calculations First: Next: Next: Next: Next: Remainder: Table: A Contract Amount $ 500,000 $ 2,000,000 S 2,500,000 $ 2,500,000 $ 7,500,000 Description: Underground Utilities Rate per 1000 12.00 7.25 5.83 5.42 5.00 5.83 Bond Amount $ 307.45 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 Time Threshold 1: 0 Time Threshold 2: 0 Length of Job: 3 Subtotal: $ 307.45 Extended Time Rate 1: 0.0000% $ 0.00 Extended Time Rate 2: 0.0000% $ 0.00 Total Bond Amount: $ 307.45 172 Western Municipal Construction, Inc. KH-1904-1 C02 Pear Booster Station - C02 FRP 12/12/2019 13 : 34 Addon Description List of Addons Basis % Cost Total Amt 1 MT Gross Reciepts Tax 2 Gen. Liability Insurance 3 Buliders Risk 4 OCP 5 Small Tools and Supplies 6 Safety Expense JB JB LS JB TH TH 1.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Y Y Y Y Y Y 256.21 0.00 0.00 0.00 0.00 0.00 256.21 Addon Basis Codes and Descriptions Used in this Estimate: JB - Job Value LS - Lump Sum TH - Total man Hoiu-s 1 173 Western Municipal Construction, Inc. KH-1904-1C02 Pear Booster Station - C02 FRP 12/12/2019 Page: 1 13:33 Bid Summary Totals Report Standard Markup Instructions Cost Basis Labor: Burden: Perm Matl: Const Matl: Sub: Eq. Op. Exp: Co. Equip: Rented Eq.: Indirect/0: Misc2: Misc3: Overrides: Total: 9,426 5,978 4,267 983 0 268 268 0 600 0 0 0 21,790 Markup % Markup Selected Bond Table: A 15.00 15.00 15.00 15.00 5.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 1,414 897 640 147 0 40 40 0 90 0 0 0 Western Municipal Construction, Inc. KH-1904-1C02 Pear Booster Station - C02 FRP *** Kirk Hogan MATEMAL/SUB REQUIREMENTS REPORT 12/12/2019 13:40 Cost Code Desc 2STRFIR Interior Firring Package 2STRMOP Rubber Mop Liner Sel Vendor Quantity Unit Unit Cost Tax/OT % Pcs/W Total Esc % 1.000 LS 4,067.250 100.00 1.000 EA 200.000 100.00 4,067.25 100.00 200.00 100.00 3DUMPFEE lOcyRollofF 3STGS01 Job STS 3STGS02 STS/PPE 3STGS03 Job Tooling 3STGS04 Sawblades (Concrete) 3STGS05 Orange Plastic Safety Fence 3STGS06 Orange Woven Barrier Fence 3STGS07 Galv. Metal T-Post Stakes 3STHILTI Hilti Shot & Nails 3STPIPELABEL Buy Pipe Labelling 3STSSAFETY Dust Masks & Eye Protect 3STZIP Zip Ties and Temp Bracing COST nTE TOTAL 1.000 LD 350.000 100.00 150.000 MH 0.400 100.00 150.000 MH 0.150 100.00 0.000 LS 1,500.000 100.00 0.000 EA 350.000 100.00 0.000 RL 50.000 100.00 0.000 RL 100.000 100.00 0.000 EA 2.450 100.00 1.000 EA 150.000 100.00 0.000 LS 500.000 100.00 1.000 EA 250.000 100.00 1.000 EA 150.000 100.00 4,267.25 350.00 100.00 60.00 100.00 22.50 100.00 0.00 100.00 0.00 100.00 0.00 100.00 0.00 100.00 0.00 100.00 Western Municipal Construction, Inc. KH-1904-1C02 Pear Booster Station - C02 FRP 12/12/2019 13:39 Biditein/ Activity/ Category Resource Description EQUIPMENT USE BY EQUIPMENT Rnt EOE Inside Outside Quantity Unit Pcs % % Equipment Equipment EOE Other Total 8TKPU *** 8TKPU Truck, Pickup 3/4 ton Truck, Pickup 3/4 ton 67.00 268 268 536 ***REPORT TOTALS*** 268 268 536 indicates non-additivc iti 176 d N ;ipA WEST MU NBT illin MT K ff- ^ ^ i?8 cofffQ Western Municipal Construction, Inc. 2066 Stadium Drive Bozeman, MT 59715 Phone (406) 624-6219 December 11.2019 AE2S Attn: Brian Viall,PE 1288 North 14th Ave, Unit 103 Bozeman,MT 59715 406-579-5104 RE: PC05 - Request for Time Extension Due to Misc. Change of Conditions Pear Street Booster Station Project - Bozeman, MT Mr. Viall: This Proposed Change Order (PCO) outlines miscellaneous field conditions differing from the conditions represented in the Project Drawings and Specifications for the Bozeman Pear Street Booster Station Rehabilitation Project and, resulting from these changes, requests an extension in Contract Time. For projects similar to the Pear Street Booster Station, we expect a certain level of changes to be identified in the field and hope the City will agree. Because Western Municipal Construction strives to build reputation with our Owners based upon positive relationships, we have not previously asked for any change in Contract Price - nor are we asking for any increase in Contract Price in this PCO. WMC proposes to absorb the additional cost of these changes in exchange for a reasonable extension in Contract Time. A brief summary of the changes significantly impacting our Construction Schedule is outlined below with an associated time extension WMC feels is reasonable. 