Loading...
HomeMy WebLinkAbout07 RNG Building ELEVATIONS 09-10-2019MAIN LEVEL 100' -0"T.O. WALL 111' -0"MECH MEZZ LEVEL 110' -0"T.O. FOOTING 95' -11 3/4" 1 A4 . 3 WOOD HORIZONTAL SIDINGFIBER CEMENT PANEL STL. TRIM ASPHALT SHINGLES ST O R E F R O N T G L A Z I N G (T E M P E R E R D ) A N D E N T R Y DO O R - C O L O R : G R E E N ME T A L " B O X " T R I M ST L . P A N E L ST L . PA N E L WO O D V E R T I C A L S I D I N G OF F S E T V E R T I C A L WO O D S I D I N G AS P H A L T SH I N G L E S 2 A4 . 1 2 A4 . 2 335 sf GLAZING FI B E R C E M E N T L A P SI D I N G @ M E C H A N I C A L SC R E E N 4 " / 1 2 " 5 " / 1 2 " T O P O F R O O F 2 3 ' - 9 " WOOD HORIZONTAL SIDING LI G H T F I X T U R E B UN D E R S I D E O F S O F F I T 1 A4 . 2 1 2 3 4 5 M0 6 M0 5 M0 4 M0 3 M0 2 M0 1 M2 5 M2 4 M2 3 M2 3 A M2 4 A M2 5 A M22 4 A5 . 0 T.O. WALL COMMONS 110' -0" 3 A4 . 3 MA I N L E V E L 10 0 ' - 0" T. O . W A L L 11 1 ' - 0" ME C H M E Z Z L E V E L 11 0 ' - 0" T. O . F O O T I N G 95 ' - 11 3 / 4 " WO O D S I D I N G FIB E R G L A S S W I N D O W S W I T H S T L . S U R R O U N D . OF F S E T W O O D S I D I N G W I T H M E T A I L D R I P T R I M D E T A I L . PA R A P E T W A L L B E Y O N D ME T A L A W N I N G 4' - 1 0 1 / 4 " 1 1 ' - 2 " FIB E R -CE M E N T P A N E L S I D I N G 5 " / 1 2 " LIG H T F I X T U R E A LIG H T F I X T U R E A 2 A4 . 3 Le v e l 1 8 11 6 ' - 0 1 / 2 " 1 A4 . 1 A B C D M0 8 M0 8 T M1 0 M0 9 M0 7 T. O . W A L L C O M M O N S 11 0 ' - 0" WA L L A R E A = 8 2 8 S F WIN D O W A R E A = 8 1 S F OP E N I N G P E R C E N T A G E = 9 . 7 8 % < 1 0 % A S P E R T A B L E 7 0 5 . 8 , I B C 2 0 1 2 ROOFING: 30 YEAR ASPHALT SHINGLES -MIDNIGHT BLACK EXTERIOR SIDING: PREFINISHED WOOD SIDING:AQUAPINE "WHITE" SIDING PREFINISHED PANEL SIDING:PAINTED DARK GREY PANEL SIDING WITH METAL TRIMS WINDOWS:FIBERGLASS WINDOWS -BLACK COLOR TRIM: METAL "BOX" STEEL BLACK TRIMS STAINED WOOD AT OTHER AREAS SHOWN EX T E R I O R F I N I S H E S LAP SIDING: WHITE 5" EXPOSURE GUTTERS : K STYLE, PRE PAINTED FINISH LIGHTING: WALL MOUNTED LIGHT FIXTURE COLOR: BLACK DRAWING NUMBER:PHASE:DATE:DRAWING TITLE:PROJECT NUMBER:DRAWN BY / CHECKED BY:REVISIONS: 0 " 1 " 2 " 9 / 1 0 / 2 0 1 9 2 : 4 4 : 1 3 P M A3.1ELEVATIONS19-03RISE &GRIND 75%09.10.19CCR---75% CD1958 STADIUM VIEW DR | BOZEMAN MT NO. DESCRIPTION DATE 1 Revision 1 Date 1 1/ 4 " = 1 ' - 0 " NO R T H 1 1/ 4 " = 1 ' - 0 " EA S T 2