HomeMy WebLinkAbout19233 Boulder Creek Master Park Plan
BoulderCreekSubdivision
MasterParkPlan
January2014
Revision:October2017
Revision2:December2019
Prepared for:
Four Corners Construction, LLC
125 Central Ave
Bozeman, MT 59718
Prepared by:
With:
C&H Engineering and Surveying, Inc.
BoulderCreekSubdivisionDecember2019
MasterParkPlan
1
MasterParkPlan
January2014
SECTION1
PROJECT LOCATION AND HISTORY 2
PROJECT SCOPE 2
PARK DEDICATION REQUIREMENTS AND PHASING 2
DEDICATED PARKLAND 3
PARKLAND AMENITIES AND COMMUNITY CENTER 3
VEGETATION 4
IRRIGATION 5
SOILS 5
PLAYGROUNDS 6
TRAILS 6
MAINTENANCE 7
SECTION2
LANDSCAPE DRAWING SHEETS
SECTION3
SOILS INFORMATION
SECTION4
PAVILION IMAGE , TRAIL CROSS SECTION AND PLAYGROUND LETTER FROM CITY
SECTION5
COST ESTIMATES
BoulderCreekSubdivisionDecember2019
MasterParkPlan
2
ProjectLocationandHistory
BoulderCreekislocatedbetweenLaurelParkwayandRosaWay,immediatelysouthofOak
StreetanddirectlynorthoftheproposedAnnieStreetconnection.BoulderCreeka63Ͳlot
majorsubdivision,withbothSingleͲFamilyandMultiͲFamilyhousing.Thelandthatmakesup
theBoulderCreekSubdivisionwasusedforagricultureandlivestockproductioninthepast,but
satunusedforthepastseveralyears.Twoperennialwaterwaysflowthroughthesite,
eventuallyflowingtotheEastGallatinRiver.Inaddition,thereisamanmadepondinthe
southeastcornerthatwascreatedfromgravelmining.Thewaterwaysandthepondhave
existingwetlandvegetationandVaughnEnvironmentalServiceshassubmittedplanswiththe
PreͲPlatfortheimprovementofthosefeatures.
ProjectScope
TheBoulderCreekMasterParkPlaniscomprisedofthreemaincomponents:DedicatedPark
areas,OpenSpaceareasandatrailnetwork.Theprimarypurposeofthisdocumentisto
describetheinitiallevelofdevelopmentandmaintenanceoftheparksandtrails.
GuidingIdeas:
x Provideconnectionsbetweenresidentialneighborhoodsandpark/openspaceareas.
x Providevarietyinrecreationexperiencesandopportunities
x Provideareasforpassiveandactiverecreation
x Protectandretainnativeandnaturaldrainagecorridors
x Minimizehardorimpervioussurface
x Addresscurrentparklandneedswhilealsoallowingforfutureflexibilitytomeetthe
needsoffutureresidents
BoulderCreekSubdivisionDecember2019
MasterParkPlan
3
Project:ParkDedicationRequirementsandPhasing
ThedevelopmentofparkandopenspacelandshasbeenplannedforonePhase.TheBoulder
CreekParkwillbedevelopedaspartofPhase3.Withthistacticcompleteconnectionsandfinal
improvementscanbemadewithoutdestroyingpreviousimprovements.SherwoodWayand
AnnieStreethavetheirfinalconnectionsmadeandsidewalksandboulevardscanbecompleted
andtiedinwithexistingparkfacilities.AllParklandwasdedicatedtotheCityofBozemanat
FinalPlatofPhase1.
DedicatedParkland
Dedicatedparklandwillmakeup2.9269acresoftheBoulderCreeksubdivision.Thefollowing
sectionoutlinestheinstallationandmaintenanceofalldedicatedparkareasforFinalPlat
filings.Theplanputsemphasisonopen,maintainedareasforpassiveandactiverecreation.
Thereisanexistingplaygroundwithageappropriateequipmentatthepark.Plantingsalong
thewatercourseshallbeappropriatetotheenvironmentandaredetailedonthe"Watercourse
Plan"sheetprovidedbyVaughnEnvironmentalServicesandC&HEngineering.BoulderCreek
Parkwillbeamixofmowedturflawnandnativegrassareas.Permanentirrigationwillprovide
headͲtoͲheadcoverageforallturflawnareas.
ParklandAmenitiesandCommunityCenter
ThemajorityofBoulderCreekParkwillbedevelopedinPhase3andwillconsistofmaintained
turflawnforactiveandpassiverecreationaswellasnativegrassareas.Alargenumberof
treeswillbeplantedtoprovideshadeduringwarmdays.Themaintenanceofthisparklandis
detailedlaterinthisdocument.Ashortgravelpathwillconnectanewpaviliontothegravel
paththatconnectsSherwoodWayandAbagailLane.Thepavilionwillbebuiltalongthelinear
BoulderCreekSubdivisionDecember2019
MasterParkPlan
4
pathinordertoprovideconvenientparkamenitiesashortwalkingdistancefromtheBoulder
CreekSubdivision.
TrailsontheeastsideofBaxterCreekwillconnecttheentiredevelopmentfromnorthtosouth.
Majoreast/westconnectionswilloccuratSamanthaLane(twice),AnnieStreetandAbigailLane
(twice).TotallengthoftrailstobeinstalledinParklandandinOpenSpaceadjacenttoPark
landequal1,850linealfeet.
ParkingRequirement:Thenorthernparkisalineartrailcorridorandthereforeisexcludedfrom
thefrontagerequirements.Thesouthparkisboundonthenorthandeastsidesbystormwater
detentionandwetlandsrespectively.Streetfrontageisprovidedimmediatelyadjacenttothe
westandsouthsidesoftheparkwithonͲstreetparkingavailableonthesouthside.Thesouth
parkparcelis51,250squarefeetandhasfrontageon50%ofthefrontage.Thesouthpark
parcelisalsoapartofalargerparkandopenspacecomponentofthedevelopmentthatis
boundonallsidesbystreetsandorpedestrianaccesspertheintentoftheUDCsection
38.420.060.
FutureImprovements:Theinstallationofdogwastestations,additionalbenches,additional
trashenclosuresandallotheramenitiesnotshownonL1.0wouldbetheresponsibilityofthe
HOA,CityofBozemanorsuchotherentityestablishedatalaterdatetoconstructandbuild
suchimprovements.
Financing:BoulderCreekPark,OpenSpaceandWatercourseimprovementswillhavemultiple
installtimehorizons.Appropriatefinancialplanningandbondingwilloccurasrequestedbythe
CityofBozeman.Costestimateshavebeenprovidedwiththissubmittal(Section5).