1. 25 hp pump shipped with incorrect pump skid. a. All reasonable efforts were made to coordinate the details of the pump skid with the process piping based on reviews of the submittal drawings provided by the pump Supplier. However, upon arrival of the pump shipment, we identified a discrepancy in the shop drawings and the pump skid actually provided by the supplier. The discrepancy resulted in the alignment on the pump suction and discharge connections being more than 3 inches off from the alignnient we had set our pump pad and process piping to match. Had the pump arrived with the proper skid, all of the other time delays could have been absorbed into the Contract Time's previously included in Change Orders and Work Change Directives to date, however given this change of conditions was only identified on December 3,2019, there was not sufficient time remaining on our contract to make the adjustment. i. Additional Contract Price Requested: ; ii. Additional Contract Days Requested: 2. Pump Supplier Changed Ownership Behveen Design, Bidding, and Construction: a. Industnal Systems (IS) was the pump supplier for the Pear Street Booster Station. WMC understands IS was one of the suppliers AE2S worked most directly with during design. ^ ?- I Contract Price Requested: $0.00 ^^-^ Ct^*l ^ olfl^vUA^L 1 Contract Days Requested: S^ays^ d i 177 I i Contract Contract Fee DaysFeque'stedIij^ Requested: $0.00 C2^//'*.L /L /. 3. 4. In the Summer of 2019, IS changed Ownership. Given so much administrative turn-over, WMC put in extra time to work with the new business owners to coordinate the approval, manufacture, shipment, and delivery of these pumps. Though we acknowledge this change of conditions is a natural part of construction supply chains and is completely out ofAE2S' or the City's control, we also feel this change is out ofWMC's control and respectfully request a time extension to cover the time this change in supplier ownership caused on the project. Most directly, it was the shipment and delivery schedule provided from the pump supplier tliat influenced WMC's decision to start construction on September 23 rather than September 15 (the day the Contract would have allowed us to start). b. Additional Contract Fee Requested: c. Additional Contract Days Requested^. Existing Process Pipe Alignments Differ from Project Drawings The existing process piping was "fixed" by the concrete floor penetrations and presented the following complications during the course of construction: a. Supply line in NW corner was represented as 10" in record drawings and in the Project Drawings. That line is actually 12" and required an additional reducer to replace where a new 12" valve was scheduled to be installed. This one change then matriculated down the distribution manifold and the bypass line because of the fitting dimensions. WMC will offer a Cost Deduct for the difference in cost between the Fitting and the Valve. i. Credit for Contract Fee: - $581.12 ii. Additional Contract Days Requested: 3 Days b. Pump discharge lines are represented as uniform and centered bit a single line. Th^ pipes are in fact not in any single alignment, nor are they perfectly parallel to the suction header as the drawings would imply. This required numerous changes to process pipe layout and required custom sizing fittings and spools for field installation. i. Additional Contract Fee Requested: $0.00 ii. Additional Contract Days Requested: 4 Days f^Q^rcl c. Pipe supports - WMC supplied and installed pipe supports abqfvd and beyond