Loading...
HomeMy WebLinkAbout19- Change Order 2 - Knife River Belgrade - Cottonwood Road from Babcock to Durston CHANGE ORDER No. 2 DATE OF ISSUANCE D.UI!� EFFECTIVE DATE OWNER: City of Bozeman CONTRACTOR Knife River-Belgrade Contract: Cottonwood Road from Babcock to Durston dated June 3,2019 Project: Cottonwood Road from Babcock to Durston OWNER's Contract No. ENGINEER: RPA ENGINEER's Contract No. 14510.002 You are directed to make the following changes in the Contract Documents: • Use on-site native suitable material for embankment, instead of using imported borrow material. The contractor was able to excavate, salvage, and stockpile the buried layer of suitable gravels for re-use in other areas of the project. Revise bid item#41 Imported Borrow from$65 per cubic yard to$20 per cubic yard. The project requires 2,000 cubic yards. The overall cost is revised from$130,000 to $40,000. Reason for Change Order: Cost savings of$90,000. Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times: Substantial Completion: 211 calendar days $ 5,207,849.50 Ready for final payment: (days or dates Net Increase(Decrease)from previous Change Net change from previous Change Orders No._to Orders No. 1 to No._: Substantial Completion: n/a $ 30,500.00 Ready for final payment: (days) Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: 211 calendar days $5,238,349.50 Ready for final payment: (days or dates Net increase(decrease) of this Change Order: Net increase (decrease)this Change Order: Substantial Completion: 0 calendar days $ (90,000.00) Ready for final payment: (days) Contract Price with all approved Change Orders: Contract Times with all approved Change Orders: Substantial Completion: 211 calendar days $5,148,349.50 Ready for final payment: (days or dates) CHANGE ORDER FORM Page 1 of 3 Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time,delays or omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set forth herein and unless expressly stated otherwise in the Change Order. And further,that the price agreed-upon herein represents the full cost and value for the subject work performed and the materials supplied under the terms of the contract and that the work quantities and value were properly determined and are correct. .,a 4- k Q0 g 3_Ad1 CONTRACTOR(Authorized Signature) Date RECOMMENDED BY: APPROVED BY: / 5A"- :n�2(ENGINEER- Signature) Date OWNER(Authorize Signa -e) Date CHANGE ORDER FORM Page 2 of 3 CHANGE ORDER INSTRUCTIONS A. GENERAL INFORMATION This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a subsequent Change Order if they affect Price or Times. Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice of accumulating Change Orders to reduce the administrative burden may lead to unnecessary disputes. If Milestones have been listed in the Agreement, any effect of a Change Order thereon should be addressed. For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times, a Field Order should be used. B. COMPLETING THE CHANGE ORDER FORM Engineer normally initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or both. Once Engineer has completed and signed the form, all copies should be sent to Owner or Contractor for approval, depending on whether the Change Order is a true order to the Contractor or the formalization of a negotiated agreement for a previously performed change. After approval by one contracting party, all copies should be sent to the other party for approval. Engineer should make distribution of executed copies after approval by both parties. If a change only applies to price or to times, cross out the part of the tabulation that does not apply. CHANGE ORDER FORM Page 3 of 3 KN I FE RIVER AN MDU RESOURCES COMPANY www.kniferiver.com Intermountain Region-Belgrade Divislon PO Box 9 Belgrade,MT 59714 (406)388-6832 (406)388.8347 Fax August 28, 2019 Staci Venner Robert Peccia&Associates 3810 Valley Commons Dr. Suite 4 Bozeman, MT 59718 Serial Letter-05 RE: Cottonwood Road from Babcock St. to Durston Rd. Imported Borrow Staci, On May 20t', 2019 we provided revised pricing for the Imported Borrow item based on obtaining the borrow material from the high school project site that adjoins the Cottonwood project. We have been able to use on site material from our excavation work for the borrow material. Since we can use this on-site material, we propose the following: Since suitable borrow material is available on-site on the Cottonwood project for our use, we can adjust our unit price for item 41 Imported Borrow to $20.00 per cubic yard. If you have any questions,please call me at 924-5602. Respectfully, 2 �a Steven R. Baeth Project Manager/Estimator Knife River—Belgrade EQUAL OPPORTUNITY EMPLOYER