Construction:Anyandallsitework(includingtrails)mustbeprecededbyapreconstruction
meetingwiththeCityofBozeman.Allplans,improvements,structuresandplantingsmustbe
approvedbytheCitypriortoinstallation.BuildingPermitsarerequiredforanystructural
improvements.AnydeviationfromtheParkMasterPlanmustbesubmittedtotheCityand
approvedbeforeconstruction.
Vegetation
Allvegetationshallbequalitynurserystockandconstructiondocumentswilldictatefurther
specificationsandspeciesselection.Avarietyofspeciesshallbeselectedtoensurethatapest
ordiseaseeventdoesnotdecimatetheentireproject.Trees,shrubsandherbaceousplantswill
bechosenfortheirsize,hardinessandaestheticnature.Plantsusedwillberegionallynative
and/oradaptedtotheextentpossible.
BoulderCreekSubdivisionDecember2019
MasterParkPlan
5
Trees
AlltreesaresubjecttoapprovalbytheCityofBozeman.Treeselectionshouldbebasedonthe
recommendedspecieslistprovidedbytheCityofBozeman.Treesizeandselectionshallbe
variedinordertocreatevisualinterestandavariedgeneticpalette.
RecommendedTreeList
ColoradoBlueSpruce
TartarianMaple
QuakingAspen
AmericanLinden
CommonHoneylocust
DiscoveryElm
AmericanElm
Shrubs
Shrubsusedwithinthewatercoursesetbackwillbeusedtoenhancetheexistingnative
vegetation,increasenativehabitatandprovideavariedvisualexperience.Plantswillbe
chosenbasedonhardiness,aestheticqualityandsize.TheCityForesterwillapprovefinalplant
selectionforallwoodyplantmaterial.
RecommendedShrubList
AmurChokecherry
AutumnBrillianceServiceberry
Grasses
Herbaceousseedmixeswillbedictatedbytheconstructiondocuments.Ingeneral,turfareas
willreceiveabluegrass/fescuemix,detentionareaswillbeseededwithamixtolerantofwet
conditions.Allareasdisturbedbyconstructionwillbeproperlypreparedandseededwitha
narrowspacingdrillseeder.Beforeseeding,thesoilshallbeloosenedtoaminimumdepthof
sixinchesinordertoimproveinitialrootdevelopment.Lawnareasaretoreceivesixinches(6”)
oftopsoilpreparedandscreenedsonodebrisandrockslargerthan1.5”arepresent.Oncesoil
islaidandtilledasoiltestshallbeconductedtoverifyifamendmentisneeded.Thesoilwill
notbecompactedinanymanner.Sufficientcompactionisreadilyachievedthroughthegrading
processandnormalrainfall.Fertilizershouldbeappliedpriortoplantingtoinsurehealthyplant
development.
RecommendedTurfGrassMix(DedicatedParklandandBoulevards)
ABCLawnMixbyCircleSSeedsorapprovedalternatesuppliedbyLocalSodGrower(within50
milesofprojectsite).
RecommendedNativeGrassMix(DisturbedareasandWaterDetentionareas)
BoulderCreekSubdivisionDecember2019
MasterParkPlan
6
AsspecifiedbyVaughnEnvironmentalServicesinthe"WatercoursePlan"document.
WatercourseSetbackPlantings
Anyareadisturbedwithinthewatercoursesetbackshallbereclaimedwithnativeplant
material.Areaofdisturbancewillbeassessedattimeofconstruction.Appropriateplantings
willbedeterminedbyarestorationexpertandsubmittedtotheCityofBozemanforapproval
beforeconstruction.PlanshavebeenprovidedbyC&HEngineeringandVaughnEnvironmental
ServicesaspartofthePreliminaryPlatSubmittal.
Irrigation
AllirrigationsystemswillbedesignedtomeetCityofBozemanrequirements.
IrrigationsystemswillbecompatiblewithMaxicomsystems.Allwaterlinesshallbeschedule
40PVC.BlackPolypipeisunacceptable.Pipeshallbeinstalledataminimumdepthoftwelve
(12)inches,mainlinesateighteeninchminimumdepth.Ifthisdepthisunachievable,theParks
Divisionmustbeconsulted.Nostackingofirrigationlinesshallbepermitted.Four(4)inchesof
sandshallbeplacedbeneathpipe,andfour(4)inchesofsandabovethepipe,to
preventcompactionandsettling.Sprinklerheadswillbeinstalledonmanufacturedswingjoints
(schedule80w/oͲrings).HeadstobeinstalledmustbeapprovedbytheParksDivisionandshall
begeardriven,withinterchangeablenozzlesizes,unlessnotedotherwise,andshallbecapable
ofproducingthespecifiedgpmandcoverageareaandshallbesettomanufacturers’
specifications.Electricallocatetapeshallbeinstalledalongalllines.Uponcompletionof
installation,allwarrantyandmaintenanceinformation,aswellaswelllogsandpump
warrantiesandinformation,ifapplicable,andan“asͲbuilt”mapshallbesuppliedtotheCityof
BozemanParksDivisionandHOA.
Soils
AllsoilstobeusedonpublicparklandshallbeinspectedbyandmeettheapprovalofCityof
BozemanParksDivisionStaffpriortoinstallationandshallmeettheminimumdepth
requirementof6inches.Allrockinexcessof1.0inchindiametershallberemoved.Soiltests(a
sieveanalysisandsoilanalysis)shallbeperformedpriortoplantingtodeterminethe
classificationandtextureofthesoils,alongwithanynutrientdeficiencies.Theclassificationand
texturewilldeterminewhatamendments,ifany,areneeded,whilethesoilanalysiswillhelp
correctanynutrientproblemswithapreͲplantfertilization.
*GuidelinesforsoilsͲThesoilwillbedeemedacceptableif:itislessthan35%clayandless
than70%sand,and70%silt.Phmustnotexceed8.4.Thesoilwillbescreenedat1”minusfor
rocksanddebris;topsoildepthwillbeatleast6inches.Thesubbase,aftergrading,willbe
scarifiedtoadepthoftwelveinchestoinsuredrainagethroughouttheprofile.
Amendmentsmayvarydependingonexistingsoils,butwillgenerallyconsistof60%coarse
sand(generallyconcretesand),20%organics(C:Nratiobelow30)and20%approvednative
soil.Soilswillbemixed,priortoinstallation,withascreener/mixermachine,orappliedin
BoulderCreekSubdivisionDecember2019
MasterParkPlan
7
layersonsiteandmixedthoroughlywithadeeprototiller.Depthofamendedsoilwillbea
minimumofsix(6)inches.Therewillbenocompactionfollowingthegradingprocess.Fertilizer,
andtherateatwhichitwillbeapplied,shouldbedictatedbythesoiltestreport.