the Kumber of pipe supports specifically identified in the project drawings. These were installed at WMC's option given our expertise in field installation and support of process pipe. Additionally, the revisions included in WCD No. 2, had unforeseen impacts to the pipe supports along the back wall for the PRV on the suction side supply header. i. Additional Contract Fee Requested: $0.00 ii. Additional Contract Days Requested: 0 Days d. Surge Anticipation Line orientation - plans show a pair of 45 deg angles to get the surge line out of the building. Due to the orientation of the existing bolt pattern on the existing flange - fixed by the discharge pipe penetrating through the concrete floor - this could not be built as drawn with the 45 Degree fittings already purchased. Measurements had to be taken and new fittings (2ea 22.5-deg, lea 9.3-deg flange wedge) were ordered at no additional cost to the owner. yi., i. Additional Contract Fee Requested: $0.00 ii. Additional Contract Days Requested: 4^dJays Changed the Location of the Electrical Light Smtch. a. We submitted an RFI for the location of the main light switch in the building that was installed per plan by our electrician. After installation, we requested the location be reconsidered as it was drawn and installed in a less then optimal location for the City's use. AE2S approved the RFI and agreed it would be more convenient for the Owner to have the switch on the other side of the door. There was no cost associated with this change and we are not requesting any additional contract days at this time. i. Additional Contract Fee Requested: $0.00 ii. Additional Contract Days Requested: 0 Days j. 1 i ^ ^ 5. Addition of security bypass switch for door contact. a. 12/9/19 John Alston asked how the door contact would be shutoffwhen someone enters. This is not addressed on the plans and the door contact would be live at all times, thus resulting in constant alarms and the City Shop. On 12/10/19 we had our electrician install an operational bypass switch for the door contact. There was no cost to the City associated with this change and WMC will waive any additional time this work required. i. Additional Contract Fee Requested: $0.00 ii. Additional Contract Days Requested: 0 Day ff]Cf 6. 60 Ton of Aggregate added for improved site access and maintenance. a. Since being on-site, WMC purchased and laid 60TN of aggregate to improve site drainage, access, and maintenance. We did this for our workers safety, work-site and facility cleanliness, and to build and maintain a cooperative relationship with the City's neighbor to the west that has been inconvenienced by this job. WMC is not requesting any additional payment or contract time for tliis project improvement, however, we hope that the City's perception of this addition is positive and shows a good-faith-effort to complete this project to the City's utmost satisfaction. i. Additional Contract Fee Requested: $0.00 g^ ii. Additional Contract Days Requested 0 Days. If painting is also required for the City to issue WMC's Certificate of Substantial Completion, we would also request that a "Stop Work Order" be issued for the^loliday Season. With the Stop Work Order, WMC would not work on site between December^25To January 5, 2020. With the City's approval of these Contract Time Extensions and Stop Work Orders, WMC estimates that Substantial Completion would be obtained on or before January 19, 2020 with Final completion achieved by February 22,2020. We have enjoyed working on this job and appreciate the open lines of communication with AE2S and the City ofBozeman Operations (John and Nick). We hope this request is fulfilled to allow us to finish this project with the utmost quality and care for the City ofBozeman. Thank you again for your time and consideration of this request. Regard?,^, 1- ) I KirkHogan Project Manager 179 178 150.00 100.00 0.00 100.00 250.00 100.00 150.00 100.00 COST