HomeMy WebLinkAboutWater Storage Tank - SourdoughCITY OF BOZEMAN
5.3 MG Water Storage Tank - 2017
Construction Drawings - RECORD DRAWINGS
prepared for:
City of Bozeman, MT
October 2019
prepared by:
Robert Peccia & Associates prepared by: Chris Hayes, PE
drawn by: Kevin Ark
checked by: Gary Swanson, PE
QA/QC approval: Keith Jensen, PE
RPA project number: 14702
HELENA - KALISPELL - BOZEMAN - FORT COLLINS
www.rpa-hln.comAPR 10/15/2019
G-0
VICINITY MAP
AND
PROJECT LOCATIONG-05.3 MG WATER STORAGE TANK - 2017HavreGreat FallsGlendiveMiles CityBillingsButteHelenaMissoulaKalispellPOWDERRIVERDEERLODGESILVERBOWLEWISANDCLARKJUDITHBASINGOLDENVALLEYDANIELSSHERIDANROOSEVELTWIBAUXPRAIRIERICHLANDDAWSONVALLEYGARFIELDROSEBUDPHILLIPSMUSSELSHELLPETROLEUMMC CONECARTERCUSTERYELLOWSTONEBIG HORNFALLONTREASUREHILLTOOLEWHEATLANDFERGUSCASCADEMEAGHERCHOUTEAULIBERTYGLACIERFLATHEADPONDERATETONPOWELLLAKEMISSOULAGRANITESTILLWATERSWEET GRASSGALLATINPARKBEAVERHEADJEFFERSONMADISONBROADWATERRAVALLILINCOLNSANDERSMINERALBLAINECARBONPROJECTSITERPAPrepared For:City of BozemanPrepared By:Robert Peccia & Associates, Inc.825 Custer AvenueHelena, Montana 59601406.447.5000DillonPROJECTLOCATIONDESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
RECORD DRAWINGS
G-1
SHEET INDEX
AND
GENERAL NOTESG-1DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702 SHEET INDEX”””GENERAL NOTES:
G-2
ABBREVIATIONS
AND
LEGENDG-2DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702XX-XAXX-XNOTES:DETAIL AND SECTION CALLOUTDRAWINGIDENTIFICATION SYSTEMLETTERDISCIPLINESTANDARDRPA FORMATABBREVIATIONS
G-3
PROJECT
LEGEND AND
SYMBOLSG-3DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702 DESCRIPTIONSINGLE LINEDOUBLE LINEDESCRIPTIONSINGLE LINEDOUBLE LINEDESCRIPTIONSINGLE LINEDESCRIPTIONSINGLE LINEDOUBLE LINEDOUBLE LINEPROPOSEDEXISTINGDESCRIPTIONPROPOSEDEXISTINGDESCRIPTIONVALVE SYMBOLSPIPE AND FITTING SYMBOLSCIVIL SYMBOLSGENERAL NOTES:
19827361054111213CP414151618171920CP1CP8CP7CP9DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
G-4
TEST PITS
AND CONTROL
POINT MAPG-4#CP#FOXTROTTER LANE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
G-5
CONTROL POINTS
AND COORDINATE
TABLESG-5Point ID Easting NorthingDescription1 1,578,121.250 496,248.89030" DI TEE2 1,578,562.531 496,244.28642" DI 22.5 BEND3 1,578,823.016 496,351.10742" DI 45 BEND4 1,578,981.766 496,497.67342" DI 45 BEND5 1,578,921.361 496,470.37842" DI 45 BEND6 1,578,884.444 496,390.68342" DI 45 BEND7 1,578,548.499 496,251.57742" DI 22.5 BEND8 1,578,136.077 496,255.60530" DI 45 BEND9 1,578,124.147 496,268.55130" DI WYE10 1,579,036.170 496,365.256CENTER OF TANK11 1,578,270.495 496,247.481TANK DRAIN TEE12 1,578,270.142 496,210.003TANK DRAIN MH13 1,578,910.931 496,396.987RING DRAIN MH14 1,578,746.404 496,324.549WEST END DETENTION POND15 1,578,863.993 496,329.039SE END DETENTION POND16 1,578,861.616 496,381.773NE END DETENTION POND17 1,578,727.472 496,311.926AIR/VAC RELIEF VAULT - INLET18 1,578,722.671 496,323.697AIR/VAC RELIEF VAULT - OUTLET19 1,579,018.905 496,267.39742" 90 DEG BEND - INLET20 1,579,062.296 496,455.49342" 