Playgrounds
PlaygroundsshallbeinstalledonParklandmanagedbytheHOA/CityofBozeman.All
playgroundsmustbeapprovedbyaCertifiedPlaygroundSafetyInspector(CPSI)andmeet
ASTMF1487Ͳ01,CPSCandADAguidelinesandspecifications.Playgroundsshallbeage
appropriate,forareaserved,andbesignedaccordingly.Thereshallbeanadequateusezone
areaaroundequipment,approvedmaterialinusezone,whichmeetsimpactattenuation
criteriaasspecifiedinASTM1292,andadequatedrainage.Allinstallationplans,materialslist,
constructionguidelines,maintenanceinformationandmanufacturer’snameshallbesupplied
totheHOA/CityofBozeman’sParksDivision,uponcompletionofplaygroundinstallation.All
workwillbeoverseenandapprovedbyaCPSI.Nowoodenstructureswillbeapproved.
TheexistingplaystructureatBoulderCreekSubdivisionhasbeenpreliminarilyapprovedbythe
CityofBozeman.Inspectionwasconductedduringwintermonthsandsothelandzone
conditionshavenotbeenassessed.Additionalinspectionisrequiredaftersnowmeltwhen
safetyconditionscanbeassessed.TheCitywilldetermineatthattimewhetheradditional
landingzonematerialisneeded.
Trails
ClassIITrailsshallbeaminimumof72inchesinwidth.Trailbedmustbeexcavatedaminimum
of6inchesdeep,priortoinstallationoftreadmix.Allexistingorganicmaterialshallbe
completelyremovedfromtheproposedtraillocationandsubgradesterilized.Treadmixshall
beinstalledintwoparts.Thefirst3Ͳinchliftshallbeof¾”Roadmix,compacted,andthenthe
top3inchesof3/8thinchminuscrushedgravel(naturalfines).Naturalfinesusedforthese
trailsshallconsistof80%sand,10%siltand10%clay.Ifthematerialfallsoutsideofthese
parameters,theCityofBozemanParksDivisionsmustbeconsultedforapprovalor
modification.Ifthenaturalfinestreadmixdoesnotcontainenoughclayorsiltbinder,
additionalbindermustbemixedin.Alternativesoilstabilizerproductsareacceptablebutmust
beapprovedbytheCityofBozemanParksDivision.Trailbedmustbefilleduptooriginal
surfacealongbothedgeswithacrossslopeof2%crossslopetoprovideforwaterdrainageand
meetADArequirements.Treadmixmustberolledflatandcompactedafterinstallation,
maintaininga2%crossslope.(Ifmoisturecontentisnotadequateforcompaction,water
shouldbeaddedpriortorollingandcompacting).Whereterrainallows,slopeoftrailshouldnot
exceed20:1withacrossslopenogreaterthan50:1(2%)toprovideforADAaccessibility.All
damagetosurroundingfeaturesand/orvegetationshallbereclaimedimmediately.
Encroachingweeds,duetotrailconstruction,shallbetreatedandcontrolledforaminimumof
2yearsaftertrailsectioniscompleted.Minimumoverheadclearanceshallbe96"for
pedestrianandbiketraffic,and120"forequestriantraffic.
BoulderCreekSubdivisionDecember2019
MasterParkPlan
8
Maintenance
ResponsibleParty
TheAssociationshallberesponsibleforliabilityinsurance,localtaxesandmaintenanceof
recreationandotherfacilitiesinthecommonspaceareas.TheassessmentsleviedbytheBoard
forthemaintenance,upkeep,repairandoperationofcommonareaslikeallotherassessments,
becomealienoneachlotwithintheBoulderCreek.TheBoardmay,initsdiscretion,adjustthe
assessmentstomeetthechangingneedsofthecommunityandtheareasservingthe
community.
TheAssociationshallenterintoanannualcontractwithacertifiedlandscapenurserypersonfor
upkeepandmaintenance.TheAssociationwillberesponsibleforparkmaintenanceuntilsuch
timeaCityͲwideParkMaintenanceDistrictiscreated.TheAssociationshallalsoberesponsible
forthemaintenanceofallcommonproperties,pathsandtrails,facilities,centers,andadjacent
sidewalksand/orlandscapinginstreetboulevards.
TheDeclarantwillberesponsibleformaintainingpathways,openspaceandparklanduntil50
percentofthelotsaresold.Atsuchtime,theAssociationwilltakeovermaintenance.
Maintenancewillincludethefollowingaswellascareandreplacementofplayground
equipment(CPSIapproved)and/orsitefurnishings,replacementofdoggiepickͲupbagsand
emptyingofrefusecontainers.Anyandallworkand/orparkfixturesmustmeetstandardsset
bytheCityParksDivision.
TreesandShrubs
Acontractorwillbehiredtoperformparkmaintenance.Maintenancedutiestobeperformed
willconsistofspringandfallcleanup,routinemowing,lawnpatching,careandreplacementof
deadtreesand/orshrubs.Alltreetrimmingandpruningmustbeperformedbyacertified
arboristasoutlinedinCityOrdinance12.30.040incoordinationwithForestryDivision.Alltrees
onpublicpropertyaresubjecttoCityofBozemanpermitsandordinances.
Trails
Naturalfinestrailswillnotbeplowed.Thesetrailswillbeinspectedregularlyandreceive
routinepatchingandsurfacemaintenancetopreventerosionorunsafeconditions.Weedson
thetrailswellbecontrolledfollowingCityofBozemanstandards,setbytheCityParksDivision,
andusingindustrystandardsoraspartoftheweedcontrolplandescribedinthisdocument.
TurfCare
Nativegrassareasshouldbemowed1Ͳ2timesperyeardependentonrainfalllevels.Thefirst
mowingshouldoccurattheendofMay,andthesecondtimeshouldtakeplacearoundmidͲ
BoulderCreekSubdivisionDecember2019
MasterParkPlan
9
July,withthefinalmowinginmidͲOctober.Verifymaintenanceneedsandschedulewith
VaughnEnvironmentalServices.
Kentuckybluegrassareasshouldbemaintainedbetween2"Ͳ41/2"andshouldreceive
approximately12"waterbetweenJune1standlateSeptember.Thistranslatestoabout1"
waterperweekforlawnareas.Mowingwillnotbedoneduringextremelywetperiodsorwhen
subͲgradeissaturatedorwithstandingwater.Establishedlawnsmayreceiveadeep,butless
frequentwateringinordertoconserveandnotoverwater.
