Loading...
HomeMy WebLinkAbout05 RNG Building SITE PLAN ARCH 07-08-2019(73_4") 175 - 21 5 161_8" 235_8" P L A N VI E W G X D P - 3 0 0 S H O R T L E G D X G N P 1 0 11 Length of baseplate CHAIR SWIVELCENTER POINT FRONT MT.PIVOT POINT Mounting hole forbolting chair to floor A-dec 411 Chair Back Link ArmInsertation Point Back of Baseplate&TrackLight Insertation PointCeiling Monitor MountPositioning Point(see Monitor Mnt table) Ceiling Monitor MountPositioning Point(see Monitor Mnt table) Ceiling Monitor Mount/Ceiling Mount LightPositioning Point (see Monitor Mnt table) Ceiling Monitor Mount/Ceiling Mount LightPositioning Point (see Monitor Mnt table) BACK EDGE OF BASEPLATE LC 30°Swivel Rotation 30°Swivel Rotation 16 7/8" [429mm] 4 1/8" [105mm]7" [179mm]9 1/2" [243mm]ELECTRICALWATER/AIR 17_8" [4 9mm]27_8" [7 3mm] 27_8" [7 3mm]11_4" [3 3mm] VACCUUM/DRAIN UM BILICAL ENTRANCE FRONT OF BASEPLATE06/13 .625 O.D. (16mm) TubingFor Central Vacum Only(see general notes) 1.5" (38mm) Nominal Pipe ForGravity Drain(when Required) C L12/ 03 AIR ELECTRICAL DRAIN VACUUM WATER Length of baseplate CHAIR SWIVELCENTER POINT FRONT MT.PIVOT POINT Mounting hole forbolting chair to floor A-dec 411 Chair Back Link ArmInsertation Point Back of Baseplate&TrackLight Insertation PointCeiling Monitor MountPositioning Point(see Monitor Mnt table)Ceiling Monitor MountPositioning Point(see Monitor Mnt table) Ceiling Monitor Mount/Ceiling Mount LightPositioning Point (see Monitor Mnt table) Ceiling Monitor Mount/Ceiling Mount LightPositioning Point (see Monitor Mnt table) BACK EDGE OF BASEPLATE LC30°Swivel Rotation 30°Swivel Rotation 16 7/8" [429mm] 4 1/8" [105mm]7" [179mm]9 1/2" [243mm]ELECTRICALWATER/AIR 17_8" [4 9mm]27_8" [7 3mm] 27_8" [7 3mm]11_4" [3 3mm] VACCUUM/DRAIN UM BILICAL ENTRANCE FRONT OF BASEPLATE06/13 .625 O.D. (16mm) TubingFor Central Vacum Only(see general notes) 1.5" (38mm) Nominal Pipe ForGravity Drain(when Required) CL12/ 03 AIR ELECTRICAL DRAIN VACUUM WATER Length of baseplate CHAIR SWIVELCENTER POINT FRONT MT.PIVOT POINTMounting hole forbolting chair to floor A-dec 411 Chair Back Link ArmInsertation Point Back of Baseplate &TrackLight Insertation Point Ceiling Monitor Mount Positioning Point(see Monitor Mnt table) Ceiling Monitor MountPositioning Point (see Monitor Mnt table)Ceiling Monitor Mount/Ceiling Mount Light Positioning Point (see Monitor Mnt table) Ceiling Monitor Mount/Ceiling Mount Light Positioning Point (see Monitor Mnt table) BACK EDGE OF BASEPLATE LC 30°Swivel Rotation 30°Swivel Rotation 16 7/8" [429mm]4 1/8" [105mm]7" [179mm]9 1/2" [243mm]ELECTRICALWATER/AIR 17_8" [49mm] 27_8" [73mm] 27_8" [73mm]11_4" [33mm] VACCUUM/DRAIN UMBILICAL ENTRANCE FRONT OF BASEPLATE 06/13 .625 