HomeMy WebLinkAbout05 RNG Building SITE PLAN ARCH 07-08-2019(73_4") 175 - 21
5
161_8"
235_8"
P
L
A
N
VI
E
W
G
X
D
P
-
3
0
0
S
H
O
R
T
L
E
G
D
X
G
N
P
1
0
11
Length of baseplate
CHAIR SWIVELCENTER POINT FRONT MT.PIVOT POINT
Mounting hole forbolting chair to floor
A-dec 411 Chair
Back Link ArmInsertation Point
Back of Baseplate&TrackLight Insertation PointCeiling Monitor MountPositioning Point(see Monitor Mnt table)
Ceiling Monitor MountPositioning Point(see Monitor Mnt table)
Ceiling Monitor Mount/Ceiling Mount LightPositioning Point (see Monitor Mnt table)
Ceiling Monitor Mount/Ceiling Mount LightPositioning Point (see Monitor Mnt table)
BACK EDGE OF BASEPLATE LC
30°Swivel Rotation
30°Swivel Rotation
16 7/8" [429mm]
4 1/8" [105mm]7" [179mm]9 1/2" [243mm]ELECTRICALWATER/AIR
17_8" [4 9mm]27_8" [7 3mm]
27_8" [7 3mm]11_4" [3 3mm]
VACCUUM/DRAIN
UM BILICAL ENTRANCE
FRONT OF BASEPLATE06/13
.625 O.D. (16mm) TubingFor Central Vacum Only(see general notes)
1.5" (38mm) Nominal Pipe ForGravity Drain(when Required)
C L12/ 03 AIR
ELECTRICAL
DRAIN
VACUUM
WATER
Length of baseplate
CHAIR SWIVELCENTER POINT FRONT MT.PIVOT POINT
Mounting hole forbolting chair to floor
A-dec 411 Chair
Back Link ArmInsertation Point
Back of Baseplate&TrackLight Insertation PointCeiling Monitor MountPositioning Point(see Monitor Mnt table)Ceiling Monitor MountPositioning Point(see Monitor Mnt table)
Ceiling Monitor Mount/Ceiling Mount LightPositioning Point (see Monitor Mnt table)
Ceiling Monitor Mount/Ceiling Mount LightPositioning Point (see Monitor Mnt table)
BACK EDGE OF BASEPLATE LC30°Swivel Rotation
30°Swivel Rotation
16 7/8" [429mm]
4 1/8" [105mm]7" [179mm]9 1/2" [243mm]ELECTRICALWATER/AIR
17_8" [4 9mm]27_8" [7 3mm]
27_8" [7 3mm]11_4" [3 3mm]
VACCUUM/DRAIN
UM BILICAL ENTRANCE
FRONT OF BASEPLATE06/13
.625 O.D. (16mm) TubingFor Central Vacum Only(see general notes)
1.5" (38mm) Nominal Pipe ForGravity Drain(when Required)
CL12/ 03 AIR
ELECTRICAL
DRAIN
VACUUM
WATER
Length of baseplate
CHAIR SWIVELCENTER POINT
FRONT MT.PIVOT POINTMounting hole forbolting chair to floor
A-dec 411 Chair
Back Link ArmInsertation Point Back of Baseplate
&TrackLight Insertation Point
Ceiling Monitor Mount
Positioning Point(see Monitor Mnt table)
Ceiling Monitor MountPositioning Point
(see Monitor Mnt table)Ceiling Monitor Mount/Ceiling Mount Light
Positioning Point (see Monitor Mnt table)
Ceiling Monitor Mount/Ceiling Mount Light
Positioning Point (see Monitor Mnt table)
BACK EDGE OF BASEPLATE
LC
30°Swivel Rotation
30°Swivel Rotation
16 7/8" [429mm]4 1/8" [105mm]7" [179mm]9 1/2" [243mm]ELECTRICALWATER/AIR
17_8" [49mm]
27_8" [73mm]
27_8" [73mm]11_4" [33mm]
VACCUUM/DRAIN
UMBILICAL ENTRANCE FRONT OF BASEPLATE
06/13
.625 O.D. (16mm) TubingFor Central Vacum Only(see general notes)
1.5" (38mm) Nominal Pipe ForGravity Drain(when Required)
CL
12/03
AIRELECTRICAL
DRAIN
VACUUM
WATER
Length of baseplate
CHAIR SWIVELCENTER POINTFRONT MT.PIVOT POINT
Mounting hole forbolting chair to floor
A-dec 411 Chair
Back Link ArmInsertation Point
Back of Baseplate&TrackLight Insertation Point Ceiling Monitor MountPositioning Point(see Monitor Mnt table)
Ceiling Monitor MountPositioning Point(see Monitor Mnt table)
Ceiling Monitor Mount/Ceiling Mount LightPositioning Point (see Monitor Mnt table)
Ceiling Monitor Mount/Ceiling Mount LightPositioning Point (see Monitor Mnt table)
BACK EDGE OF BASEPLATELC
30°Swivel Rotation
30°Swivel Rotation
16 7/8" [429mm]
4 1/8" [105mm]7" [179mm]9 1/2" [243mm]ELECTRICALWATER/AIR
17_8" [49mm]27_8" [73mm]
27_8" [73mm]11_4" [33mm]
VACCUUM/DRAIN
UMBILICAL ENTRANCE
FRONT OF BASEPLATE 06/13
.625 O.D. (16mm) TubingFor Central Vacum Only(see general notes)
1.5" (38mm) Nominal Pipe ForGravity Drain(when Required)
CL 12/03AIR
ELECTRICAL
DRAIN
VACUUM
WATER
Length of baseplate
CHAIR SWIVEL
CENTER POINT
FRONT MT.