90 DEG BEND - OUTLETDROP INLET MANHOLE TABLESTRUCTURE NAME:DETAILS:PIPES OUTPIPES IN:PIPE ANGLE IN:DI-130"RIM = 5202.90SUMP = 5197.58" INV OUT =5198.50 3" INV IN =5201.64 70°DI-230"RIM = 5202.90SUMP = 5197.08" INV OUT =5198.058" INV IN =5198.153" INV IN =5201.643" INV IN =5201.17140°70°125°DI-330"RIM = 5202.90SUMP = 5196.68" INV OUT =5197.608" INV IN =5197.703" INV IN =5201.643" INV IN =5201.17140°70°125°DI-430"RIM = 5202.93SUMP = 5196.28" INV OUT =5197.158" INV IN =5197.253" INV IN =5201.643" INV IN =5201.17140°70°125°DI-530"RIM = 5203.91SUMP = 5196.28" INV OUT =5197.158" INV IN =5197.253" INV IN =5201.103" INV IN =5201.64140°127°70°DI-730"RIM = 5202.90SUMP = 5196.68" INV OUT =5197.608" INV IN =5197.703" INV IN =5201.103" INV IN =5201.64140°127°70°DI-830"RIM = 5202.90SUMP = 5197.08" INV OUT =5198.058" INV IN =5198.153" INV IN =5201.103" INV IN =5201.64140°127°70°DI-930"RIM = 5202.80SUMP = 5197.58" INV OUT =5198.503" INV IN =5201.643" INV IN =5201.1070°127°MH-630"RIM = 5202.98SUMP = 5195.712" INV OUT =5196.708" INV IN =5196.808" INV IN =5196.803" INV IN =5201.103" INV IN =5201.643" INV IN =5201.17137°277°150°207°262°INV ELEV = 5179.77INV ELEV = 5181.28INV ELEV = 5180.16INV ELEV = 5178.94INV ELEV = 5179.50INV ELEV = 5179.98INV ELEV = 5181.24INV ELEV = 5180.02INV ELEV = 5179.59TOP OF FLOOR ELEV = 5183.58INV ELEV = 5180.82INV IN ELEV = 5180.72RIM ELEV = 5202.93RIM ELEV = 5199.17RIM ELEV = 5198.94INV ELEV = 5173.41INV ELEV = 5173.36Elevations
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-0-HAUL-ROAD
CIVIL
SITE
PLANC-0PR
I
V
ATE
PROPER
TY
CITY
PROPER
TY
FOXTROTTER LANEPRIVATE ROAD
NO ACCESSPRIVATE PROPERTY
PRI
V
ATE
PROPER
TY
SKYRIDGE DRIVECONSTRUCTION NOTES:
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-1
TANK
SITE
PLANC-1CONSTRUCTION NOTES:FOXTROTTER LANE - PRIVATE ROAD NO ACCESSPRIVATE PROPERTY
CI
TY
PROPERTYTANK SITE PLAN
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-2
TANK
EXCAVATION
PLANC-2TANK EXCAVATION PLANFOXTROTTER LANE - PRIVATE ROAD NO ACCESS5.3 MG TANK
GG GDESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-3
TANK SITE
FINAL
GRADING PLANC-3FOXTROTTER LANE - PRIVATE ROAD NO ACCESSTANK SITE FINAL GRADING PLAN PRIVATE PROPERTY
IRR
IGAT
ION
D
ITCH CONSTRUCTION NOTES:
BERM DETAILTANK FINAL GRADING SECTION C-4
TANK FINAL
GRADING
CROSS SECTIONSC-4DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702DITCH DETAILTANK FINAL GRADING SECTION CONSTRUCTION NOTES:TANK OVERFLOW DETAIL
INLET TANK CONNECTION C-5a
INLET/OUTLET
TANK CONNECTIONSC-5DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702OUTLET TANK CONNECTION
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-6
TANK SITE
DRAINAGE PLAN
AND DETAILSC-6TANK SITE DRAINAGE PLANTANK STORM WATER DROP INLETSECTIONFOXTROTTER LANE - PRIVATE ROAD NO ACCESSCONSTRUCTION NOTES:LEGEND:
GGGGGGDI-7
STA:5+03.39
RIM:5202.90
PVC Pipe INV IN:5197.70
PVC Pipe INV IN:5201.10
PVC Pipe INV IN:5201.64
PVC Pipe INV OUT:5197.60
