Loading...
HomeMy WebLinkAbout10-14-19 City Commission Packet Materials - C4. Agreement with Elkhorn Commission Group for Commissioning Services for the BPSC Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Chuck Winn, Assistant City Manager SUBJECT: Contract for a Commissioning Services for the Pre-construction and Construction Phases for the Bozeman Public Safety Center (BPSC). MEETING DATE: October 14, 2019 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign contracts between City of Bozeman and Elkhorn Commission Group for Commissioning Services for the pre-construction and the option to amend the contract to include construction phases of the BPSC. BACKGROUND: On August 5, 2019, the City Commission approved a contract with Langlas and Associates for general contractor/construction manager services for the BPSC. Langlas joined Thinkone Architects on the City’s project team and now with the hiring of a commissioning agent, the City’s project team will be complete. In short, commissioning services are used to ensure that the mechanical, electrical, and building systems for the BPSC are specified, installed and operating properly and in a highly efficient manner. The commissioning agent will also work with the City to analyze the long-term operating costs of these systems to ensure efficiencies well into the building’s operational life span. Through the qualifications-based selection process the City chose Elkhorn Commissioning Group as the finalist and entered into contract negotiations. The result of those negotiations is the contract attached to this memorandum. A full list of services provided by the commissioning agent is included in the agreement beginning on page 6 of the City’s Request for Qualifications (Attachment 1). A short summary of these services include: Pre-construction Services: • Systems review – working with design team and contractor to review and analyze all building, envelop, electrical systems, mechanical systems and controls to ensure highly efficient systems and practices are utilized throughout the project • Operational cost estimating – working with design team and contractor to develop systems costs and long-term performance projections for the project. Construction and Acceptance Services: • Commissioning Plan – write the BPSC project commissioning plan • Review GC/CM submittals and shop drawings for commissioned systems • Monitor and perform quality assurance checks of all test/adjust/balance work and recommend any changes or corrective actions necessary • Review all building management and controls systems • Coordinate and monitor all functional performance testing 36 • Assist with troubleshooting of any commissioned systems • End of warranty period testing, review and report of commissioned building systems UNRESOLVED ISSUES: None. ALTERNATIVES: None identified FISCAL EFFECTS: The cost of commissioning services has been anticipated since conception of the BPSC and monies have been included in the overall construction budget. The contract under consideration by the City Commission is for a not to exceed total of $104,910 which includes up to $12,610 for pre-construction services and up to $92,300 for construction phase services. The fee section in on page 4 of the Elkhorn Commissioning Proposal. Attachments: BPSC Commissioning Services Agreement Report compiled on: September 30, 2019 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74