PIVOT POINT
Mounting hole for
bolting chair to floor
A-dec 411 Chair
Back Link Arm
Insertation Point
Back of Baseplate
&TrackLight Insertation Point
Ceiling Monitor Mount
Positioning Point
(see Monitor Mnt table)
Ceiling Monitor Mount
Positioning Point
(see Monitor Mnt table)
Ceiling Monitor Mount/Ceiling Mount Light
Positioning Point (see Monitor Mnt table)
Ceiling Monitor Mount/Ceiling Mount Light
Positioning Point (see Monitor Mnt table)
BACK EDGE OF BASEPLATE
LC
30°
Swivel Rotation
30°
Swivel Rotation
16 7/8" [429mm]
4 1/8" [105mm]7" [179mm]
9 1/2" [243mm]ELECTRICALWATER/AIR
17_8" [49mm]
27_8" [73mm]27_8" [73mm]11_4" [33mm]
VACCUUM/DRAIN
UMBILICAL ENTRANCEFRONT OF BASEPLATE
06/13
.625 O.D. (16mm) Tubing
For Central Vacum Only
(see general notes)
1.5" (38mm) Nominal Pipe For
Gravity Drain(when Required)
CL
12/03
AIR
ELECTRICAL
DRAIN VACUUMWATER
Length of baseplate
CHAIR SWIVEL
CENTER POINT
FRONT MT.
PIVOT POINT
Mounting hole for
bolting chair to floor
A-dec 411 Chair
Back Link Arm
Insertation PointBack of Baseplate
&TrackLight Insertation Point
Ceiling Monitor Mount
Positioning Point
(see Monitor Mnt table)
Ceiling Monitor Mount
Positioning Point
(see Monitor Mnt table)
Ceiling Monitor Mount/Ceiling Mount Light
Positioning Point (see Monitor Mnt table)
Ceiling Monitor Mount/Ceiling Mount Light
Positioning Point (see Monitor Mnt table)
BACK EDGE OF BASEPLATE
LC
30°Swivel Rotation30°Swivel Rotation
16 7/8" [429mm]
4 1/8" [105mm]7" [179mm]
9 1/2" [243mm]
ELECTRICAL
WATER/
AIR
17_8" [49mm]
27_8" [73mm]27_8" [73mm]11_4" [33mm]
VACCUUM/DRAIN
UMBILICAL ENTRANCEFRONT OF BASEPLATE
06/13
.625 O.D. (16mm) TubingFor Central Vacum Only(see general notes)
1.5" (38mm) Nominal Pipe For
Gravity Drain(when Required)
CL
12/03
AIR
ELECTRICALDRAINVACUUMWATERLength of baseplate
CHAIR SWIVEL
CENTER POINT
FRONT MT.PIVOT POINT
Mounting hole for
bolting chair to floor
A-dec 411 Chair
Back Link Arm
Insertation Point
Back of Baseplate
&TrackLight Insertation Point
Ceiling Monitor MountPositioning Point
(see Monitor Mnt table)
Ceiling Monitor Mount
Positioning Point
(see Monitor Mnt table)
Ceiling Monitor Mount/Ceiling Mount Light
Positioning Point (see Monitor Mnt table)
Ceiling Monitor Mount/Ceiling Mount Light
Positioning Point (see Monitor Mnt table)
BACK EDGE OF BASEPLATE
LC
30°Swivel Rotation30°Swivel Rotation
16 7/8" [429mm]
4 1/8" [105mm]7" [179mm]9 1/2" [243mm]ELECTRICALWATER/AIR
17_8" [49mm]
27_8" [73mm]
27_8" [73mm]11_4" [33mm]VACCUUM/DRAIN
UMBILICAL ENTRANCEFRONT OF BASEPLATE
06/13
.625 O.D. (16mm) TubingFor Central Vacum Only(see general notes)1.5" (38mm) Nominal Pipe For
Gravity Drain(when Required)
CL
12/03
AIR
ELECTRICAL
DRAIN
VACUUMWATER
Length of baseplate
CHAIR SWIVEL
CENTER POINT
FRONT MT.
