HomeMy WebLinkAbout12-02-19 City Commission Packet Materials - C5. Water Fund CIP for FY21-25 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Kristin Donald, Finance Director SUBJECT: Adopt the Water Fund Capital Improvement Plan (CIP) for Fiscal Years 2021-2025. AGENDA ITEM TYPE: Consent MEETING DATE: December 2, 2019 RECOMMENDATION: Adopt the Water Fund Capital Improvement Plan (CIP) for Fiscal Years 2021 - 2025. BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital Improvements Plan and submit it to the Commission by December 15th. The Public Works Department, City Manager, and other city staff met during September - October to develop the attached Capital Improvement Plan (CIP) for the capital needs of the equipment and capital needs of the Water Fund. The Water Fund CIP tracks the capital equipment replacements and construction projects for Water Operations (distribution system) and the Water Treatment Plant. Similar to recent years past, we are bringing the various parts of the plan forward as items on the Consent agenda. We will be prepared to address questions, if they arise, at the public meeting. Public Works Master Plan in Progress The Public Works Department is currently having a master plan drafted that will address the Department’s space needs. This will include space for workers based on the staffing plan and 40 projected growth, equipment storage based on the CIP and other master plans, and shop space. The completion of this plan will most likely change all Public Works’ funds CIPs next year. Stiff Building Remodel FY20 Project Changes The FY20 Approved Budget contains a total of $656,116 for the Stiff Building Remodel, funded from the General, Community Development, and Building Inspection Funds. This estimate was made from initial information developed more than 5 years ago, prior to Phase 1 of the project (basement conference room, etc.). After we completed the final programming on this next phase, the project has expanded to include other departments within the building with a focus on centralizing customer service, accommodating future staffing needs, and improved safety. The project is in final design stages and will be bid in mid-November. Our most recent estimates show the project could total between $1.2- $1.5 Million. These increased costs have not been added to the CIP or reflected in the FY20 amounts shown. Once bids are received, we will likely recommend making adjustments to the FY20 Budget by delaying or canceling current projects, using budget or vacancy savings, and/or possibly budget amendments. UNRESOLVED ISSUES: None. ALTERNATIVES: As suggested by the City Commission. If the Commission does not wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda. 41 FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for FY21. Report compiled on: November 14, 2019 Attached: Water Fund CIP 42   WATER FUND FINANCIAL SUMMARY  Financial Summary Current YearFY20 FY21 FY22 FY23 FY24 FY25UnscheduledProjected Beginning Reserve Balance Dedicated to CIP 1,008,079$      152,198$            1,035,375$      905,388$          2,517,734$       4,172,448$     ‐$                   Plus:  Water Revenues Dedicated to CIP 2,972,017$      3,061,177$         3,153,012$      3,247,603$       3,345,031$       3,445,382$     ‐$                   Plus:  Loan or Financingfor Hyalite Dam Improvements W79 4,000,000$        Plus:  Loan or Financing for Automation Upgrades W71 6,710,000$        Plus:  Loan or Financing for Lyman Tank Construction  10,000,000$      Less:  FY19 Carryover Capital (1,285,397)$      Less:  Scheduled CIP Project Costs (2,542,500)$     (2,178,000)$        (3,283,000)$     (15,635,257)$    (8,400,316)$      (1,683,606)$    (355,000)$       Projected Year‐End Cash Dedicated to CIP 152,198$         1,035,375$         905,388$         2,517,734$       4,172,448$       5,934,224$     (355,000)$       Assumptions Made for Revenue Estimates Current YearFY20 FY21 FY22 FY23 FY24 FY25Estimated Annual Water Revenues 9,906,722$         9,906,722$              10,203,924$       10,510,041$        10,825,343$        11,150,103$        Estimated Annual Increase 3.0% 3.0% 3.0% 3.0% 3.0%Total Estimated Revenues 9,906,722$         10,203,924$           10,510,041$       10,825,343$        11,150,103$        11,484,606$      Current Revenues Dedicated to CIP % 26.0% 30.0% 30.0% 30.0% 30.0% 30.0%  Plus:  Increase Dedicated to CIP 4.0% 0.0% 0.0% 0.0% 0.0% 0.0%  Total % Dedicated to CIP 30.0% 30.0% 30.0% 30.0% 30.0% 30.0%Total Estimated Revenues Dedicated to CIP 2,972,017$         3,061,177$              3,153,012$         3,247,603$          3,345,031$          3,445,382$         ProjectedProjectedCURRENT$(2,178,000)$(3,283,000)$(15,635,257)$(8,400,316)$(1,683,606)$(355,000)FY20 FY21 FY22 FY23 FY24 FY25 UNSCHEDULEDWATER FUND PROJECTS & EQUIPMENT 43   WATER FUND PROJECT SUMMARY  Project # Project Name FY2021 FY2022 FY2023 FY2024 FY2025 UnscheduledW03   ANNUAL WATER PIPE REPLACEMENT 25,000                25,000                25,000                25,000                25,000             ‐                   W04‐21WATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION 1,200,000          ‐                      ‐                      ‐                      ‐                    ‐                   W04‐22WATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION ‐                      1,200,000          ‐                      ‐                      ‐                    ‐                   W04‐23WATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION ‐                      ‐                      1,200,000          ‐                      ‐                    ‐                   W04‐24WATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION ‐                      ‐                      ‐                      1,200,000          ‐                    ‐                   W04‐25WATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION ‐                      ‐                      ‐                      ‐                      1,200,000        ‐                   W47   REPLACE #2647 ‐ 1998 1/2 TON CHEVY PICKUP 27,000                ‐                      ‐                      ‐                      ‐                    ‐                   W49   REPLACE #3078 ‐ 2002 1/2 TON CHEVY PICKUP          ‐                      27,000                ‐                      ‐                      ‐                    ‐                   W56   WTP FACILITY REPAIR & REPLACEMENT   40,000                40,000                40,000                40,000                40,000             ‐                   W57   WTP FACILITY ENGINEERING & OPTIMIZATION      30,000                30,000                30,000                30,000                30,000             ‐                   W69   WATER SYSTEM CONDITION ASSESSMENT           ‐                      100,000             ‐                      100,000             ‐                    200,000          W71   PRV PHASE 2 ‐ AUTOMATION & INSTRUMENTATION UPGRADES ‐                      ‐                      ‐                      6,710,000          ‐                    ‐                   W72   PRV PHASE I ‐ MECHANICAL & STRUCTURAL UPGRADES    ‐                      1,750,000          ‐                      ‐                      ‐                    ‐                   W79   HYALITE DAM & RESERVOIR OPTIMIZATION IMPROVEMENTS  ‐                      ‐                      4,000,000          ‐                      ‐                    ‐                   W87LYMAN TANK & TRANMISSION MAIN  DESIGN   750,000             ‐                      ‐                      ‐                    ‐                   W88   LYMAN TANK & TRANMISSION MAIN CONSTRUCTION      ‐                      ‐                      10,000,000        ‐                      ‐                    ‐                   W90   TOTAL ORGANIC CARBON ANALYZER ‐                      ‐                      30,000                ‐                      ‐                    ‐                   W93   3/4 TON FORD 4 WHEEL DRIVE REPLACEMENT  ‐                      ‐                      ‐                      60,000                ‐                    ‐                   W97REPLACE 1 TON TRUCK ‐                      ‐                      ‐                      53,000                ‐                    ‐                   W98REPLACE 1 TON TRUCK ‐                      ‐                      ‐                      ‐                      53,000             ‐                   W99HYALITE GUARDRAIL EXTENSION 70,000                ‐                      ‐                      ‐                      ‐                    ‐                   W100REPLACE #3605 GMC CANYON ‐                      ‐                      ‐                      ‐                      45,000             ‐                   W101WTP TANK OUTLET MONITOR ‐                      ‐                      ‐                      ‐                      100,000           ‐                   W102REPLACE BACKHOE 1772 ‐                      ‐                      142,054             ‐                      ‐                    ‐                   W103REPLACE DUMP TRUCK 3157 ‐                      ‐                      132,203             ‐                      ‐                   W104REPLACE BACKHOE 3293 ‐                      ‐                      ‐                      146,316             ‐                    ‐                   W105REPLACE BACKHOE 3419 ‐                      ‐                      ‐                      ‐                      150,706           ‐                   W106SCADA  MASTER PLAN ‐                      75,000                ‐                      ‐                      ‐                    ‐                   WC02  METER SOFTWARE SUBSCRIPTION    36,000                36,000                36,000                36,000                36,000             ‐                   WWW1WHEELED EXCAVATOR ‐                      ‐                      ‐                      ‐                      ‐                    155,000          GF346FACILITY CONDITION INVENTORY ‐                      ‐                      ‐                      ‐                      3,900                ‐                   Fiscal Year totals 2,178,000         3,283,000         15,635,257       8,400,316         1,683,606       355,000         44   WATER FUND DETAIL BACKGROUND This enterprise fund revenue source are rate fees charged to water users. We estimate water rates dedicated to capital will need to increase by at least 3%  bringing the portion of Water Utility revenues that support capital to 31% in order to fund this capital plan.  