TYPE TOTAL 982.50 REPORT TOTAL 5,249.75 Cost Types Selected: Permanent Materials, Consti-uction Materials, Subcontractor Subtotal line items selected in the subtotal. vendor, quantity, units, and unit price only display if they are the same for all 1 175 I 3,268 Previous Run Summary: 10/16/2019 5:07 PM Spread: 10/16/2019 5:07 PM Summary mn on TakeoffQuan and Adjusted to Bid Quan. Standard Spreads Indirect Spread: Markup Spread: Addon/Bond Spread: Total less Sub Markup % Total Totals as of Last Spread Direct: Indirect: Addons: Bond: SubTotal: Pass Through: Total: Cost: 21,106 683 256 307 22,352 0 22,352 Markup: 3,166 102 0 3,268 3,268 Total: 24,272 785 256 307 25,620 0 25,620 Key Indicators Balanced Markup 3,268.34 Indirect Cost 682.50 Direct Manhours 268.00 / Total Labor / 15,403.09 / Direct Cost / 21,106.34 + Indirect Manhours + 0.00 Balanced Markup/Total Labor 21.22% Indirect Cost/Direct Cost 3.23% total manhours 268.00 174 6/12 2x4-16#2SBtrWhitewood 2/16 Zx6-12#2&BtrWhitewood 10/12 Blue Board DowSB Square Edge Styrofoam 25 PSI 4x8 2" 4x8 5/8 USG lightweight Firecode Type X GYP-Board 1-5/8" G&S Black Coarse Sheetrock Screw DC6158/DWG6158 4x1 OFRPGIasliner White Frp Divider White 10' FRP Adhesive Henry FP00444069 #444 4 Gallon '°°f ':;:"^^?:^;:"> ^:^-^ 6 ea 2 ea Sea 92 ea 6 ea 2 ea 10 ea 36 ea 38 ea 20 LB 30 ea 22 ea 6 ea 930.801 mbf 956.80 4.29 530.40 530,40 540.80 525.20 28.96 420.16 2.29 52.59 2.69 55.35 mbt ea mbf mbf mbf mbf ea msf LB ea ea ea 44.68 20.41 8.58 325.31 25.46 11.54 63.02 1,042.56 510.91 45.80 1,577.70 59.18 332.10 i°M'M ii $4,067.25 S%-S;iSsK®S-:4.s;'®l $0.00 $4,067.25 By your signature below, you are agreeing to Ihe Terms & Conditions ol sale set forth on the back of this document. ;" I L ! I i- i I Buyer Date II no! paid viilhln leims, I understand Ihal I am tiaUe to pay (or all llnance charges (15'A APR), 3»d parly collection court coslsrtees, ril reasonabls court cosls and allo»ney fees hcumd by SlmMns Hallin, Inc. Simhins Hallin. Inc. charge accounts aro due the 10th o( Uie following month (Net lOlh). Terms S CorKfitions ol sale ars on the back of Ihis dacumenl. Simktns Hatltn delivers onto private proparty at customer's direction. Customor assumes risk and responsibility (or rosutlinQ pfopflfty damaga unless Sfmkfns Haliln has acted negtiQenUy. 10/15/2019 8;44:23AM Page 1 of 1 170 I Previous Run Summary: 10/16/2019 5:07 PM Spread: 10/16/2019 5:07 PM Summary run on TakeoffQyan and Adjusted to Bid Quan. Standard Spreads Indirect Spread: Markup Spread; Addon/Bond Spread: Total less Sub Markup % Total Totals as of Last Spread Direct: Indirect; Addons: Bond; SubTotal: Pass Through: Total: Cost; Markup: 21,106 3,166 683 256 307 22,352 0 22,352 102 0 3,268 3,268 Total: 24,272 785 256 307 25.620 0 25,620 i i ; j i I Key Indicators Balanced Markup 3,268.34 Indirect Cost 682.50 Direct Manhours 268.00 / Total Labor / 15,403.09 / Direct Cost / 21.106.34 + Indirect Manhours + 0.00 Balanced Markup/Total Labor 21.22% Indirect Cost/Direct Cost 3.23% total manhours 268.00 I I I 1 i ! ) 169 ^ ->i ^^^ 168 $25,038.88 [Ready for final payment (days or date): 23 $ j Contract Times with all approved Change Orders: ! Substantial completion (days or date): January 9, 2020* $557,736.40 {Ready for final payment (days or date): February 12,2020I** 1 RECOMMENCED: By: ACCEPTED: By: ACCEPTED: By: engineer /^(Aufhclrized /2s/Signatui ^ Buyer (Authorized Signature) Date: ~~f T Approved by Funding Agency (if applicable): Date: Date: Date: /Sell^^TAuthori^/^/>ifSignature) 9 ^r EJCDC No. C-94I (2002 Edition) Prepared by the Engineers' Joint Contract Documents Committee and endorsed by the Associated General Contractors of America and the Construction Specifications Institute. Page 1 of 1 * Substantial Completion Date including Stop Work Order between December 23, 2019 and January 5, 2020. *Final Completion Date including Stop Work Order between December 23, 2019 and January 5, 2020. 166