PIVOT POINT
Mounting hole forbolting chair to floor
A-dec 411 Chair
Back Link ArmInsertation Point
Back of Baseplate
&TrackLight Insertation Point
Ceiling Monitor Mount
Positioning Point
(see Monitor Mnt table)
Ceiling Monitor Mount
Positioning Point
(see Monitor Mnt table)
Ceiling Monitor Mount/Ceiling Mount Light
Positioning Point (see Monitor Mnt table)
Ceiling Monitor Mount/Ceiling Mount Light
Positioning Point (see Monitor Mnt table)
BACK EDGE OF BASEPLATE
LC
30°Swivel Rotation30°Swivel Rotation
16 7/8" [429mm]
4 1/8" [105mm]7" [179mm]9 1/2" [243mm]
ELECTRICALWATER/AIR
17_8" [49mm]
27_8" [73mm]
27_8" [73mm]11_4" [33mm]VACCUUM/DRAIN
UMBILICAL ENTRANCE
FRONT OF BASEPLATE
06/13
.625 O.D. (16mm) Tubing
For Central Vacum Only
(see general notes)1.5" (38mm) Nominal Pipe ForGravity Drain(when Required)CL
12/03
AIR
ELECTRICAL
DRAIN
VACUUMWATER
GENERAL NOTES 1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB SITE CONDITIONS BEFORE COMMENCING WORK AND SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT.2. GENERAL CONTRACTOR TO COORDINATE ARCHITECTURAL DRAWINGS WITH MECHANICAL, ELECTRICAL, AND PLUMBING.3. GENERAL CONTRACTOR AND SUBCONTRACTORS TO COORDINATE ALL ARCHITECTURAL AND ENGINEERING DRAWINGS, INCLUDING TRUSS DRAWINGS AND LAYOUTS, PRIOR TO CONSTRUCTION APPLICABLE CODES:2012 INTERNATIONAL RESIDENTIAL CODE 2012 UNIFORM PLUMBING CODE 2012 INTERNATIONAL MECHANICAL CODE 2014 NATIONAL ELECTRIC CODE 2012 INTERNATIONAL FUEL GAS CODE 2012 INTERNATIONAL ENERGY CONSERVATION CODE DESIGN CRITERIA SEISMIC ZONE D0 90 MPH WIND
11
6
.
6
1
'
P
R
O
P
E
R
T
Y
L
I
N
E
LO
T
1
1
S
T
A
D
I
U
M
C
E
N
T
E
R
S
U
B
LO
T
A
R
E
A
=
7
,
4
6
3
S
F
19
5
8
S
T
A
D
I
U
M
D
R
I
V
E
HB
=
H
O
S
E
B
I
B
L
O
C
A
T
I
O
N
S
LE
G
E
N
D
6
4
.
0
0
'
P
R
O
P
E
R
T
Y
L
I
N
E
6
4
.
0
0
'
P
R
O
P
E
R
T
Y
L
I
N
E
11
6
.
6
1
'
P
R
O
P
E
R
T
Y
L
I
N
E
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
1
0
'
-
0
"
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
1
0
'
-
0
"
8'
-
0
"
8'
-
0
"
A
N
D
F
O
N
T
Y
A
R
D
10
0
.
6
1
1
5
'
-
0
"
2 A4
.
1
PA
R
K
I
N
G
L
O
T
(
E
X
I
S
T
I
N
G
)
V
E
R
I
F
Y
W
I
T
H
E
X
I
S
T
I
N
G
7
'
-
0
"
DS
1
H
R
R
A
T
E
D
W
A
L
L
1
H
R
R
A
T
E
D
W
A
L
L
"C
H
A
I
N
D
R
A
I
N
"
D
S
A
W
N
I
N
G
5
'
-
0
"
OV
E
R
H
A
N
G
3'
-
0
"
DSDS
DS
DS
DS
4
'
-
0
"
4"
R
E
C
E
S
S
E
D
L
I
G
H
T
I
N
G
LIG
H
T
B
4"
R
E
C
E
S
S
E
D
L
I
G
H
T
I
N
G
:
LIG
H
T
B
WA
L
L
L
I
G
H
T
A
WA
L
L
L
I
G
H
T
A
HB
HB
1 A4
.