O.D. (16mm) TubingFor Central Vacum Only(see general notes) 1.5" (38mm) Nominal Pipe ForGravity Drain(when Required) CL 12/03 AIRELECTRICAL DRAIN VACUUM WATER Length of baseplate CHAIR SWIVELCENTER POINTFRONT MT.PIVOT POINT Mounting hole forbolting chair to floor A-dec 411 Chair Back Link ArmInsertation Point Back of Baseplate&TrackLight Insertation Point Ceiling Monitor MountPositioning Point(see Monitor Mnt table) Ceiling Monitor MountPositioning Point(see Monitor Mnt table) Ceiling Monitor Mount/Ceiling Mount LightPositioning Point (see Monitor Mnt table) Ceiling Monitor Mount/Ceiling Mount LightPositioning Point (see Monitor Mnt table) BACK EDGE OF BASEPLATELC 30°Swivel Rotation 30°Swivel Rotation 16 7/8" [429mm] 4 1/8" [105mm]7" [179mm]9 1/2" [243mm]ELECTRICALWATER/AIR 17_8" [49mm]27_8" [73mm] 27_8" [73mm]11_4" [33mm] VACCUUM/DRAIN UMBILICAL ENTRANCE FRONT OF BASEPLATE 06/13 .625 O.D. (16mm) TubingFor Central Vacum Only(see general notes) 1.5" (38mm) Nominal Pipe ForGravity Drain(when Required) CL 12/03AIR ELECTRICAL DRAIN VACUUM WATER Length of baseplate CHAIR SWIVEL CENTER POINT FRONT MT. PIVOT POINT Mounting hole for bolting chair to floor A-dec 411 Chair Back Link Arm Insertation Point Back of Baseplate &TrackLight Insertation Point Ceiling Monitor Mount Positioning Point (see Monitor Mnt table) Ceiling Monitor Mount Positioning Point (see Monitor Mnt table) Ceiling Monitor Mount/Ceiling Mount Light Positioning Point (see Monitor Mnt table) Ceiling Monitor Mount/Ceiling Mount Light Positioning Point (see Monitor Mnt table) BACK EDGE OF BASEPLATE LC 30° Swivel Rotation 30° Swivel Rotation 16 7/8" [429mm] 4 1/8" [105mm]7" [179mm] 9 1/2" [243mm]ELECTRICALWATER/AIR 17_8" [49mm] 27_8" [73mm]27_8" [73mm]11_4" [33mm] VACCUUM/DRAIN UMBILICAL ENTRANCEFRONT OF BASEPLATE 06/13 .625 O.D. (16mm) Tubing For Central Vacum Only (see general notes) 1.5" (38mm) Nominal Pipe For Gravity Drain(when Required) CL 12/03 AIR ELECTRICAL DRAIN VACUUMWATER Length of baseplate CHAIR SWIVEL CENTER POINT FRONT MT. PIVOT POINT Mounting hole for bolting chair to floor A-dec 411 Chair Back Link Arm Insertation PointBack of Baseplate &TrackLight Insertation Point Ceiling Monitor Mount Positioning Point (see Monitor Mnt table) Ceiling Monitor Mount Positioning Point (see Monitor Mnt table) Ceiling Monitor Mount/Ceiling Mount Light Positioning Point (see Monitor Mnt table) Ceiling Monitor Mount/Ceiling Mount Light Positioning Point (see Monitor Mnt table) BACK EDGE OF BASEPLATE LC 30°Swivel Rotation30°Swivel Rotation 16 7/8" [429mm] 4 1/8" [105mm]7" [179mm] 9 1/2" [243mm] ELECTRICAL WATER/ AIR 17_8" [49mm] 27_8" [73mm]27_8" [73mm]11_4" [33mm] VACCUUM/DRAIN UMBILICAL ENTRANCEFRONT OF BASEPLATE 06/13 .625 O.D. (16mm) TubingFor Central Vacum Only(see general notes) 1.5" (38mm) Nominal Pipe For Gravity Drain(when Required) CL 12/03 AIR ELECTRICALDRAINVACUUMWATERLength of baseplate CHAIR SWIVEL CENTER POINT FRONT MT.PIVOT POINT Mounting hole for bolting chair to floor A-dec 411 Chair Back Link Arm Insertation Point Back of Baseplate &TrackLight Insertation Point Ceiling Monitor MountPositioning Point (see Monitor Mnt table) Ceiling Monitor Mount Positioning Point (see Monitor Mnt table) Ceiling Monitor Mount/Ceiling Mount Light Positioning Point (see Monitor Mnt table) Ceiling Monitor Mount/Ceiling Mount Light Positioning Point (see Monitor Mnt table) BACK EDGE OF BASEPLATE LC 30°Swivel Rotation30°Swivel Rotation 16 7/8" [429mm] 4 1/8" [105mm]7" [179mm]9 1/2" [243mm]ELECTRICALWATER/AIR 17_8" [49mm] 27_8" [73mm] 27_8" [73mm]11_4" [33mm]VACCUUM/DRAIN UMBILICAL ENTRANCEFRONT OF BASEPLATE 06/13 .625 O.D. (16mm) TubingFor Central Vacum Only(see general notes)1.5" (38mm) Nominal Pipe For Gravity Drain(when Required) CL 12/03 AIR ELECTRICAL DRAIN VACUUMWATER Length of baseplate CHAIR SWIVEL CENTER POINT FRONT MT. PIVOT POINT Mounting hole forbolting chair to floor A-dec 411 Chair Back Link ArmInsertation Point Back of Baseplate &TrackLight Insertation Point Ceiling Monitor Mount Positioning Point (see Monitor Mnt table) Ceiling Monitor Mount Positioning Point (see Monitor Mnt table) Ceiling Monitor Mount/Ceiling Mount Light Positioning Point (see Monitor Mnt table) Ceiling Monitor Mount/Ceiling Mount Light Positioning Point (see Monitor Mnt table) BACK EDGE OF BASEPLATE LC 30°Swivel Rotation30°Swivel Rotation 16 7/8" [429mm] 4 1/8" [105mm]7" [179mm]9 1/2" [243mm] ELECTRICALWATER/AIR 17_8" [49mm] 27_8" [73mm] 27_8" [73mm]11_4" [33mm]VACCUUM/DRAIN UMBILICAL ENTRANCE FRONT OF BASEPLATE 06/13 .625 O.D. (16mm) Tubing For Central Vacum Only (see general notes)1.5" (38mm) Nominal Pipe ForGravity Drain(when Required)CL 12/03 AIR ELECTRICAL DRAIN VACUUMWATER GENERAL NOTES 1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB SITE CONDITIONS BEFORE COMMENCING WORK AND SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT.2. GENERAL CONTRACTOR TO COORDINATE ARCHITECTURAL DRAWINGS WITH MECHANICAL, ELECTRICAL, AND PLUMBING.3. GENERAL CONTRACTOR AND SUBCONTRACTORS TO COORDINATE ALL ARCHITECTURAL AND ENGINEERING DRAWINGS, INCLUDING TRUSS DRAWINGS AND LAYOUTS, PRIOR TO CONSTRUCTION APPLICABLE CODES:2012 INTERNATIONAL RESIDENTIAL CODE 2012 UNIFORM PLUMBING CODE 2012 INTERNATIONAL MECHANICAL CODE 2014 NATIONAL ELECTRIC CODE 2012 INTERNATIONAL FUEL GAS CODE 2012 INTERNATIONAL ENERGY CONSERVATION CODE DESIGN CRITERIA SEISMIC ZONE D0 90 MPH WIND 11 6 . 