Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Kristin Donald, Finance Director
SUBJECT: Adopt the Parking Fund Capital Improvement Plan (CIP) for Fiscal
Years 2021-2025.
AGENDA ITEM TYPE: Consent
MEETING DATE: December 2, 2019
RECOMMENDATION: Adopt the Parking Fund Capital Improvement Plan (CIP) for
Fiscal Years 2021-2025.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. The Assistant City
Manager and other city staff met in November to develop the attached Capital Plan for the
equipment and capital needs of the Parking Fund. Similar to recent years past, we are bringing
the various parts of the plan forward as items on the Consent agenda. We will be prepared to
address questions, if they arise, at the public meeting.
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
22
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY21.
Report compiled on: November 11, 2019
Attached: Parking Fund CIP Section
23
PARKING FUND FINANCIAL SUMMARY Financial Summary Current YearFY20 FY21 FY22 FY23 FY24 FY25UnscheduledProjected Beginning Balance Dedicated to CIP 573,373$ 743,113$ 749,591$ 633,535$ 470,996$ 202,149$ Plus: Parking Revenues Dedicated to CIP63,800$ 66,990$ 70,340$ 73,857$ 77,550$ 81,427$ Cash In Lieu of Parking Plus: Parking Revenues Dedicated to Capital 70,940$ 74,487$ 53,604$ 53,604$ 53,604$ 53,604$ Plus: Downtown TIF Interest Contribution 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ Plus: TIF Contribution for parking lot redesign and improv. 280,000$ 170,000$ ‐$ ‐$ ‐$ Less: Carryforward FY19 (45,000)$ Less: Scheduled CIP Costs (adjusted) (210,000)$ (315,000)$ (250,000)$ (300,000)$ (410,000)$ (300)$ ‐$ Projected Year‐End Cash Dedicated to CIP 743,113$ 749,591$ 633,535$ 470,996$ 202,149$ 346,881$ Assumptions Made for Revenue Estimates: Current YearFY20 FY21 FY22 FY23 FY24 FY25Estimated Annual Parking Fund Revenues 1,063,340$ 1,063,340$ 1,116,507$ 1,172,332$ 1,230,949$ 1,292,496$ Estimated Growth in Revenues 0% 5% 5% 5% 5% 5%Total Estimated Revenues 1,063,340$ 1,116,507$ 1,172,332$ 1,230,949$ 1,292,496$ 1,357,121$ Current Revenues Dedicated to CIP % 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% Plus: Increase Dedicated to Capital Improvements % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Total % Dedicated to CIP 6.0% 6.0% 6.0% 6.0% 6.0% 6.0%Total Estimated Revenues Dedicated to Capital 63,800$ 66,990$ 70,340$ 73,857$ 77,550$ 81,427$ ProjectedProjectedCURRENT$(315,000)$(250,000)$(300,000)$(410,000)$(300)$‐FY20 FY21 FY22 FY23 FY24 FY25 UNSCHEDULEDPARKING FUND CAPITAL PROJECTS 24
PARKING FUND PROJECT SUMMARY Project # Project Name FY2021 FY2022 FY2023 FY2024 FY2025 UnscheduledP001WILLSON LOT REDESIGN ‐ ‐ 300,000 ‐ ‐ ‐ P012 ARMORY LOT REDESIGN AND IMPROVEMENTS ‐ 250,000 ‐ ‐ ‐ ‐ P017 ROUSE PARKING LOT RE‐DESIGN AND IMPROVEMENTS 280,000 ‐ ‐ ‐ ‐ ‐ P024BLACK LOT IMPROVEMENTS ‐ ‐ ‐ 410,000 ‐ ‐ P025REPLACEMENT VEHICLE 35,000 GF346FACILITY CONDITION INVENTORY ‐ ‐ ‐ ‐ 300 ‐ FISCAL YEAR TOTALS315,000 250,000 300,000 410,000 300 ‐ 25
PARKING FUND DETAIL BACKGROUND Parking Revenues are unpredictable; a large portion of the funds (roughly 50%) comes from parking enforcement (ticket/fine) revenues. Parking operations do not generate adequate revenues to fund capital replacement or expansion projects. The Parking Fund must rely heavily on the Downtown Tax Increment Finance (TIF) District to support its capital plan. The Downtown TIF is planning to contribute $1,000,000 to Parking Capital between FY19‐FY21. CAPITAL PLAN SUMMARY The Parking plan has the continuing the rotation of parking lot re‐design and resurfacing. $584,593.00 $647,708.63 $788,713.00 $958,379.00 $958,504.00 $787,579.53 $‐ $200,000.00 $400,000.00 $600,000.00 $800,000.00 $1,000,000.00 $1,200,000.002015 2016 2017 2018 2019 Average FY15‐FY19Parking Fund Revenues26