NoxiousWeedControl
AweedcontrolprogramwillbedevelopedthatconformstotherequirementsoftheCityof
Bozeman,GallatinCountyWeedControlBoardSupervisorandNRCS.Thisprogramwillconsist
ofanannualvisitinJunetospotspraywherenecessary,includingtrailsandsidewalks.Weeds
willbesprayedbyalicensedcontractor,accordingtoindustryandlocalstandards,onaregular
basis,usingappropriateapplicationsandproducts.Theutmostcarewillbetakentoprotect
watersources,parkusersandadjacentpropertyowners.TheCityofBozemanshallbenotified
ofanyandallapplicationsofpesticidesand/orherbicideonpubliclands.Signsshallbeposted
priortoapplicationinappropriateandnoticeablelocationsidentifyingtheproductappliedand
thedateapplied.Signswillremaininplaceforaminimumoftwodaysaftertreatment.
RecordsshallbemaintainedinaccordancewithStateofMontanaPesticideAct,Administrative
Rule4.10.207andcopiessubmittedtotheCityofBozemanParksDivision.
Fertilization
Fertilizationshouldbeminimizedtopreventunnecessarilyhighamountsofnutrientsrunning
offintostreamsandwetlandsonandoffthesite.Nofertilizershouldbeappliedwithin50ftof
streamsorwetlandstofurtherminimizethepotentialforcontaminationthroughrunͲoff.Trees
andshrubsinsidethe50ftbuffershouldbemonitoredandiffertilizationisnecessary,capsule
fertilizershouldbeused.
Lawnsshouldbefertilizedonceinspringwitha24Ͳ4Ͳ24blendafterthelastfrostandwitha21Ͳ
3Ͳ21inmidtolatesummer.Itisrecommendedthatslowreleasefertilizerbeusedtoprevent
excessiveshootgrowthandtoprovideturfnutritionoveranextendedperiodoftime.Lawns
shouldbefertilizedaccordingtomanufacturerstandards.Annualsoiltestshouldbeperformed
tochecknutrientlevelsanddeterminewhetherchangesarenecessary.
Outsidethe50ftbuffer,shadetreesshouldbefertilizedinAprilwitha16Ͳ10Ͳ9blendplusiron
andzinc.Othertreesshouldbefertilizedwithfoodspikes,butnofertilizationofwoody
vegetationshouldoccurpastmidͲJuly.Treesunderoneyearoldshouldnotbefertilized.
EvergreensshouldbeprunedasnecessaryinJuneandshadetreepruningshouldbedonein
April,exceptforbirches.BirchesshouldbeprunedinmidͲJuly.Alltreesshouldbecontinually
BoulderCreekSubdivisionDecember2019
MasterParkPlan
10
monitoredforpestsanddiseasesthroughoutthegrowingseason.Woodyvegetationshouldbe
deepwateredrightbeforethegroundfreezes.
SnowandLeafRemoval
Snowremovalwillbeprovidedwithintheparkbyasnowremovalserviceretainedbythe
NeighborhoodAssociation.Sidewalksmustbeclearedwithin24hoursaftertheendofa
snowfalleventperBozemanOrdinance1529.TheHomeowner’sAssociationwillbe
responsibleforclearingsnowonsidewalks,onwalksadjacenttoParksandOpenSpacesand
theSouth19thboulevard;nosnowremovalwillbeperformedonthenaturalfinestrails.Leaf
removalwillbeprovidedmostlikelybyalandscapecontractororhandymanservice,as
retainedbytheNeighborhoodAssociation.
PlaygroundInspection
Playgroundinspectionshouldbeperformedonanannualbasisbyanindependentcontractor
certifiedasaNationalCertifiedPlaygroundSafetyInspector.Theinspectorsshallsubmita
reporttotheCityofBozemanParksandRecreationDepartment.TheNeighborhood
Associationisresponsibleforhiringtheindependentcontractor.
IrrigationSystem
TheirrigationsystemshouldbechargedinApril,afterthegroundthawsandplantsstart
growing.Themanualdrainvalvesshouldbeturnedtotheclosedpositionandwellpump
powerswitchturnedon.Thecontrollershouldbeprogrammedfortheanticipatedwater
requirementsforthecurrentmonth.Allheadsshouldbecheckedforbreakageandproper
coverageandcheckedonamonthlybasisfornecessaryadjustments.Dripemittersshouldbe
periodicallycheckedandtheentiresystemshouldberegularlymonitoredforlinebreaks,head
breakageandvandalism.
Headreplacementshouldbedonewiththesamebrandtoensureefficientcoverageforthe
shallworkingpressureanddispersalatanequalprecipitationrate.Theheightofheadsshould
becheckedtoavoiddamagefrommowersormaintenanceequipment.
WinterizationshouldtakeplaceduringthelastweekofOctober.Powertothewellpump
shouldbeshutoffandallmanualdrainvalvesopened.Toflushoutthelines,ahighͲpowerair
pumpshallbeconnectedtothequickcouplervalvesandairshouldberunthroughthesystem.
Eachvalvezoneshouldbeopenedandcloseduntilallwateriscompletelyflushedout,thenthe
controllershouldbeturnedoffandwaterleftoffuntilspring.Anynecessarywateringduring
thewintermonthsshouldbedonewithatanktopreventdamagetotheirrigationsystem.
AnimalControl
Petsshouldbeleashedatalltimeswhileintheparksandopenspaceandresidentsmustclean
upaftertheirpets.Ifrodentsbecomeaproblemwithregardstodamagingplantmaterialor
BoulderCreekSubdivisionDecember2019
MasterParkPlan
11
posingahealthrisktoresidentsorpets,rodentcontrolshouldbeutilized.However,nopoison
ispermittedonwithinparklandoropenspaceareas.
Refuse
Refusewithintheparksandopenspacewillbecollectedweeklybyaserviceretainedbythe
NeighborhoodAssociationorthepartyresponsibleformaintenance.
