HomeMy WebLinkAbout19- Early Work Amendment 2 to GC-CM Agreement - Langlas & Associates, Inc. - Bozeman Public Safety Center EARLY WORK AMENDMENT(EWA)NO. 2 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Pursuant to Subparagraphs 3.7.1-3.7.3 and 4.12 of the Preconstruction Services Conditions Agreement between Owner and Construction Manager this amendment dated the 15th day of November, 2019, between City of Bozeman ("Owner") and Langlas &Associates, Inc. ("Contractor") for the Bozeman Public Safety Center, hereby establishes authorization to proceed with the Work as set forth below, along with associated Unit Prices. The Construction Manager is hereby authorized to proceed with grubbing onsite asphalt and concrete material outside the footprints of existing/demolished structures, as well as crushing same material, in addition to concrete foundations from demolished structures, for future use as bedding material for the new Work at the Bozeman Public Safety Center. Upon completion of crushing operations, material piles will be surveyed to calculate total volumes for each class of material, then convert to tonnage for the purpose of applying Unit Prices. Agreed upon Unit Prices are as follows: Crushed Concrete from Demolished Foundations $ 8.50 /ton Grubbing Concrete /Asphalt Outside Structures, then Crush $ 12.50 /ton General Conditions $ 725.00 /week Material Quantity Survey for Purpose of Payment At Cost General Liability Insurance _ 0.625% of the above Construction Manger's Fee (3.2%) 3.2% of the above 100% Payment and Performance Bonds 1% of the above CONTRACT TIME Work shall begin on or about December 2"d, 2019 with an anticipated duratioli of approximately three weeks. OWNER: CONTRACTOR: City of Bozeman Langlas & Associates, Inc. 121 N. Rouse Ave. 1019 E. Main St. Suite 101 Bozeman, MT 59715 Bozeman, MT 59715 'l - By: By: Andrea Surratt, i y Manager Steve T. Langlas, Preside EWA#2—Bozeman Public Safety Center Page t