DI-1STA:0+00.00RIM:5202.90PVC Pipe INV IN:5201.64PVC Pipe INV OUT:5198.50DI-2STA:0+83.90RIM:5202.90PVC Pipe INV IN:5198.15PVC Pipe INV IN:5201.64PVC Pipe INV IN:5201.17PVC Pipe INV OUT:5198.05DI-3STA:1+67.80RIM:5202.90PVC Pipe INV IN:5197.70PVC Pipe INV IN:5201.64PVC Pipe INV IN:5201.17PVC Pipe INV OUT:5197.60
DI-4
STA:2+51.70
RIM:5202.93
PVC Pipe INV IN:5197.25
PVC Pipe INV IN:5201.64
PVC Pipe INV IN:5201.17
PVC Pipe INV OUT:5197.15
MH-6
STA:3+35.60
RIM:5202.98PVC Pipe INV IN:5196.80
PVC Pipe INV IN:5196.80
PVC Pipe INV IN:5201.10
PVC Pipe INV IN:5201.64
PVC Pipe INV IN:5201.17
PVC Pipe INV OUT:5196.70
DI-5
STA:4+19.50
RIM:5203.91
PVC Pipe INV IN:5197.25
PVC Pipe INV IN:5201.10
PVC Pipe INV IN:5201.64
PVC Pipe INV OUT:5197.15
DI-8
STA:5+87.29
RIM:5202.90PVC Pipe INV IN:5198.15
PVC Pipe INV IN:5201.10
PVC Pipe INV IN:5201.64
PVC Pipe INV OUT:5198.05
DI-9
STA:6+71.19
RIM:5202.80
PVC Pipe INV IN:5201.64
PVC Pipe INV IN:5201.10
PVC Pipe INV OUT:5198.50
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-7
DRAINAGE PIPE
PLAN AND PROFILEC-7STORM DRAINAGE PIPE PLAN AND PROFILE FOXTROTTER LANE - PRIVATE ROAD NO ACCESSPRIVATE PROP
ER
TY
DI-9DI-1DI-2DI-3DI-4MH-6DI-5DI-7DI-8CONSTRUCTION NOTES:CITY PROPERTY
GGGGGGGDESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-8
ACCESS ROAD
PLAN AND PROFILEC-8ACCESS ROAD PLAN AND PROFILE FOXTROTTER LANE - PRIVATE ROADCONSTRUCTION NOTES:
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-9
ACCESS ROAD
CROSS SECTIONSC-9
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-10
TANK SITE
FENCING PLANC-10CHAIN LINK FENCE TANK SITE FENCING PLAN FOXTROTTER LANE - PRIVATE ROAD NO ACCESS
GGGGGGGGGG G G GG30 DI18 DI18 VC 18 VC 18 VC
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-11a
TANK OUTLET
PIPING
PLAN AND PROFILEC-11TANK OUTLET PIPING PLAN AND PROFILE CONSTRUCTION NOTES:
GGGGGGGGGGGG G GGG30 DI18 DI18 VC 18 VC
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-12a
TANK INLET
PIPING
PLAN AND PROFILEC-12TANK INLET PIPING PLAN AND PROFILE CONSTRUCTION NOTES:
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-13
CIVIL DETAILSC-13TIE-IN CONNECTION CONSTRUCTION NOTES:DRAIN PIPE DETAIL SECTION
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-14
GENERAL DETAILSC-14BURIED FITTING CORROSION PROTECTIONNOTES:UTILITY MARKEREQUIVALENT LENGTH TABLE PIPE RESTRAINT LENGTH "L" (FEET) TABLEPIPE SIZE(IN)MAXIMUMPRESSURE(PSI)WALLTHICKNESSTEE, VALVE, OR DEAD END90DEGREEBEND45DEGREEBEND22.5DEGREEBEND11.25DEGREEBEND6 150 CLASS 51 2020 20 20 2012150 CLASS 51 4020 20 20 2030 150 CLASS 51 8040 20 20 2042150 CLASS 51 120 60 40 20 2048 150 CLASS 51 140 80 40 20 20MEGA-LUG OR APPROVED EQUAL JOINT RESTRAINTS MAY BE USED IN LIEU OF CONCRETE THRUST BLOCK,CONCRETE THRUST BLOCKS SHOWN ARE REQUIRED IN ADDITION TO RESTRAINT JOINT SYSTEMS.EBAA RESTRAINT LENGTH CALCULATOR v7.1.2 WAS USED FOR THESE CALCULATIONS.ASSUMED "CL" SOIL TYPE, SAFETY FACTOR 1.5, 4' BURY, TRENCH TYPE 5.CALCULATIONS WILL HAVE TO BE UPDATED BY THE CONTRACTOR AND SUBMITTED TO THE ENGINEER FORREVIEW IF THERE IS ANY DEVIATION OF MANUFACTURER PIPING TYPE, SOIL TYPE, OR PRESSURE CHANGESINSTALL RESTRAINTS PER MANUFACTURER'S RECOMMENDATIONS.NOTES:AIR/VAC RELIEF VAULT