BoulderCreekSubdivisionDecember2019
MasterParkPlan
12
Section2
ParkPlanDrawings
ARRANGE 8 LARGE BOULDERSBETWEEN TREES FOR KIDS PLAYACTIVITIES
NEWPAVILION
PARK BOUNDARY
PUBLIC PARK 175,440 SQ.FT.1.7319 ACRES
SIDEWALK
LAWN LIMITNATURALTRANSITION
LAWN LIMITNATURALTRANSITION
(2) 4" IRRIGATIONCONDUITS
(1) 4" IRRIGATIONCONDUIT(1) 4" IRRIGATIONCONDUIT
(1) 4"IRRIGATIONCONDUIT
(1) 4" IRRIGATIONCONDUIT
(1) 4" IRRIGATIONCONDUIT
(1) 4" IRRIGATIONCONDUIT
(1) 4" IRRIGATIONCONDUIT
WETLAND BOUNDARY
WATERCOURSE PLANTING SYMBOLS.SEE "WATERCOURSE PLAN" SHEET
EXISTING PICNICTABLE HERE
EXISTINGWELL
EXISTING TREE
EXISTING TREE
EXISTING TREE
EXISTING SOD IN THISBOULEVARD SECTION
EXISTING SOD IN THISBOULEVARD SECTION
PARKBOUNDARY
EXISTING PICNICTABLE HERE
(1) 4" IRRIGATIONCONDUIT
EXISTINGPLAYGROUND
STREAM CENTER LINE
PUBLIC PARK 252,054 SQ.FT.1.1950 ACRES
(1) 4" IRRIGATIONCONDUIT
(1) 4" IRRIGATIONCONDUIT
(1) 4" IRRIGATIONCONDUIT
FUTURESIGN
NATURALSTEELEDGING
GRAVELFINES TRAIL
POT
BOTANICAL NAME
COMMON NAME
SYM SIZE TYPE NOTES #
ACER TATATICUMTATARIAN MAPLE
TILIA AMERICANA
AMERICAN LINDEN
ULMUS AMERICANA
AMERICAN ELM
POPULUS TREMULOIDES
QUAKING ASPEN
2" CAL.
2 " CAL
B&B
B&B
B&B
SINGLE STEM
SINGLE STEM
SINGLE STEM
PER PLAN
6
25
21
14
TREES
LARGE SHRUBS/SMALL ORNAMENTALS
BOULDER CREEK: MASTER PARK PLAN
PLANT LIST
PRUNUS MAACKII
AMUR CHOKECHERRY 10 GAL.PER PLAN 11
AMELANCHIER X GRANDIFLORA
AUTUMN BRILLIANCE SERVICEBERRY 10 GAL.POT MULTI STEM 22
GLEDITSIA TRIACANTHOS INERMIS
HONEYLOCUST SINGLE STEM 9
B&B
B&B2 " CAL
2" CAL.
2" CAL.
PICEA PUNGENS
COLORADO SPRUCE
8'-14' B&B 10
NATIVE GRASSES, LAWN, AND OTHER
UPLAND NATIVE SEED MIX
* SEE "WATERCOURSE" SHEET FORRECOMMENDED UPLAND SEED MIX
235,000
SQ.FT.
HIGH TRAFFIC "ABC SEED MIX" BY CIRCLE S
SEEDS. BLUEGRASS / FESCUE MIX.97,635
SQ.FT.DRILL SEED PER SUPPLIER
SPECIFICATIONS
DRILL SEED 18.5 LBS / ACRE
MOSSY PIPESTONE BOULDERS. ROUNDED.MIN. 41/2 FTDIAMETER ARRANGE W/ LANDSCAPE
ARCHITECT PRESENT
ULMUS SP.DISCOVERY ELM SINGLE STEM 19B&B2 " CAL
MEDIUM/LARGE CEDAR BARK MULCH 2,500
SQ.FT.MINIMUM 4" DEEP LAID
OVER WEED BARRIER
PLANTING NOTES:
A.PLACE SHRUBS AND TREES WITH LANDSCAPE ARCH. PRESENT TO GIVE DIRECTION AND MAKE ADJUSTMENTS.
B.ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.0-1996).
C.VERIFY ALL QUANTITIES. THE ILLUSTRATED LOCATION SHALL DICTATE COUNT.
D. COORDINATE PLANTING WITH IRRIGATION INSTALLATION.
E.NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT WRITTEN CONSENT FROM THE LANDSCAPE ARCH.
F. PLANTS SHOWN REPRESENT AN AVERAGE OF INSTALLED SIZE AND MATURE/MAINTAINED SIZE
G.IRRIGATION PLAN AND LAYOUT SHALL HAVE THE WRITTEN APPROVAL OF DESIGN 5 BEFORE INSTALLATION.
H. ALL PLANT MATERIAL SHALL BE WARRANTIED FOR (1) ONE YEAR FROM THE DATE OF INSTALLATION.
I.ALL TREES SHALL HAVE A 3FT DIAMETER RING OF SHREDDED CEDAR MULCH AT THEIR BASE
J.ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE RE-SEEDED WITH RECLAMATION SEED MIX
K.ALL TURF LAWN AREAS SHALL RECEIVE A MINIMUM OF 6" TOPSOIL. TOPSOIL SHALL BE RAKED AND FREE FROM ROCKSLARGER THAN 1.0" IN DIAMETER. SOIL TO BE TESTED AT COMPLETION AND AMENDED IF NECESSARY.
L.ALL NATIVE RECLAMATION GRASS AREAS SHALL RECEIVE A MINIMUM OF1.5" SCREENED TOPSOIL FREE FROM ROCKS LARGERTHAN 1" IN DIAMETER.
M.ALL TREES SHALL HAVE PERMANENT DRIP IRRIGATION. ALL LAWN AREAS SHALL HAVE PERMANENT OVERHEAD IRRIGATION.
N. ALL TREES SHALL BE STAKED FOR A MINIMUM OF 2 YEARS. REMOVE STAKES AFTER 2 YEARS.
O. ALL EDGING SHALL BE
316"x 4" NATURAL STEEL ON STRAIGHT RUNS AND 18" X 4" NATURAL STEEL FOR CURVED RUNS (OR ASOTHERWISE SPECIFIED IN DETAILS). TAC WELD TO #4 REBAR DRIVEN A MINIMUM OF 18" DEEP.