Project Name YearDescription AmountTotal Project #WILLSON LOT REDESIGN 300,000 DESCRIPTION: ‐ IMPROVE THE PARKING LOT LAYOUT, SET‐BACKS, ‐ LANDSCAPING, SIGNAGE, LIGHTING, REQUIRED STORM ‐ WATER TREATMENT INFRASTRUCTURE REQUIREMENTS AND ‐ PARKING KIOSK. ‐ ALTERNATIVES CONSIDERED: ‐ KEEP LOT AS IS ‐ ADVANTAGES OF APPROVAL: ‐ IMPROVED FUNCTIONING OF PARKING LOT ‐ ADD OPERATING COSTS: ‐ MINIMAL ‐ ARMORY LOT REDESIGN AND IMPROVEMENTS 250,000 DESCRIPTION: ‐ THIS PROJECT IS SCHEDULED AFTER THE COMPLETION OF ‐ THE ETHA HOTEL CONSTRUCTION PROJECT. LAYOUT, SET‐ ‐ BACKS, LANDSCAPING, SIGNAGE, LIGHTING, SIDEWALKS, ‐ AND STORM WATER TREATMENT FACILITIES ARE BEING ‐ PLANNED. ‐ ALTERNATIVES CONSIDERED: ‐ KEEP THE LOT AS IS. ‐ ADVANTAGES OF APPROVAL: ‐ BETTER FUNCTIONING AND SAFER PARKING LOT LAYOUT. ‐ WILL REDUCE A SIGNIFICANT AMOUNT OF UNTREATED ‐ STORMWATER RUNOFF. INCREASED REVENUE AND ‐ PARKING ASSET COORDINATION THROUGH THE ‐ IMPLEMENTATION OF PAY KIOSKS. ‐ ADD OPERTING COSTS: ‐ NEW ASPHALT WILL REQUIRE LESS MAINTENANCE, BUT ‐ PLANTINGS AND LANDSCAPING WILL REQUIRE ADDITIONAL ‐ MAINTENANCE. ‐ WILLSON LOT REDESIGN 2023300,000 P001 ARMORY LOT REDESIGN AND IMPROVEMENTS 2022250,000 P012 27
Project Name YearDescription AmountTotal Project #ROUSE PARKING LOT RE‐DESIGN AND IMPROVEMENTS 280,000 DESCRIPTION: ‐ ROUSE LOT IMPROVEMENTS LAYOUT, SET‐BACKS, ‐ LANDSCAPING, SIGNAGE, LIGHTING, SIDEWALKS, AND ‐ STORMWATER TREATMENT FACILITIES. THESE ‐ IMPROVEMENTS ARE SEPARATE FROM ANY CREEK ‐ RESTORATION PROJECT AND WILL ONLY INVOLVE THE ‐ SURFACE LOT. ‐ ALTERNATIVES CONSIDERED: ‐ MAINTAIN CURRENT CONFIGURATION. ‐ ADVANTAGES OF APPROVAL: ‐ BETTER FUNCTIONING AND SAFER PARKING LOT LAYOUT. ‐ INCREASED REVENUE AND PARKING ASSET ‐ COORDINATION THROUGH THE IMPLEMENTATION OF ‐ PAY KIOSKS. ‐ ADD OPERATING COSTS: ‐ NEW ASPHALT WILL REQUIRE LESS MAINTENANCE, BUT ‐ PLANTINGS AND LANDSCAPING WILL REQUIRE ADDITIONAL ‐ MAINTENANCE. ‐ BLACK LOT IMPROVEMENTS 410,000 DESCRIPTION: ‐ IMPROVE THE PARKING LOT LAYOUT, SET‐BACKS, ‐ LANDSCAPING, SIGNAGE, LIGHTING, REQUIRED STORM ‐ WATER TREATMENT INFRASTRUCTURE REQUIREMENTS AND ‐ PARKING KIOSK. ‐ ALTERNATIVES CONSIDERED: ‐ KEEP LOT AS IS ‐ ADVANTAGES OF APPROVAL: ‐ IMPROVED FUNCTIONING OF PARKING LOT ‐ ADD OPERATING COSTS: ‐ MINIMAL ‐ 410,000 P024 BLACK LOT IMPROVEMENTS 2024ROUSE PARKING LOT RE‐DESIGN AND IMPROVEMENTS 2021280,000 P017 28
Project Name YearDescription AmountTotal Project #REPLACEMENT VEHICLE 35,000 DESCRIPTION: ‐ REPLACE VEHICLE WITH AN ALL WHEEL DRIVE HYBRID ‐ TO AID IN EFFICIENCY FOR PARKING OFFICERS TO GET ‐ AROUND TOWN. ‐ ALTERNATIVES CONSIDERED: ‐ LEASE THE VEHICLE OR BUY THE TWO‐WHEEL DRIVE FOR ‐ MINIMAL SAVINGS. ‐ ADD OPERATING COSTS: ‐ MAINTENANCE ‐ FACILITY CONDITION INVENTORY 300 DESCRIPTION: ‐ CONDITION ASSESSMENT FOR ALL CITY‐OWNED FACILITIES ‐ THIS PROJECTS BUILDS ON PREVIOUS EFFORTS WHILE ‐ ESTABLISHING A RECURRING FIVE YEAR CYCLE BASED ON ‐ INDUSTRY BEST PRACTICE (STRATEGIC PLAN 7.3). ‐ FUNDING WILL BE ALLOCATED ACROSS MULTIPLE DIVISION ‐ BASED ON BUILDING SQUARE FOOTAGE. ‐ ALTERNATIVES: ‐ CONTINUE TO RESPOND TO UNPLANNED MAINTENANCE NEEDS ‐ ADVANTAGES: ‐ A COMPREHENSIVE INVENTORY OF ALL BUILDING ‐ DEFERRED MAINTENANCE WILL ALLOW FOR A MORE ‐ PROACTIVE APPROACH TO PRIORITIZING NEEDED REPAIRS ‐ RESULTING IN BETTER RISK MANAGEMENT AND REDUCED ‐ LIFECYCLE COSTS. ‐ ADD OPERATING COSTS: NONE. ‐ REPLACEMENT VEHICLE 202135,000 P025 FACILITY CONDITION INVENTORY 2025300 GF34629