6 1 ' P R O P E R T Y L I N E LO T 1 1 S T A D I U M C E N T E R S U B LO T A R E A = 7 , 4 6 3 S F 19 5 8 S T A D I U M D R I V E HB = H O S E B I B L O C A T I O N S LE G E N D 6 4 . 0 0 ' P R O P E R T Y L I N E 6 4 . 0 0 ' P R O P E R T Y L I N E 11 6 . 6 1 ' P R O P E R T Y L I N E U T I L I T Y E A S E M E N T 1 0 ' - 0 " U T I L I T Y E A S E M E N T 1 0 ' - 0 " 8' - 0 " 8' - 0 " A N D F O N T Y A R D 10 0 . 6 1 1 5 ' - 0 " 2 A4 . 1 PA R K I N G L O T ( E X I S T I N G ) V E R I F Y W I T H E X I S T I N G 7 ' - 0 " DS 1 H R R A T E D W A L L 1 H R R A T E D W A L L "C H A I N D R A I N " D S A W N I N G 5 ' - 0 " OV E R H A N G 3' - 0 " DSDS DS DS DS 4 ' - 0 " 4" R E C E S S E D L I G H T I N G LIG H T B 4" R E C E S S E D L I G H T I N G : LIG H T B WA L L L I G H T A WA L L L I G H T A HB HB 1 A4 . 2 1 A4 . 2 PR O J E C T I N F O R M A T I O N PR O J E C T A D D R E S S : 1 9 5 8 S T A D I U M V I E W D R I V E | B O Z E M A N , M T LE G A L D E S C R I P T I O N : L O T 1 1 , S T A D I U M C E N T E R S U B (S T A D I U M C E N T E R S U B , S 1 3 , T 0 2 S , R 0 5 E , L o t 1 1 , P L U S C O M M O N A R E A & PRIVATE STRS ) SF S U M M A R Y BU I L D I N G A R E A : UN I T 1 = 2 1 6 9 ( F I N I S H E D D E N T A L S U I T E ) UN I T 2 = 8 1 7 ( U N F I N I S H E D O F F I C E S U I T E - F U T U R E T . I . ) UN I T 3 = 8 8 3 ( U N F I N I S H E D O F F I C E S U I T E - F U T U R E T . I . ) UN I T 4 = 4 8 8 ( F I N I S H E D C O M M O N S A R E A ) TO T A L = 4 , 3 5 8 S F MECH MECH MECH2' - 11"4' - 1"2' - 6"4' - 1"2' - 6"4' - 1"2' - 6"2' - 0" 9' - 4" 1' - 9 1/2"48" HIGH SOLID FIBER CEMENT LAP SIDING @ SCREENGUTTER GUTTER G U T T E R GUTTER 4" / 1 2 " 5" / 12"5" / 12"7" / 12"RIDGE RIDGE STEEL POST TO ROOF DECK AS PER STRUCTURAL ENGINEERSIDING PER ELEV TYPICALSCREEN WALL DETAILPER SIDING PRODUCTSLOPEDRIPEDGECLEAT4"4" SE L F T A P P I N G FA S T E N E R SELF TAPPING FASTENER CONT. COPING AT PARAPET WALLS,GALVANEAL FINISH. WE A T H E R B A R R I E R BO T H S I D E S O F W A L L BREAK METAL AT UNDERSIDE OF WALLSHIMMETAL DRIP CAP1/2" OSB SHEATHING (BOTH SIDES) ON 2X6 STUD WALL FRAMING FIB E R C E M E N T SID I N G @ B A C K S I D E 4'-0" TO ROOF DECK DRAWING NUMBER:PHASE:DATE:DRAWING TITLE:PROJECT NUMBER:DRAWN BY / CHECKED BY:REVISIONS: 0 " 1 " 2 " 7 / 5 / 2 0 1 9 1 1 : 4 7 : 5 9 A M A1.1SITE PLAN19-03RISE &GRIND 07.03.2019CCR---SP1958 STADIUM VIEW DR | BOZEMAN MT 1/ 8 " = 1 ' - 0 " SI T E P L A N 1 NO. DESCRIPTION DATE 1/ 1 6 " = 1 ' - 0 " RO O F P L A N 2 BU I L D I N G B I R D S E Y E V I E W 3 SE E C I V I L A N D L A N D S C A P E P L A N S F O R DE T A I L E D I N F O R M A T I O N O N S E R V I C E S , GR A D I N G , D R A I N A G E A N D P L A N T I N G S . 3" = 1 ' - 0 " RO O F S C R E E N W A L L 4