P.ALL PLANTING BEDS SHALL HAVE A WEED BARRIER INSTALLED BETWEEN THE SOIL AND COVERING LAYER OF ROCK OR MULCHPER PLAN. DRIP IRRIGATION SHALL BE PLACED ABOVE WEED FABRIC, BUT UNDER MULCH.BOULDER CREEK SUBDIVISIONBOZEMAN, MTBOULDER CREEKSUBDIVISIONTMSBC: MPPBC: MPPc://design5/clientsCHECKED BY:FILE:DATE:PROJECT:DIR:4249 Cover Street, Bozeman, Montana406.600.0342L1.0
PARK MASTER
PLAN
750 150'NORTHSCALE 1:150
PARK MASTER PLAN1
L1.0 4/16/14OCTOBER 2017
5(/2&$7('
1(: 3$9,/,21
/2&$7,21
*5$9(/75$,/ 723$9,/,21
ARRANGE 8 LARGE BOULDERS
BETWEEN TREES FOR KIDS PLAY
ACTIVITIES
NEW
PAVILION
SIDEWALK
LAWN LIMIT
NATURAL
TRANSITION
4" IRRIGATION
NDUIT
IRRIGATION
DUIT
(1) 4" IRRIGATION
CONDUIT
(1) 4" IRRIGATION
CONDUIT
LAWN
XISTING PICNIC
ABLE HERE
P
EXISTING
WELL
XISTING TREE
EXISTING TREE
EXISTING TREE
NG SOD IN THIS
VARD SECTION
NG SOD IN THIS
VARD SECTION
PARK
BOUNDARY
EXISTING PICNIC
TABLE HERE
EXISTING
PLAYGROUND
PUBLIC PARK 2
52,054 SQ.FT.
1.1950 ACRES
FUTURE
SIGN
NATURAL
STEEL
EDGING
IRRIGATION NOTES:
-BACK FLOW PREVENTION DEVICES (IF NEEDED) SHALL MEET ALL FEDERAL, STATE AND LOCAL CODES. INSTALLATION SHALL CONFORM TO LOCAL CODES.
-CONTRACTOR SHALL ADJUST ALL SPRINKLERS TO PROVIDE PROPER RADIUS, ARC AND TO MINIMIZE OVER-SPRAY ONTO SIDEWALKS. OVER SPRAY ON BUILDINGS SHALL NOT BEPERMITTED.
-PROVIDE VALVE BOX EXTENSIONS AS REQUIRED.
-ELECTRICAL & MANUAL GATE VALVES SHALL BE INSTALLED IN CARSON VALVE BOXES. USE A 12" STANDARD BOX FOR ALL CONTROL VALVES. (TWO VALVE MAXIMUM PER BOX).
ALL VALVE BOXES SHALL HAVE A LOCKING LID.
-MAINLINE SHALL BE SDR-21 SOLVENT WELDED PVC & LATERAL IRRIGATION PIPE SHALL BE SDR-21 SOLVENT WELDED PVC. ALL LATERAL LINES SHALL BE 1" UNLESS SPECIFIEDDIFFERENTLY.
-THE PLAN IS DIAGRAMMATIC FOR PIPING. ADJUST PIPE LOCATION AS NECESSARY. ALL VALVES & PIPING ARE TO BE INSTALLED IN PLANTING OR LAWN AREAS.
-LINE SIZE WINTERIZATION BLOW-OUT ADAPTER SHALL BE INSTALLED IMMEDIATELY DOWN STREAM OF POINT OF CONNECTION SHOWN ON DRAWINGS. A 1" QUICK COUPLER MAYBE USED.
-DO NOT INSTALL THE IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS, GRADE CHANGES OR OTHER DETRIMENTAL SITE GEOMETRY EXISTS.
2)
3)
4)
5)
7)
8)
9)
10)
11)
12)
13)
14)
15)
- ROTORS 4GPM & LARGER SHALL USE A HUNTER SJ SERIES PRE-FAB SWING PIPE FOR CONNECTION TO LATERAL LINE. HUNTER HFT SWING PIPE FOR ALL HEAD CONNECTIONS OF4GPM OR LESS.
6)
16)
-QUICK COUPLER SHALL USE A LASCO G13S-218 SWING JOINT FOR CONNECTION TO MAINLINE.
-THESE PLANS WERE CREATED BASED ON INFORMATION AND MEASUREMENTS PROVIDED BY OTHERS. ALL INFORMATION SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIORTO CONSTRUCTION.
-GROUNDING SHALL COMPLY WITH ARTICLE 250 OF THE NATIONAL ELECTRICAL CODE CONSIST OF A 58" COPPER CLAD GROUNDING ROD AND A 4"X96" SOLID GROUNDING PLATE.ALL GROUNDING CONNECTION SHALL USE A PAIGE CADWELD FOR CONNECTIONS. THE EARTH TO GROUND RESISTANCE SHALL BE NO MORE THAN 10 OHMS.
-CONTRACTOR SHALL CONFIRM WATER SOURCE FOR PRESSURE AND GPM REQUIREMENTS PRIOR TO CONSTRUCTION.
1)
- WIRES MAY BE INSTALLED IN TRENCHES WITH PIPE AS LONG AS THE WIRES ARE INSTALLED UNDER THE PIPE.
17)
18)
19)
20)
-3M DBY DRY SPLICE WIRE CONNECTORS SHALL BE USED FOR VALVE CONNECTION.
-THE CONTRACTOR PRIOR TO CONSTRUCTION SHALL VERIFIED THAT THERE ARE NO DISCREPANCIES WITH THE SITE LAYOUT AND THE PLAN. ANY DISCREPANCIES SHALL BEFORWARDED TO THE LANDSCAPE ARCHITECT OR THE IRRIGATION DESIGNER IMMEDIATELY.
-CONTROL WIRE SHALL BE RED 14awg SOLID COPPER, UL APPROVED FOR DIRECT BURIAL . THE COMMON WIRE SHALL BE WHITE 12 awg SOLID COPPER, UL APPROVED FORDIRECT BURIAL. INSTALL 2 SPARE 14awg BLUE WIRES FOR SPARES.
-THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT AS-BUILT DRAWING ON THE JOB SITE AT ALL TIMES.
21)
-IRRIGATION PIPE SLEEVE GREATER THAN 4" SHALL BE SDR-21, ALL OTHER SLEEVES SHALL BE SCH 40,ALL PIPE SLEEVE SHALL BE A MINIMUM OF 4" OR 2 TIMES THE IRRIGATIONPIPE DIAMETER, CONTROL WIRE SHALL HAVE A SEPARATE 2" SCH 40 SLEEVE. ALL SLEEVES UNDER VEHICLE-TRAVERSED PAVEMENT SHALL BE INSTALL TO A MINIMUM DEPTH OF24" TO THE TOP OF THE SLEEVE.
-THE IRRIGATION CONTRACTOR SHALL CONFIRM THE WATER SOURCE FOR GPM AND PRESSURE REQUIREMENTS.
22)
-THE CONTRACTOR SHALL WRITE AN IRRIGATION SCHEDULE FOR A COMPLETE IRRIGATION SEASON AND SUBMITTED THE PROPOSED SCHEDULE TO THE LANDSCAPE ARCHITECTFOR APPROVAL.