2
1 A4
.
2
PR
O
J
E
C
T
I
N
F
O
R
M
A
T
I
O
N
PR
O
J
E
C
T
A
D
D
R
E
S
S
:
1
9
5
8
S
T
A
D
I
U
M
V
I
E
W
D
R
I
V
E
|
B
O
Z
E
M
A
N
,
M
T
LE
G
A
L
D
E
S
C
R
I
P
T
I
O
N
:
L
O
T
1
1
,
S
T
A
D
I
U
M
C
E
N
T
E
R
S
U
B
(S
T
A
D
I
U
M
C
E
N
T
E
R
S
U
B
,
S
1
3
,
T
0
2
S
,
R
0
5
E
,
L
o
t
1
1
,
P
L
U
S
C
O
M
M
O
N
A
R
E
A & PRIVATE STRS )
SF
S
U
M
M
A
R
Y
BU
I
L
D
I
N
G
A
R
E
A
:
UN
I
T
1
=
2
1
6
9
(
F
I
N
I
S
H
E
D
D
E
N
T
A
L
S
U
I
T
E
)
UN
I
T
2
=
8
1
7
(
U
N
F
I
N
I
S
H
E
D
O
F
F
I
C
E
S
U
I
T
E
-
F
U
T
U
R
E
T
.
I
.
)
UN
I
T
3
=
8
8
3
(
U
N
F
I
N
I
S
H
E
D
O
F
F
I
C
E
S
U
I
T
E
-
F
U
T
U
R
E
T
.
I
.
)
UN
I
T
4
=
4
8
8
(
F
I
N
I
S
H
E
D
C
O
M
M
O
N
S
A
R
E
A
)
TO
T
A
L
=
4
,
3
5
8
S
F
MECH MECH MECH2' - 11"4' - 1"2' - 6"4' - 1"2' - 6"4' - 1"2' - 6"2' - 0" 9' - 4" 1' - 9 1/2"48" HIGH SOLID FIBER CEMENT LAP SIDING @ SCREENGUTTER GUTTER
G
U
T
T
E
R
GUTTER
4"
/
1
2
"
5" / 12"5" / 12"7" / 12"RIDGE RIDGE STEEL POST TO ROOF DECK AS PER STRUCTURAL ENGINEERSIDING PER ELEV TYPICALSCREEN WALL DETAILPER SIDING PRODUCTSLOPEDRIPEDGECLEAT4"4"
SE
L
F
T
A
P
P
I
N
G
FA
S
T
E
N
E
R
SELF TAPPING FASTENER CONT. COPING AT PARAPET WALLS,GALVANEAL FINISH.
WE
A
T
H
E
R
B
A
R
R
I
E
R
BO
T
H
S
I
D
E
S
O
F
W
A
L
L
BREAK METAL AT UNDERSIDE OF WALLSHIMMETAL DRIP CAP1/2" OSB SHEATHING (BOTH SIDES) ON 2X6 STUD WALL FRAMING
FIB
E
R
C
E
M
E
N
T
SID
I
N
G
@
B
A
C
K
S
I
D
E
4'-0" TO ROOF DECK DRAWING NUMBER:PHASE:DATE:DRAWING TITLE:PROJECT NUMBER:DRAWN BY / CHECKED BY:REVISIONS:
0
"
1
"
2
"
7
/
5
/
2
0
1
9
1
1
:
4
7
:
5
9
A
M
A1.1SITE PLAN19-03RISE &GRIND 07.03.2019CCR---SP1958 STADIUM VIEW DR | BOZEMAN MT
1/
8
"
=
1
'
-
0
"
SI
T
E
P
L
A
N
1
NO. DESCRIPTION DATE
1/
1
6
"
=
1
'
-
0
"
RO
O
F
P
L
A
N
2
BU
I
L
D
I
N
G
B
I
R
D
S
E
Y
E
V
I
E
W
3
SE
E
C
I
V
I
L
A
N
D
L
A
N
D
S
C
A
P
E
P
L
A
N
S
F
O
R
DE
T
A
I
L
E
D
I
N
F
O
R
M
A
T
I
O
N
O
N
S
E
R
V
I
C
E
S
,
GR
A
D
I
N
G
,
D
R
A
I
N
A
G
E
A
N
D
P
L
A
N
T
I
N
G
S
.
3"
=
1
'
-
0
"
RO
O
F
S
C
R
E
E
N
W
A
L
L
4