A full rate‐study and analysis is currently underway.   $7,990,070 $8,398,899 $9,646,160 $9,281,821 $10,157,888 $9,396,171 $9,376,188  $‐ $2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 $12,000,000FY14 FY15 FY16 FY17 FY18 FY19  5 yr avgFY15‐ FY19Water Fund Revenue45    CAPITAL PLAN SUMMARY Numerous items have been adjusted or added based on current condition assessments and projections; including Water Pipe Replacements projects of $1,200,000 annually. Four projects require borrowing in the 5‐year horizon totaling over $20 million (W71, W79, and W88.). The largest project planned is Lyman Tank and Transmission Main scheduled for design in FY21 (W87) and construction in FY23 (W88). This project is to construct a new 5MG storage tank at Lyman. This would decommission the existing Lyman storage tank, Condition Assessment‐based repairs of the existing Lyman transmission main, new supply main tie in to new storage tank, new transmission main tie in from new storage tank to existing transmission main, new chlorination/fluoridation feed facility. Decommission Pear Street Booster Station if Hydraulic Grade Line of tank raised to meet Sourdough Tank. The Lyman water supply is a critical element of the city's overall water supply portfolio accounting for roughly 20% of annual supply volume to the city currently.    The Water Treatment plant and Water Operations has replacement vehicles and equipment throughout the plan to the plan. Some larger equipment added this year are scheduled in FY23‐FY25 including replacing three back hoes (W102, W104 & W105) and a dump truck (W103).    46 Project NameYear Description  Amount Total Project #ANNUAL WATER PIPE REPLACEMENT PROGRAM ‐ DESIGN     25,000           THIS ITEM PROVIDES FOR DESIGN WORK TO BE COMPLETED ‐                  EVERY YEAR, IN ANTICIPATION OF THE ANNUAL WATER    ‐                  SYSTEM UPGRADES.                                   ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NONE                                               ‐                  ADVANTAGES OF APPROVAL:                           ‐                  PROVIDES FOR THE DESIGN OF NECESSARY WATER SYSTEM  ‐                  MAINTENANCE WORK.                                  ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  NONE                                               ‐                  ANNUAL WATER PIPE REPLACEMENT PROGRAM ‐ DESIGN     25,000           DESCRIPTION:                                      ‐                  THIS ITEM PROVIDES FOR DESIGN WORK TO BE COMPLETED ‐                  EVERY YEAR, IN ANTICIPATION OF THE ANNUAL WATER    ‐                  SYSTEM UPGRADES.                                   ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NONE                                               ‐                  ADVANTAGES OF APPROVAL:                           ‐                  PROVIDES FOR THE DESIGN OF NECESSARY WATER SYSTEM  ‐                  MAINTENANCE WORK.                                  ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  NONE                                               ‐                  ANNUAL WATER PIPE REPLACEMENT PROGRAM ‐ DESIGN     25,000           DESCRIPTION:                                      ‐                  THIS ITEM PROVIDES FOR DESIGN WORK TO BE COMPLETED ‐                  EVERY YEAR, IN ANTICIPATION OF THE ANNUAL WATER    ‐                  SYSTEM UPGRADES.                                   ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NONE                                               ‐                  ADVANTAGES OF APPROVAL:                           ‐                  PROVIDES FOR THE DESIGN OF NECESSARY WATER SYSTEM  ‐                  MAINTENANCE WORK.                                  ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  NONE                                               ‐                  ANNUAL WATER PIPE REPLACEMENT 202125,000           W03   (FY21)ANNUAL WATER PIPE REPLACEMENT 202225,000           W03  (FY22) ANNUAL WATER PIPE REPLACEMENT 202325,000           W03   (FY23)47 Project NameYear Description  Amount Total Project #ANNUAL WATER PIPE REPLACEMENT PROGRAM‐DESIGN       25,000           DESCRIPTION:                                      ‐                  THIS ITEM PROVIDES FOR DESIGN WORK TO BE COMPLETED ‐                  EVERY YEAR, IN ANTICIPATION OF THE ANNUAL WATER    ‐                  SYSTEM UPGRADES.                                   ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NONE                                               ‐                  ADVANTAGES OF APPROVAL:                           ‐                  PROVIDES FOR THE DESIGN OF NECESSARY WATER SYSTEM  ‐                  MAINTENANCE WORK.                                  ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  NONE                                               ‐                  ANNUAL WATER PIPE REPLACEMENT PROGRAM‐DESIGN       25,000           DESCRIPTION:                                      ‐                  THIS ITEM PROVIDES FOR DESIGN WORK TO BE COMPLETED ‐                  EVERY YEAR, IN ANTICIPATION OF THE ANNUAL WATER    ‐                  SYSTEM UPGRADES.                                   ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NONE                                               ‐                  ADVANTAGES OF APPROVAL:                           ‐                  PROVIDES FOR THE DESIGN OF NECESSARY WATER SYSTEM  ‐                  MAINTENANCE WORK.                                  ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  NONE                                               ‐                  ANNUAL WATER PIPE REPLACEMENT 202425,000           W03   (FY24)ANNUAL WATER PIPE REPLACEMENT 202525,000           W03   (FY25)48 Project NameYear Description  Amount Total Project #WATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION IN   1,200,000      2021                                               ‐                  DESCRIPTION:                                      ‐                  THE WATER REPLACEMENT PROGRAM SETS ASIDE FUNDS TO  ‐                  ASSESS AND REPLACE FAILING WATER PIPES. PRIORITY   ‐                  WILL GO TO REPLACE THE WATER PIPE ASSOCIATED WITH  ‐                  THE THE ANNUAL STREET CONSTRUCTION. THE REMAINING  ‐                  FUNDS WILL BE USED TO CONDUCT WATER PIPE CONDITION ‐                  ASSESSMENTS AND REPAIR IDENTIFIED PIPES.           ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NONE                                               ‐                  ADVANTAGES OF APPROVAL:                           ‐                  PROVIDES FOR CONSTRUCTION OF NECESSARY WATER       ‐                  SYSTEM MAINTENANCE WORK.                           ‐                  ADDITIONAL OPERATING COST:                        ‐                  THIS PROJECT RESULTS IN A NET DECREASE IN OVERALL  ‐                  MAINTENANCE COSTS OVER THE LIFECYCLE OF ALL PIPES. ‐                  WATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION IN   1,200,000      2022                                               ‐                  DESCRIPTION:                                      ‐                  THE WATER REPLACEMENT PROGRAM SETS ASIDE FUNDS TO  ‐                  ASSESS AND REPLACE FAILING WATER PIPES. PRIORITY   ‐                  WILL GO TO REPLACE THE WATER PIPE ASSOCIATED WITH  ‐                  THE ANNUAL STREET CONSTRUCTION (N 17TH FROM        ‐                  DURSTON TO THE END). THE REMAINING FUNDS WILL BE   ‐                  USED TO CONDUCT WATER PIPE CONDITION ASSESSMENTS   ‐                  AND REPAIR IDENTIFIED PIPES.                       ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NONE                                               ‐                  ADVANTAGES OF APPROVAL:                           ‐                  PROVIDES FOR THE CONSTRUCTION OF NECESSARY WATER   ‐                  SYSTEM MAINTENANCE WORK.                           ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  THIS PROJECT RESULTS IN A NET DECREASE IN OVERALL  ‐                  MAINTENANCE COSTS OVER THE LIFE CYCLE OF ALL PIPES‐                  WATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION20211,200,000     W04‐21  (FY21)WATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION20221,200,000     W04‐22  (FY22)49 Project NameYear Description  Amount Total Project #WATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION IN   1,200,000      2023                                               ‐                  DESCRIPTION:                                      ‐                  THE WATER REPLACEMENT PROGRAM SETS ASIDE FUNDS TO  ‐                  ASSESS AND REPLACE FAILING WATER PIPES. PRIORITY   ‐                  WILL GO TO REPLACE THE WATER PIPE ASSOCIATED THE   ‐                  ANNUAL STREET CONSTRUCTION. THE REMAINING FUNDS    ‐                  WILL BE USED TO CONDUCT WATER PIPE CONDITION       ‐                  ASSESSMENTS AND REPAIR IDENTIFIED PIPES.           ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NONE                                               ‐                  ADVANTAGES OF APPROVAL:                           ‐                  PROVIDES FOR THE CONSTRUCTION OF NECESSARY WATER   ‐                  SYSTEM MAINTENANCE WORK.                           ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  THE PROJECT RESULTS IN A NET DECREASE IN OVERALL   ‐                  MAINTENANCE COSTS OVER THE LIFE CYCLE OF ALL PIPES‐                  WATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION      1,200,000      DESCRIPTION:                                      ‐                  THE WATER REPLACEMENT PROGRAM SETS ASIDE FUNDS TO  ‐                  ASSESS AND REPLACE FAILING WATER PIPES. PRIORITY   ‐                  WILL GO TO REPLACE THE WATER PIPE ASSOCIATED THE   ‐                  ANNUAL STREET CONSTRUCTION. THE REMAINING FUNDS    ‐                  WILL BE USED TO CONDUCT WATER PIPE CONDITION       ‐                  ASSESSMENTS AND REPAIR IDENTIFIED PIPES.           ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NONE                                               ‐                  ADVANTAGES OF APPROVAL:                           ‐                  PROVIDES FOR THE CONSTRUCTION OF NECESSARY WATER   ‐                  SYSTEM MAINTENANCE WORK.                           ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  THE PROJECT RESULTS IN A NET DECREASE IN OVERALL   ‐                  MAINTENANCE COSTS OVER THE LIFE CYCLE OF ALL PIPES‐                  WATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION20241,200,000     W04‐24  (FY24)WATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION20231,200,000     W04‐23  (FY23)50 Project NameYear Description  Amount Total Project #WATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION      1,200,000      DESCRIPTION:                                      ‐                  THE WATER REPLACEMENT PROGRAM SETS ASIDE FUNDS TO  ‐                  ASSESS AND REPLACE FAILING WATER PIPES. PRIORITY   ‐                  WILL GO TO REPLACE THE WATER PIPE ASSOCIATED THE   ‐                  ANNUAL STREET CONSTRUCTION. THE REMAINING FUNDS    ‐                  WILL BE USED TO CONDUCT WATER PIPE CONDITION       ‐                  ASSESSMENTS AND REPAIR IDENTIFIED PIPES.           ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NONE                                               ‐                  ADVANTAGES OF APPROVAL:                           ‐                  PROVIDES FOR THE CONSTRUCTION OF NECESSARY WATER   ‐                  SYSTEM MAINTENANCE WORK.                           ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  THE PROJECT RESULTS IN A NET DECREASE IN OVERALL   ‐                  MAINTENANCE COSTS OVER THE LIFE CYCLE OF ALL PIPES‐                  * PROJECT NAME IS INCORRECT ‐ CIP ITEM IS AS       27,000           FOLLOWS:                                           ‐                  REPLACE #2647 ‐ 1998 1/2 TON CHEVY PICKUP          ‐                  DESCRIPTION:                                      ‐                  THIS PROJECT IS TO REPLACE A 1998 CHEVY WITH       ‐                  70,779 MILES. AS OUR CREW GROWS THIS TYPE OF       ‐                  VEHICLE IS USED DAILY IN SUPPORT OF THE DEPT'S     ‐                  MISSION. THIS TRUCK RESPONDS TO ALL TYPES OF       ‐                  CALLS FROM LOCATING TO WITNESSING BORES TO A       ‐                  SUPPORT VEHICLE FOR EXCAVATION JOBS. USING AN      ‐                  OLDER VEHICLE BECOMES MORE UNRELIABLE, BUT IF WE   ‐                  HAD TO, WE COULD HOLD OFF A YEAR.                  ‐                  ALTERNATIVES CONSIDERED:                          ‐                  CONTINUE TO USE OLDER VEHICLE WHICH IS BECOMING    ‐                  UNRELIABLE & COSTLY TO MAINTAIN.                   ‐                  ADVANTAGES OF APPROVAL:                           ‐                  INCREASED RELIABILITY & SAFETY FOR STAFF.          ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  AS THE TRUCK AGES THERE WILL BE UNFORESEEN COSTS   ‐                  WATER PIPE REPLACEMENT PROGRAM ‐ CONSTRUCTION20251,200,000     W04‐25  (FY25)REPLACE #2647 ‐ 1998 1/2 TON CHEVY PICKUP202127,000           W47   51 Project NameYear Description  Amount Total Project #REPLACE #3078 ‐ 2002 1/2 TON CHEVY PICKUP          27,000           DESCRIPTION:                                      ‐                  THIS PROJECT REPLACES A 2002 CHEVY PICKUP WITH     ‐                  85,816 MILES. THIS TRUCK IS USED FOR LEAK          ‐                  DETECTION, LOCATING, AND FIRE HYDRANT FLUSHING,    ‐                  WHICH ARE 3 CRITICAL PROGRAMS FOR OUR DEPARTMENT.  ‐                  THIS TRUCK WILL BE REPLACED WITH A MORE FUEL       ‐                  EFFICIENT VEHICLE.                                 ‐                  ALTERNATIVES CONSIDERED:                          ‐                  CONTINUE TO USE OLDER PIECE OF EQUIPMENT WHICH IS  ‐                  BECOMING UNRELIABLE AND COSTLY TO MAINTAIN.        ‐                  ADVANTAGES OF APPROVAL:                           ‐                  INCREASE RELIABILITY AND SAFETY FOR STAFF.         ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  AS THE TRUCK AGES THERE WILL BE UNFORESEEN COSTS   ‐                  TO MAINTAIN THIS VEHICLE.                          ‐                  WTP FACILITY R & R                                 40,000           DESCRIPTION:                                      ‐                  REPAIR & REPLACEMENT FUND FOR THE WTP. HAVING THIS ‐                  ITEM IN THE BUDGET WILL ALLOW FOR UNEXPECTED &     ‐                  RAPID REPAIR OF EQUIPMENT. IN THE EVENT OF FAILURE ‐                  THIS WILL RESULT IN SHORTER DOWN TIME & NOT DEFER  ‐                  OTHER PLANNED PROJECTS. WITHOUT THIS FUND,         ‐                  MAINTENANCE COULD BE DEFERRED FOR UP TO A YEAR.    ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NOT HAVING THIS FUND WOULD DEFER OTHER NEEDED      ‐                  MAINTENANCE.                                       ‐                  ADVANTAGES OF APPROVAL:                           ‐                  IF SYSTEMS FAIL, THEY NEED TO BE REPAIRED          ‐                  IMMEDIATELY. IF THE FAILURE IS UNEXPECTED, OTHER   ‐                  ITEMS THAT HAVE BEEN BUDGETED FOR WILL NEED TO BE  ‐                  POSTPONED. NOT ALL REPAIRS OR EQUIPMENT FAILURES   ‐                  CAN BE PREDICTED & BUDGETED AS CAPITAL IMPROVEMENT ‐                  PROJECTS.                                          ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  WTP FACILITY REPAIR & REPLACEMENT      202140,000           W56   (FY21)REPLACE #3078 ‐ 2002 1/2 TON CHEVY PICKUP         202227,000           W49   52 Project NameYear Description  Amount Total Project #WTP FACILITY R & R                                 40,000           DESCRIPTION:                                      ‐                  REPAIR & REPLACEMENT FUND FOR THE WTP. HAVING THIS ‐                  ITEM IN THE BUDGET WILL ALLOW FOR UNEXPECTED &     ‐                  RAPID REPAIR OF EQUIPMENT, IN THE EVENT OF FAILURE ‐                  THIS WILL RESULT IN SHORTER DOWN TIME & NOT DEFER  ‐                  OTHER PLANNED PROJECTS. WITHOUT THIS FUND,         ‐                  MAINTENANCE COULD BE DEFERRED FOR UP TO A YEAR.    ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NOT HAVING THIS FUND WOULD DEFER OTHER NEEDED      ‐                  MAINTENANCE.                                       ‐                  ADVANTAGES OF APPROVAL:                           ‐                  IF SYSTEMS FAIL, THEY NEED TO BE REPAIRED          ‐                  IMMEDIATELY. IF THE FAILURE IS UNEXPECTED, OTHER   ‐                  ITEMS THAT HAVE BEEN BUDGETED FOR WILL NEED TO     ‐                  BE POSTPONED. NOT ALL REPAIRS OR EQUIPMENT FAILURE ‐                  CAN BE PREDICTED AND BUDGETED AS CAPITAL           ‐                  IMPROVEMENT PROJECTS.                              ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  NONE                                               ‐                  WTP FACILITY REPAIR & REPLACEMENT      202240,000           W56   (FY22)53 Project NameYear Description  Amount Total Project #WTP FACILITY R & R                                 40,000           DESCRIPTION:                                      ‐                  REPAIR & REPLACEMENT FUND FOR THE WTP. HAVING THIS ‐                  ITEM IN THE BUDGET WILL ALLOW FOR UNEXPECTED &     ‐                  RAPID REPAIR OF EQUIPMENT. IN THE EVENT OF FAILURE ‐                  THIS WILL RESULT IN SHORTER DOWN TIME AND WILL     ‐                  PREVENT DEFERRMENT OF OTHER PROJECTS. WITHOUT THIS ‐                  FUND, MAINTENANCE COULD BE DEFERRED FOR UP TO A    ‐                  YEAR.                                              ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NOT HAVING THIS FUND WOULD DEFER OTHER NEEDED      ‐                  MAINTENANCE.                                       ‐                  ADVANTAGES OF APPROVAL:                           ‐                  IF SYSTEMS FAIL, THEY NEED TO BE REPAIRED          ‐                  IMMEDIATELY. IF THE FAILURE IS UNEXPECTED OTHER    ‐                  ITEMS THAT HAVE BEEN BUDGETED FOR WILL NEED TO BE  ‐                  POSTPONED. NOT ALL REPAIRS OR EQUIPMENT FAILURES   ‐                  CAN BE PREDICTED & BUDGETED AS CAPITAL IMPROVEMENT ‐                  PROJECTS.                                          ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  NONE                                               ‐                  WTP FACILITY REPAIR & REPLACEMENT     202340,000           W56   (FY23)54 Project NameYear Description  Amount Total Project #WTP FACILITY R & R                                 40,000           DESCRIPTION:                                      ‐                  REPAIR & REPLACEMENT FUND FOR THE WTP. HAVING THIS ‐                  ITEM IN THE BUDGET WILL ALLOW FOR UNEXPECTED &     ‐                  RAPID REPAIR OF EQUIPMENT, IN THE EVENT OF FAILURE ‐                  THIS WILL RESULT IN SHORTER DOWN TIME AND NOT      ‐                  DEFER OTHER PLANNED PROJECTS. WITHOUT THIS FUND    ‐                  MAINTENANCE COULD BE DEFERRED FOR UP TO A YEAR.    ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NOT HAVING THIS FUND WOULD DEFER OTHER NEEDED      ‐                  MAINTENANCE.                                       ‐                  ADVANTAGES OF APPROVAL:                           ‐                  IF SYSTEMS FAIL, THEY NEED TO BE REPAIRED          ‐                  IMMEDIATELY. IF THE FAILURE IS UNEXPECTED OTHER    ‐                  ITEMS THAT HAVE BEEN BUDGETED FOR WILL NEED TO     ‐                  BE POSTPONED. NOT ALL REPAIRS OR EQUIPMENT         ‐                  FAILURES CAN BE PREDICTED & BUDGETED AS CAPITAL    ‐                  IMPROVEMENT PROJECTS.                              ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  NONE                                               ‐                  WTP FACILITY REPAIR & REPLACEMENT      202440,000           W56   (FY24)55 Project NameYear Description  Amount Total Project #WTP FACILITY R & R                                 40,000           DESCRIPTION:                                      ‐                  REPAIR & REPLACEMENT FUND FOR THE WTP. HAVING THIS ‐                  ITEM IN THE BUDGET WILL ALLOW FOR UNEXPECTED &     ‐                  RAPID REPAIR OF EQUIPMENT, IN THE EVENT OF FAILURE ‐                  THIS WILL RESULT IN SHORTER DOWN TIME AND NOT      ‐                  DEFER OTHER PLANNED PROJECTS. WITHOUT THIS FUND    ‐                  MAINTENANCE COULD BE DEFERRED FOR UP TO A YEAR.    ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NOT HAVING THIS FUND WOULD DEFER OTHER NEEDED      ‐                  MAINTENANCE.                                       ‐                  ADVANTAGES OF APPROVAL:                           ‐                  IF SYSTEMS FAIL, THEY NEED TO BE REPAIRED          ‐                  IMMEDIATELY. IF THE FAILURE IS UNEXPECTED OTHER    ‐                  ITEMS THAT HAVE BEEN BUDGETED FOR WILL NEED TO     ‐                  BE POSTPONED. NOT ALL REPAIRS OR EQUIPMENT         ‐                  FAILURES CAN BE PREDICTED & BUDGETED AS CAPITAL    ‐                  IMPROVEMENT PROJECTS.                              ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  NONE                                               ‐                  WTP FACILITY REPAIR & REPLACEMENT      202540,000           W56   (FY25)56 Project NameYear Description  Amount Total Project #WTP FACILITY ENGINEERING & OPTIMIZATION            20,000           DESCRIPTION:                                      ‐                  THE LONGER THE WTP IS IN OPERATION, OPERATORS      ‐                  BECOME FAMILIAR WITH THE PROCESSES AND COME UP     ‐                  WITH IDEAS TO OPTIMIZE THE PROCESS. THIS LINE ITEM ‐                  WILL ALLOW FOR ENGINEERING STUDIES ON THE OPERATOR ‐                  IDEAS BEFORE THE EXPENSE OF CHANGING THE PROCESS.  ‐                  IN PARTICULAR, THE PLAN FOR THIS BUDGET ITEM IS TO ‐                  IMPROVE THE PROCESS FROM THE RAW WATER INTAKES TO  ‐                  THE TREATED WATER RESERVOIRS. IT WILL ALLOW        ‐                  STUDIES TO BE CONDUCTED TO MAKE SURE THAT PROPOSED ‐                  OPTIMIZATIONS WILL ACTUALLY IMPROVE THE PROCESS AT ‐                  A REASONABLE EXPENSE. THROUGH THE OPTIMIZATION OF  ‐                  THE PLANT WITH ENGINEERING STUDIES THE PROCESS     ‐                  WILL BE STREAMLINED AND WILL SAVE MONEY IN THE     ‐                  FUTURE.                                            ‐                  ALTERNATIVES CONSIDERED:                          ‐                  PROCEED WITH OPTIMIZATION PROJECTS WITHOUT         ‐                  KNOWING IF THE PROJECT WILL ACTUALLY IMPROVE PLANT ‐                  PERFORMANCE.                                       ‐                  ADVANTAGES OF APPROVAL:                           ‐                  THE ADVANTAGE OF HAVING FUNDS AVAILABLE TO DO      ‐                  ENGINEERING STUDIES BEFORE ANY PROJECT IS STARTED  ‐                  WILL MAKE SURE THAT THE RIGHT EQUIPMENT IS         ‐                  PURCHASED AND THAT IT WILL PERFORM PROPERLY.       ‐                  OPTIMIZATION STUDIES WILL PREDICT ACTUAL COST/     ‐                  BENEFIT OVER TIME TO MAKE SURE THE CITY IS         ‐                  SPENDING ITS MONEY EFFICIENTLY.                    ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  NONE                                               ‐                  INCREASE:                                         10,000           SERVICE COST INCREASE                              ‐                  WTP FACILITY ENGINEERING & OPTIMIZATION     202130,000           W57  (FY21) 57 Project NameYear Description  Amount Total Project #WTP FACILITY ENGINEERING & OPTIMIZATION            20,000           DESCRIPTION:                                      ‐                  THE LONGER THE WTP IS IN OPERATION, OPERATORS      ‐                  BECOME FAMILIAR WITH THE PROCESSES & COME UP WITH  ‐                  IDEAS TO OPTIMIZE THE PROCESS. THIS LINE ITEM WILL ‐                  ALLOW FOR ENGINEERING STUDIES ON THE OPERATOR'S    ‐                  IDEAS BEFORE THE EXPENSE OF CHANGING THE PROCESS.  ‐                  IN PARTICULAR, THE PLAN FOR THIS BUDGET ITEM IS TO ‐                  IMPROVE THE PROCESS FROM THE RAW WATER INTAKES TO  ‐                  THE TREATED WATER RESERVOIRS. IT WILL ALLOW        ‐                  STUDIES TO BE CONDUCTED TO MAKE SURE THAT PROPOSED ‐                  OPTIMIZATIONS WILL ACTUALLY IMPROVE THE PROCESS    ‐                  AT A REASONABLE EXPENSE. THROUGH THE OPTIMIZATION  ‐                  OF THE PLANT WITH ENGINEERING STUDIES THE PROCESS  ‐                  WILL BE STREAMLINED AND WILL SAVE MONEY IN THE     ‐                  FUTURE.                                            ‐                  ALTERNATIVES CONSIDERED:                          ‐                  PROCEED WITH OPTIMIZATION PROJECTS WITHOUT         ‐                  KNOWING IF THE PROJECT WILL ACTUALLY IMPROVE       ‐                  PLANT PERFORMANCE.                                 ‐                  ADVANTAGES OF APPROVAL:                           ‐                  THE ADVANTAGE OF HAVING FUNDS AVAILABLE TO DO      ‐                  ENGINEERING STUDIES BEFORE ANY PROJECT IS          ‐                  STARTED WILL MAKE SURE THAT THE RIGHT EQUIPMENT    ‐                  IS PURCHASED AND THAT IT WILL PERFORM PROPERLY.    ‐                  OPTIMIZATION STUDIES WILL PREDICT ACTUAL COST/     ‐                  BENEFIT OVER TIME TO MAKE SURE THE CITY IS         ‐                  SPENDING ITS MONEY EFFICIENTLY.                    ‐                  ADDITIONAL OPERATING COST:                        ‐                  NONE                                               ‐                  INCREASE:                                         10,000           SERVICE COSTS INCREASE                             ‐                  WTP FACILITY ENGINEERING & OPTIMIZATION     202230,000           W57   (FY22)58 Project NameYear Description  Amount Total Project #WTP FACILITY ENGINEERING & OPTIMIZATION            20,000           DESCRIPTION:                                      ‐                  THE LONGER THE WTP IS IN OPERATION, OPERATORS      ‐                  BECOME FAMILIAR WITH THE PROCESSES AND COME UP     ‐                  WITH IDEAS TO OPTIMIZE THE PROCESS. THIS LINE ITEM ‐                  WILL ALLOW FOR ENGINEERING STUDIES ON THE          ‐                  OPERATOR'S IDEAS BEFORE THE EXPENSE OF CHANGING    ‐                  THE PROCESS. IN PARTICULAR, THE PLAN FOR THIS      ‐                  BUDGET ITEMS IS TO IMPROVE THE PROCESS FROM THE    ‐                  RAW WATER INTAKES TO THE TREATED WATER RESERVOIRS. ‐                  IT WILL ALLOW STUDIES TO BE CONDUCTED TO MAKE      ‐                  SURE THAT PROPOSED OPTIMIZATIONS WILL ACTUALLY     ‐                  IMPROVE THE PROCESS AT A REASONABLE EXPENSE.       ‐                  THROUGH THE OPTIMIZATION OF THE PLANT WITH         ‐                  ENGINEERING STUDIES THE PROCESS WILL BE            ‐                  STREAMLINED & WILL SAVE MONEY IN THE FUTURE.       ‐                  ALTERNATIVES CONSIDERED:                          ‐                  PROCEED WITH OPTIMIZATION PROJECTS WITHOUT         ‐                  KNOWING IF THE PROJECT WILL ACTUALLY IMPROVE PLANT ‐                  PERFORMANCE.                                       ‐                  ADVANTAGES OF APPROVAL:                           ‐                  THE ADVANTAGE OF HAVING FUNDS AVAILABLE TO DO      ‐                  ENGINEERING STUDIES BEFORE ANY PROJECT IS STARTED  ‐                  WILL MAKE SURE THAT THE RIGHT EQUIPMENT IS         ‐                  PURCHASED & THAT IT WILL PERFORM PROPERLY.         ‐                  OPTIMIZATION STUDIES WILL PREDICT ACTUAL COST/     ‐                  BENEFIT OVER TIME TO MAKE SURE THE CITY IS         ‐                  SPENDING ITS MONEY EFFICIENTLY.                    ‐                  ADDITIONAL OPERATING COST:                        ‐                  NONE                                               ‐                  INCREASE:                                         10,000           SERVICE COSTS INCREASE                             ‐                  WTP FACILITY ENGINEERING & OPTIMIZATION     202330,000           W57  (FY23) 59 Project NameYear Description  Amount Total Project #WTP FACILITY ENGINEERING & OPTIMIZATION            30,000           DESCRIPTION:                                      ‐                  THE LONGER THE WTP IS IN OPERATION, OPERATORS      ‐                  BECOME FAMILIAR WITH THE PROCESSES AND COME UP     ‐                  WITH IDEAS TO OPTIMIZE THE PROCESS. THIS LINE      ‐                  ITEM WILL ALLOW FOR ENGINEERING STUDIES ON THE     ‐                  OPERATOR'S IDEAS BEFORE THE EXPENSE OF CHANGING    ‐                  THE PROCESS. IN PARTICULAR, THE PLAN FOR THIS      ‐                  BUDGET ITEM IS TO IMPROVE THE PROCESS FROM THE     ‐                  RAW WATER INTAKES TO THE TREATED WATER RESERVOIRS. ‐                  IT WILL ALLOW STUDIES TO BE CONDUCTED TO MAKE SURE ‐                  THAT PROPOSED OPTIMIZATIONS WILL ACTUALLY IMPROVE  ‐                  THE PROCESS AT A REASONABLE EXPENSE. THROUGH THE   ‐                  OPTIMIZATION OF THE PLANT WITH ENGINEERING STUDIES ‐                  THE PROCESS WILL BE STREAMLINED & WILL SAVE MONEY  ‐                  IN THE FUTURE.                                     ‐                  ALTERNATIVES CONSIDERED:                          ‐                  PROCEED WITH OPTIMIZATION PROJECTS WITHOUT KNOWING ‐                  IF THE PROJECT WILL ACTUALLY IMPROVE PLANT         ‐                  PERFORMANCE.                                       ‐                  ADVANTAGES OF APPROVAL:                           ‐                  THE ADVANTAGE OF HAVING FUNDS AVAILABLE TO DO      ‐                  ENGINEERING STUDIES BEFORE ANY PROJECT IS STARTED  ‐                  WILL MAKE SURE THAT THE RIGHT EQUIPMENT IS         ‐                  PURCHASED & THAT IT WILL PERFORM PROPERLY.         ‐                  OPTIMIZATION STUDIES WILL PREDICT ACTUAL COST/     ‐                  BENEFIT OVER TIME TO MAKE SURE THE CITY IS         ‐                  SPENDING ITS MONEY EFFICIENTLY.                    ‐                  ADDITIONAL OPERATING COST:                        ‐                  NONE                                               ‐                  WTP FACILITY ENGINEERING & OPTIMIZATION     202430,000           W57   (FY24)  60 Project NameYear Description  Amount Total Project #WTP FACILITY ENGINEERING & OPTIMIZATION            30,000           DESCRIPTION:                                      ‐                  THE LONGER THE WTP IS IN OPERATION, OPERATORS      ‐                  BECOME FAMILIAR WITH THE PROCESSES AND COME UP     ‐                  WITH IDEAS TO OPTIMIZE THE PROCESS. THIS LINE      ‐                  ITEM WILL ALLOW FOR ENGINEERING STUDIES ON THE     ‐                  OPERATOR'S IDEAS BEFORE THE EXPENSE OF CHANGING    ‐                  THE PROCESS. IN PARTICULAR, THE PLAN FOR THIS      ‐                  BUDGET ITEM IS TO IMPROVE THE PROCESS FROM THE     ‐                  RAW WATER INTAKES TO THE TREATED WATER RESERVOIRS. ‐                  IT WILL ALLOW STUDIES TO BE CONDUCTED TO MAKE SURE ‐                  THAT PROPOSED OPTIMIZATIONS WILL ACTUALLY IMPROVE  ‐                  THE PROCESS AT A REASONABLE EXPENSE. THROUGH THE   ‐                  OPTIMIZATION OF THE PLANT WITH ENGINEERING STUDIES ‐                  THE PROCESS WILL BE STREAMLINED & WILL SAVE MONEY  ‐                  IN THE FUTURE.                                     ‐                  ALTERNATIVES CONSIDERED:                          ‐                  PROCEED WITH OPTIMIZATION PROJECTS WITHOUT KNOWING ‐                  IF THE PROJECT WILL ACTUALLY IMPROVE PLANT         ‐                  PERFORMANCE.                                       ‐                  ADVANTAGES OF APPROVAL:                           ‐                  THE ADVANTAGE OF HAVING FUNDS AVAILABLE TO DO      ‐                  ENGINEERING STUDIES BEFORE ANY PROJECT IS STARTED  ‐                  WILL MAKE SURE THAT THE RIGHT EQUIPMENT IS         ‐                  PURCHASED & THAT IT WILL PERFORM PROPERLY.         ‐                  OPTIMIZATION STUDIES WILL PREDICT ACTUAL COST/     ‐                  BENEFIT OVER TIME TO MAKE SURE THE CITY IS         ‐                  SPENDING ITS MONEY EFFICIENTLY.                    ‐                  ADDITIONAL OPERATING COST:                        ‐                  NONE                                               ‐                  WTP FACILITY ENGINEERING & OPTIMIZATION     202530,000           W57   (FY25)  61 Project NameYear Description  Amount Total Project #WATER SYSTEM CONDITION ASSESSMENT                  100,000         DESCRIPTION:                                      ‐                  PREPARE & EVALUATE CONDITION ASSESSMENT PLAN &     ‐                  EXECUTE WATER MAIN CONDITION ASSESSMENTS IN HIGH   ‐                  RISK PORTIONS OF THE CITY. THESE ARE MAJOR ASSETS  ‐                  WHOSE FAILURE COULD AFFECT A LARGE POPULATION OF   ‐                  END‐USERS. WORK‐AROUND MAY BE POSSIBLE WITH HEAVY  ‐                  BURDEN ON UTILITY RESOURCES. ADDITIONALLY, THESE   ‐                  STUDIES COULD PRODUCE SUBSTANTIAL & QUANTIFIABLE   ‐                  BENEFITS THAT IMPROVE PROJECT QUALITY, PROCESSES,  ‐                  OR ADOPTION OF BEST INDUSTRY PRACTICES. DEPENDING  ‐                  ON THE RESULTS, THESE STUDIES COULD RESULT IN      ‐                  FOLLOW‐UP R & R.                                   ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NO INSPECTION                                      ‐                  ADVANTAGES OF APPROVAL:                           ‐                  DOING PLANNED CONDITION ASSESSMENT CAN PROVIDE A   ‐                  COST EFFECTIVE MECHANISM OF IDENTIFYING LIKELY     ‐                  ASSET FAILURES & THEREBY OFFERING THE OPPORTUNITY  ‐                  OF REPAIRING THE DEFICIENCY OR THE WHOLE ASSET IF  ‐                  NEEDED PRIOR TO FAILURE. ADDITIONALLY, CA OFTEN    ‐                  CAN IDENTIFY ASSETS IN GOOD WORKING CONDITION, SO  ‐                  ONLY REQUIRED REPAIRS ARE COMPLETED THEREBY        ‐                  SAVING SIGNIFICANT MONEY IN REPLACING ASSETS IN    ‐                  GOOD WORKING ORDER.                                ‐                  ADDITIONAL OPERATING COST:                        ‐                  NONE.                                              ‐                  WATER SYSTEM CONDITION ASSESSMENT      2022100,000         W69 (FY22)   62 Project NameYear Description  Amount Total Project #WATER SYSTEM CONDITION ASSESSMENT                  100,000         DESCRIPTION:                                      ‐                  PREPARE & EVALUATE CONDITION ASSESSMENT PLAN &     ‐                  EXECUTE WATER MAIN CONDITION ASSESSMENTS IN HIGH   ‐                  RISK PORTIONS OF THE CITY. THESE ARE MAJOR ASSETS  ‐                  WHOSE FAILURE COULD AFFECT A LARGE POPULATION OF   ‐                  END‐USERS. WORK‐AROUND MAY BE POSSIBLE WITH HEAVY  ‐                  BURDEN ON UTILITY RESOURCES. ADDITIONALLY, THESE   ‐                  STUDIES COULD PRODUCE SUBSTANTIAL & QUANTIFIABLE   ‐                  BENEFITS THAT IMPROVE PROJECT QUALITY, PROCESSES,  ‐                  OR ADOPTION OF BEST INDUSTRY PRACTICES. DEPENDING  ‐                  ON THE RESULTS, THESE STUDIES COULD RESULT IN      ‐                  FOLLOW‐UP R & R.                                   ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NO INSPECTION                                      ‐                  ADVANTAGES OF APPROVAL:                           ‐                  DOING PLANNED CONDITION ASSESSMENT CAN PROVIDE A   ‐                  COST EFFECTIVE MECHANISM OF IDENTIFYING LIKELY     ‐                  ASSET FAILURES & THEREBY OFFERING THE OPPORTUNITY  ‐                  OF REPAIRING THE DEFICIENCY OR THE WHOLE ASSET IF  ‐                  NEEDED PRIOR TO FAILURE. ADDITIONALLY, CA OFTEN    ‐                  CAN IDENTIFY ASSETS IN GOOD WORKING CONDITION, SO  ‐                  ONLY REQUIRED REPAIRS ARE COMPLETED THEREBY        ‐                  SAVING SIGNIFICANT MONEY IN REPLACING ASSETS IN    ‐                  GOOD WORKING ORDER.                                ‐                  ADDITIONAL OPERATING COST:                        ‐                  NONE.                                              ‐                  WATER SYSTEM CONDITION ASSESSMENT      2024100,000         W69  (FY24)63 Project NameYear Description  Amount Total Project #WATER SYSTEM CONDITION ASSESSMENT                  200,000         DESCRIPTION:                                      ‐                  PREPARE & EVALUATE CONDITION ASSESSMENT PLAN &     ‐                  EXECUTE WATER MAIN CONDITION ASSESSMENTS IN HIGH   ‐                  RISK PORTIONS OF THE CITY. THESE ARE MAJOR ASSETS  ‐                  WHOSE FAILURE COULD AFFECT A LARGE POPULATION OF   ‐                  END‐USERS. WORK‐AROUND MAY BE POSSIBLE WITH HEAVY  ‐                  BURDEN ON UTILITY RESOURCES. ADDITIONALLY, THESE   ‐                  STUDIES COULD PRODUCE SUBSTANTIAL & QUANTIFIABLE   ‐                  BENEFITS THAT IMPROVE PROJECT QUALITY, PROCESSES,  ‐                  OR ADOPTION OF BEST INDUSTRY PRACTICES. DEPENDING  ‐                  ON THE RESULTS, THESE STUDIES COULD RESULT IN      ‐                  FOLLOW‐UP R & R.                                   ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NO INSPECTION                                      ‐                  ADVANTAGES OF APPROVAL:                           ‐                  DOING PLANNED CONDITION ASSESSMENT CAN PROVIDE A   ‐                  COST EFFECTIVE MECHANISM OF IDENTIFYING LIKELY     ‐                  ASSET FAILURES & THEREBY OFFERING THE OPPORTUNITY  ‐                  OF REPAIRING THE DEFICIENCY OR THE WHOLE ASSET IF  ‐                  NEEDED PRIOR TO FAILURE. ADDITIONALLY, CA OFTEN    ‐                  CAN IDENTIFY ASSETS IN GOOD WORKING CONDITION, SO  ‐                  ONLY REQUIRED REPAIRS ARE COMPLETED THEREBY        ‐                  SAVING SIGNIFICANT MONEY IN REPLACING ASSETS IN    ‐                  GOOD WORKING ORDER.                                ‐                  ADDITIONAL OPERATING COST:                        ‐                  NONE.                                              ‐                  WATER SYSTEM CONDITION ASSESSMENT      UNSCHEDULED200,000         W69  (UNSCHEDULED)64 Project NameYear Description  Amount Total Project #PRV PHASE 2 ‐ AUTOMATION & INSTRUMENTATION         6,710,000      UPGRADES                                           ‐                  DESCRIPTION:                                      ‐                  UPGRADE PRESSURE INSTRUMENTATION, AUTOMATE VALVE   ‐                  ACTUATION, AND PROVIDE A LAN CONNECTION & SCADA    ‐                  PROGRAMMING FOR REALTIME MONITORING & REMOTE       ‐                  CONTROL OF PRV SETTINGS. WITHOUT THIS PROJECT,     ‐                  SYSTEM OPERATORS ARE WITHOUT VITAL DATA ON SYSTEM  ‐                  OPERATING CONDITIONS. LIMITED REAL TIME DATA       ‐                  ALLOWS OPERATORS TO ANTICIPATE, DIAGNOSE, OR       ‐                  CORRECT ABNORMAL OPERATING CONDITIONS.             ‐                  STANDARDIZED PRESSURE CONTROL OFFERS IMPROVED      ‐                  PROTECTIONS FROM SURGE CONDITIONS WHICH ARE A      ‐                  LIKELY CAUSE OF PIPE FAILURE. IT WILL ALSO         ‐                  IMPROVE SERVICE LEVELS TO EXISTING CUSTOMERS       ‐                  WHERE PRESSURE TRANSIENTS CAUSE LEAKS IN SPRINKLER ‐                  SYSTEMS OR WITHIN CUSTOMER PREMISES.               ‐                  ALTERNATIVES CONSIDERED:                          ‐                  STATUS QUO OPERATION.                              ‐                  ADVANTAGES OF APPROVAL:                           ‐                  IMPROVE WATER DISTRIBUTION OPERATIONS THROUGH      ‐                  INCREASED UNDERSTANDING OF SYSTEM OPERATING        ‐                  CHARACTERISTICS. IMPROVE RESPONSIVENESS TO         ‐                  DYNAMIC OPERATING CONDITIONS. FACILITATE IMPROVED  ‐                  ACCESS TO EXISTING SITES NOW REQUIRING CONFINED    ‐                  SPACE ENTRY PROCEDURES. STANDARDIZE AND IMPROVE    ‐                  SURGE CONTROL FEATURES THROUGHOUT SYSTEM.          ‐                  ADDITIONAL OPERATING COST:                        ‐                  DEBT SERVICE (IF ANY) TO CONSTRUCT, POWER COSTS,   ‐                  SCADA MAINTENANCE, VAULT MAINTENANCE, INSTRUMENT   ‐                  MAINTENANCE, PROGRAMMING LIBRARIES.                ‐                  PRV PHASE 2 ‐ AUTOMATION & INSTRUMENTATION UPGRADES20246,710,000     W71   65 Project NameYear Description  Amount Total Project #PRV PHASE I ‐ MECHANICAL & STRUCTURAL UPGRADES     1,750,000      DESCRIPTION:                                      ‐                  UPGRADE HATCH/ENTRY, VALVING, PIPING, PRESSURE     ‐                  SETTINGS, SUMP PUMPS AND PROVIDE POWER, WHICH WILL ‐                  PROVIDE OPERATORS WITH A SAFE WORK ENVIRONMENT,    ‐                  AND SETS PRVS AT OPERATING PRESSURES AT PRESSURE   ‐                  ZONE INTERFACES CONSISTENT WITH THE WFPU           ‐                  RECOMMENDATIONS. ADDITIONALLY, IT WILL PROVIDE     ‐                  NECESSARY UPGRADES TO EQUIPMENT, PIPING AND        ‐                  VALVING IN PRV VAULTS TO REDUCE LIKELIHOOD OF      ‐                  FAILURES. STANDARDIZED PRESSURE CONTROLS OFFERS    ‐                  IMPROVED PROTECTIONS FROM SURGE CONDITIONS, WHICH  ‐                  ARE LIKELY CAUSES OF PIPE FAILURE. IT IMPROVES     ‐                  SERVICE LEVELS TO EXISTING CUSTOMERS WHERE         ‐                  PRESSURE TRANSIENTS CAUSE LEAKS IN SPRINKLER       ‐                  SYSTEMS OR WITHIN CUSTOMERS' PREMISES.             ‐                  ALTERNATIVES CONSIDERED:                          ‐                  STATUS QUO OPERATION                               ‐                  ADVANTAGES OF APPROVAL:                           ‐                  IMPROVE WATER DISTRIBUTION OPERATIONS THROUGH      ‐                  INCREASED UNDERSTANDING OF SYSTEM OPERATING        ‐                  CHARACTERISTICS. IMPROVE RESPONSIVENESS TO         ‐                  DYNAMIC OPERATING CONDITIONS. FACILITATE IMPROVED  ‐                  ACCESS TO EXISTING SITES NOW REQUIRING CONFINED    ‐                  SPACE ENTRY PROCEDURES. STANDARDIZE AND IMPROVE    ‐                  SURGE CONTROL FEATURES THROUGHOUT SYSTEM.          ‐                  ADDITIONAL OPERATING COST:                        ‐                  DEBT SERVICE (IF ANY) TO CONSTRUCT, POWER COSTS,   ‐                  SCADA MAINTENANCE, VAULT MAINTENANCE, INSTRUMENT   ‐                  MAINTENANCE, PROGRAMMING LIBRARIES.                ‐                  PRV PHASE I ‐ MECHANICAL & STRUCTURAL UPGRADES   20221,750,000     W72   66 Project NameYear Description  Amount Total Project #HYALITE DAM & RESERVOIR OPTIMIZATION IMPROVEMENTS  4,000,000      DESCRIPTION:                                      ‐                  ARMORING OF THE CONTROL TOWER (TO ENABLE SOME      ‐                  YEAR‐OVER‐YEAR STORAGE CAPACITY) AND CONTROL       ‐                  UPGRADES TO IMPROVE WINTER OPERATION. CURRENT      ‐                  VULNERABILITY OF BOZEMAN TO DROUGHT IS VERY HIGH,  ‐                  DUE TO THE LACK OF SOURCES THAT ARE ROBUST IN      ‐                  DROUGHT (LARGE RAW WATER RESERVOIRS WITH YEAR‐OVER ‐                  ‐YEAR STORAGE CAPACITY, LARGE RIVERS, OR           ‐                  GROUNDWATER). HYALITE RESERVOIR IS CAPABLE OF      ‐                  PROVIDING YEAR‐OVER‐YEAR STORAGE, BUT IS NOT       ‐                  OPERATED IN THAT MANNER DUE TO CONCERNS OF ICE     ‐                  DAMAGE TO THE CONTROL TOWER. THIS INCREASES THE    ‐                  RISK OF  AN EXTREMELY DRY YEAR RESULTING IN      ‐                  THE INABILITY TO FILL THE HYALITE RESERVOIR WITH   ‐                  ENOUGH WATER FOR THE CITY AND IRRIGATION USES.     ‐                  THIS PROJECT COULD POTENTIALLY REMOVE THE 20%      ‐                  SURCHARGE THE CITY PAYS FOR HYALITE RELEASES.      ‐                  ALTERNATIVES CONSIDERED:                          ‐                  CONTINUE TO DEAL WITH CURRENT HYALITE DAM          ‐                  OPERATION.                                         ‐                  ADVANTAGES OF APPROVAL:                           ‐                  DROUGHT MITIGATION, IMPROVED WATER USE AND COST    ‐                  EFFICIENCIES.                                      ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  UNKNOWN                                            ‐                  HYALITE DAM & RESERVOIR OPTIMIZATION IMPROVEMENTS 20234,000,000     W79   67 Project NameYear Description  Amount Total Project #LYMAN TANK & TRANMISSION MAIN         750,000         DESCRIPTION:                                      ‐                  DESIGN WITH CONSTRUCTION IN FY23                   ‐                  CONSTRUCT A NEW 5MG STORAGE TANK AT LYMAN,         ‐                  DECOMMISSIONING EXISTING LYMAN STORAGE TANK,       ‐                  CONDITION ASSESSMENT‐BASED REPAIRS OF THE EXISTING ‐                  LYMAN TANK & TRANSMISSION MAIN DESIGN              ‐                  LYMAN TRANSMISSION MAIN, NEW SUPPLY MAIN TIE IN TO ‐                  NEW STORAGE TANK, NEW TRANSMISSION MAIN TIE IN     ‐                  FROM NEW STORAGE TANK TO EXISTING TRANSMISSION     ‐                  MAIN, NEW CHLORINATION/FLUORIDATION FEED FACILITY. ‐                  DESIGN ONLY NO ADDITIONAL OPERATING COSTS.       ‐                  LYMAN TANK & TRANMISSION MAIN DESIGN  2021750,000         W87   68 Project NameYear Description  Amount Total Project #LYMAN TANK & TRANMISSION MAIN CONSTRUCTION         10,000,000   DESCRIPTION:                                      ‐                  CONSTRUCT A NEW 5MG STORAGE TANK AT LYMAN,         ‐                  DECOMMISSIONING EXISTING LYMAN STORAGE TANK,       ‐                  CONDITION ASSESSMENT‐BASED REPAIRS OF THE EXISTING ‐                  LYMAN TRANSMISSION MAIN, NEW SUPPLY MAIN TIE IN TO ‐                  NEW STORAGE TANK, NEW TRANSMISSION MAIN TIE IN     ‐                  FROM NEW STORAGE TANK TO EXISTING TRANSMISSION     ‐                  MAIN, NEW CHLORINATION/FLUORIDATION FEED FACILITY. ‐                  DECOMMISSION PEAR STREET BOOSTER STATION IF        ‐                  HYDRAULIC GRADE LINE OF TANK RAISED TO MEET        ‐                  SOURDOUGH TANK. THE LYMAN WATER SUPPLY IS A        ‐                  CRITICAL ELEMENT OF THE CITY'S OVERALL WATER       ‐                  SUPPLY PORTFOLIO ACCOUNTING FOR ROUGHLY 20% OF     ‐                  ANNUAL SUPPLY VOLUME TO THE CITY CURRENTLY. THE    ‐                  SOURCE PROVIDES SUPPLY REDUNDANCY & RESILIENCY AS  ‐                  IT IS GEOGRAPHICALLY REMOVED FROM THE SOURDOUGH/   ‐                  HYALITE SOURCE & PROVIDES AN INDEPENDENT           ‐                  CONNECTION TO THE DISTRIBUTION SYSTEM. THE         ‐                  EFFECTIVE AVAILABLE WATER SUPPLY IS INCREASED      ‐                  SINCE THE NEW STORAGE SYSTEM WILL NOT LEAK & WILL  ‐                  EXPAND THE NUMBER OF CUSTOMERS ABLE TO BE SUPPLIED ‐                  BY LYMAN WATER. LIKELIHOOD OF FAILURE OF LYMAN     ‐                  SUPPLY SYSTEM WILL BE DRAMATICALLY REDUCED BY      ‐                  REPLACED STORAGE.   ‐                  ALTERNATIVES CONSIDERED:                          ‐                  STATUS QUO OPERATION OF EXISTING LYMAN SYSTEM.     ‐                  ADVANTAGES OF APPROVAL:                           ‐                  REPLACES LYMAN STORAGE TANK WHICH IS AT THE END OF ‐                  ITS USEFUL LIFE. INCREASES EFFECTIVE AVAILABLE     ‐                  SUPPLY AS EXISTING TANK LEAKS.  ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  ANTICIPATED OPERATING COST REDUCTION RELATED TO    ‐                  PEAR STREET BOOSTER DECOMMISSIONING.               ‐                  LYMAN TANK & TRANMISSION MAIN CONSTRUCTION     202310,000,000   W88   69 Project NameYear Description  Amount Total Project #TOC ANALYZER                                       30,000           DESCRIPTION:                                      ‐                  WE DON'T CURRENTLY HAVE A TOC ANALYZER IN THE LAB. ‐                  IT WILL INCREASE EFFICIENCY BY ANALYZING SAMPLES   ‐                  ON SITE INSTEAD OF SENDING TO A LAB AND WAITING    ‐                  FOR RESULTS. TURN AROUND TIME WILL BE REDUCED      ‐                  SUBSTANTIALLY.                                     ‐                  ALTERNATIVES CONSIDERED:                          ‐                  CONTINUE TO USE OUTSIDE LABS AND WAIT LONG PERIODS ‐                  FOR RESULTS.                                       ‐                  ADVANTAGES OF APPROVAL:                           ‐                  REDUCED LAB COSTS AND WAIT TIME.                   ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  NONE                                               ‐                  3/4 TON FORD 4 WHEEL DRIVE REPLACEMENT             60,000           DESCRIPTION:                                      ‐                  REPLACEMENT OF MAINTENANCE/SNOW PLOW VEHICLE.      ‐                  TRUCK GETS HEAVY USE AND IS CRITICAL TO OPERATIONS ‐                  AND MAINTENANCE OF BOTH THE SOURDOUGH PLANT &      ‐                  LYMAN CREEK. IT IS A 2008 WITH HIGH MILEAGE.       ‐                  ALTERNATIVES CONSIDERED:                          ‐                  RISK OF VEHICLE BREAKDOWN AND INCREASED            ‐                  REPAIR COSTS AS VEHICLE HAS HIGH MILEAGE & IS      ‐                  USED DAILY.                                        ‐                  ADVANTAGES OF APPROVAL:                           ‐                  REDUCED MAINTENANCE COSTS AND DOWN TIME.           ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  NONE                                               ‐                  3/4 TON FORD 4 WHEEL DRIVE REPLACEMENT 202460,000           W93   TOTAL ORGANIC CARBON ANALYZER 202330,000           W90   70 Project NameYear Description  Amount Total Project #REPLACE 1 TON TRUCK 3361                           53,000           DESCRIPTION:                                      ‐                  REPLACEMENT OF 2006 1 TON SERVICE TRUCK WITH       ‐                  55328 MILES                                        ‐                  ALTERNATIVES CONSIDERED:                          ‐                  RENT OR LEASE                                      ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  NONE                                               ‐                  CHANGES FROM LAST CIP:                            ‐                  NONE                                               ‐                  REPLACE 1 TON TRUCK 3402                           53,000           DESCRIPTION                                       ‐                  REPLACE 2008 1 TON TRUCK WITH 57593 MILES          ‐                  ALTERNATIVES CONSIDERED                           ‐                  LEASE OR RENT                                      ‐                  ADDITIONAL OPERATING COSTS                        ‐                  NONE                                               ‐                  CHANGES FROM LAST CIP                             ‐                  NONE                                               ‐                  HYALITE GUARDRAIL                                  70,000           DESCRIPTION:                                      ‐                  THESE ARE MATCHING FUNDS TO THE FOREST SERVICE TO  ‐                  INSTALL GUARDRAIL ON HYALITE ROAD NEAR THE CITY'S  ‐                  WATER INTAKE. THERE WERE MULTIPLE CAR ACCIDENTS    ‐                  IN THIS VICINITY IN 2019 POTENTIALLY CONTAMINATING ‐                  CITY WATER SUPPLY AT THE RAW WATER INTAKE. NEW     ‐                  GUARDRAIL WILL HELP PREVENT VEHICLE ACCIDENTS INTO ‐                  THE CREEK.                                         ‐                  ALTERNATIVES CONSIDERED:                          ‐                  ADD OPERATING COSTS:                              ‐                  CHANGES FROM LAST CIP:                            ‐                  NEW ITEM.                                          ‐                  REPLACEMENT 1 TON TRUCK 202553,000           W98   HYALITE GUARDRAIL EXTENSIONREPLACEMENT 1 TON TRUCK 202453,000           W97   202170,000           W99   71 Project NameYear Description  Amount Total Project #REPLACE #3605 GMC CANYON                           45,000           DESCRIPTION:                                      ‐                  THIS VEHICLE REPLACES #3605 THAT HAS BEEN USED     ‐                  ROUTINELY FOR SAMPLING UNTIL 2018.                 ‐                  IT CURRENTLY HAS OVER 50,000 MILES ON IT.          ‐                  ALTERNATIVES CONSIDERED:                           ‐                  CONTINUE DRIVING #3605 AND RISK BREAK DOWNS &      ‐                  INCREASED MAINTENANCE COSTS                        ‐                  ADVANTAGES TO APPROVAL:                           ‐                  NEW VEHICLE WILL BE MORE RELIABLE & RESULT IN      ‐                  LOWER MAINTENANCE & REPAIR COSTS                   ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  MINIMAL MAINTENANCE COSTS                          ‐                  WTP TANK OUTLET MONITORING                         100,000         DESCRIPTION:                                      ‐                  THE NEED TO MONITOR WATER QUALITY LEAVING THE WTP  ‐                  TANK IS GOING TO BECOME NECESSARY AS THE CITY ADDSREDUNDANT LINES TO TOWN. IN ORDER TO MEET CT      REQUIREMENTS, CHLORINE, PH, AND FLOW WILL HAVE    TO BE MONITORED AT THE OUTLET OF THE TANK.        PUTTING A DOGHOUSE STRUCTURE WITH HEATING, POWER, AND VENTILATION TO HOUSE THE ANALYZER EQUIPMENT   ON THE OUTLET PIPE OF THE WTP TANK WITH TAPS INTO THE PIP WILL ACCOMPLISH THIS.                     ALTERNATIVES CONSIDERED:                          ‐                  NOT BEING ABLE TO USE THE WTP TANK FOR CT VALUE    ‐                  CALCULATION AND RISK BEING OUT OF COMPLIANCE.      ‐                  ADVANTAGES OF APPROVAL:                           ‐                  BEING ABLE TO BETTER TRACK WATER QUALITY AND ADD   ‐                  CONNECTIONS BEFORE THE SOURDOUGH TANK AND AT       ‐                  THE END OF FUTURE PIPES TO TOWN.                   ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  MINIMAL FOR CALIBRATION STANDARDS AND EQUIPMENT    ‐                  REPLACE #3605 GMC CANYON 202445,000           W100   WTP TANK OUTLET MONITOR 2025100,000         W10172 Project NameYear Description  Amount Total Project #REPLACE BACKHOE 1772                               142,054         DESCRIPTION:                                      ‐                  REPLACE  1996 BACKHOE WITH 5007 HOURS              ‐                  ALTERNATIVES CONSIDERED                           NONE                                              ADDITIONAL OPERATING COSTS                        NONE                                              CHANGES FROM LAST CIP                             NONE                                              REPLACE DUMP TRUCK 3157                            132,203         DESCRIPTION:                                      ‐                  REPLACE SINGLE AXLE DUMP TRUCK WITH DOUBLE AXLE    ‐                  EXISTING 2004 DUMP TRUCK WITH 34821 MILES         ALTERNATIVES CONSIDERED                           NONE                                              ADDITIONAL OPERATING COSTS:                       NONE                                              CHANGES FROM LAST CIP                             NONE                                              REPLACE BACKHOE                                    146,316         DESCRIPTION                                       ‐                  REPLACE 2006 CATERPILLAR BACKHOE WITH 2856 HR      ‐                  ALTERNATIVES CONSIDERED                           RENT OR LEASE                                     ADDITIONAL OPERATION COSTS                        NONE                                              CHANGES FROM LAST CIP                             NONE                                              REPLACE BACKHOE 1772 2023142,054         W102REPLACE DUMP TRUCK 3157 2023132,203         W103REPLACE BACKHOE 3293 2024146,316         W10473 Project NameYear Description  Amount Total Project #REPLACE BACKHOE 3419                               150,706         DESCRIPTION                                       ‐                  REPLACE 2008 BACKHOE WITH 3077 HOURS               ‐                  ALTERNATIVES CONSIDERED                           NONE                                              ADDITIONAL OPERATING COSTS                        NONE                                              CHANGES FROM LAST CIP                             NONE                                              SCADA MASTER PLAN                                  75,000           EVALUATE OPTIONS AND DEVELOP RECOMMENDATIONS       ‐                  FOR AREA‐WIDE NETWORK IMPLEMENTATION FOR PLANNED   ‐                  REMOTE WATER INFRASTRUCTURE. DEVELOP SCADA DESIGN, ‐                  EQUIPMENT, AND SCADA TAGGING AND PROGRAMMING       ‐                  STANDARDS. FORMULATE DATA ACCESSIBILITY AND SCADA  ‐                  INTEGRATION WITH OTHER CITY APPLICATIONS.          ‐                  ALTERNATIVES CONSIDERED:                          ‐                  STATUS QUO OPERATION OF LIMITED SCADA WITHIN       ‐                  DISTRIBUTION SYSTEM AND PLANT.                     ‐                  ADD OPERATING COSTS:                              ‐                  UNKNOWN                                            ‐                  CHANGES FROM LAST CIP:                            ‐                  MOVED FROM FY18.                                   ‐                  202275,000           W106REPLACE BACKHOE 3419 2025150,706         W105SCADA MASTER PLAN74 Project NameYear Description  Amount Total Project #METER SOFTWARE SUBSCRIPTION                        36,000           DESCRIPTION:                                      ‐                  SOFTWARE UPGRADES TO PROVIDE FOR FLOW MANAGEMENT   ‐                  ALERTS TO CUSTOMERS & INDIVIDUALIZED WATER USE     ‐                  TO CUSTOMERS AND INDIVIDUALIZED WATER USE          ‐                  ASSESSMENTS. THIS PROJECT IS VITAL TO BOTH WATER   ‐                  CONSERVATION & WATER & SEWER OPERATIONS. A         ‐                  MECHANISM MUST BE ESTABLISHED TO ALERT CUSTOMERS   ‐                  OF LEAKS & INEFFICIENT WATER USAGE IN REAL TIME.   ‐                  DELAYS IN RELAYING THIS INFORMATION ARE COSTLY FOR ‐                  CUSTOMERS & HARM RELATIONS BETWEEN UTILITY &       ‐                  FOR CUSTOMERS AND HARM RELATIONS BETWEEN UTILITY   ‐                  AND CUSTOMERS. THIS PROJECT WILL PROVIDE BEST      ‐                  STANDARDS FOR EMPOWERING CUSTOMERS WITH REAL TIME  ‐                  PRACTICE STANDARDS FOR EMPOWERING CUSTOMERS WITH   ‐                  INFORMATION ABOUT THEIR WATER USAGE.               ‐                  REAL TIME INFORMATION ABOUT THEIR WATER USAGE.     ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NONE                                               ‐                  ADVANTAGES OF APPROVAL:                           ‐                  CATCHES LEAKS VERY EARLY & EDUCATES CUSTOMERS      ‐                  ABOUT INDIVIDUAL WATER USAGE TO REDUCE WATER       ‐                  CONSUMPTION.                                       ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  NONE                                               ‐                  METER SOFTWARE SUBSCRIPTION    202136,000           WC02  (FY21)75 Project NameYear Description  Amount Total Project #METER SOFTWARE SUBSCRIPTION                        36,000           DESCRIPTION:                                      ‐                  SOFTWARE UPGRADES TO PROVIDE FOR FLOW MANAGEMENT   ‐                  ALERTS TO CUSTOMERS & INDIVIDUALIZED WATER USE     ‐                  ASSESSMENTS. THIS PROJECT IS VITAL TO BOTH WATER   ‐                  CONSERVATION & WATER & SEWER OPERATIONS. A         ‐                  MECHANISM MUST BE ESTABLISHED TO ALERT CUSTOMERS   ‐                  OF LEAKS & INEFFICIENT WATER USAGE IN REAL TIME.   ‐                  DELAYS IN RELAYING THIS INFORMATION ARE COSTLY FOR ‐                  CUSTOMERS & HARM RELATIONS BETWEEN UTILITY  &      ‐                  CUSTOMERS. THIS PROJECT WILL PROVIDE BEST PRACTICE ‐                  STANDARDS FOR EMPOWERING CUSTOMERS WITH REAL TIME  ‐                  INFORAMTION ABOUT THEIR WATER USAGE.               ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NONE                                               ‐                  ADVANTAGES OF APPROVAL:                           ‐                  CATCHES LEAKS VERY EARLY & EDUCATES CUSTOMERS      ‐                  ABOUT INDIVIDUAL WATER USAGE TO REDUCE WATER       ‐                  CONSUMPTION.                                       ‐                  ADDITIONAL OPERATING COST:                        ‐                  NONE                                               ‐                  METER SOFTWARE SUBSCRIPTION     202236,000           WC02  (FY22)76 Project NameYear Description  Amount Total Project #METER SOFTWARE SUBSCRIPTION                        36,000           DESCRIPTION:                                      ‐                  SOFTWARE UPGRADES TO PROVIDE FOR FLOW MANAGEMENT   ‐                  ALERTS TO CUSTOMERS & INDIVIDUALIZED WATER USE     ‐                  ASSESSMENTS. THIS PROJECT IS VITAL TO BOTH WATER   ‐                  CONSERVATION & WATER & SEWER OPERATIONS. A         ‐                  MECHANISM MUST BE ESTABLISHED TO ALERT CUSTOMERS   ‐                  OF LEAKS & INEFFICIENT WATER USAGE IN REAL TIME.   ‐                  DELAYS IN RELAYING THIS INFORMATION ARE COSTLY     ‐                  FOR CUSTOMERS & HARM RELATIONS BETWEEN UTILITY &   ‐                  CUSTOMERS. THIS PROJECT WILL PROVIDE BEST          ‐                  PRACTICE STANDARDS FOR EMPOWERING CUSTOMERS WITH   ‐                  REAL TIME INFORMATION ABOUT THEIR WATER USAGE.     ‐                  ALTERNATIVES CONSIDERED:                          ‐                  NONE                                               ‐                  ADVANTAGES OF APPROVAL:                           ‐                  CATCHES LEAKS VERY EARLY & EDUCATES CUSTOMERS      ‐                  ABOUT INDIVIDUAL WATER USAGE TO REDUCE WATER       ‐                  CONSUMPTION.                                       ‐                  ADDITIONAL OPERATING COST:                        ‐                  NONE                                               ‐                  METER SOFTWARE SUBSCRIPTION                        36,000           DESCRIPTION:                                      ‐                  SOFTWARE UPGRADES TO PROVIDE FOR FLOW MGMT ALERTS  ‐                  TO CUSTOMERS AND INDIVIDUALIZED WATER USE          ‐                  ASSESSMENTS. THIS PROJECT IS VITAL FOR BOTH WATER  ‐                  CONSERVATION AND WATER & SEWER OPERATIONS. A       ‐                  MECHANISM MUST BE ESTABLISHED TO ALERT CUSTOMERS   ‐                  OF LEAKS AND INEFFICIENT WATER USAGE IN REAL TIME. ‐                  DELAYS IN RELAYING THIS INFORMATION ARE COSTLY     ‐                  FOR CUSTOMERS AND HARM RELATIONS BETWEEN UTILITY   ‐                  AND CUSTOMERS. THIS PROJECT WILL PROVIDE BEST      ‐                  PRACTICE STANDARDS FOR EMPOWERING CUSTOMERS WITH   ‐                  REAL TIME INFORMATION ABOUT THEIR WATER USAGE.     ‐                  METER SOFTWARE SUBSCRIPTION     202336,000           WC02  (FY23)METER SOFTWARE SUBSCRIPTION     202436,000           WC02  (FY24)77 Project NameYear Description  Amount Total Project #METER SOFTWARE SUBSCRIPTION                        36,000           DESCRIPTION:                                      ‐                  SOFTWARE UPGRADES TO PROVIDE FOR FLOW MGMT ALERTS  ‐                  TO CUSTOMERS AND INDIVIDUALIZED WATER USE          ‐                  ASSESSMENTS. THIS PROJECT IS VITAL FOR BOTH WATER  ‐                  CONSERVATION AND WATER & SEWER OPERATIONS. A       ‐                  MECHANISM MUST BE ESTABLISHED TO ALERT CUSTOMERS   ‐                  OF LEAKS AND INEFFICIENT WATER USAGE IN REAL TIME. ‐                  DELAYS IN RELAYING THIS INFORMATION ARE COSTLY     ‐                  FOR CUSTOMERS AND HARM RELATIONS BETWEEN UTILITY   ‐                  AND CUSTOMERS. THIS PROJECT WILL PROVIDE BEST      ‐                  PRACTICE STANDARDS FOR EMPOWERING CUSTOMERS WITH   ‐                  NOT HAVING THIS FUND WOULD DEFER OTHER NEEDED      ‐                  MAINTENANCE.                                       ‐                  ADVANTAGES OF APPROVAL:                           ‐                  IF SYSTEMS FAIL, THEY NEED TO BE REPAIRED          ‐                  IMMEDIATELY. IF THE FAILURE IS UNEXPECTED, OTHER   ‐                  ITEMS THAT HAVE BEEN BUDGETED FOR WILL NEED TO     ‐                  BE POSTPONED. NOT ALL REPAIRS OR EQUIPMENT FAILURE ‐                  CAN BE PREDICTED AND BUDGETED AS CAPITAL           ‐                  IMPROVEMENT PROJECTS.                              ‐                  ADDITIONAL OPERATING COSTS:                       ‐                  NONE                                               ‐                  WHEELED EXCAVATOR UNSCHEDULED155,000         WWW1METER SOFTWARE SUBSCRIPTION     202536,000           WC02  (FY25)78 Project NameYear Description  Amount Total Project #FACILITY CONDITION INVENTORY                       3,900              DESCRIPTION:                                      ‐                  CONDITION ASSESSMENT FOR ALL CITY‐OWNED FACILITIES ‐                  THIS PROJECTS BUILDS ON PREVIOUS EFFORTS WHILE     ‐                  ESTABLISHING  A RECURRING FIVE YEAR CYCLE BASED ON‐                  INDUSTRY BEST PRACTICE (STRATEGIC PLAN 7.3).       ‐                  FUNDING WILL BE ALLOCATED ACROSS MULTIPLE DIVISION‐                  BASED ON BUILDING SQUARE FOOTAGE.                  ‐                  ALTERNATIVES:                                     ‐                  CONTINUE TO RESPOND TO UNPLANNED MAINTENANCE NEEDS ‐                  ADVANTAGES:                                        ‐                  A COMPREHENSIVE INVENTORY OF ALL BUILDING         ‐                  DEFERRED MAINTENANCE WILL ALLOW FOR A MORE         ‐                  PROACTIVE APPROACH TO PRIORITIZING NEEDED REPAIRS  ‐                  RESULTING IN BETTER RISK MANAGEMENT AND REDUCED   ‐                  LIFECYCLE COSTS.                                   ‐                  ADD OPERATING COSTS:  NONE.                       ‐                  FACILITY CONDITION INVENTORY 20253,900             GF346 79