-IT IS THE SOLE RESPONSIBILITY OF THE IRRIGATION CONTRACTOR TO MEET THE ABOVE REQUIREMENTS, ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THELANDSCAPE ARCHITECT.
23)-TREES AND SHRUBS SHALL HAVE THREE (3) 2GPH EMITTERS, ALL OTHER SHALL HAVE TWO (1) 2 GPH EMITTERS. SPACE EMITTER EQUALLY AROUND THE BASE OF THE PLANT.
24)-IRRIGATION CONTRACTOR SHALL SUPPLY COMPLETE AS-BUILT IRRIGATION LAYOUT FOR SUBMITTAL TO CITY OF BOZEMAN. IRRIGATION CONTRACTOR SHALL SUPPLY PARTS LIST,OPERATING INSTRUCTIONS AND WATERING SCHEDULE TO OWNER OR HOA.
LEGEND:
CONTROL VALVE
QUICK COUPLER VALVE
1.5"
1"
HUNTER
HUNTER HQ-44RC
ISOLATION GATE VALVE
ICV-101G1"
SYMBOL DESCRIPTION SIZE MANUF. MODEL NUMBER DETAIL REF
ALL EQUIPMENT TO BE AS LISTED
IRRIGATION
P
DRAIN VALVE
DRIP LINE
NEW MAIN LINE
SLEEVE SIZE 4" THRU 10" SDR 214" MINIMUM
SDR-21 SOLVENT WELDED
POINT OF CONNECTION, EXISTING WELL
CONTROLLER I-COREHUNTER
1.5"
DRIP CONTROL VALVE HUNTER ICZ-101-401"
16 STATION
SIZE 2" SCH 40 PVC FOR CONTROL WIRE
T113KNIBCO
1" NIBCO T-113K
FLOW SENSOR 220BDATA INDUSTRIAL 1"
BACKFLOW PREVENTER 975XLWILKINS1.25"
WEATHER SENSOR WSS-SENHUNTER
5-I1.2
6-I1.3
5-I1.3
8-I1.2
9-I1.2
4-I1.3
3-I1.3
3-I1.2
MASTER VALVE ICV-101GHUNTER1"
7-I1.2
3/4" POLYETHYLENE DISTRIBUTION DRIP TUBING
HUNTER IRRIGATION PARTS
SPRINKLER HEAD LEGEND
HUNTER I-20-04, NOZZLE AS LISTED
HUNTER PROS-04-PRS40-CV w/ MP2000-90 MP ROTATORNOZZLE
XX
HUNTER PROS-04-PRS40-CV w/ MP1000-90 MP ROTATORNOZZLE
HUNTER PROS-04-PRS30-CV w/ PRO-SPRAY NOZZLE
HUNTER PROS-04-PRS40-CV w/ MP1000-360 MP ROTATORNOZZLE
HUNTER PROS-04-PRS30-CV w/ PRO-ADJUSTABLENOZZLES
HUNTER PROS-04-PRS30-CV w/ SHORT RADIUS NOZZLES BOULDER CREEK SUBDIVISIONBOZEMAN, MTBOULDER CREEKSUBDIVISIONTMS4/16/14BC: MPPBC: MPPc://design5/clientsCHECKED BY:FILE:DATE:PROJECT:DIR:4249 Cover Street, Bozeman, Montana406.600.0342L1.1
PARK MASTER
PLAN:
IRRIGATION
CONCEPT
IRRIGATOIN MAIN LINE
VALVE
EVENLY SPACED SPRAY NOZZLES W/
HEAD-TO-HEAD COVERAGE
EVENLY SPACED ROTATOR HEADS
W/ HEAD-TO-HEAD COVERAGE
CONCEPT SYSTEM AND PARTS LIST. FINAL DESIGN SHALL HAVE
APPROVAL OF LANDSCAPE ARCHITECT BEFORE INSTALLATION.
25050'NORTHSCALE 1:50
IRRIGATION CONCEPT (FOR DESIGN INTENT ONLY. FINAL DESIGN AND AS-BUILTS BY CONRACTOR)1
L1.1
OCTOBER 2017
PRUNE TREE TO REMOVE
DEAD OR DAMAGED LIMBS AND
BRANCHES
TREE STAKES AND TIES
AS SHOWN. STAKES SHALL
BE DRIVEN INTO EXISTING,
UNDISTURBED SOIL AND
SHALL NOT PENETRATE THE
ROOT BALL. STAKES TO BE
REMOVED AFTER TWO YEARS.
FINISHED ELEVATION OF TREE
CROWN TO BE MIN 3" AND
MAX 6" ABOVE FINISHED GRADE
CIRCULAR SWALE TO RING TREE,
3' DIAMETER WITH 3" HIGH
MOUNDED RING OF SOILBURLAP TO BE REMOVED
FROM TOP 13 OF ROOT BALL.
REMOVE WIRE CAGE FOLLOWING
PLANTING.
13 NATIVE SOIL WITH 13 SANDY LOAM
AND 13 DEBRIS FREE TOPSOIL.
EXCAVATE HOLE
2X DIAMETER OF ROOT BALL
Coniferous Ball and Burlap Planting
3/8"=1'L5.1
1
PRUNE TREE TO REMOVE
DEAD OR DAMAGED LIMBS AND
BRANCHES
TREE STAKES AND TIES
AS SHOWN. STAKES SHALL
BE DRIVEN INTO EXISTING,
UNDISTURBED SOIL AND
SHALL NOT PENETRATE THE
ROOT BALL. STAKES TO BE
REMOVED AFTER TWO YEARS.
FINISHED ELEVATION OF TREE
CROWN TO BE MIN 3" AND
MAX 6" ABOVE FINISHED GRADE
CIRCULAR SWALE TO RING TREE,
4' DIAMETER WITH 3" HIGH
MOUNDED RING OF SOIL
BURLAP TO BE REMOVED
FROM TOP 13 OF ROOT BALL.
REMOVE WIRE CAGE FOLLOWING
PLANTING.
13 NATIVE SOIL WITH 13 SANDY LOAM
AND 13 DEBRIS FREE TOPSOIL.
EXCAVATE HOLE
2X DIAMETER OF ROOT BALL
Ball and Burlap Deciduous Tree Planting Detail
3/8"=1'L5.1
2
PRUNE SHRUB TO REMOVE
DEAD OR DAMAGED LEAVES
AND BRANCHES
ELEVATION OF SHRUB
CROWN TO BE 3" ABOVE
FINISHED GRADE ELEVATION
CIRCULAR SWALE TO RING
SHRUB, 2' DIAMETER WITH 3"
HIGH MOUNDED RING OF SOIL
ALL CONTAINMENT MATERIALS
AROUND ROOTS TO BE REMOVED
PRIOR TO INSTALLATION
13 NATIVE SOIL WITH 13 SANDY
LOAM AND 13 DEBRIS FREE
TOPSOIL.