GGGGGGGGSymbolPlant Name (Scientific)Size @PLantingMatureSizeQtyKEYLetterSymbolDouglas Fir (Pseudotsuga menziesii) Common Chokecherry (Prunus virginiana)60-80'8-10'Cottonless Cottonwood (Populus 'Brooks'Lodgepole Pine (Pinus contorta v. latifolia)16F20-25'1-1.5"11C40-60'1.5-2"17B60-80'8-10'10PFFFFFFFFFFFFFFFFCCCCCCCCCCCBBBBBBBBBBBBBBBBBPPPPPPPPPPDESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-15
LANDSCAPING
PLANC-15FOXTROTTER LANE - PRIVATE ROAD NO ACCESSLANDSCAPING PLAN PRIVATE PROP
ERTY
I
R
R
IGA
T
ION
D
I
TCH
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-16
LANDSCAPING
DETAILSC-16QUICK-COUPLING VALVETREE BUBBLER ASSEMBLY REMOTE CONTROL VALVE EVERGREEN TREE PLANTING DETAIL DECIDUOUS TREE PLANTING DETAIL
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-17
GENERAL DETAILSC-17DEEP VALVE BOX NEAR TANKNOTES:SECTIONTRENCH PLUG NOTES:PIPE SUPPORT ANCHOR & STRAP SIZECONCRETE PIPE SUPPORT DETAIL NOTES:
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
C-18a
GENERAL
DETAILSC-18FLOW METER VAULT CONSTRUCTION NOTES:WATER TREATMENT PLANT BUILDINGPLAN VIEWSECTIONSECTION
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
M-1
TANK SECTION
AND MISCELLANEOUS
DETAILSM-1TANK SECTIONRING DRAIN DETAILULTRASONIC LEVEL SENSOR MOUNTING
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
M-2
INTERIOR LADDER
AND ROOF HATCH
DETAILSM-2ELEVATION OF INTERIOR LADDERINTERIOR LADDER AND ROOF HATCHSECTIONS SECTION SECTION SECTION DETAIL DETAIL DETAIL
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
M-3
TANK
INLET/OUTLET
DETAILSM-3INLET/OUTLET SILT STOPSECTIONRING DRAIN PIPING DETAILSECTION CONSTRUCTION NOTES:3'-0" SQ ROOF HATCH SECTION SECTION NOT USED
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
M-4
ROOF VENT
AND DOWNSPOUT
DETAILSM-4ROOF VENT DETAIL DOWNSPOUT DETAILS DRAIN BOX DETAIL
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
M-5
PIPE
CONNECTION
DETAILSM-5PIPE FLOOR PENETRATION DETAIL PIPE FLOOR PENETRATION PIPE BLOCK TO FLOOR WATERSTOP DETAIL PIPE BLOCK SECTION
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
S-0
TANK ROOF AND
FLOOR PLANS AND
GENERAL NOTESS-0TANK FLOOR PLAN TANK ROOF PLAN
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
S-1
WALL AND
WALL FOOTING
DETAILSS-1RADIAL SECTION OF WALL AND WALL FOOTING ELEVATION OF WALL AND WALL FOOTINGHORIZONTAL SECTION OF VERTICAL WALL JOINTELEVATION OF VERTICAL WALL JOINT
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
S-2
TANK BAFFLE
DETAILSS-2ELEVATION OF MEMBRANE SUSPENSION ASSEMBLY SECTION NOT INSTALLED
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
E-0
ELECTRICAL
SITE
PLANE-0CONSTRUCTION NOTES:FOXTROTTER LANEPRIVA
T
E
PROPERTYCITY
PROPER
T
YELECTRICAL SITE PLAN
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
FILESHEETPROJECT TITLESHEET TITLE APPR. DATEREVISIONSYMBY
OF5.3 MG Water Storage
Tank - 2017
Bozeman, Montana RPACopyright ãRobert Peccia& Associates 2019C. HAYES, PE
G. LESOFSKI
G. SWANSON, PE
OCTOBER 2019
14702
E-1
ELECTRICAL
DETAILSE-1MINI POWER ZONE INFORMATIONAL PHOTO SUBPANEL TTANK SITE PANEL