EXCAVATE HOLE
2X DIAMETER OF ROOT BALLShrub Planting Detail
3/4"=1'L5.1
3
PAVEMENT EDGE - SEE PLANS
AND PAVING DETAILS FOR
ADDITIONAL INFORMATION.
SEE ALSO EDGING DETAILS AS
APPLICABLE.
34" MINUS WASHED AGGREGATE
BASE MATERIAL UNLESS
OTHERWISE NOTED. SEE
PAVING DETAILS FOR BASE
MATERIAL DEPTH
PREPARED SUBGRADE. REMOVE
ALL STONES OR OTHER DEBRIS
GREATER THAN 1" DIA. AND TILL
EXISTING SOIL MIN. 4" BEFORE
ADDING TOPSOIL OR
AMENDMENTS.
1"REVEAL - SEE NOTE 2
NOTE:
1. SLOPE PLANTED AREAS AWAY FROM PAVED AREAS
2. FINISH GRADES AT PAVEMENT EDGES MUST BE AT A LEVEL SUCH THAT
THE ESTABLISHED TURF SURFACE WILL BE ONE (1) INCH BELOW TOP OF
PAVEMENT FOR A MINIMUM DISTANCE OF SIX (6) FEET FROM THE EDGE.
3.CONTRACTOR SHALL PROVIDE A 6" MINIMUM DEPTH OF TOPSOIL ON
ALL LAWN AREAS. TOPSOIL SHALL BE DRUM ROLLED OR TRACK-PACKED
AND GRADED SMOOTHLY AND EVENLY.
6" MIN. TOPSOIL. SEE NOTE 3SLOPE
SEED PER PLAN
Sod Planting at Pavement Edge
3/4"=1'L5.1
4
316" x 4" NATURAL STEEL EDGING
MULCH MATERIAL PER PLAN
MIN 4" DEEP.
FINAL ELEVATION MIN 1" BELOW
TOP OF STEEL EDGING
1" FACE REVEAL
#4 REBAR, 24" OC, MIN. 18" DEPTH
SPOT WELD ON SITE
TO STEEL EDGING
WEED FABRIC PER PLAN
4" STAPLES, 18" OC
PREPARED SUBGRADE. REMOVE ALL
STONES OR OTHER DEBRIS GREATER
THAN 1" DIA. AND TILL EXISTING
SOIL MIN. 4" BEFORE ADDING
TOPSOIL OR AMENDMENTS.
6" MIN. TOPSOIL. SEE NOTE
LAWN MIX SEED PER PLAN
Edging Detail
1"=1'L5.1
5
NOTE:
1. CONTRACTOR SHALL PROVIDE A 6" MINIMUM DEPTH OF TOPSOIL TILLED ON ALL LAWN AREAS.
TOPSOIL SHALL BE DRUM ROLLED OR TRACK-PACKED AND GRADED SMOOTHLY AND EVENLY.
BOULDER PER PLAN
FINISHED GRADE
COMPACT AGGREGATE
BASE, 3" DEPTH
NATIVE SOIL
1/2 TO 1/3 OF BOULDER TO BE
BURIED BELOW FINISH GRADE.
Boulder Detail
1"=1'L5.1
6
6' Min WIDTH
3" Min THICKNESS OF 38" Minus
CRUSHED GRAVEL
( NATURAL FINES SEE NOTE 1.)
3" Min THICKNESS OF
34" Minus COMPACTED
CRUSHED GRAVEL BASE
COMPACTED SUBGRADE
(SEE NOTE 2.)
2% Max SLOPE4:1 Max
NOTES:
1. NATURAL FINES SHALL CONSIST OF 80% SAND, 10%
SILT, AND 10% CLAY
2. A SOIL STERILANT SHALL BE APPLIED TO THE
SUBGRADE PRIOR TO PLACEMENT OF GRAVEL BASE.
Gravel Fines Trail (typ)
3/8"=1'L5.1
7
WEED FABRIC BOULDER CREEK SUBDIVISIONBOZEMAN, MTBOULDER CREEKSUBDIVISIONTMS4/16/14BC: MPPBC: MPPc://design5/clientsCHECKED BY:FILE:DATE:PROJECT:DIR:4249 Cover Street, Bozeman, Montana406.600.0342L5.1
LANDSCAPE
DETAILS
OCTOBER 2017
BoulderCreekSubdivisionDecember2019
MasterParkPlan
13
Section3
SoilsInformation
BoulderCreekSubdivisionDecember2019
MasterParkPlan
14
SoilsTestPitMap
PitsrelevanttoBoulderCreekParksandOpenSpace:15,21,39,41and42
SoilsTestingandReportingby:
AlliedEngineeringServices,Inc.
ReportDate:January2002
CompleteReportsubmittedwiththeBoulderCreekSubdivisionPreliminaryPlat
BoulderCreekSubdivisionDecember2019
MasterParkPlan
15
BoulderCreekSubdivisionDecember2019
MasterParkPlan
16
BoulderCreekSubdivisionDecember2019
MasterParkPlan
17
BoulderCreekSubdivisionDecember2019
MasterParkPlan
18
Section4
PavilionandTrailInformation
BoulderCreekSubdivisionDecember2019
MasterParkPlan
18
YardistryPavilion
Yardistryshelters.com888Ͳ509Ͳ4382(Orapprovedalternate)
Model#YM12949
14’X12’PavilionwithAluminumRoof
Typical6'trailcrosssection
BoulderCreekSubdivisionDecember2019
MasterParkPlan
19
From:ThomWhite[mailto:TWhite@BOZEMAN.NET]
Sent:Tuesday,January21,20149:54AM
To:MikeBalch
Subject:RE:BoulderCreekParkPlayStructure
MikeͲ
IhadmyplaygroundguylookoverthestructureandexistingplaystructureattheproposedBoulder
CreekSubdivisionisacceptable,however,thegroundwassnowcoveredatthetimeofinspectionsoa
followupinspectionandpossibleremediationmaybeneededbeforetheparkcanbededicatedtothe
cityperourdiscussion?
Thom White
Parks/Cemetery Superintendent
City of Bozeman
(406) 582-3224
BoulderCreekSubdivisionDecember2019
MasterParkPlan
21